26004-_Redi-Mix_Concrete_-_Attachment_A.xlsx
XLSX spreadsheet 51 KB Posted
- Attached to
- Redi-Mix Concrete (2026)
- Solicitation number
- 2026-RFB-004
- Issued by
- Dane County, Wisconsin
About this file
This is a price proposal attachment for a redi-mix concrete bid solicitation issued by a Wisconsin county government for the 2026 fiscal year under bid number 2026-RFB-004. The solicitation seeks redi-mix concrete products available for both weekday and Saturday delivery. Line items include various concrete mixes ranging from 6.0 bag mix to 10.0 bag mix formulations, with and without fiber mesh additives, as well as specialized batches designed to attain compressive strengths of 3000 PSI and 4000 PSI at varying cure times of 6, 8, 12, and 20 hours. Additional services requested include heated material charges, minimum load charges for quantities less than 3 cubic yards, delivery charges for evening and overnight hours between 7 p.m. and 1 a.m. for special projects, and chloride and non-chloride accelerator options measured in milliliters.
All pricing must be submitted in cubic yards (CY) or milliliters (ML) and must be inclusive of labor, delivery costs, and all other expenses necessary to provide the products in accordance with the bid specifications and terms and conditions. Bidders are required to complete all orange-highlighted cells in the Excel price proposal template or enter "no bid" for any line items they are not bidding on. Vendors must also complete a plant locations table identifying all plant names, street addresses, phone numbers, and hours of operation. The solicitation notes that washed stone products have been moved to separate bid solicitations (2026-RFB-002 and 2025-RFB-005), and the completed price proposal must be uploaded in Microsoft Excel format to Section 1.2 of the bid submission portal.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Redi-Mix_Concrete_(2026).pdf | ||
| Redi-Mix_Concrete_(2026).pdf | ||
| 26004-_Redi-Mix_Concrete_-_Attachment_A.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Proposal
| Price Proposal | |
| Redi-Mix Concrete (2026) | |
| 2026-RFB-004 | |
| Instructions: |
1. Pricing shall be inclusive of all labor, delivery costs and other expenses necessary to provide product in accordance with the specifications and terms and conditions of this bid document and your proposal.
2. Bidders must complete all cells in orange.
A. If not bidding on a line the vendor must enter "no bid" in the No Bid column.
3. Use the Plant Locations table to enter plant name, address, contact information, and hours of operation for all plants.
4. Upload completed Price Proposal in MS Excel format to Section 1.2.
| NO 1 AND NO 2 WASHED STONE HAS BEEN MOVED TO 2026-RFB-002 CRUSHED STONE & GRAVEL (2026) | WASHED STONE MOVED TO 2025-RFB-005 CRUSHED STONE & GRAVEL (2025) | |||
| Vendor Name: | ||||
| WEEKDAY PRICE | ||||
| Line # | Description | UOM | Unit Cost | No Bid |
| 1 | 6.0 BAG MIX | CY | $ - 0 | |
| 2 | 7.0 BAG MIX | CY | $ - 0 | |
| 3 | 7.0 BAG MIX WITH FIBER MESH | CY | $ - 0 | |
| 4 | 9.0 BAG MIX | CY | $ - 0 | |
| 5 | 9.0 BAG MIX WITH FIBER MESH | CY | $ - 0 | |
| 6 | 10.0 BAG MIX | CY | $ - 0 | |
| 7 | BATCH TO ATTAIN 3000 PSI @ 20 HOURS.* | CY | $ - 0 | |
| 8 | BATCH TO ATTAIN 3000 PSI @ 12 HOURS.* | CY | $ - 0 | |
| 9 | BATCH TO ATTAIN 3000 PSI @ 8 HOURS.* | CY | $ - 0 | |
| 10 | BATCH TO ATTAIN 3000 PSI @ 6 HOURS.* | CY | $ - 0 | |
| 11 | BATCH TO ATTAIN 4000 PSI @ 20 HOURS.* | CY | $ - 0 | |
| 12 | BATCH TO ATTAIN 4000 PSI @ 12 HOURS.* | CY | $ - 0 | |
| 13 | BATCH TO ATTAIN 4000 PSI @ 8 HOURS.* | CY | $ - 0 | |
| 14 | BATCH TO ATTAIN 4000 PSI @ 6 HOURS.* | CY | $ - 0 | |
| 15 | ADD'L CHARGE FOR HEATED MATERIAL | CY | $ - 0 | |
| 16 | MINIMUM LOAD CHARGE (LESS THAN 3 CY) | CY | $ - 0 | |
| 17 | ADD'L CHARGE FOR DELIVERY BETWEEN 7 P.M. AND 1 A.M. (FOR SPECIAL PROJECTS) | CY | $ - 0 | |
| 18 | CHLORIDE ACCELERATOR | ML | $ - 0 | |
| 19 | NON-CHLORIDE ACCELERATOR | ML | $ - 0 | |
| SATURDAY PRICE | ||||
| Line # | Description | UOM | Unit Cost | No Bid |
| 20 | 6.0 BAG MIX | CY | $ - 0 | |
| 21 | 7.0 BAG MIX | CY | $ - 0 | |
| 22 | 7.0 BAG MIX WITH FIBER MESH | CY | $ - 0 | |
| 23 | 9.0 BAG MIX | CY | $ - 0 | |
| 24 | 9.0 BAG MIX WITH FIBER MESH | CY | $ - 0 | |
| 25 | 10.0 BAG MIX | CY | $ - 0 | |
| 26 | BATCH TO ATTAIN 3000 PSI @ 20 HOURS.* | CY | $ - 0 | |
| 27 | BATCH TO ATTAIN 3000 PSI @ 12 HOURS.* | CY | $ - 0 | |
| 28 | BATCH TO ATTAIN 3000 PSI @ 8 HOURS.* | CY | $ - 0 | |
| 29 | BATCH TO ATTAIN 3000 PSI @ 6 HOURS.* | CY | $ - 0 | |
| 30 | BATCH TO ATTAIN 4000 PSI @ 20 HOURS.* | CY | $ - 0 | |
| 31 | BATCH TO ATTAIN 4000 PSI @ 12 HOURS.* | CY | $ - 0 | |
| 32 | BATCH TO ATTAIN 4000 PSI @ 8 HOURS.* | CY | $ - 0 | |
| 33 | BATCH TO ATTAIN 4000 PSI @ 6 HOURS.* | CY | $ - 0 | |
| 34 | ADD'L CHARGE FOR HEATED MATERIAL | CY | $ - 0 | |
| 35 | MINIMUM LOAD CHARGE (LESS THAN 3 CY) | CY | $ - 0 | |
| 36 | ADD'L CHARGE FOR DELIVERY BETWEEN 7 P.M. AND 1 A.M. (FOR SPECIAL PROJECTS) | CY | $ - 0 | |
| 37 | CHLORIDE ACCELERATOR | ML | $ - 0 | |
| 38 | NON-CHLORIDE ACCELERATOR | ML | $ - 0 | |
| Plant Names |
List the Plant Name(s) with street address, phone numbers and hours of operations for each plant.
Plant Name Plant Address Hours of Operation Phone number
WisDOT Spec image1.tiff
File details come from the government source that posted it. Updated .