26-VSW-UNK-004 Amendment 3.pdf
PDF 394 KB Posted
- Solicitation number
- ITB 26-VSW-UNK-004 Unalakleet Covenant Lift Station Project
- Issued by
- Matanuska-Susitna Borough, Trapper Creek CDP, Alaska
About this file
This document is an Amendment (Amendment 3) issued by the State of Alaska's Department of Environmental Conservation Village Safe Water Program for Invitation to Bid (ITB) 26-VSW-UNK-004, which concerns the Covenant Lift Station Project. The ITB is scheduled to be due on August 21, 2025, at 2:00 PM AST, and this amendment addresses a specific vendor question regarding soil erosion control requirements. The amendment modifies Section 01 57 13 of the project specifications, shifting responsibility to the contractor for obtaining construction-related permits, performing notifications and inspections, and ensuring compliance with local, state, and federal laws, including specific Alaska Administrative Code (18 AAC 75) and Alaska Statutes (Title 46).
The amendment does not provide specific details about project costs, funding sources, or contract value. The primary focus is on clarifying the contractor's responsibilities for environmental compliance, specifically related to construction discharges, permit acquisition, and regulatory adherence. The document is signed by John McDonald, a Procurement Specialist, and is part of the procurement process for what appears to be a village infrastructure project involving a lift station.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 26-VSW-UNK-004 Amendment 2.pdf | ||
| 26-VSW-UNK-004 Amendment 1.pdf | ||
| ITB 26-VSW-UNK-004.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
State of Alaska Department of Environmental Conservation
Village Safe Water Program 555 Cordova Street
Anchorage, AK 99501 john.mcdonald@alaska.gov
August 7, 2025
To: Vendor List
Re: Amendment 3
ITB 26-VSW-UNK-004
Covenant Lift Station Project ITB Due Date: August 21, 2025 @ 2:00 PM AST
The following are vendor questions and the department’s response:
1. Vendor: Section 01 57 13 Soil Erosion Control 3.1.C
Please confirm that a Professional Engineer is required to provide the Erosion Control Prevention Plan (project is less than 1 acre of disturbance) and a Professional Engineer is to conduct all onsite SWPPP inspections.
Department: Covenant Lift Station Specifications IFC, Section 01 57 13, Part 3.1C. Delete current language and replace with “The Contractor is responsible for obtaining all construction related permits and performing all notifications and inspections as required by local, state, and Federal Law and these specifications. Contain, clean up, and dispose of all construction related discharges of petroleum products and/or other substances hazardous to the land or water. Comply with 18 AAC 75 and Title 46 of the Alaska Statutes”.
John McDonald
Procurement Specialist