This is Addendum 1 to a bid solicitation for a Wired Clock System project issued by Northville Public Schools in Michigan, managed by Rob Levitt and Ric Geiger. The project involves installing a new synchronized wired clock system throughout the school building, featuring digital clocks in two sizes (2.3-inch and 4-inch digit heights) with four-digit displays and countdown timer functionality between classes. The system will use two-wire or three-wire configurations as required, with all cabling terminating in the Main Distribution Frame (MDF) or Intermediate Distribution Frame (IDF). The scope includes complete demolition and disposal of existing clocks and wiring, including removal of high-voltage cabling. A pre-bid meeting was conducted with attendees including Brandon Julian and Andrew Piazza. Critical dates include questions due by April 29, 2026 at 5:00 PM, answers due May 1, 2026 at 5:00 PM, bid submission deadline of May 7, 2026 at 1:00 PM to Devin Kling at the Northville Public Schools Business Office, project award on June 10, 2026, and project start on June 11, 2026 with completion by August 14, 2026.

Bid responses must include one original plus two hard copies and one electronic copy on a USB drive, accompanied by a 5% bid bond; a 100% performance bond and 100% labor and materials bond are required at contract execution. The solicitation specifies red LED lettering for clock displays and requires protective cages for clocks in the gym, fitness room, and pool areas. Bidders must provide base bid breakdowns, compliance statements, and confirm acknowledgment of addendums. All mounting hardware, surface boxes, adapter plates, conduit, raceway, and related installation accessories required for manufacturer-recommended installation are the contractor's responsibility. Warranty requirements have been clarified to reference Section 017836, with the new Master Clock to be located in the MDF and powered by existing 110V receptacles. The district will not reuse existing clock infrastructure, and a licensed electrician hired by the contractor is required to handle high-voltage power removal.

View the file

Other files

File Type Posted
2026 Northville PS - Wired Clock System.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum

Number: 1 Project: Wired Clock System Date: May 1, 2026 Project #: 26-NPS-WCS-01 Type: Addendum Project Mgr.: Rob Levitt/Ric Geiger Location: Northville Public Schools

PRE-BID MEETING MINUTES

1. Welcome and Introductions

a. Brandon Julian

b. Andrew Piazza

c. Rob Levitt

d. Ric Geiger

2. Discussed Timelines

a. Questions due: April 29th at 5:00PM

i. All questions shall be Non-Binding unless submitted in writing to rlevitt@wrighthunter.com

b. Answers due: May 1st at 5:00PM

c. Bid due: May 7th at 1:00PM

To:

Devin Kling Assistant Superintendent for Finance & Operations Northville Public Schools Business Office, 3rd Floor 405 W. Main Street Northville, MI 4816

d. Award: June 10th 2026

e. Start date: June 11, 2026

f. Completion date: August 14th

3. Discussed Bid Response

a. Bid responses must include Familial Disclosure, Iran Economic Sanctions, and Criminal

Background check affidavit.

b. Bidders are to provide one (1) original plus two (2) hard copies, and one (1) full electronic copy on a USB drive with the sealed proposal.

7303 West 7 Mile Road | Detroit, MI 48221 | Tel 248-594-5850 | Fax 248-594-5851 | http://wrighthunter.com

c. 5% Bid bond with the bid, 100% performance bond and 100% labor and materials bond at time of contract.

d. Reviewed Section 004113 BID FORMS:

1. Affidavit Forms

2. Base Bid

3. No Mandatory Alternates

4. A section for voluntary alternates

5. Base Bid Breakdown

6. Compliance section to state yes or no whether you comply with each section of the bid

7. Make sure you note that your bid accounts for the Addendums

8. Fill out the rest, sign, etc.

e. Reviewed Section 275313 WIRED CLOCK SYSTEM:

1. Drawings – if need a copy of drawings email me. rlevitt@wrighthunter.com

2. Work includes:

Wired Clock System through the building as indicated in the project plans All Clocks shall be digital Clocks are designated in two (2) sizes

2.3 “ digit height shown as SDC 4” digit height shown as LDC

Clocks shall be four (4) digit Countdown timer operation between classes Two (2) wire or three (3) wire as required All cabling shall terminate in the MDF or IDF, as shown on the plans Demolition and disposal of all existing clocks and wiring is required.

f. Performed Walk-thru of Athletic spaces, hallway and office spaces

SPECIFICATION CHANGES

1. Refer to Section 275313. Remove Section 1.9 WARRANTY

2. Refer to section 275313. Remove section 275313. 2.1F

CONTRACTOR CLARIFICATIONS:

1. RFP states one year manufacturer warranty and also includes language specifying 5-year comprehensive warranty. Please confirm and clarify.

a. Refer to Section 275313 CLOCK SYSTEMS. Remove Section 1.9 WARRANTY.

b. Refer to section 017836 WARRANTIES for warranty requirements.

7303 West 7 Mile Road | Detroit, MI 48221 | Tel 248-594-5850 | Fax 248-594-5851 | http://wrighthunter.com

2. Please confirm the following: "System shall be compatible with existing 3-wire synchronous clock infrastructure where indicated.

We don’t believe we are tying into or reusing any established clock infrastructure.

a. Correct. There is no plan to re-use any existing clock infrastructure.

3. Synchronized clocks are the basis of design and connected to the master clock. The RFP includes a statement, “Stand-Alone Operation: Clock time shall be manually settable at each clock using integral user interface without connected master clock.” Please clarify.

a. Stand-alone operation” means the clock must have the capability for local/manual time setting at the clock if needed. It does not mean the Contractor is required to manually set each clock individually for the completed installation.

The intent of the project remains a master-clock-controlled synchronized system for normal operation.

4. Timer function: Can the district explain how this would be used? A standard school installation allows for a school-wide countdown timer that is set from the web browser. Please clarify if every classroom needs to have the ability to set a count-down or count-up individually at each clock or classroom?

a. The system shall Provide timer functionality such that count-up and/or count-down features may be accessed and controlled by multiple authorized users as designated by the District’s Technology Director. The district does not require each classroom or instructor to have independent local control of timer functions at each individual clock. Local timer-setting capability at a clock should be considered a product feature only, and not a required mode of end-user operation.

5. Please confirm that demolition includes the removal of all high voltage cabling?

a. The abatement and removal of all high voltage cabling will be the responsibility of the contractor. Coordination with an electrician will be needed to complete this work.

6. Please confirm that school is able to provide location existing headend and/or master clock?

a. No Master Clock currently exists. The new Master Clock shall be located in the

MDF.

7303 West 7 Mile Road | Detroit, MI 48221 | Tel 248-594-5850 | Fax 248-594-5851 | http://wrighthunter.com

7. Please confirm that a 110V receptacle is available per IDF/MDF/tech closet?

a. Confirmed. Sufficient power will be provided in MDF/IDF location.

8. What is the required color of the LED lettering on the displays?

a. Red

9. For the demo of the 110V clocks at Northville High School, are we to just remove the existing clocks and cover/or install new clock at the location?

a. The power must be removed from the existing high voltage clock locations, and the space can be re-utilized for the new clocks.

10. If we must remove the 110V cabling, would the district have a licensed electrician to shut the power off at the panel?

a. A licensed electrician should be hired by the contractor for the removal of the 110V power.

11. I have two documents for this bid, the prints and the specs. Are there any other documents that I may be missing?

a. There are no other documents provided for this project.

12. How are we handling the mounting of these clocks?

a. Provide installation in accordance with the manufacturer’s recommendations and the conditions at each location.

13. May I assume there will be a box with a stubbed-up conduit at most locations?

a. No.

14. Do I need to add a Surface Mount Box at each clock location? With some additional metal raceway?

a. No, surface mount boxes and metal raceway are not required at every location by default. Provide installation in accordance with the manufacturer’s recommendations and the conditions at each location. Furnish surface boxes, corridor/double-face mounting hardware, adapter plates, conduit, raceway, and related accessories as required for a complete installation. Assume that, other

7303 West 7 Mile Road | Detroit, MI 48221 | Tel 248-594-5850 | Fax 248-594-5851 | http://wrighthunter.com than the existing corridor clocks, new mounting/pathway components required for the new system are part of the Contractor’s scope.

15. Is there any way to know which clocks need additional accessories?

a. The only location-specific “additional accessories” currently identified by the District are protective guards/cages for clocks in the gym, weight room, pool, and similar athletic areas. No other special accessories are specifically scheduled by location at this time. Bidders shall, however, include all standard mounting/installation accessories required for a complete manufacturer-recommended installation, including items such as surface boxes, adapter plates, corridor kits, and related hardware as required by each clock location and mounting condition.

16. May I assume only the Gym and Aux Gym clocks need protective cages? Maybe the fitness rooms too?

a. Please provide protective cages for the gym, fitness room and pool areas.