26011-Steel_Plate_Beam_Guards_-_Attachment_A.xlsx
XLSX spreadsheet 60 KB Posted
- Attached to
- Steel Plate Beam Guards (2026)
- Solicitation number
- 2026-RFB-011
- Issued by
- Dane County, Mattoon Village, Wisconsin
About this file
This is a Price Proposal Attachment for Request for Bid 2026-RFB-010 issued by Dane County, Wisconsin's Highway and Transportation Department for the procurement of steel plate beam guards on an as-needed basis for the 2026 calendar year. The bid encompasses 209 line items organized across ten product categories: nuts and bolts (11 items), MGS guardrail sections (17 items), MASH parts (11 items), guardrail blocks and end sections (13 items), guardrail posts (5 items), SKT 350 and MSKT end treatments (28 items), Trinity Thrie-Beam Bullnose parts (9 items), Trinity Thrie-Beam Bullnose parts (new) (47 items), Type I and II anchorage systems (8 items), Cass Cable Guard parts (45 items), and SafeFence Cable Guard parts (7 items). All items are priced on a delivered basis to the Department of Public Works Highway and Transportation facility in Madison, Wisconsin, with pricing inclusive of labor, delivery, and all other expenses necessary to provide products in accordance with specifications. Bidders are required to provide vendor part numbers for each line item submitted and must complete all orange-highlighted cells in the pricing table, entering "no bid" for any items not being quoted. Vendors are encouraged to bid on all items within each section, and completed price proposals must be submitted in Microsoft Excel format to the County's eProcurement Portal by February 23, 2026, at 2:00 p.m. The contract term runs for one year from the purchase order date, with no renewal options specified in the available documentation.
All materials must comply with Section 614 of the Wisconsin Department of Transportation Standard Specifications for Road and Bridge Construction (2026 edition) and be listed on the Wisconsin DOT Prequalified Vendor Inventory List. Pricing terms are on a delivered, FOB destination basis with all shipping costs included via flatbed trucks with proper labeling. Dane County applies local vendor preferences offering up to 15% price preference for Dane County-made goods, 12.5% for regionally-made goods, and 10% for Wisconsin-made goods. The County reserves the right to award on a total net bid basis per category or on a per-item basis, whichever is most advantageous. Vendors must carry Commercial General Liability insurance at $1,000,000 per occurrence, Business Auto Liability at $1,000,000, Environmental Impairment Liability at $1,000,000, and Workers' Compensation at Wisconsin statutory limits. Invoices are due within 30 days of goods receipt and acceptance. No specific budget or award value range is disclosed in the solicitation materials, and no incumbent vendors or current contractors are identified. Vendor questions must be submitted by February 13, 2026, at 4:00 p.m., with responses provided by February 18, 2026. Interested vendors may request to inspect premises by contacting Purchasing Officer Hazel Schuster at (608) 896-3861 or schuster.hazel@countyofdane.com, though no mandatory bidders' conference or site visit is required.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Steel_Plate_Beam_Guards_(2026).pdf | ||
| 26011-Steel_Plate_Beam_Guards_-_Attachment_A.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Proposal
| Price Proposal | |
| 2026-RFB-010 | |
| Steel Plate Beam Guards (2026) | |
| 1. Pricing shall be inclusive of all labor, delivery costs and other expenses necessary to provide product in accordance with the specifications and terms and conditions of this bid document and your proposal. |
2. The pricing table includes a column for a “Part Number.” It is required that you provide your vendor part number for each item that you are submitting a bid for.
3. Bidders must complete all cells in orange A. If not bidding on a line the vendor must enter "no bid" in the No Bid column.
4. It is encouraged that vendors bid on all items within a section.
5. Upload completed Price Proposal in MS Excel format to Section 1.2.
| Vendor Name | |||||
| NUTS & BOLTS- DELIVERED PRICING | |||||
| Line Item | Description | Quantity | Unit Cost | Part # | No Bid |
| 1 | 5/8”x 1 ¼” Splice Bolt | 1 | $ - 0 | ||
| 2 | 5/8”X 2” Post Bolt | 1 | $ - 0 | ||
| 3 | 5/8”X10” Post Bolt | 1 | $ - 0 | ||
| 4 | 5/8”X14” Post Bolt | 1 | $ - 0 | ||
| 5 | 5/8”X18” Post Bolt | 1 | $ - 0 | ||
| 6 | 5/8"X20" Post Bolt | 1 | $ - 0 | ||
| 7 | 5/8”X22” Post Bolt | 1 | $ - 0 | ||
| 8 | 5/8”X26” Post Bolt | 1 | $ - 0 | ||
| 9 | 1 3/4”X3” Guardrail Cut Washer | 1 | $ - 0 | ||
| 10 | 5/8" Post Bolt Washer | 1 | $ - 0 | ||
| 11 | 5/8" Post Bolt Nut | 1 | $ - 0 | ||
| MGS GUARDRAIL - DELIVERED PRICING |
All MGS rail to be punched at 3’ 1½” centers unless otherwise noted.
| Line Item | Description | Quantity | Unit Cost | Part # | No Bid |
| 12 | MGS Beam Guard Sec., Straight, 12’ 6‘’ | 1 | $ - 0 | ||
| 13 | MGS Beam Guard Sec., Straight, 15’ 7.5”’ | 1 | $ - 0 | ||
| 14 | MGS Beam Guard Sec., Straight, 25’ 0” | 1 | $ - 0 | ||
| 15 | MGS Radius Rail, 5-degree | 1 | $ - 0 | ||
| 16 | MGS Radius Rail, 10-degree | 1 | $ - 0 | ||
| 17 | MGS Radius Rail, 15-degree | 1 | $ - 0 | ||
| 18 | MGS Radius Rail, 20-degree | 1 | $ - 0 | ||
| 19 | MGS Radius Rail, 25-degree | 1 | $ - 0 | ||
| 20 | MGS Radius Rail, 30-degree | 1 | $ - 0 | ||
| 21 | MGS Radius Rail, 35-degree | 1 | $ - 0 | ||
| 22 | MGS Radius Rail, 40-degree | 1 | $ - 0 | ||
| 23 | MGS Radius Rail, 45-degree | 1 | $ - 0 | ||
| 24 | MGS Radius Rail, 50-degree | 1 | $ - 0 | ||
| 25 | MGS Thrie Beam Straight, 12’ 6” Section, 3' 1.75" spacing | 1 | $ - 0 | ||
| 26 | MGS Thrie Beam Straight, 12’ 6” Section, 1' 6.75" spacing | 1 | $ - 0 | ||
| 27 | MGS Thrie Beam Transition, 6’3” Section | 1 | $ - 0 | ||
| 28 | MGS Thrie Beam End shoe | 1 | $ - 0 | ||
| MASH PARTS - DELIVERED PRICING | |||||
| Line Item | Description | Quantity | Unit Cost | Part # | No Bid |
| 29 | MASH Bolt 3/4" x 8.5" hdg | 1 | $ - 0 | ||
| 30 | MASH Bolt 9" Hex Head | 1 | $ - 0 | ||
| 31 | MASH CABLE TIE Stainless Steel zip tie | 1 | $ - 0 | ||
| 32 | MASH Lower Post 1; with Welded Soil Plate | 1 | $ - 0 | ||
| 33 | MASH MGS HARDWARE PACKAGE | 1 | $ - 0 | ||
| 34 | MASH Nut - 3/4" Heavy Hex DH Nut | 1 | $ - 0 | ||
| 35 | MASH Nut - 5/8" Hex Head | 1 | $ - 0 | ||
| 36 | MASH Second Post Assembly BOTTOM | 1 | $ - 0 | ||
| 37 | MASH Second Post Assembly TOP | 1 | $ - 0 | ||
| 38 | MASH Strut and Yoke | 1 | $ - 0 | ||
| 39 | MASH Upper Post 1 | 1 | $ - 0 | ||
| GUARDRAIL BLOCKS AND END SECTIONS - DELIVERED PRICING | |||||
| Line Item | Description | Quantity | Unit Cost | Part # | No Bid |
| 40 | Plastic Guardrail Block, 4” x 8” x 14” | 1 | $ - 0 | ||
| 41 | Plastic Guardrail Block, 4” x 12” x 14” | 1 | $ - 0 | ||
| 42 | Wood Post Block, 6” x 8” x 14” | 1 | $ - 0 | ||
| 43 | Wood Post Block, 6” x 8” x 19” | 1 | $ - 0 | ||
| 44 | Wood Post Block, 6” x 8” x 22” | 1 | $ - 0 | ||
| 45 | Wood Post Block, 6” x 12” x 14” | 1 | $ - 0 | ||
| 46 | Wood Post Block, 6” x12” x 19” | 1 | $ - 0 | ||
| 47 | Tapered Wood Post Block, 6” x 8” x 14” | 1 | $ - 0 | ||
| 48 | Michigan Shoe (bridge connection) | 1 | $ - 0 | ||
| 49 | Bronstad End (melt barrier) | 1 | $ - 0 | ||
| 50 | Bronstad End Type I (wraparound) | 1 | $ - 0 | ||
| 51 | Wrap Around End Type II (round end/ boxing glove) | 1 | $ - 0 | ||
| 52 | Wisconsin MGS MASH Type 2 | 1 | $ - 0 | ||
| GUARDRAIL POSTS - DELIVERED PRICING | |||||
| Line Item | Description | Quantity | Unit Cost | Part # | No Bid |
| 53 | Metal I-Beam Posts – W6 x 9 - 6’ | 1 | $ - 0 | ||
| 54 | Metal I-Beam Posts – W6 x 9 - 7’ | 1 | $ - 0 | ||
| 55 | Metal I-Beam Posts – W6 x 15 - 6’ | 1 | $ - 0 | ||
| 56 | Treated Wood Posts, 6” x 8” x 6’-6” | 1 | $ - 0 | ||
| 57 | Treated Wood Posts, 6” x 8” x 8’-0” | 1 | $ - 0 | ||
| SKT 350 & MSKT END TREATMENTS - DELIVERED PRICING | |||||
| Line Item | Description | Quantity | Unit Cost | Part # | No Bid |
| 58 | SKT 350, complete* | 1 | $ - 0 | ||
| 59 | MSKT, complete* | 1 | $ - 0 | ||
| 60 | S3000, Impact Head, SKT Extruder Head | 1 | $ - 0 | ||
| 61 | Starter Rail W-beam Guardrail End Section, 12 Ga. S1303, 12’-6” Section | 1 | $ - 0 | ||
| 62 | S730, Foundation Soil Tubes, 6”x8”x6’0” | 1 | $ - 0 | ||
| 63 | MSKT - First Post Top (6x6x1/8” Tube) MTPHP1A | 1 | $ - 0 | ||
| 64 | MSKT - First Post Bottom (6’ W6x15) MTPHP1B | 1 | $ - 0 | ||
| 65 | MSKT - Second Post Assembly Top UHP2A | 1 | $ - 0 | ||
| 66 | MSKT - Second Post Assembly Bottom HP2B | 1 | $ - 0 | ||
| 67 | MSKT – Strut, MS785 | 1 | $ - 0 | ||
| 68 | E740,Pipe Sleeve 2” Standard Pipex5 ½” | 1 | $ - 0 | ||
| 69 | E750, Bearing Plate – 8”x 8” x 5/8” | 1 | $ - 0 | ||
| 70 | Short Radius Cable Box | 1 | $ - 0 | ||
| 71 | S760, Cable Anchor Bracket | 1 | $ - 0 | ||
| 72 | E770, BCT Cable Anchor Assembly | 1 | $ - 0 | ||
| 73 | SKT E780, Ground Strut | 1 | $ - 0 | ||
| 74 | P650, 5 ½” x 7 ½” x 45” Wood Posts, Single Hole Breakaway | 1 | $ - 0 | ||
| 75 | P671, 6” x 8” x 6’-0” Wood CRT Posts, Double Hole Breakaway | 1 | $ - 0 | ||
| 76 | P675, 6” x 8” x 14” Timber Blockouts, non-tapered | 1 | $ - 0 | ||
| 77 | E3151, Impact Face Object Marker | 1 | $ - 0 | ||
| 78 | B580754, 5/8” x 7 ¼” Hex Bolts | 1 | $ - 0 | ||
| 79 | B581004, 5/8” x 10” Hex Bolts | 1 | $ - 0 | ||
| 80 | B581002, 5/8” x 10” HGR Post Bolt | 1 | $ - 0 | ||
| 81 | B581802, 5/8” x 18” HGR Post Bolt | 1 | $ - 0 | ||
| 82 | N050, 5/8” HGR Nuts | 1 | $ - 0 | ||
| 83 | W050, 5/8” Flat Washer | 1 | $ - 0 | ||
| 84 | N100, 1” Anchor Cable Hex Nuts | 1 | $ - 0 | ||
| 85 | W100, 1” Anchor Cable Washers | 1 | $ - 0 | ||
| 86 | SB58A, Cable Anchor Bracket Shldr Bolts | 1 | $ - 0 | ||
| 87 | N055, ½” A325 Structural Nuts | 1 | $ - 0 | ||
| 88 | W050A, 1-1/16” OD x 9/16” ID, A325 Structural Washer | 1 | $ - 0 | ||
| TRINITY THRIE-BEAM BULLNOSE PARTS - DELIVERED PRICING | |||||
| Line Item | Description | Quantity | Unit Cost | Part # | No Bid |
| 89 | 12379G Slotted Thrie Beam, 12.5' - 5 degree | 1 | $ - 0 | ||
| 90 | 12385G Slotted Thrie Beam, 12.5' - 34 degree, 2A Symmetrical | 1 | $ - 0 | ||
| 91 | 12383G Slotted Thrie Beam, 12.5' slotted rail, #3 | 1 | $ - 0 | ||
| 92 | Thrie Beam, 12'6" Section, 3' 1.75" Panel, 2B Widened | 1 | $ - 0 | ||
| 93 | Thrie Beam, 12'6" Section, 1' 6.75" Panel, 2B Widened | 1 | $ - 0 | ||
| 94 | 729G - 6" x 8" x 8' Tube Sleeve | 1 | $ - 0 | ||
| 95 | 749G - 6" x 8" x 6' Tube Sleeve | 1 | $ - 0 | ||
| 96 | 6115B - 5.5" x 7.5" x 3'10" Treated Posts | 1 | $ - 0 | ||
| 97 | 6669G - 5/8" x 14'4" Nose Cable | 1 | $ - 0 | ||
| 98 | 19361G - Nose Cable Anchor Plates | 1 | $ - 0 | ||
| TRINITY THRIE-BEAM BULLNOSE PARTS (NEW) - DELIVERED PRICING |
Refer to WisDOT Standard Detail Drawing SDD 14B26. Materials must meet specifications within SDD 14B26.
| Line Item | Description | Quantity | Unit Cost | Part # | No Bid |
| 99 | A1 Long Foundation Tube | 1 | $ - 0 | ||
| 100 | A2 Foundation Tube | 1 | $ - 0 | ||
| 101 | A3 Bearing Plate at Post | 1 | $ - 0 | ||
| 102 | B1 Lower Slip Post Assembly - Plate | 1 | $ - 0 | ||
| 103 | B2 Lower Slip Post Assembly - Tube | 1 | $ - 0 | ||
| 104 | C1 Upper Slip Post Assembly - Plate | 1 | $ - 0 | ||
| 105 | C2 Upper Slip Post Assembly - Post | 1 | $ - 0 | ||
| 106 | D1 Block for Steel Post - Wood | 1 | $ - 0 | ||
| 107 | D2 Tapered Block for Steel Post - Wood | 1 | $ - 0 | ||
| 108 | D3 Tapered Block for BCT Post - Wood | 1 | $ - 0 | ||
| 109 | E1 Thrie Beam Rail | 1 | $ - 0 | ||
| 110 | E2 Thrie Beam Rail - Shop Bent and Punched | 1 | $ - 0 | ||
| 111 | E3 Thrie Beam Rail - Punched | 1 | $ - 0 | ||
| 112 | E4 Thrie Beam Rail - Shop Bent and Punched | 1 | $ - 0 | ||
| 113 | F1 5/8" Dia Hex Head Ground Strut and Yoke Bolt | 1 | $ - 0 | ||
| 114 | F2 5/8" Ground Strut and Yoke Bolt - Washer | 1 | $ - 0 | ||
| 115 | F3 Ground Strut and Yoke Bolt - Nut | 1 | $ - 0 | ||
| 116 | G1 5/8" Dia. Post Bolt | 1 | $ - 0 | ||
| 117 | G2 Post Bolt - Washer | 1 | $ - 0 | ||
| 118 | G3 Post Bolt - Nut | 1 | $ - 0 | ||
| 119 | H1 7/8" Dia. Soil Tube Bolt | 1 | $ - 0 | ||
| 120 | H2 Soil Tube Bolt - Washer | 1 | $ - 0 | ||
| 121 | H3 Soil Tube Bolt - Nut | 1 | $ - 0 | ||
| 122 | J1 16D Double Head Nail | 1 | $ - 0 | ||
| 123 | L1 BCT Timber Post | 1 | $ - 0 | ||
| 124 | L2 BCT Post Sleeve | 1 | $ - 0 | ||
| 125 | M1 W6x8.5 or W6x9 Steel Post | 1 | $ - 0 | ||
| 126 | M2 W6x8.5 or W6x9 Steel Post | 1 | $ - 0 | ||
| 127 | N1 Anchor Bracket | 1 | $ - 0 | ||
| 128 | N2 Anchor Bracket - Bearing Plate | 1 | $ - 0 | ||
| 129 | P1 5/8" Dia. Anchor Bracket Bolt | 1 | $ - 0 | ||
| 130 | P2 Anchor Bracket Bolt - Washer | 1 | $ - 0 | ||
| 131 | P3 Soil Tube Bolt - Nut | 1 | $ - 0 | ||
| 132 | Q1 5/8"Dia. Nose Cable | 1 | $ - 0 | ||
| 133 | Q2 Nose Cable - Swage Button | 1 | $ - 0 | ||
| 134 | R1 Nose Cable Anchor Bracket | 1 | $ - 0 | ||
| 135 | S1 5/8" Dia. Splice Bolt - Bolt | 1 | $ - 0 | ||
| 136 | S2 Splice - Bolt Nut | 1 | $ - 0 | ||
| 137 | T1 1/4" Dia. Nose Cable - U Bolt | 1 | $ - 0 | ||
| 138 | T2 U Bolt - Plate Washer | 1 | $ - 0 | ||
| 139 | T3 U Bolt - Nut | 1 | $ - 0 | ||
| 140 | U1 7/16" Dia. Slip Post Assembly - Breakaway Bolt | 1 | $ - 0 | ||
| 141 | U2 7/16" Dia. Slip Post Assembly - Breakaway Bolt - Washer | 1 | $ - 0 | ||
| 142 | U3 7/16" Dia. Slip Post Assembly - Breakaway Bolt - Nut | 1 | $ - 0 | ||
| 143 | V1 3/4" Dia. BCT Cable | 1 | $ - 0 | ||
| 144 | V2 Anchor Cable - Swage Fitting | 1 | $ - 0 | ||
| 145 | V3 1" Dia. Anchor Cable - Washer | 1 | $ - 0 | ||
| 146 | V4 1" Dia. Anchor Cable - Nut | 1 | $ - 0 | ||
| 147 | W1 Reflector | 1 | $ - 0 | ||
| TYPE I & II ANCHORAGE - DELIVERED PRICING | |||||
| Line Item | Description | Quantity | Unit Cost | Part # | No Bid |
| 148 | Type I Anchor Assembly Complete | 1 | $ - 0 | ||
| 149 | Type II Anchor Assembly Complete | 1 | $ - 0 | ||
| 150 | 12.5’ Rail(Special Punched for Type I&II) | 1 | $ - 0 | ||
| 151 | 12.5’ Rail (Special Punched for Type III) | 1 | $ - 0 | ||
| 152 | SKT Cable Anchor Box | 1 | $ - 0 | ||
| 153 | SKT Double Swagged Cable | 1 | $ - 0 | ||
| 154 | Steel Tube (LG 6” x 8” x 5’) | 1 | $ - 0 | ||
| 155 | 1 Piece Buffered Terminal End Section | 1 | $ - 0 | ||
| CASS CABLE GUARD PARTS - DELIVERED PRICING- TRINITY HIGHWAY PRODUCTS | |||||
| Line Item | Description | Quantity | Unit Cost | Part # | No Bid |
| 156 | 5/16” Breakaway Hex Nut A563, #3245G | 1 | $ - 0 | ||
| 157 | 5/16”X2” Breakaway Hex Bolt Grd 5, #34211G | 1 | $ - 0 | ||
| 158 | Cass Cable Spacer TL3, #5700B | 1 | $ - 0 | ||
| 159 | Cass CBL SPCR TL3 Ref Yellow #5701B | 1 | $ - 0 | ||
| 160 | Cass Post StrapS4 TL3/4, #5707T | 1 | $ - 0 | ||
| 161 | Cass Dust Cover S4 Post, #5708B | 1 | $ - 0 | ||
| 162 | Cass Cbl Int 1000’ LT/RT, #5816G | 1 | $ - 0 | ||
| 163 | Cass Cble Term 54.4" LT/RT, #5817G | 1 | $ - 0 | ||
| 164 | Cass Cbl Term 48.1" LT/RT, #5818G | 1 | $ - 0 | ||
| 165 | Cass Cbl Term 41.1" LT/RT, #5819G | 1 | $ - 0 | ||
| 166 | Cass Lock Bolt 5/16”, #5825G | 1 | $ - 0 | ||
| 167 | Cass 5/16” Rnd Wshr F436, #3240G | 1 | $ - 0 | ||
| 168 | Cass 5/16” Hx Nut SAE GR5, #5832G | 1 | $ - 0 | ||
| 169 | Cass Sleeve Cover S3 Post #4-9, #5839B | 1 | $ - 0 | ||
| 170 | Cass-Cbl L-Bracket for CRP PST, #33909G | 1 | $ - 0 | ||
| 171 | CCT Line Post S3x5.7 5’3, #33910G | 1 | $ - 0 | ||
| 172 | Cass-CRP-Upper Post 2’0, #33935A | 1 | $ - 0 | ||
| 173 | Cass-TL3 Spost 3’-11 ¼" Turnbuckle Post, #33973G | 1 | $ - 0 | ||
| 174 | Cap - IBeam Post | 1 | $ - 0 | ||
| 175 | Cass TL3 3" 11.25 Line Post Short | 1 | $ - 0 | ||
| 176 | Post Line TL3 4'CCT Term 4-9 | 1 | $ - 0 | ||
| 177 | RH Thread 1" Cable Field Splice | 1 | $ - 0 | ||
| 178 | LH Thread 1" Cable Field Splice | 1 | $ - 0 | ||
| 179 | 1" Cable End Casting | 1 | $ - 0 | ||
| 180 | 1" Stud Flattened RH Thread | 1 | $ - 0 | ||
| 181 | 1" Heavy Hex Nut | 1 | $ - 0 | ||
| 182 | 3/4" Cable Wedge | 1 | $ - 0 | ||
| 183 | 3/4" Cable Splice Open Body Complete | 1 | $ - 0 | ||
| 184 | 3/4" Stud Assy LH Thread Each Piece Separate | 1 | $ - 0 | ||
| 185 | 3/4" Stud Assy RH Thread Each Piece Separate | 1 | $ - 0 | ||
| 186 | 3/4" Turnbuckle Open Body Style Each Piece Separate | 1 | $ - 0 | ||
| 187 | 1" Cass Turnbuckle Open Body Style Each Piece Separate | 1 | $ - 0 | ||
| 188 | 5' Cable Field Repair Section | 1 | $ - 0 | ||
| 189 | Yellow Reflective Sticker | 1 | $ - 0 | ||
| 190 | 1" Hex Nut - Not Heavy | 1 | $ - 0 | ||
| 191 | 1" Flat Washer | 1 | $ - 0 | ||
| 192 | Torpedo Cable Splice | 1 | $ - 0 | ||
| 193 | 1" Cable Splice | 1 | $ - 0 | ||
| 194 | Sleeve for Concrete | 1 | $ - 0 | ||
| 195 | Reinforcing Ring | 1 | $ - 0 | ||
| 196 | Rebar | 1 | $ - 0 | ||
| 197 | Cage | 1 | $ - 0 | ||
| 198 | Cass Sleeve Knockdown Cover Boot 5x3.25 S4 | 1 | $ - 0 | ||
| 199 | Cass CRP Knockdown Lower Post 2' | 1 | $ - 0 | ||
| 200 | Cass Line Post Sleeve S4 27" | 1 | $ - 0 | ||
| SAFEFENCE CABLE GUARD PARTS - DELIVERED PRICING- GREGORY IND | |||||
| Line Item | Description | Quantity | Unit Cost | Part # | No Bid |
| 201 | Post Line 48.42" | 1 | $ - 0 | ||
| 202 | Plastic Foundation Cover | 1 | $ - 0 | ||
| 203 | Plastic Cap | 1 | $ - 0 | ||
| 204 | Stiffening Clamps | 1 | $ - 0 | ||
| 205 | Plastic Spacers | 1 | $ - 0 | ||
| 206 | C-Hook | 1 | $ - 0 | ||
| 207 | 1" Cable Anchor | 1 | $ - 0 | ||
| 208 | Stiffening Plate A-123 | 1 | $ - 0 | ||
| 209 | Tensioning Clamp | 1 | $ - 0 |
image1.tiff
File details come from the government source that posted it. Updated .