26-SIMACQ-E50-0001_SOW_11212025.docx

DOCX document 31 KB Posted

Attached to
26-SIMACQ-E50-0001 -Missile Restraint System Control Console Federal contract opportunity
Solicitation number
N6339426Q4005
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This Statement of Work (SOW) details a contract for the Naval Surface Warfare Center Port Hueneme Division to manufacture and install control interfaces for column restraint adapters at a Missile Test Cell in Kyoto, Japan. The project requires designing and fabricating a control console with specific technical specifications, including electrical cabling, GREEN/RED indicator lights for PIN/SOCKET alignment, and two push buttons to control pneumatic actuator solenoid valves.

The contractor will be responsible for designing the control system using Wright Industries drawing #S4501-E-814-A00 as a baseline, modifying it to remove Autonomous Guidance Vehicle and test sled components. Deliverables include the control console, monthly progress reports, and technical documentation. Manufacturing will occur at the contractor's facility, with the completed system first delivered to EZRig Corporation in Ventura, California, and then ultimately installed at the Japanese Maritime Self Defense Force Missile Intermediate-Level Maintenance Facility (M-ILMF) in Maizuru, Japan. The work will be performed and documented in both Japanese and English, with classified documents requiring specific delivery protocols.

View the file

Other files for this federal contract opportunity

Other files attached to 26-SIMACQ-E50-0001 -Missile Restraint System Control Console, newest first.
File Type Posted
26Q4005_SOURCES SOUGHT_11212025.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. INTRODUCTION

Naval Surface Warfare Center Port Hueneme Division requires manufacture and installation of control interfaces for the column restraint adapters for a Missile Test Cell located in Kyoto, Japan.

Top of Page

2. OBJECTIVE

The objective of this contract is to provide Manufacture and installation of the Control Console including all electrical cabling necessary for detecting proper PIN/SOCKET alignment and providing GREEN/RED indicator lights for go/no-go condition respectively; Two (2) push buttons to send ENGAGE/DISENGAGE control signals to the solenoid valves in the pneumatic actuators.

Top of Page

3. SCOPE OF WORK

The scope of work under this contract includes the following:

· 3.1 management, co-ordination and oversight of the contractor:

· 3.2. threat and risk assessment:

· 3.2.1 statement of sensitivity;

· 3.2.2 threat assessment;

· 3.2.3 non-technical vulnerability assessment;

· 3.2.4 risk assessment; and

· 3.2.5 recommendations for risk mitigation.

Top of Page

Top of Page

4. SERVICES REQUIRED

The resources listed below will provide the following services

6. DELIVERABLES

The Contractor shall provide a control console, including all electrical cabling necessary for detection of proper PIN/SOCKET alignment and providing GREEN/RED indicator lights for go/no go condition respectively; two (2) pushbuttons to send ENGAGE/DISENGAGE control signals to the solenoid valves in the pneumatic actuators.

The Column Restraint Adapters require the following control interfaces:

· Supply of compressed air (provided by the facility)

· Supply of electrical power (provided by the facility

· Control Console, provided by successful awardee of this solicitation.

Awardee shall use existing drawings from Wright Industries (no the Doerfer Company) as a baseline for their own design of the control system. The system will be a simplified version of that shown on Wright’s drawings since the controls for the Automated Guidance Vehicle (AGV) and the test Sled are not required for the M-ILMF installation.

· Monthly Progress Reports must include the following information:

· 6.1.1 all significant activities performed during the period covered by the progress report;

· 6.1.2 status of all action/decision items originating from each task, as well as a list of outstanding activities and the expected completion date;

· 6.1.3 a description of any issues or problems encountered which are likely to require attention by the Technical Authority;

· 6.1.4 recommendations relating to the conduct of the work, if applicable;

· 6.2 the initial and regularly updated Project Plan;

· 6.3 draft and final copies of technical documentation

· 6.4 managerial reports.

Top of Page

7. FORMAT OF DELIVERABLES

· 7.1 Protected A, B and Secret documents must include one hard copy and one copy in electronic format (on CD or DVD) and shall be hand delivered to the Technical Authority; unclassified documents must be delivered as e-mail attachments.

· 7.2 Monthly Progress Reports must be attached to each Progress claim and submitted to the Technical Authority by email.

· 7.3 Deliverables must be in Microsoft Word version 2000 or newer.

Top of Page

8. LANGUAGE OF WORK

Work will be performed and delivered in both Japanese and English.

Top of Page

9. Reference Drawings

1. RRMIF Column Restraints Ablative ICD

Drawing #2869917
Raytheon Company Tucson, AZ

2. RRMIF Column Restraint

Drawing #2869912
Raytheon Company Tucson, AZ

3. Restraint Fixture Assembly, SM-3 Booster/GMA

Drawing # 2344632
Raytheon Company, Tucson, AZ

4. GMR Container Restraint Fixture Assembly, SM3

Drawing # 2330581
Raytheon Company, Tucson, AZ

5. Wright Industries Drawing # S4501-E-814-A00 Wright Industries, A Doerfer Co, Nashville TN

Top of Page

10. LOCATION OF WORK

Manufacturing will be performed at the contractor's facilities. Once Completed the Control System will be delivered to EZRig corporation in Ventura California, to be packaged with other components to be shipped to the worksite for installation.

Installation will occur at the Japanese Maritime Self Defense Force (JMSDF) Missile Intermediate-Level Maintenance Facility (M-ILMF) in Maizuru, Japan

CONTROL SYSTEM DESIGN AND INSTALLATION –

· Reference Drawing: Item No.5

· Recommend using as BASELINE drawing for design (provided by WRIGHT INDUSTRIES)

· Awardee to modify drawing to delete portions applicable to the Autonomous Vehicle Vehicles (AGV) and the Missile’s Test Sled, and to keep only the portions applicable to the CR Adapters (i.e., Pneumatic Clamps)

· Awardee to fabricate a Control Console (installed within MTC1) to include interfaces to perform the following:

· Detect and indicate PIN-to-SOCKET proper alignment (performed by CR Adapter’s Photo Sensors). This can be accomplished by using green/red LIGHTS for a go/no-go condition, respectively.

· Engage/disengage SOCKETS and PINS (performed by the CR Adapter’s pneumatic actuators). This can be accomplished by using green/red PUSH-BUTTONS for a go/no-go condition, respectively. The actuators’ limit switches need to be monitored during extend/retract operations.

· Awardee to assist during the onsite installation at M-ILMF to monitor the following:

· Connection of the Control Console to the facility-provided Electrical Power Receptacle, including connections to the Power Supply, Photo Sensors, Limit Switches and Pneumatic Actuators’ Solenoid Valves

· Connection of the Pneumatic Actuators to the facility-provided Compressed Air Drop

· Ensure satisfactory performance of the completed Control System after installation image1.gif