26-SIMACQ-E60-0006_SOW Stud Flange rev D_7162026.pdf
PDF 137 KB Posted
- Attached to
- 26-SIMACQ-E60-0006 Stud Flange
- Solicitation number
- N6339426Q4057
About this file
This is a Statement of Work for the manufacture of Rev D Stud Flanges supporting the NATO SEASPARROW program. The Naval Surface Warfare Center, Port Hueneme Division (NSWC PHD) requires contractors to manufacture precision stud flanges (Part Number 2890608-2) used in flanged connections for NATO Sea Sparrow launcher upgrades. All manufacturing and testing must comply strictly with Drawing 2890608 Rev D.
The contract includes two phases contingent on First Article Testing (FAT) requirements. For new contractors, two FAT units must be delivered within 30 days of order receipt, accompanied by an internal test report submitted within 14 days of prototype completion. If FAT units fail testing, the contractor must provide replacement parts at no cost. Upon written Government approval of FAT, contractors must deliver 184 production units within 70 days. Previously qualified manufacturers may have the FAT requirement waived, in which case all 186 production units must be delivered as a single shipment within 70 days of order receipt. All units must conform 100 percent to drawing specifications, dimensions, and tolerances. Contractors must fabricate custom transportation fixtures and crates, with all shipping costs included in their quote on an FOB Destination basis. Deliverables ship to Naval Surface Warfare Center, Port Hueneme Division, 4363 Missile Way, Building 1387, Port Hueneme, California 93043-4307. Contractors must participate in a post-award kickoff meeting within 10 business days of award and support intermittent project status reviews at the Government's discretion. Primary and alternate technical points of contact are Firozul Chowdhury (firozul.m.chowdhury.civ@us.navy.mil) and Steve Martinez (steve.w.martinez3.civ@us.navy.mil).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 26-SIMACQ-E60-0006-Sources Sought with DOD Safe_7162026.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work for Rev D Stud Flange for NATO SEASPARROW Program
1.0 Scope:
NSWC PHD requires the manufacture of Stud Flanges in accordance with the identified drawing in Section 2.0 of this SOW. The Stud Flanges support the NATO SEASPARROW program and are used in flanged connections and are essential components used in the upgrades of the NATO Sea Sparrow launcher. The Stud Flange is a small precision component used inside a larger electronic/mechanical assembly that is supported by the Diminishing Manufacturing Sources and Material Shortages (DMSMS) team.
First Article Testing (FAT) is required for any contractor who is not a previously approved source. If the contract is awarded to a previously qualified manufacturer, the FAT requirement may be waived by the Government.
2.0 Applicable Documents:
The Contractor shall ensure all work, manufacturing, and testing are performed in strict accordance with the following document:
• Drawing 2890608 Rev D – Stud Flange
3.0 Requirements
3.1 General
The Contractor shall provide all labor, materials, and resources necessary to manufacture, test, and deliver the items described in this Statement of Work (SOW) in strict accordance with the drawing specified in Section 2.0.
3.2 First Article Testing (FAT)
The FAT requirement defined below may be waived by the Government if the Contractor is a previously approved manufacturer with recent, successful performance manufacturing this part number.
The Contractor shall manufacture and deliver two (2) units of the Rev D Stud Flange (P/N: 2890608-2) for Government-led First Article Testing.
• Testing Location: FAT testing will be conducted by the Government at NSWC PHD.
• Failure Protocol: If any FAT unit fails to meet the technical drawing requirements, the Contractor shall provide replacement parts at no additional cost to the Government to repeat the FAT testing.
3.3 Production
Upon receiving written authorization from the Contracting Officer confirming successful FAT completion, the Contractor shall manufacture and deliver one hundred eighty-four (184) production units of Part Number 2890608-2 conforming to the technical drawing. All units delivered under this contract must conform 100% to the specifications, dimensions, and tolerances of the applicable technical drawing.
If the FAT requirement is waived by the Government under Section 3.2, the Contractor shall proceed directly to full production and deliver a total of one hundred eighty-six (186) production units of Part Number 2890608-2 as a single shipment.
3.4 Shipping
The Contractor shall fabricate any necessary custom transportation fixtures, crates, or packaging required to ensure the items are delivered without damage.
• Shipping Terms: Shipping shall be FOB Destination. All shipping and transportation charges shall be included in the Contractor's quote.
4.0 Meetings
4.1 Post-Award Kickoff Meeting
Within 10 business days of contract award, the Contractor shall participate in a post-award kickoff teleconference conducted by the Government.
4.2 Intermittent Project Status Reviews.
At the sole discretion of the Government, the Contractor shall support and participate in intermittent project status reviews. The reviews may be conducted on an informal basis via telephone or teleconference to assess manufacturing progress.
5.0 Deliverables, Schedule, and Delivery Location
5.1 Delivery Schedule
All hardware deliverables shall be packaged securely and shipped in accordance with the schedule defined below.
• The vendor shall notify the Government in writing within 7 days of prototype completion.
• The Vendor shall submit the internal test report to the Government within 14 days of that notification, or concurrently with the physical delivery of the FAT units, whichever occurs first.
• First Article Testing (FAT) Units: (2 Units) Deliver FAT units no later than 30 Days After Receipt of
Order (ARO). The internal test report must be submitted before prototypes will be accepted. (Note: If the FAT is waived, these units shall be added to the final production delivery).
• Production Units: (184 Units) Due no later than 70 days after receiving written Government approval of the FAT units. (Note: If the FAT is waived, all 186 units shall be delivered no later than 70 days ARO).
5.2 Delivery Address
Commander Naval Surface Warfare Center, Port Hueneme Division 4363 Missile Way, Bldg. 1387, FL 2, POC: Austin Garcia (805) 228 8292, austin.b.garcia3.civ@us.navy.mil Port Hueneme, CA 93043-4307 *The Contractor shall clearly mark the Contract Number on the exterior of all shipping boxes, crates, and containers, as well as on all associated packing slips.
6.0 Technical Points of Contact
mailto:austin.b.garcia3.civ@us.navy.mil
6.1 Primary Point of Contact
Name: Firozul (Phil) Chowdhury, Code E23 Team Lead Email: firozul.m.chowdhury.civ@us.navy.mil
6.2 Alternate Point of Contact
Name: Steve Martinez, Code E62 Team Lead Email: steve.w.martinez3.civ@us.navy.mil