This Addendum No. 1, dated November 11, 2026, modifies the original bidding documents for a bleachers project issued by Genesee School District located at 7347 North Genesee Road in Genesee, Michigan. The project involves the provision and installation of a new bleacher system, with the construction manager being Lurvey Construction Co. in Flint, Michigan. The revised bid submission deadline is Wednesday, November 18, 2026, at 2:00 PM EST, with bids to be submitted in person in duplicate sealed envelopes to Genesee Schools. The base bid scope includes demolition and removal of existing bleachers, while three alternates are separately priced: Alternate No. 1 for concrete slab installation with subbase preparation and finishing; Alternate No. 2 for existing pavement demolition and concrete pour-back with specified removal and replacement requirements; and Alternate No. 3 for visitor bleacher systems with two options—either two thirty-foot sections or one sixty-foot section—each available in elevated and non-elevated configurations with associated concrete pads and site work. Bidders must identify project schedules, lead times, and any anticipated constraints, with completion required prior to the 2027 football season.
All bids must include a bid bond or certified check equal to at least 5% of the total bid amount, with performance and payment bonds available as additional options. The contract will be issued through Lurvey Construction Co. as a subcontract and is subject to applicable prevailing wage requirements. Bidders are required to include all applicable taxes in submitted proposals and must provide comprehensive pricing with clearly itemized base bid and alternate costs, along with identification of all exclusions, qualifications, and assumptions. Required bid documentation includes a completed and signed bid form with addendum acknowledgment, separate alternate pricing, proposed project schedules, manufacturer warranties and technical specifications, a notarized familial relationship disclosure affidavit, a written statement confirming no outstanding personal property tax obligations, and Iran Economic Sanctions Certification. Value engineering options are encouraged and shall be priced separately from the base bid. Electronic submissions are not permitted.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11/11/2026
GENESEE SCHOOL DISTRICT
7347 N GENESEE RD
GENESEE, MI 48437
WORK SCOPE / BID FORM = BLEACHERS
ADDENDUM NO. 1
BLEACHER SYSTEM
7347 North Genesee Road
Genesee, Michigan 48437
CONSTRUCTION MANAGER
Lurvey Construction Co.
601 S. Grand Traverse Street
Flint, Michigan 48502
TO: PROSPECTIVE BIDDERS
DATE: November 9, 2026
1. GENERAL
A. Contract Documents
This Addendum forms an integral part of the Contract Documents and modifies the original bidding documents dated November 9, 2026. All provisions of the original bidding documents not specifically modified or supplemented herein shall remain in full force and effect.
B. Acknowledgment of Receipt
Bidders shall acknowledge receipt of this Addendum in the space provided on the bid form.
Failure to acknowledge receipt may result in disqualification of the bid.
C. Work Requirements
Unless specifically modified by this Addendum, the general scope, character, and requirements of the work shall remain as originally specified. Each bidder shall include all labor, materials, equipment, supervision, and incidental items necessary for a complete and functional installation, whether specifically identified or reasonably implied by the Contract Documents.
D. Reference to Original Documents
Where an item is referenced without additional clarification or modification, the requirements of the original Contract Documents shall govern.
2. ITEMS OF ADDENDUM NO. 1
A. Revised Bid Due Date
The bid submission deadline has been revised as follows:
Wednesday, November 18, 2026, at 2:00 PM EST.
All bids shall be submitted in accordance with the Bid Delivery Instructions included at the end of this Addendum.
B. Revised Bleacher Work Scope / Bid Form
A revised Bleacher Work Scope and Bid Form, dated November 9, 2026, is being issued with this
Addendum.
All prospective bidders shall utilize the revised bid form when preparing and submitting their proposals. The revised document provides clarification of the base bid requirements and incorporates additional alternate pricing requirements.
C. Alternates
Bidders shall provide separate pricing for the following alternates. All alternate pricing shall be clearly identified and submitted in addition to the Base Bid.
Alternate No. 1 – Concrete Slab for Bleachers
Provide and install the concrete slab required to accommodate the proposed bleacher system.
Include all necessary subbase preparation, aggregate placement, compaction, fine grading, forming, reinforcement, concrete placement, finishing, and associated work required for a complete installation.
Alternate No. 2 – Existing Pavement Demolition / Concrete Pour-Back
Provide demolition and removal of existing pavement and/or concrete within the areas affected by the proposed work, including loading, hauling, and legal disposal. Include replacement concrete (pour-back) within the affected areas.
Bidders shall clearly identify proposed demolition and replacement limits, concrete thicknesses, and any assumptions or exclusions included in the alternate pricing.
Alternate No.3 – Visitor Bleacher System
Option 1 – Visitor Bleachers (Two Sections)
Provide two (2) bleacher sections, each approximately thirty (30) feet long and five (5) rows high, for a combined system approximately sixty (60) feet long. Provide pricing for both elevated and non-elevated bleacher configurations as outlined below.
Include all required site work, concrete pad, materials, engineering, labor, equipment, delivery, installation, and associated work necessary for a complete installation. Identify the proposed configuration, seating capacity, overall dimensions, and any assumptions or exclusions.
Option 2 – Visitor Bleachers (One Section)
Provide one (1) complete visitor bleacher system approximately sixty (60) feet long and five (5) rows high. Provide pricing for both elevated and non-elevated bleacher configurations as outlined below.
Include all required materials, engineering, labor, equipment, delivery, installation, and associated site work. This option shall also include a concrete pad measuring approximately seventy (70) feet by twenty-five (25) feet. Include all necessary subbase preparation, aggregate placement, compaction, fine grading, forming, reinforcement, concrete placement, and finishing required for a complete installation.
Identify the proposed configuration, seating capacity, overall dimensions, and any assumptions or exclusions.
3. PROJECT CLARIFICATIONS
The following clarifications shall be incorporated into all submitted proposals and shall govern the applicable project requirements.
A. Contract Agreement and Requirements
1. The contract agreement will be issued through Lurvey Construction Co. in the form of a subcontract.
2. The project is subject to applicable prevailing wage requirements.
3. All applicable taxes shall be included in the submitted proposal.
4. Bid bond or certified check equal to at least 5% of the total bid amount for applicable construction contracts.
5. Performance and Payment Bonds may be provided as an additional option. Associated costs shall be identified separately in the proposal.
B. Demolition Requirements
1. Demolition and removal of the existing bleachers shall be included in the Base Bid.
2. Any additional demolition associated with Alternate No. 2 shall be identified and priced separately.
3. Bidders shall account for proper removal, hauling, and disposal of demolition materials in accordance with applicable requirements.
C. Project Schedule
1. The selected subcontractor shall be prepared to commence work immediately following contract award.
2. The subcontractor shall coordinate all fabrication, material procurement, delivery, and installation activities with Lurvey Construction Co.
3. The completed bleacher installation shall be coordinated to meet the anticipated project completion deadline prior to the start of the 2027 football season.
4. Bidders shall identify any anticipated lead times, fabrication durations, or scheduling constraints that may affect project completion.
D. Project Budget and Pricing
1. Bidders shall provide competitive and comprehensive pricing for the proposed scope of work.
2. Base Bid and all alternate pricing shall be clearly itemized.
3. All proposed exclusions, qualifications, allowances, and assumptions shall be clearly identified in the submitted proposal.
4. Value Engineering options are encouraged and to be priced separately from the base bid.
4. BID DELIVERY INSTRUCTIONS
Bids shall be submitted in person on Wednesday, November 18, 2026, no later than 2:00
PM EST, in accordance with the instructions provided to prospective bidders.
Bids shall be submitted in duplicate (two complete copies) and shall include the following signed exhibits and required documentation:
• Completed and signed Bid Form.
• Acknowledgment of Addendum No. 1.
• Separate pricing for all requested alternates.
• Proposed project schedule, including anticipated fabrication, delivery, and installation durations.
• Identification of all exclusions, qualifications, and scope assumptions.
• Any additional documentation specifically requested within the original bidding documents.
• All bids must be physically submitted to Genesee Schools in sealed envelopes. Electronic submissions are not permitted.
• Each envelope must clearly identify "Bid Opening," the project name, bid opening date and time, and bidder's name.
• Familial Relationship Disclosure: Notarized affidavit identifying any familial relationships with Board members or the Superintendent.
• Bid bond or certified check equal to at least 5% of the total bid amount for applicable construction contracts.
• Written statement confirming no outstanding personal property tax obligations.
• Iran Economic Sanctions Certification: Certification confirming compliance with applicable requirements.
• Applicable manufacturer warranties, technical specifications, and supporting documentation for proposed alternatives.
All bid documents shall be properly completed, signed, and submitted by the established deadline.
File details come from the government source that posted it. Updated .