26-27-11 ITB GKBTC Landscape.pdf
PDF 898 KB Posted
- Solicitation number
- 311-26-27-11
- Issued by
- Randolph County, North Carolina
About this file
Contract Summary
This Invitation to Bid (ITB #26-27-11) is issued by the City of Greenville, North Carolina, Facilities Operations Department, Building and Grounds Division for landscape and turf maintenance services at the GK Butterfield Transportation Center (GKBTC). The scope of work includes litter removal, clipping removal, mowing, weed trimming, pruning, fertilization, weeding, herbicide application, plant removal and replacement, mulch maintenance, edging, and leaf removal on a weekly maintenance cycle. A mandatory pre-bid meeting is scheduled for Tuesday, December 1, 2026 at 2:00 p.m. at the GKBTC conference room, with sealed bids due on Tuesday, December 15, 2026 at 2:00 p.m. at 600 S. Pitt Street, Greenville, NC. The contract period runs from approximately January 1, 2027 through June 30, 2030, with an option for the City to extend the contract annually for up to two additional years if both parties agree in writing, with renewals commencing on July 1st. Eligible contractors upon successful completion of year one may request a 3% annual increase for years two and three, subject to written request submitted at least 30 days prior to the renewal date and approval by the B&G Superintendent.
Payment is rendered monthly based on work completed in the previous month, with invoices due by the 10th of each month and City payment within 30 days of invoice approval. Contractors must provide worker's compensation insurance, commercial general liability coverage with minimum limits of $1,000,000 per occurrence and $2,000,000 aggregate, commercial automobile liability of $1,000,000 combined single limit, and must hold a valid North Carolina pesticide license and North Carolina landscape contractors license prior to award. The contractor must comply with all federal requirements including Title VI Civil Rights Act provisions, E-Verify employment verification, debarment and suspension certifications, DBE nondiscrimination provisions, and FTA-mandated terms and conditions. Bidders must submit three client references, contractor data forms, acknowledgement of any addenda, federal lobbying certifications, and E-Verify affidavits with their bids. The City reserves the right to reject any or all bids, waive informalities, modify service areas, and terminate the contract for convenience or default with 10 days to cure deficiencies.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Exhibit A
INVITATION TO BID
BID # 26-27-11
CITY OF GREENVILLE
FACILITIES OPERATIONS DEPARTMENT
BUILDING AND GROUNDS DIVISION
CONTRACT #15 LANDSCAPE/TURF MAINTENANCE
GK BUTTERFIELD TRANSPORTATION CENTER (GKBTC)
City of Greenville, North Carolina
Pre-Bid Meeting: Tuesday, December 1, 2026 at 2:00 pm GK Butterfield Transportation Center 600 S. Pitt Street, Greenville, NC
Bid Due Date: Tuesday, December 15, 2026 at 2:00 pm GK Butterfield Transportation Center 600 S. Pitt Street, Greenville, NC
Contact Persons:
Questions regarding the bid package: Questions regarding the specifications:
Wanda House Ross Peterson Financial Services Manager Project Coordinator Telephone: 252-329-4862 Telephone: 252-329-4570 Fax: 252-329-4464 Fax: 252-329-4844 Email: whouse@greenvillenc.gov Email: rpeterson@greenvillenc.gov
ADVERTISEMENT FOR BIDS
“CITY OF GREENVILE FACILITIES OPERATIONS DEPARTMENT
CONTRACT #15 LANDSCAPE/TURF MAINTENANCE
GK BUTTERFIELD TRANSPORTATION CENTER ”
The City of Greenville, NC is requesting bids for “Contract #15 Turf/Landscape Maintenance GK Butterfield Transportation Center” as listed below. The scope of work will include litter removal, clipping removal, mowing, weed trimming, pruning, fertilization, weeding, herbicide application, plant removal/replacement, mulch maintenance, and edging on each contract area per scope of work and specifications.
Contract # 15 – Weekly Cycle
• Turf/landscape maintenance at GK Butterfield Transportation Center
Sealed bids will be received by the City of Greenville until Tuesday, December 15, 2026 at 2:00 pm at the GK Butterfield Transportation Center office located at 600 S. Pitt Street, Greenville, NC 27835 with the Company Name, Attention: Ross Peterson, and the words Contract #15 GKBTC Landscape/Turf Maintenance Bid written on the outside of the sealed envelope. All bids will be marked with the date and time they are received by reception staff. Bids will not be opened and read aloud at this time but will be reviewed and contracts will be awarded at a later date.
A Pre-bid Conference will be held at the GK Butterfield Transportation Center conference room (second floor), located at 600 S. Pitt Street, on Tuesday, December 1, 2026 at 2:00 pm. The Pre-bid conference is mandatory for prospective bidders to attend. The City of Greenville reserves the right to reject any or all bids, waive any informality and award contracts that appear to be in its best interest. The right is reserved to hold any or all proposals for a period of ninety (90) days from the bid opening thereof.
From the date of this advertisement until the date of opening the proposals, and specifications of the proposed work and/or a complete description of the apparatus, supplies, materials or equipment are and will continue to be on file in the office of the Wanda House, Financial Services Manager, 201 W. Fifth Street, Greenville NC, or at the Facilities Operations Department located at 1500 Beatty Street, Greenville NC, during regular business hours, and available to prospective bidders. Inquiries regarding the bidding process or documents should be directed to the Financial Services Manager at whouse@greenvillenc.gov or by telephone (252) 329-4862.
Wanda House, Financial Services Manager City of Greenville P O Box 7207 Greenville, NC 27835-7207
INSTRUCTIONS TO CONTRACTORS
Proposal to Provide GK Butterfield Transportation Center Landscape and Turf Maintenance
Location: Greenville N.C.
1. Contractor is to provide verification to the City that the company’s employees are covered under worker’s compensation insurance coverage prior to award on this contract.
2. It is expressly understood by the contractor offering a bid, after a written notice of award by the City, a written contract will be required to be executed and will serve together with this proposal, these instructions, and any detailed specifications as the entire form of contract between the parties.
3. Each Contractor submitting a bid is affirming that no official or employee of the City is directly or indirectly interested in this proposal for any reason of personal gain.
4. Sales taxes may be listed on the proposal, but as a separate item. No charge will be allowed for Federal Excise and Transportation Tax from which the City is exempt.
5. Questions regarding the specifications, or mowing and landscape maintenance areas for Contract #15
GKBTC Landscape/Turf Maintenance contract, shall be directed by email to Ross Peterson, Project Coordinator at rpeterson@greenvillenc.gov.
6. By submitting a bid for the Contractor to provide the Contract #15 GKBTC Landscape/Turf
Maintenance contract, the Contractor attests that it is in compliance with all items listed in the bid/proposal instructions. Further, the Contractor attests that the City of Greenville accepts no responsibility for any injuries to the firm’s employees while on City property performing their duties.
7. Contractor shall comply with all local, state, federal laws, safety/regulatory requirements, and ordinances associated with the work within this contract.
8. It is expected that work would begin around January 1, 2026. However, such starting date is subject to change based on time needed to finalize the contract, the approval/signature process or other reasons.
9. No work will be performed at any time without proper supervision. Supervisors name and direct contact information shall be provided to Michael Davis, B&G Grounds Manager at mdavis@greenvillenc.gov
10. All City of Greenville facility mowing or landscaping, must be performed Monday
– Sunday during daylight hours.
11. The Contractor shall accompany a designated representative(s) of the City on inspections of work at any time during the contract period. The City reserves the right to make determinations as to whether service is performed satisfactorily.
Deficiencies in work performance must be corrected immediately.
12. The City reserves the right to add or delete similar items/services specified in the proposal as requirements change during the period of the contract. Prices for items/services to be added or deleted from contract will be mutually agreed upon by the City of Greenville and the Contractor. A contract amendment will be issued for each addition or deletion.
13. The Contractor shall NOT have the right to subcontract any part of its obligations and service requirements without the prior written authorization of the City. This authorization may be given by the B&G Superintendent or designee. If any part of this work under this agreement is sublet, the subcontractor shall be required to meet all insurance requirements set forth in the Agreement. The parties stipulate that the Company will maintain each type of insurance set forth in the Agreement at a coverage equal to the amount set forth for each type of insurance. However, nothing contained herein shall relieve the Company from meeting all insurance requirements or otherwise being responsible for the subcontractor.
14. The Contractor will need to show proof of a valid North Carolina pesticide license and North Carolina landscape contractors license for the Contract #15 GKBTC Landscape/Turf
Maintenance contract and include this information/documentation with the Bid package.
The remainder of this page intentionally left blank
FACILITIES OPERATIONDEPARTMENT
BUILDING AND GROUNDS DIVISION
SPECIFICATIONS FOR:
CONTRACT #15 GKBTC
LANDSCAPE/TURF MAINTENANCE
1.0 SCOPE:
1.1 The scope of work shall include litter removal, clipping removal, weed trimming, pruning, fertilization, weeding, herbicide application, edging, mowing, plant removal, mulch maintenance, and leaf removal for the GK Butterfield Transportation Center in this contract area per scope of work and specifications.
1.2 The total monthly bid amount shall be included on the attached Contract # 15 Request for Bids sheet as indicated.
2.0 GENERAL:
2.1 Areas of work are to be maintained on the frequency specified and started and completed within a week period (Monday-Sunday). Maintenance frequency is subject to change due to weather conditions such as drought or increased wet conditions.
2.2 All landscape bed maintenance and turf mowing shall be completed in a professional manner and shall conform to these specifications. The City reserves the right to make determinations as to whether service is performed satisfactorily. Deficiencies in work performance must be corrected immediately.
2.3 Failure of the contractor to meet or perform work to these specifications as determined by the
Facilities Operations Department shall warrant written notice to the contractor specifying areas of nonperformance or unacceptable performance and the contractor shall have ten (10) days to rectify. Immediate cancellation of the contract may occur if performance is not rectified in ten (10) days.
2.4 Within seven (7) days of notice to proceed, the contractor must be prepared to begin work on the awarded sites.
3.0 GK BUTTERFIELD TRANSPORTATION CENTER LANDSCAPE MAINTENANCE:
3.1 The contractor is expected to remove scattered debris, litter, animal waste, cigarette butts and limbs PRIOR to mowing and/or maintaining beds or tree rings, excluding material that has been illegally dumped. Contractor must notify Michael Davis, B&G Grounds Manager, with location of illegally dumped material.
3.2 The contractor is responsible for removing from each site, and properly disposing of, all tree limbs of six (6) inch in diameter and below.
3.3 The City will be responsible for hauling limbs larger than six (6) inches in diameter from all areas. Contractor must notify Michael Davis, B&G Grounds Manager, with location of limbs larger than six (6) inches in diameter.
3.4 Herbicide spraying WILL be allowed in these areas. Contractor must provide a copy of their North Carolina pesticide license via email to Michael Davis, B&G Grounds Manager, prior to award of contract. The Contractor must be licensed in the required categories for the specified work in this contract area.
3.5 Mechanical edging must be performed on each cycle along sidewalks, medians, curbs, along landscape beds and tree rings. Edging can be performed with mechanical edger or string trimmer.
3.6 Weed trimming must be performed around all poles, trees and signs.
3.7 Clippings and debris scattered into the streets from landscape maintenance must be removed immediately and before relocating to another work site. Do not blow debris into, or on, paved areas, storm drains, adjacent parking lots, vehicles, landscape beds, tree rings, or structures.
3.8 The City of Greenville reserves the right to reduce or add to the number of line item areas for any reason it deems necessary during the contract period. Any elimination or addition of areas will be communicated to the contractor in a timely manner. The bid price will be adjusted in the event of any elimination or addition of areas.
3.9 The contractor shall avoid performing landscape bed maintenance or mowing under extremely wet conditions where heavy equipment or vehicles could rut the soil. Notify Michael Davis, B&G Grounds Manager, in the event that a site is too wet to maintain.
3.10 All turf areas will be finished mowed at two and one-half (2.5) inches in height. All turf areas must be mowed with push mowers. Turf shall be mowed at a different mowing direction each mowing cycle in order to reduce soil compaction and wear injury in mower wheel tracks.
3.11 Contractor must not park on any median and/or affect normal traffic flow along designated streets.
3.12 The following landscape maintenance services shall be provided by the contractor for:
• Pruning of Shrubs/Groundcovers
1. Shrubs and groundcovers must be trimmed in the appropriate manner for type of plant material and landscape design at appropriate times for the plant.
2. A pruning plan will be developed by the City and Contractor prior to pruning of shrubs and groundcovers within this contract.
3. Pruning of shrubs should be monthly to maintain the planned design for plantings.
4. Pruning will include deadheading of perennials and removal of dead stalks, or leaves at least one time per month.
5. Cut back perennials and groundcovers as species requires prior to spring growing season.
6. Liriope must be cut back in February. Cut back Liriope in a manner to avoid damaging the crown of
Liriope and remove all clippings and debris immediately after pruning.
7. Shrubs and groundcovers must be trimmed to avoid encroachment of the curb, streets, or sight lines.
8. Remove each cycle any dead, dying, or damaged shrub limbs.
• Pruning of trees
1. Trees must be trimmed in the appropriate manner and time for type of plant material and landscape design one time per year or as directed.
2. Pruning as directed is defined as direction from the City to prune in the case of safety concerns, low limbs, damage to the plant, or other reasons determined by the City.
3. A pruning plan will be developed by the City and Contractor prior to beginning pruning of trees within this contract.
4. Contractor is only responsible for lower limbs of large canopy trees to maintain clearance from the ground, sidewalks, streets, ornamental plantings and for safety considerations.
5. Water sprouts or suckers must be removed from trees within the contract at least one time per month from March to November.
6. Remove each cycle any dead, diseased, dying tree limbs within the contract area for trees contractually responsible for.
• Litter Cleanup
1. Litter cleanup includes pickup of litter, animal waste, cigarette butts and debris within the landscape beds, tree rings, and turf areas within the contract area prior to each mowing. Any waste created by the Contractor will be hauled off and properly disposed of. This includes, but is not limited to plant clippings, dead plants, general trash and other debris.
2. Litter removal and trash can liners in the trash containers are not included as part of this contract.
• Mowing
1. Edging, utilizing a mechanical edger or string trimmer, shall be completed weekly.
2. Mowing height shall be 2 ½ inches.
3. Mowing will be required in all designated areas shown on the maps for GK Butterfield
Transportation Center. Maps are attached.
4. Mowing must occur weekly during the mowing season for GK Butterfield Transportation Center and as needed or as directed by the City during winter months for immediate aesthetic improvement.
5. All mulched areas, including tree rings, must not be damaged from mowing operations. Damage to mulched areas must be repaired immediately and prior to relocating another work site.
6. Weed trimming must be completed around all signs, trees, poles, and along fenced areas weekly.
• Annuals (Various locations)
1. Annuals will be planted three (3) times per year per the following schedule:
-May 1 through May 10 (Summer annuals) -1st full week of October (Fall Chrysanthemums) -1st full week of November (Winter annuals)
2. Beds will be hand weeded upon each weekly visit or at the discretion of the City.
3. An annual planting plan will be developed by the City and the Contractor prior to installation of annuals within this contract.
4. Contractor will need to water the annuals around the sign as needed to maintain plants in continual peak condition year round.
5. Annual beds shall be mulched upon completion of each new planting.
6. Contractor will replace plants as needed due to damage or plants dying to ensure the annual plant beds are always in peak condition.
• Weed Control
1. The contractor must provide a copy of their valid pesticide license(s) and be licensed in the correct categories for pesticide application within this contract area prior to award of contract.
2. All pesticides proposed to be applied within this contract area must be approved in advance by Ross
Peterson, Project Coordinator.
3. Hand weed control will be necessary for prevention of plant damage or for immediate visual improvement.
4. Must maintain all concrete areas, sidewalks, concrete medians, rock area in mechanical yard, and curb lines free of vegetation, grass or weed growth.
5. Spray bands around poles, signs, beds or along sidewalks or curbs are NOT permitted.
6. Judicious herbicide spraying of the turf shall occur using the appropriate means and methods to achieve a weed free, vibrant and dense stand of turf.
• Mulch Bed Maintenance
1. The contractor will rake mulch in landscape beds and tree rings during maintenance activities one time per month where bare areas exist to ensure coverage of bed areas with mulch. At least once per year, the Contractor must turn over all the mulch in all the beds with a small mechanical tiller.
2. Leaves must be removed from tree rings or beds during leaf fall periods at least every two weeks.
3. Mulch shall not be raked against trunks of trees or base of shrubs but must be tapered to ground level at base of plants.
• Fertilization
1. The City and Contractor will develop a fertilization plan for this project.
2. The slow release fertilizer, all labor and equipment to apply fertilizer to shrubs, trees, and groundcovers one time per year at a rate of 1 pound of Nitrogen per 1,000 square feet will be included in the monthly bid price.
3. Fertilization of trees, shrubs, perennials, groundcovers and turf are included in this contract.
4. The timeline for fertilizing the landscape beds with slow release fertilizer will be during the months of March or April.
5. The turf areas will be fertilized once with slow release fertilizer in March or April and again in July at a rate of 1 pound of Nitrogen per 1,000 square feet.
6. All fertilizer applications will be discussed and coordinated with the City prior to application.
• Dead or Damage Shrub Removal
1. The contractor should remove all dead plants during each maintenance visit and notify Ross Peterson, Project Coordinator, of plants removed. The contractor shall, if notified by the City, remove any dead plants within five (5) working days of notification if between maintenance visits. Repair of the area the plant was removed from will be required prior to contractor leaving the contract area or if supplies are needed within the same day of removal.
• Leaf Removal
1. Leaves must be removed from turf, tree rings, and landscape bed areas weekly during periods of leaf drop. Timing will depend on plant or tree variety.
2. Leaves collected shall be disposed of properly. Mulching of leaves when minimal is acceptable as long as this does not create visible thatch.
Notes:
• Insect or disease control for plantings will not be provided by contractor but the contractor shall notify Michael Davis, B&G Grounds Manager, within 24 hours if detected.
• The contractor will be required to submit a maintenance plan in writing via email to Michael Davis at mdavis@greenvillenc.gov by the 20th of each month for the upcoming month. The City will respond with any questions, comments, or concerns prior to the end of the month the maintenance plan is submitted. The maintenance plan must have the following components at a minimum:
o Pruning plan o Fertilization plan including listing of materials proposed to be used o Herbicide application plan including herbicides proposed to be used o Other planned work such as mulching, edging or leaf removal o Report of previous month maintenance notes
4.0 PAYMENT AND BID:
4.1 The contract period will be from approximately January 1, 2027 to June 30, 2030. The City reserves the right to extend the contract annually for up to a total of two (2) additional years if the City and contractor agree in writing starting annually on July 1st and ending the last day of June. Upon successful completion of year one
(1) of this contract, per specifications and directives, and at the written request by the Contractor at least 30 days prior to the renewal date of this contract, the Contractor may be eligible for a 3% annual increase for year two (2) and year three (3). Each request MUST be in writing and submitted at least 30 days prior to the contract renewal date for each year of the request in order to receive the 3% increase. This request for increase will be reviewed and approved by the Superintendent of B&G (or their Designee) and the Contractor will be notified in writing of these changes.
4.2 Payment will be made by the City to the contractor on a monthly basis for the work completed within the previous month. The invoice is expected prior to the 10th of each month. This contract will be billed monthly throughout the year during the contract period. The City will render payment within thirty days of receipt of an approved invoice.
4.3 Bidders will comply with all local, state, and federal laws and ordinances governing said work including the current Occupational Safety and Health regulations.
4.4 By submitting a proposal, the firm is attesting that they are an Equal Opportunity Employer.
4.5 The City of Greenville has adopted an Affirmative Action Program. Firms submitting a proposal are attesting that they also have taken affirmative action to insure equality of opportunity in all aspects of employment.
4.6 The attached bid sheet details the bid entries required. Each contract bid sheet line item shall be filled in as directed.
4.8 Bidder, its assignees and successors in interest, further agrees that in the performance of these services that it shall comply with the requirements of Title VI of the Civil Rights Act of 1964 and other pertinent Nondiscrimination Authorities, as cited in Attachment “A” to this Agreement, and will not discriminate in its hiring, employment, and contracting practices in any manner or form based on actual or perceived political affiliation, genetic information, sexual orientation, age, sex, race, color, religion, marital status, veteran status, economic status, national origin, handicap or disability.
4.9 TITLE VI NONDISCRIMINATION NOTIFICATION
The City of Greenville, North Carolina in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 US.C. §§ 2000d to 2000d-4) and the Regulations, hereby notifies all respondents that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit proposals in response to this advertisement and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award.
4.10 The City of Greenville reserves the right to reject any and all bids, to waive any informalities and to accept the bid if it seems most advantageous to the City. Any bid submitted will be binding for ninety
(90) days after the date of the bid opening.
4.11 Contractor must register with the City of Greenville’s online portal at the following web address https://cityofgreenvillenc.munisselfservice.com/vss or update an existing profile as required upon acceptance of mowing contract.
5.0 WORKERS COMPENSATION AND INSURANCE:
5.1 The contractor must maintain during the life of this contract, Worker’s Compensation Insurance for all employees working at the project site under this contract, or as otherwise required by North Carolina General Statutes.
5.2 The Consultant/Contractor agrees to purchase at its own expense insurance coverages to satisfy the following minimum requirements. Work under this contract shall not commence until all insurance required as listed has been obtained. Insurance required shall remain in effect through the life of this contract.
a. Workers’ Compensation Insurance: No contractor or subcontractor may exclude executive officers.
Workers’ Compensation must include all employees
Limits:
Workers’ Compensation: Statutory for the State of North Carolina.
Employers Liability: Bodily Injury by Accident $1,000,000 each accident.
Bodily Injury by Disease $1,000,000 policy limit.
Bodily Injury by Disease $1,000,000 each employee.
b. Commercial General Liability:
Limits:
Each Occurrence: $1,000,000 Personal and Advertising Injury $1,000,000 General Aggregate Limit $2,000,000
Products and Completed Operations Aggregate $2,000,000
The aggregate limit must apply per project. The form of coverage must be the ISO CG 00 01 policy as approved by the State of North Carolina Department of Insurance. If a form of coverage other than the CG 00 01 is used it must be approved by the City. Any endorsed exclusions or limitations from the standard policy must be clearly stated in writing and attached to the Certificate of Insurance. Completed Operations coverage must be maintained for the period of the applicable statute of limitations. Additionally, the Consultant/Contractor must be added as an Additional Insured to the Commercial General Liability policy.
c. Commercial Automobile Liability:
Limits: $1,000,000 combined single limit.
d. Cancellation:
Each certificate of insurance shall bear the provision that the policy cannot be altered or canceled in less than ten (10) days after mailing written notice to the assured of such alteration or cancellation, sent registered mail.
e. Proof of Carriages:
i. The Consultant/Contractor shall provide the City with insurance industry standard ACCORD form Certificate(s) of Insurance on all policies of insurance and renewals thereof in a form(s) acceptable to the City prior to the commencement of services. Said policies shall provide that the City be an additional named insured.
ii. The City shall be notified in writing of any reduction, cancellation, or substantial change of policy or policies at least thirty (30) days prior to the effective date of said action.
iii. All insurance policies shall be issued by responsible companies who are acceptable to the City and licensed and authorized to do business under the laws of North Carolina.
5.3 The contractor shall furnish such additional insurance as may be required by the General Statues of
North Carolina, including motor vehicle insurance in amounts not less than statutory limits.
5.4 Executed contract documents, insurance certifications, invoices and other information requested, are to be sent to:
Michael Davis B&G Grounds Manager
City of Greenville Facilities Operations Department Buildings and Grounds Division 1500 Beatty Street Greenville, N.C. 27834 Email: mdavis@greenvillenc.gov
6.0 DAMAGE TO CONTRACTORS’ PROPERTY:
6.1 Should fire, theft, vandalism or other casualty, damage or destroy the equipment or property belonging to the Contractor while on City property, the City shall be under no obligation to replace or in any way compensate the contractor for said property.
6.2 The successful bidder agrees to indemnify or hold harmless City from and against any liability, loss, cost, damage suit, claim, or expense arising occurrence on the part of the successful bidder to include its officers, servants, agents or employees arising from its activities, operations, and performance of services while on City property and further agrees to release and discharge City and its Agents from all claims or liabilities arising from or caused by the successful bidder in fulfilling its obligations under this Agreement.
6.3 It is understood and agreed by the parties that City will assume no liability for damages, injury, or other loss to the successful bidder, its employees or property, tools or equipment, or to other persons or properties located on City facilities resulting from the successful bidder’s activities and operations while performing those service enumerated herein.
6.4 The successful bidder shall assume full and complete liability for any and all damages to building improvements, fences, or other City or private properties caused by or resulting from its activities, operations, and that of its employees, agents and officers.
7.0 AMENDMENTS, ADDENDA, OR QUESTIONS:
7.1 Addendum: Any changes to the specifications will be issued as a written addendum. No oral statements, explanations, or commitments by whosoever shall be of any effect. Any issued addenda will be posted on the City’s bid advertisement site. The contractor must acknowledge reading each addendum on the bid sheet.
7.2 Amendment: The contract may be amended from time to time through written agreement by both parties.
7.3 Questions: Any questions regarding these bid specifications must be sent by email to rpeterson@greenvillenc.gov
7.4 Schedule for questions and addenda:
Last date to submit a question: Tuesday, December 8, 2026; by 5:00 p.m. Questions will be answered via addendum posted on the City’s website answered by: Thursday, December 10, 2026; by 5:00 p.m.
8.0 E-VERIFY COMPLIANCE:
8.1 The Contractor shall comply with the requirements of Article 2 of Chapter 64 of the North Carolina General Statutes. Further, if the Contractor utilizes a Subcontractor, the Contractor shall require the Subcontractor to comply with the requirements of Article 2 of Chapter 64 of the North Carolina General Statutes. The Contractor represents that the Contractor and its Subcontractors are in compliance with the requirements of Article 2 of Chapter 64 of the North Carolina General Statutes.
8.2 BIDDER acknowledges that compliance with the requirements of Article 2 of Chapter 64 of the North Carolina General Statutes is required by the Contractor and its Subcontractors by North Carolina law and the provisions of the Contract Documents. The BIDDER represents that the BIDDER and its Subcontractors are in compliance with the requirements of Article 2 of Chapter 64 of the North Carolina General Statutes.
9.0 IRAN DIVESTMENT ACT:
9.1 Vendor certifies that it is not on the Iran Final Divestment List created by the North Carolina State Treasurer pursuant to N.C.G.S. 147-86.58. The vendor will not utilize on the contract any subcontractor that is listed on the Iran Final Divestment List created by the North Carolina State Treasurer pursuant to N.C.G.S. 147-86.58.
10.0 NON-COLLUSION:
10.1 Respondents, by submitting a signed proposal, certify that the accompanying submission is not the result of, or affected by, any unlawful act of collusion with any other person or company engaged in the same line of business or commerce, or any other fraudulent act punishable under North Carolina or United States law.
11.0 WITHDRAWAL OF PROPOSALS:
11.1 No bid/proposal may be changed or withdrawn after the stated time and date for submittal.
Bids/proposals submitted shall be binding for ninety (90) days after the date of submittal.
12.0 REFERENCE INFORMATION:
12.1 All bidders must provide a list of three (3) client references of similar turf and maintenance projects. The reference information must include the company’s name, a contact person’s name with his or her title and their telephone number. Please provide the information on the “Contractor Reference Information” sheet and attach with the bid sheet.
13.0 CONTRACTOR INFORMATION:
13.1 Please provide the information on the “Contractor Data Form” and attach with the bid sheet. All information should be accurate and detailed in description.
14.0 SPECIAL CONDITIONS (FEDERAL):
ACCESS TO RECORDS AND REPORTS
1. Record Retention. The Contractor will retain and will require its subcontractors of all tiers to retain, complete and readily accessible records related in whole or in part to the contract, including, but not limited to, data, documents, reports, statistics, leases, subcontracts, arrangements, other third-party Contracts of any type, and supporting materials related to those records.
2. Retention Period. The Contractor agrees to comply with the record retention requirements in accordance with 2 C.F.R. § 200.334. The Contractor shall maintain all books, records, accounts and reports required under this Contract for a period of at not less than three (3) years after the date of termination or expiration of this Contract, except in the event of litigation or settlement of claims arising from the performance of this Contract, in which case records shall be maintained until the disposition of all such litigation, appeals, claims or exceptions related thereto.
3. Access to Records. The Contractor agrees to provide sufficient access to FTA and its contractors to inspect and audit records and information, including such records and information the contractor or its subcontractors may regard as confidential or proprietary, related to performance of this contract in accordance with 2 CFR § 200.337.
4. Access to the Sites of Performance. The Contractor agrees to permit FTA and its contractors’ access to the sites of performance under this contract in accordance with 2 CFR § 200.337.
CONFORMANCE WITH ITS NATIONAL ARCHITECTURE
Intelligent Transportation Systems (ITS) projects shall conform to the National ITS Architecture and standards pursuant to 23 CFR § 940. Conformance with the National ITS Architecture is interpreted to mean the use of the National ITS Architecture to develop a regional ITS architecture in support of integration and the subsequent adherence of all ITS projects to that regional ITS architecture. Development of the regional ITS architecture should be consistent with the transportation planning process for Statewide and Metropolitan Transportation Planning (49 CFR Part 613 and 621).
CHANGES TO FEDERAL REQUIREMENTS
Federal requirements that apply to the Recipient or the Award, the accompanying Underlying Agreement, and any Amendments thereto may change due to changes in federal law, regulation, other requirements, or guidance, or changes in the Recipient’s Underlying Agreement including any information incorporated by reference and made part of that Underlying Agreement; and
Applicable changes to those federal requirements will apply to each Third Party Agreement and parties thereto at any tier.
FEDERAL TAX LIABILITY AND RECENT FELONY CONVICTIONS
(1) The contractor certifies that it:
(a) Does not have any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability; and
(b) Was not convicted of the felony criminal violation under any Federal law within the preceding 24 months.
If the contractor cannot so certify, the Recipient will refer the matter to FTA and not enter into any Third Party Agreement with the Third Party Participant without FTA’s written approval.
(2) Flow-Down. The Recipient agrees to require the contractor to flow this requirement down to participants at all lower tiers, without regard to the value of any sub agreement.
CIVIL RIGHTS LAWS AND REGULATIONS
The following Federal Civil Rights laws and regulations apply to all contracts.
The Contractor and any subcontractor agree to comply with all the requirements prohibiting discrimination on the basis of race, color, or national origin of the Title VI of the Civil Rights Action of 1964, as amended 52 U.S.C 2000d, and U.S. DOT regulation “Nondiscrimination in Federally-Assisted Programs of the Department of Transportation – Effectuation of the Title VI of the Civil rights Act, “49 C.F. R. Part 21 and any implementing requirement FTA may issue.
1 Federal Equal Employment Opportunity (EEO) Requirements. These include, but are not limited to:
a) Nondiscrimination in Federal Public Transportation Programs. 49 U.S.C. § 5332, covering projects, programs, and activities financed under 49 U.S.C. Chapter 53, prohibits discrimination on the basis of race, color, religion, national origin, sex (including sexual orientation), disability, or age, and prohibits discrimination in employment or business opportunity.
b) Prohibition against Employment Discrimination. Title VII of the Civil Rights Act of 1964, as amended, 42 U.S.C. § 2000e, Title VI of the Civil Rights Act of 1964,” 49 CFR Part 21, and 49 U.S.C. § 5332, prohibits discrimination in employment on the basis of race, color, religion, sex, or national origin.
2 Nondiscrimination on the Basis of Sex. Title IX of the Education Amendments of 1972, as amended, 20 U.S.C. § 1681 et seq. and implementing Federal regulations, “Nondiscrimination on the Basis of Sex in Education Programs or Activities Receiving Federal Financial Assistance,” 49 C.F.R. part 25 prohibit discrimination on the basis of sex.
3 Nondiscrimination on the Basis of Age. The “Age Discrimination Act of 1975,” as amended, 42 U.S.C. § 6101 et seq., and Department of Health and Human Services implementing regulations, “Nondiscrimination on the Basis of Age in Programs or Activities Receiving Federal Financial Assistance,” 45 C.F.R. part 90, prohibit discrimination by participants in federally assisted programs against individuals on the basis of age. The Age Discrimination in Employment Act (ADEA), 29 U.S.C. § 621 et seq., and Equal Employment Opportunity Commission (EEOC) implementing regulations, “Age Discrimination in
Employment Act,” 29 C.F.R. part 1625, also prohibit employment discrimination against individuals age 40 and over on the basis of age.
4 Federal Protections for Individuals with Disabilities. The Americans with Disabilities Act of 1990, as amended (ADA), 42 U.S.C. § 12101 et seq., prohibits discrimination against qualified individuals with disabilities in programs, activities, and services, and imposes specific requirements on public and private entities. Third party contractors must comply with their responsibilities under Titles I, II, III, IV, and V of the ADA in employment, public services, public accommodations, telecommunications, and other provisions, many of which are subject to regulations issued by other Federal agencies.
Civil Rights and Equal Opportunity The Agency is an Equal Opportunity Employer. As such, the Agency agrees to comply with all applicable Federal civil rights laws and implementing regulations. Apart from inconsistent requirements imposed by Federal laws or regulations, the Agency agrees to comply with the requirements of 49 U.S.C.
§ 5323(h) (3) by not using any Federal assistance awarded by FTA to support procurements using exclusionary or discriminatory specifications. Under this Contract, the Contractor shall at all times comply with the following requirements and shall include these requirements in each subcontract entered into as part thereof.
1. Nondiscrimination. In accordance with Federal transit law at 49 U.S.C. § 5332, the Contractor agrees that it will not discriminate against any employee or applicant for employment because of race, color, religion, national origin, sex, disability, or age. In addition, the Contractor agrees to comply with applicable Federal implementing regulations and other implementing requirements FTA may issue.
2. Equal Employment Opportunity. In accordance with Title VII of the Civil Rights Act, as amended, 42 U.S.C. § 2000e et seq., Title I of the Americans with Disabilities Act of 1990, as amended, 42 U.S.C. §§ 12101, et seq.; and Federal transit laws at 49 U.S.C. § 5332, the Contractor agrees to comply with all applicable equal employment opportunity requirements, without regard to their race, color, religion, national origin, or sex (including sexual orientation). In addition, the Contractor agrees to comply with any implementing requirements FTA may issue.
3. Age. In accordance with the Age Discrimination in Employment Act, 29 U.S.C. §§ 621-634, U.S.
Equal Employment Opportunity Commission (U.S. EEOC) regulations, “Age Discrimination in Employment Act,” 29 C.F.R. part 1625, the Age Discrimination Act of 1975, as amended, 42 U.S.C. § 6101 et seq., U.S. Health and Human Services regulations, “Nondiscrimination on the Basis of Age in Programs or Activities Receiving Federal Financial Assistance,” 45 C.F.R. part 90, and Federal transit law at 49 U.S.C. § 5332, the Contractor agrees to refrain from discrimination against present and prospective employees for reason of age. In addition, the Contractor agrees to comply with any Implementing requirements FTA may issue.
4. Disabilities. In accordance with section 504 of the Rehabilitation Act of 1973, as amended, 29 U.S.C.
§ 794, the Americans with Disabilities Act of 1990, as amended, 42 U.S.C. § 12101 et seq., the Architectural Barriers Act of 1968, as amended, 42 U.S.C. § 4151 et seq., and Federal transit law at 49 U.S.C. § 5332, the Contractor agrees that it will not discriminate against individuals on the basis of disability. In addition, the Contractor agrees to comply with any implementing requirements FTA may issue.
5. Federal Law and Public Policy Requirements. The Contractor shall ensure that Federal funding is expended in full accordance with the U.S. Constitution, Federal Law, and statutory and public policy requirements: including, but not limited to, those protecting free speech, religious liberty, public welfare, the environment, and prohibiting discrimination.
DEBARMENT AND SUSPENSION
Debarment and Suspension (Executive Orders 12549 and 12689). A covered transaction (see 2 C.F.R. §§ 180.220 and 1200.220) must not be entered into with any party listed on the governmentwide exclusions in the System for Award Management (SAM), in accordance with the OMB guidelines at 2 C.F.R. 180 that implement Executive Orders 12549 (31 U.S.C. § 6101 note, 51 Fed. Reg. 6370,) and 12689 (31 U.S.C. § 6101 note, 54 Fed. Reg. 34131), “Debarment and Suspension.” SAM Exclusions contains the names of parties debarred, suspended, or otherwise excluded by agencies, as well as parties declared ineligible under statutory or regulatory authority other than Executive Order 12549. The Recipient agrees to include, and require each Third Party Participant to include, a similar provision in each lower tier covered transaction, ensuring that each lower tier Third Party Participant:
(1) Complies with federal debarment and suspension requirements; and
(2) Reviews the SAM at https://www.sam.gov, if necessary to comply with U.S. DOT regulations, 2 CFR Part 1200.
DISADVANTAGED BUSINESS ENTERPRISE (DBE)
(Does not apply to projects fully funded by the Tribal Transportation Program (TTP).)
It is the policy of the Agency and the United States Department of Transportation ("DOT") that Disadvantaged Business Enterprises ("DBE’s"), as defined herein and in the Federal regulations published at 49 C.F.R. part 26, shall have an equal opportunity to participate in DOT-assisted contracts.
The contractor or subcontractor shall not discriminate on the basis of race, color, national origin, or sex in the performance of this contract. The contractor shall carry out applicable requirements of 49 C.F.R. part 26 in the award and administration of DOT-assisted contracts. Failure by the contractor to carry out these requirements is a material breach of this contract, which may result in the termination of this contract or such other remedy as the Agency deems appropriate, which may include, but is not limited to:
(1) Withholding monthly progress payments;
(2) Assessing sanctions;
(3) Liquidated damages; and/or
(4) Disqualifying the contractor from future bidding as non-responsible. 49 C.F.R. § 26.13(b).
Prime contractors are required to pay subcontractors for satisfactory performance of their contracts no later than 30 days from receipt of each payment the Agency makes to the prime contractor. 49 C.F.R. § 26.29(a).
Finally, for contracts with defined DBE contract goals, the contractor shall utilize the specific DBEs listed unless the contractor obtains the Agency’s written consent; and that, unless the Agency’s consent is provided, the contractor shall not be entitled to any payment for work or material unless it is performed or supplied by the listed DBE. 49 C.F.R. § 26.53(f) (1).
DOMESTIC PREFERENCES FOR PROCUREMENTS
a. The recipient or subrecipient should, to the greatest extent practicable and consistent with law, provide a preference for the purchase, acquisition, or use of goods, products, or materials produced in the United States (including but not limited to iron, aluminum, steel, cement, and other manufactured products).
The requirements of this section must be included in all subawards, contracts, and purchase orders under Federal awards.
b. For purposes of this section:
(1) "Produced in the United States" means, for iron and steel products, that all manufacturing processes, from the initial melting stage through the application of coatings, occurred in the United States.
(2) "Manufactured products" means items and construction materials composed in whole or in part of non-ferrous metals such as aluminum; plastics and polymer-based products such as polyvinyl chloride pipe; aggregates such as concrete; glass, including optical fiber; and lumber.
c. Federal agencies providing Federal financial assistance for infrastructure projects must implement the Buy America preferences set forth in 2 CFR 184.
ENERGY CONSERVATION
The contractor agrees to comply with mandatory standards and policies relating to energy efficiency, which are contained in the state energy conservation plan issued in compliance with the Energy Policy and Conservation Act (42 U.S.C.§ 6201).
FLY AMERICA
a) Definitions. As used in this clause—
1) “International air transportation” means transportation by air between a place in the United States and a place outside the United States or between two places both of which are outside the United States. 2) “United States” means the 50 States, the District of Columbia, and outlying areas. 3) “U.S.-flag air carrier” means an air carrier holding a certificate under 49 U.S.C. Chapter 411.
b) When Federal funds are used to fund travel, Section 5 of the International Air Transportation Fair Competitive Practices Act of 1974 (49 U.S.C. 40118) (Fly America Act) requires contractors, Agencys, and others use U.S.-flag air carriers for U.S. Government-financed international air transportation of personnel (and their personal effects) or property, to the extent that service by those carriers is available. It requires the Comptroller General of the United States, in the absence of satisfactory proof of the necessity for foreign-flag air transportation, to disallow expenditures from funds, appropriated or otherwise established for the account of the United States, for international air transportation secured aboard a foreign-flag air carrier if a U.S.-flag air carrier is available to provide such services.
c) If available, the Contractor, in performing work under this contract, shall use U.S.-flag carriers for international air transportation of personnel (and their personal effects) or property.
d) In the event that the Contractor selects a carrier other than a U.S.-flag air carrier for international air transportation, the Contractor shall include a statement on vouchers involving such transportation essentially as follows:
Statement of Unavailability of U.S.-Flag Air Carriers International air transportation of persons (and their personal effects) or property by U.S.-flag air carrier was not available or it was necessary to use foreign-flag air carrier service for the following reasons. See FAR §
47.403. [State reasons]:
e) Contractor shall include the substance of this clause, including this paragraph (e), in each subcontract or purchase under this contract that may involve international air transportation.
INCORPORATION OF FEDERAL TRANSIT ADMINISTRATION (FTA) TERMS
The provisions within include, in part, certain Standard Terms and Conditions required under the Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards (2 CFR § 200), whether or not expressly set forth in the preceding contract provisions. All contractual provisions required by DOT, detailed in 2 CFR § 200 or as amended by 2 CFR § 1201, or the most recent version of FTA Circular
4220.1 are hereby incorporated by reference. Anything to the contrary herein notwithstanding, all mandated terms shall be deemed to control in the event of a conflict with other provisions contained in this Contract.
The Contractor shall not perform any act, fail to perform any act, or refuse to comply with any request which would cause a violation of the FTA terms and conditions.
NO GOVERNMENT OBLIGATION TO THIRD PARTIES
The Recipient and Contractor acknowledge and agree that, notwithstanding any concurrence by the Federal Government in or approval of the solicitation or award of the underlying Contract, absent the express written consent by the Federal Government, the Federal Government is not a party to this Contract and shall not be subject to any obligations or liabilities to the Recipient, Contractor or any other party (whether or not a party to that contract) pertaining to any matter resulting from the underlying Contract. The Contractor agrees to include the above clause in each subcontract financed in whole or in part with Federal assistance provided by the FTA. It is further agreed that the clause shall not be modified, except to identify the subcontractor who will be subject to its provisions.
NOTICE TO FTA AND U.S. DOT INSPECTOR GENERAL OF INFORMATION RELATED TO
FRAUD, WASTE, ABUSE, OR OTHER LEGAL MATTERS
If a current or prospective legal matter that may affect the Federal Government emerges, the Recipient must promptly notify the FTA Chief Counsel and FTA Regional Counsel for the Region in which the Recipient is located. The Recipient must include a similar notification requirement in its Third Party Agreements and must require each Third Party Participant to include an equivalent provision in its subagreements at every tier, for any agreement that is a “covered transaction” according to 2 C.F.R. §§ 180.220 and 1200.220.
(1) The types of legal matters that require notification include, but are not limited to, a major dispute, breach, default, litigation, or naming the Federal Government as a party to litigation or a legal disagreement in any forum for any reason.
(2) Matters that may affect the Federal Government include, but are not limited to, the Federal Government’s interests in the Award, the accompanying Underlying Agreement, and any Amendments thereto, or the Federal Government’s administration or enforcement of federal laws, regulations, and requirements.
(3) The Recipient must promptly notify the U.S. DOT Inspector General in addition to the FTA Chief Counsel or Regional Counsel for the Region in which…