26-8661R_Bid_Schedule.xlsx
XLSX spreadsheet 24 KB Posted
- Solicitation number
- 26-8661R
- Issued by
- Collier County, Florida
About this file
This is a Bid Schedule for Collier County, Florida's Wiggins Pass and Doctors Pass Maintenance Dredging Project 2026, a grant-funded construction initiative advertised on May 8, 2026. The project comprises two primary dredging components: Wiggins Pass maintenance dredging involving 85,000 cubic yards of material with beach disposal, and Doctors Pass maintenance dredging involving 37,000 cubic yards from the settling basin, turning basin, and west channel. Associated work includes navigational and manatee marker installation and removal/reinstallation at both locations, environmental control and turbidity testing, pre- and post-construction surveys, final tilling and grading, debris removal, and restoration of construction access. Sealed bids were required by May 22, 2026, at 3:00 p.m. local time, with prospective bidders registering through the Collier County procurement portal at https://procurement.opengov.com/portal/collier-county-fl to obtain complete bid documents.
The bid schedule presents line items with estimated quantities and unit costs, with all pricing fields showing zero values in the provided document, indicating this is a blank template awaiting contractor submissions. Key technical specifications include requirements that sand placed on the beach exceed no more than five percent material greater than 0.5 inches in diameter, with contractors determining appropriate screening and placement methods. The owner will provide navigational channel marker materials at Wiggins Pass, while the contractor must provide manatee marker materials. Final dredged quantities will be determined based on pre-construction survey results rather than the estimated amounts listed. The project is grant-funded, reflecting its public investment nature and the specialized environmental and navigational requirements inherent to coastal inlet maintenance dredging operations.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Schedule
| WIGGINS PASS AND DOCTORS PASS MAINTENANCE DREDGING PROJECT 2026 - GRANT FUNDED |
| CONSTRUCTION ITB: 26-8661R |
| BID SCHEDULE |
A. Wiggins Pass Maintenance Dredging
Item Item Description Estimated Quantity Unit Unit Cost Total Cost
1 Mobilization and Demobilization 1 Lump Sum $ - 0
2 Dredge Wiggins Pass Channel with Beach Disposal (See Note I & V) 85,000 CY $ - 0
3a Navigational Channel Marker Install (See Note II) 15 Each $ - 0
3b Manatee Marker Installation (See Note III) 1 Each $ - 0
4 Environmental Control including Turbidity Testing 1 Lump Sum $ - 0
5 Construction Surveys (Pre, Interim, and Post) 1 Lump Sum $ - 0
6 Final Tilling and Grading 1 Lump Sum $ - 0
7 Debris Removal (See Note VI) 1 20 cy container $ - 0
8 Restoration of Construction Access 1 Lump Sum $ - 0
Subtotal $ - 0
Subtotal Bid Item A. Wiggins Pass $ - 0
B. Doctors Pass Maintenance Dredging
Item Item Description Estimated Quantity Unit Unit Cost Total Cost
1 Mobilization and Demobilization 1 Lump Sum $ - 0
2 Dredge Doctors Pass Settling Basin, Turning Basin, and West Channel with Beach Disposal (See Note I & V) 37,000 CY $ - 0
3 Temporary Removal and Re-Install Navigational Channel Marker Install (See Note IV) 5 Each $ - 0
4 Environmental Control including Turbidity Testing 1 Lump Sum $ - 0
5 Construction Surveys (Interim & Post-Construction, See Note IV) 1 Lump Sum $ - 0
6 Final Tilling and Grading 1 Lump Sum $ - 0
7 Debris Removal (See Note VI) 1 20 cy container $ - 0
8 Restoration of Construction Access 1 Lump Sum $ - 0
Subtotal $ - 0
| Subtotal Bid Item B. Doctors Pass | $ - 0 |
| Total Bid (Section A + Section B ) | $ - 0 |
| Notes: |
| I. Quantity is estimated; final quantity based on results of the pre-construction survey. |
| II. Includes replacement of removed markers or installation of new makers at Wiggins Pass (OWNER to provide materials). |
| III. Includes replacement of removed manatee markers or installation of new makers at Wiggins Pass (CONTRACTOR to provide materials). |
| IV. Includes removal and re-installation of markers temporarily removed for construction purposes at Doctors Pass |
| V. Includes measures to ensure sand placed on the beach greater than 0.5" diameter does not exceed 5% through the use of |
screen boxes, raking, and/or other means as determined by the contractor. (Ref. Technical Spec. 11.4)
VI. Potential debris from storms. (Re. Technical Spec. 8.3)
File details come from the government source that posted it. Updated .