26-27-03 Peppermint Park Project Manual.pdf
PDF 1 MB Posted
- Solicitation number
- 311-26-27-03
- Issued by
- Randolph County, North Carolina
About this file
Summary
This is a Project Manual and Specifications document issued by the City of Greenville, North Carolina for the Peppermint Park Parking Lot Paving project (Contract No. 4676, TEG Project No. 20260009). The project involves the installation of asphalt paving in a parking lot located in Greenville, NC 27858. The manual was issued for bid on July 14, 2026, with detailed specifications organized into divisions covering general requirements, earthwork, and exterior improvements including asphalt paving, concrete paving, and landscaping elements. The specifications require contractors to coordinate construction operations through preconstruction conferences, weekly progress meetings, and Owner-Architect-Contractor (OAC) meetings held at intervals determined prior to construction. Submittals must include product data, shop drawings, and samples submitted in digital PDF format where possible, with a 21-day processing period for initial submittals and resubmittals. The project encompasses site clearing, erosion control, earthwork preparation, base course installation, and final asphalt paving with compaction requirements of 98 percent maximum dry unit weight under pavements.
The specifications detail extensive execution requirements including construction layout performed by a professional land surveyor, field measurements and verification of existing conditions, dewatering procedures, and excavation tolerances of plus or minus one-half inch for pavements. Backfill and fill materials must meet specific ASTM classifications with satisfactory soil materials free of debris and deleterious matter. The contractor bears all expenses resulting from substitutions and must submit detailed comparison data, cost information, and performance certifications for any proposed product substitutions. Project closeout procedures require submission of Project Record Documents, operation and maintenance manuals, warranties organized in three-ring binders, final cleaning to commercial standards, and instruction of Owner's personnel in system operation and maintenance. The document establishes a formal change order process through Change Proposal Requests (CPR) and requires the contractor to waive claims for additional costs related to accepted substitutions that subsequently prove inadequate.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 26-27-03 Peppermint Park Parking Lot Plans.pdf | ||
| 26-27-03-Asphalt Parking Lot-Peppermint Park.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF GREENVILLE
RECREATION AND PARKS
PEPPERMINT PARK
PARKING LOT PAVING
Greenville, NC 27858
PROJECT SPECIFICATIONS
TEG PROJECT NO. 20260009
Issue for Bid July 14, 2026
324 Evans Street Greenville, NC 27858
Tel (252) 758-3746 www.eastgroup.com
NC Engineering License No. C-0206 NC Landscape Architectural License No. C-427
City of Greenville 07.14.26 Peppermint Park Parking Lot Paving Issue for Bid Contract No. 4676
Table of Contents Page 1 of 1
TABLE OF CONTENTS
Professional Seal Sheet
DIVISION 1 - GENERAL REQUIREMENTS
01310 Project Management and Coordination 01315 Project Meetings 01330 Submittal Procedures 01631 Product Substitutions 01700 Execution Requirements 01731 Cutting and Patching 01732 Selective Demolition 01770 Closeout Procedures
DIVISIONS 2 thru 30 & 33 – Not Used
DIVISION 31 – EARTHWORK
31 00 00 Earthwork 31 10 00 Site Clearing 31 25 00 Erosion and Pollution Control
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 12 00 Asphalt Paving 32 13 00 Concrete Paving 32 92 20 Fertilizer Seeding Mulch and Sod
END OF TABLE OF CONTENTS
Contract No. 4676
Project Management and Coordination Page 1 of 4
SECTION 01310 - PROJECT MANAGEMENT AND COORDINATION
PART 1 - GENERAL
1.1 SUMMARY
A. This Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:
1. General Project coordination procedures.
2. Coordination Drawings.
3. Project meetings.
1.2 COORDINATION
A. Coordination: Coordinate construction operations included in various Sections of the Specifications to ensure efficient and orderly installation of each part of the Work. Coordinate construction operations, included in different Sections, that depend on each other for proper installation, connection, and operation.
1. Schedule construction operations in sequence required to obtain the best results where installation of one part of the Work depends on installation of other components, before or after its own installation.
2. Coordinate installation of different components with other contractors to ensure maximum accessibility for required maintenance, service, and repair.
3. Make adequate provisions to accommodate items scheduled for later installation.
B. If necessary, prepare memoranda for distribution to each party involved, outlining special procedures required for coordination. Include such items as required notices, reports, and list of attendees at meetings.
1. Prepare similar memoranda for Owner and separate contractors if coordination of their Work is required.
C. Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other construction activities and activities of other contractors to avoid conflicts and to ensure orderly progress of the Work. Such administrative activities include, but are not limited to, the following:
1. Preparation of Contractor's Construction Schedule.
2. Preparation of the Schedule of Values.
3. Installation and removal of temporary facilities and controls.
4. Delivery and processing of submittals.
5. Progress meetings.
6. Preinstallation conferences.
7. Project closeout activities.
1.3 SUBMITTALS
Contract No. 4676
Project Management and Coordination Page 1 of 4
1.4 PROJECT MEETINGS
A. General: Schedule and conduct meetings and conferences at Project site, unless otherwise indicated.
1. Attendees: Inform participants and others involved, and individuals whose presence is required, of date and time of each meeting. Notify Owner and Architect of scheduled meeting dates and times.
2. Agenda: Prepare the meeting agenda. Distribute the agenda to all invited attendees.
3. Minutes: Record significant discussions and agreements achieved. Distribute the meeting minutes to everyone concerned, including Owner and Architect, within 3 days of the meeting.
B. Preconstruction Conference: Schedule a preconstruction conference before starting construction, at a time convenient to Owner and Architect, but no later than 15 days after execution of the Agreement.
Hold the conference at Project site or another convenient location. Conduct the meeting to review responsibilities and personnel assignments.
1. Attendees: Authorized representatives of Owner, Architect, and their consultants; Contractor and its superintendent; major subcontractors; manufacturers; suppliers; and other concerned parties shall attend the conference. All participants at the conference shall be familiar with Project and authorized to conclude matters relating to the Work.
2. Agenda: Discuss items of significance that could affect progress, including the following:
a. Tentative construction schedule.
b. Phasing.
c. Critical work sequencing.
d. Designation of responsible personnel.
e. Procedures for processing field decisions and Change Orders.
f. Procedures for processing Applications for Payment.
g. Distribution of the Contract Documents.
h. Submittal procedures.
i. Preparation of Record Documents.
j. Use of the premises.
k. Responsibility for temporary facilities and controls.
l. Parking availability.
m. Office, work, and storage areas.
n. Equipment deliveries and priorities.
o. First aid.
p. Security.
q. Progress cleaning.
r. Working hours.
C. Preinstallation Conferences: Conduct a preinstallation conference at Project site before each construction activity that requires coordination with other construction.
1. Attendees: Installer and representatives of manufacturers and fabricators involved in or affected by the installation and its coordination or integration with other materials and installations that have preceded or will follow, shall attend the meeting. Advise Architect of scheduled meeting dates.
2. Agenda: Review progress of other construction activities and preparations for the particular activity under consideration, including requirements for the following:
a. Contract Documents.
Contract No. 4676
Project Management and Coordination Page 1 of 4
b. Options.
c. Related Change Orders.
d. Purchases.
e. Deliveries.
f. Submittals.
g. Review of mockups.
h. Possible conflicts.
i. Compatibility problems.
j. Time schedules.
k. Weather limitations.
l. Manufacturer's written recommendations.
m. Warranty requirements.
n. Compatibility of materials.
o. Acceptability of substrates.
p. Temporary facilities and controls.
q. Space and access limitations.
r. Regulations of authorities having jurisdiction.
s. Testing and inspecting requirements.
t. Required performance results.
u. Protection of construction and personnel.
3. Record significant conference discussions, agreements, and disagreements.
4. Do not proceed with installation if the conference cannot be successfully concluded. Initiate whatever actions are necessary to resolve impediments to performance of the Work and reconvene the conference at earliest feasible date.
D. Progress Meetings: Conduct progress meetings at monthly intervals. Coordinate dates of meetings with preparation of payment requests.
1. Attendees: In addition to representatives of Owner and Architect, each contractor, subcontractor, supplier, and other entity concerned with current progress or involved in planning, coordination, or performance of future activities shall be represented at these meetings. All participants at the conference shall be familiar with Project and authorized to conclude matters relating to the Work.
2. Agenda: Review and correct or approve minutes of previous progress meeting. Review other items of significance that could affect progress. Include topics for discussion as appropriate to status of Project.
a. Contractor's Construction Schedule: Review progress since the last meeting. Determine whether each activity is on time, ahead of schedule, or behind schedule, in relation to Contractor's Construction Schedule. Determine how construction behind schedule will be expedited; secure commitments from parties involved to do so. Discuss whether schedule revisions are required to ensure that current and subsequent activities will be completed within the Contract Time.
b. Review present and future needs of each entity present, including the following:
1) Interface requirements.
2) Sequence of operations.
3) Status of submittals.
4) Deliveries.
5) Off-site fabrication.
6) Access.
7) Site utilization.
8) Temporary facilities and controls.
Contract No. 4676
Project Management and Coordination Page 1 of 4
9) Work hours.
10) Hazards and risks.
11) Progress cleaning.
12) Quality and work standards.
13) Change Orders.
14) Documentation of information for payment requests.
3. Reporting: Distribute minutes of the meeting to each party present and to parties who should have been present. Include a brief summary, in narrative form, of progress since the previous meeting and report.
a. Schedule Updating: Revise Contractor's Construction Schedule after each progress meeting where revisions to the schedule have been made or recognized. Issue revised schedule concurrently with the report of each meeting.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SECTION 01310
Contract No. 4676
Project Meetings Page 1 of 2
SECTION 01315 - PROJECT MEETINGS
PART 1 - GENERAL
1.1 DESCRIPTION OF WORK
A. Work Included This Section:
1. This Section specifies administrative and procedural requirements for project meetings including but not limited to:
a) Pre-Construction Conference.
b) Coordination Meetings.
c) Progress Meetings.
1.2 PRE-CONSTRUCTION CONFERENCE
A. A pre-construction conference shall be scheduled by the Architect and held at the Project site or other convenient location after execution of the Agreement or Notice To Proceed, whichever comes first and prior to commencement of construction activities.
B. Attendees:
1. The Owner, Architect, the Contractor(s) and its superintendent(s) shall each be represented at the conference by persons authorized to conclude matters relating to the Work.
C. Agenda:
1. Discuss items of significance that could affect progress including such topics as:
a) Work sequencing.
b) Tentative construction schedule.
c) Designation of responsible personnel.
d) Procedures for processing Change Proposal Requests and Change orders.
e) Procedures for processing Applications for Payment.
f) Submittal of Shop Drawings, Product Data and Samples.
g) Preparation of record documents.
h) Use of the premises.
i) Staging areas.
j) Security.
k) Housekeeping.
1.3 COORDINATION MEETINGS
A. The General Contractor shall conduct project coordination meetings at regularly scheduled times convenient for all parties involved. Project coordination meetings are in addition to specific meetings held for other purposes, such as regular progress meetings and special Pre-installation meetings.
B. Record meeting results and distribute copies to everyone in attendance and to others affected by decisions or actions resulting from each meeting, such as the Owner and Architect.
Contract No. 4676
Project Meetings Page 1 of 2
C. Weekly Progress Meetings:
1. To enable orderly review of progress during construction and to provide for systematic discussion of problems, weekly project meetings shall be held throughout the construc-tion period.
2. Persons designated by each Subcontractor shall attend and participate in weekly project meetings shall have all required authority to commit the Contractor or Subcontractor to decisions agreed upon in the project meetings.
3. The General Contractor shall conduct the meetings, compile minutes of each meeting and will distribute copies to the Owner and the Architect. The General Contractor shall distribute such other copies as he wishes. Each Contractor shall, to the maximum extent practicable, assign the same person or persons to represent the Contractor or Subcontractor at project meetings throughout the construction period.
D. Owner, Architect, Contractor (OAC) Project Meetings:
1. To enable orderly review of progress during construction and to provide for systematic discussion of problems, project meetings shall be held throughout the construction period at intervals determined prior to construction.
2. The General Contractor shall attend and participate in the OAC project meetings and shall have all required authority to commit the Contractor and Subcontractor(s) to decisions agreed upon in the project meetings.
3. The Architect will conduct the OAC meetings and compile minutes of each meeting and will distribute copies to the Owner and Contractor. The Contractor shall distribute such other copies as required. The General Contractor shall, to the maximum extent practicable, assign the same person or persons to represent the Contractor at project meetings throughout the construction period.
PART 2 - PRODUCTS (Not Applicable)
PART 3 - EXECUTION (Not Applicable)
END OF SECTION 01315
Contract No. 4676
Submittal Procedures Page 1 of 7
SECTION 01330 - SUBMITTAL PROCEDURES
PART 1 - GENERAL
1.1 SUMMARY
A. This Section includes administrative and procedural requirements for submitting Shop Drawings, Product Data, Samples, and other miscellaneous submittals.
B. See Division 1 Section "Construction Progress Documentation" for submitting schedules and reports, including Contractor's Construction Schedule and the Submittals Schedule.
C. See Division 1 Section "Closeout Procedures" for submitting warranties Project Record Documents and operation and maintenance manuals.
1.2 DEFINITIONS
A. Action Submittals: Written and graphic information that requires Architect's responsive action.
B. Informational Submittals: Written information that does not require Architect's approval.
Submittals may be rejected for not complying with requirements.
1.3 SUBMITTAL PROCEDURES
A. Coordination: Coordinate preparation and processing of submittals with performance of construction activities.
1. Coordinate each submittal with fabrication, purchasing, testing, delivery, other submittals, and related activities that require sequential activity.
2. Coordinate transmittal of different types of submittals for related parts of the Work so processing will not be delayed because of need to review submittals concurrently for coordination.
a. Architect reserves the right to withhold action on a submittal requiring coordination with other submittals until related submittals are received.
B. Submittals Schedule: Comply with requirements in Division 1 Section "Construction Progress Documentation" for list of submittals and time requirements for scheduled performance of related construction activities.
C. Processing Time: Allow enough time for submittal review, including time for resubmittals, as follows. Time for review shall commence on Architect's receipt of submittal.
1. If intermediate submittal is necessary, process it in same manner as initial submittal.
2. Allow 21 days for processing each resubmittal.
3. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing.
D. Identification: Place a permanent label or title block on each submittal for identification.
1. Indicate name of firm or entity that prepared each submittal on label or title block.
Contract No. 4676
Submittal Procedures Page 1 of 7
2. Provide a space approximately 4 by 5 inches (100 by 125 mm) on label or beside title block to record Contractor's review and approval markings and action taken by Architect.
3. Include the following information on label for processing and recording action taken:
a. Project name.
b. Date.
c. Name and address of supplier.
d. Name of manufacturer.
e. Unique identifier, including revision number.
f. Number and title of appropriate Specification Section.
g. Drawing number and detail references, as appropriate.
h. Other necessary identification.
E. Deviations: Highlight, encircle, or otherwise identify deviations from the Contract Documents on submittals.
F. Additional Copies: Unless additional copies are required for final submittal, and unless Architect observes noncompliance with provisions of the Contract Documents, initial submittal (preferably digital in pdf format) may serve as final submittal.
G. Transmittal: Package each submittal individually and appropriately for transmittal and handling.
Transmit each submittal using a transmittal form. Architect will return submittals, without review, received from sources other than Contractor.
1. Include Contractor's certification stating that information submitted complies with requirements of the Contract Documents.
H. Distribution: Furnish copies of final submittals to manufacturers, subcontractors, suppliers, fabricators, installers, authorities having jurisdiction, and others as necessary for performance of construction activities. Show distribution on transmittal forms.
I. Use for Construction: Use only final submittals with mark indicating action taken by Architect in connection with construction.
PART 2 - PRODUCTS
2.1 ACTION SUBMITTALS
A. General: Prepare and submit Action Submittals required by individual Specification Sections.
1. Number of Copies: Submit 1 digital copy in pdf format via email or unless a digital copy cannot be processed then provide three copies of each submittal by exception, unless otherwise indicated. Architect will return a digital copy via email. Mark up and retain one returned copy as a Project Record Document.
B. Product Data: Collect information into a single submittal for each element of construction and type of product or equipment.
1. If information must be specially prepared for submittal because standard printed data are not suitable for use, submit as Shop Drawings, not as Product Data.
2. Mark each copy of each submittal to show which products and options are applicable.
3. Include the following information, as applicable:
Contract No. 4676
Submittal Procedures Page 1 of 7
a. Manufacturer's written recommendations.
b. Manufacturer's product specifications.
c. Manufacturer's installation instructions.
d. Manufacturer's catalog cuts.
e. Wiring diagrams showing factory-installed wiring.
f. Printed performance curves.
g. Operational range diagrams.
h. Compliance with recognized trade association standards.
i. Compliance with recognized testing agency standards.
C. Shop Drawings: Prepare Project-specific information, drawn accurately to scale. Do not base Shop Drawings on reproductions of the Contract Documents or standard printed data.
1. Preparation: Include the following information, as applicable:
a. Dimensions.
b. Identification of products.
c. Fabrication and installation drawings.
d. Roughing-in and setting diagrams.
e. Wiring diagrams showing field-installed wiring, including power, signal, and control wiring.
f. Shopwork manufacturing instructions.
g. Templates and patterns.
h. Schedules.
i. Notation of coordination requirements.
j. Notation of dimensions established by field measurement.
2. Wiring Diagrams: Differentiate between manufacturer-installed and field-installed wiring.
3. Sheet Size: Except for templates, patterns, and similar full-size drawings, submit Shop
Drawings on sheets at least 8-1/2 by 11 inches (215 by 280 mm) but no larger than 30 by 40 inches (750 by 1000 mm).
D. Samples: Prepare physical units of materials or products, including the following:
1. Comply with requirements in Division 1 Section "Quality Requirements" for mockups.
2. Samples for Initial Selection: Submit manufacturer's color charts consisting of units or sections of units showing the full range of colors, textures, and patterns available.
a. Submit one full set of available choices where color, pattern, texture, or similar characteristics are required to be selected from manufacturer's product line.
Architect will return submittal with options selected.
3. Samples for Verification: Submit full-size units or Samples of size indicated, prepared from the same material to be used for the Work, cured and finished in manner specified, and physically identical with the product proposed for use, and that show full range of color and texture variations expected. Samples include, but are not limited to, partial sections of manufactured or fabricated components; small cuts or containers of materials;
complete units of repetitively used materials; swatches showing color, texture, and pattern; color range sets; and components used for independent testing and inspection.
a. Submit 3 sets of Samples. Architect will retain 1 Sample set; 2 will be returned to contractor, one of which will remain at job site.
Contract No. 4676
Submittal Procedures Page 1 of 7
4. Preparation: Mount, display, or package Samples in manner specified to facilitate review of qualities indicated. Prepare Samples to match Architect's sample where so indicated.
Attach label on unexposed side.
5. Submit Samples for review of kind, color, pattern, and texture for a final check of these characteristics with other elements and for a comparison of these characteristics between final submittal and actual component as delivered and installed.
6. Disposition: Maintain sets of approved Samples at Project site, available for quality-control comparisons throughout the course of construction activity. Sample sets may be used to determine final acceptance of construction associated with each set.
E. Product Schedule or List: Prepare a written summary indicating types of products required for the Work and their intended location.
F. Submittals Schedule: Comply with requirements in Division 1 Section "Construction Progress Documentation."
2.2 INFORMATIONAL SUBMITTALS
A. General: Prepare and submit Informational Submittals required by other Specification Sections.
1. Number of Copies: Submit 1 digital submittal in pdf format via email, or two copies of each submittal (if a digital copy cannot be processed), unless otherwise indicated.
Architect will not return copies.
2. Certificates and Certifications: Provide a notarized statement that includes signature of entity responsible for preparing certification. Certificates and certifications shall be signed by an officer or other individual authorized to sign documents on behalf of that entity.
3. Test and Inspection Reports: Comply with requirements in Division 1 Section "Quality Requirements."
B. Contractor's Construction Schedule: Comply with requirements in Division 1 Section "Construction Progress Documentation."
C. Qualification Data: Prepare written information that demonstrates capabilities and experience of firm or person. Include lists of completed projects with project names and addresses, names and addresses of architects and owners, and other information specified.
D. Product Certificates: Prepare written statements on manufacturer's letterhead certifying that product complies with requirements.
E. Welding Certificates: Prepare written certification that welding procedures and personnel comply with requirements. Submit record of Welding Procedure Specification (WPS) and Procedure Qualification Record (PQR) on AWS forms. Include names of firms and personnel certified.
F. Installer Certificates: Prepare written statements on manufacturer's letterhead certifying that Installer complies with requirements and, where required, is authorized for this specific Project.
G. Material Certificates: Prepare written statements on manufacturer's letterhead certifying that material complies with requirements.
H. Material Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting test results of material for compliance with requirements.
Contract No. 4676
Submittal Procedures Page 1 of 7
I. Product Test Reports: Prepare written reports indicating current product produced by manufacturer complies with requirements. Base reports on evaluation of tests performed by manufacturer and witnessed by a qualified testing agency, or on comprehensive tests performed by a qualified testing agency.
J. Maintenance Data: Prepare written and graphic instructions and procedures for operation and normal maintenance of products and equipment. Comply with requirements in Division 1 Section "Closeout Procedures."
K. Design Data: Prepare written and graphic information, including, but not limited to, performance and design criteria, list of applicable codes and regulations, and calculations. Include list of assumptions and other performance and design criteria and a summary of loads. Include load diagrams if applicable. Provide name and version of software, if any, used for calculations.
Include page numbers.
L. Manufacturer's Instructions: Prepare written or published information that documents manufacturer's recommendations, guidelines, and procedures for installing or operating a product or equipment. Include name of product and name, address, and telephone number of manufacturer.
M. Manufacturer's Field Reports: Prepare written information documenting factory-authorized service representative's tests and inspections.
N. Insurance Certificates and Bonds: Prepare written information indicating current status of insurance or bonding coverage. Include name of entity covered by insurance or bond, limits of coverage, amounts of deductibles, if any, and term of the coverage.
PART 3 - EXECUTION
3.1 CONTRACTOR'S REVIEW
A. Review each submittal and check for compliance with the Contract Documents. Note corrections and field dimensions. Mark with approval stamp before submitting to Architect.
B. Approval Stamp: Stamp each submittal with a uniform, approval stamp. Include Project name and location, submittal number, Specification Section title and number, name of reviewer, date of Contractor's approval, and statement certifying that submittal has been reviewed, checked, and approved for compliance with the Contract Documents.
3.2 ARCHITECT'S ACTION
C. General: Architect will not review submittals that do not bear Contractor's approval stamp and will return them without action.
D. Action Submittals: Architect will review each submittal, make marks to indicate corrections or modifications required, and return it. Architect will stamp each submittal with an action stamp and will mark stamp appropriately to indicate action taken:
E. Informational Submittals: Architect will review each submittal and will not return it, or will reject and return it if it does not comply with requirements. Architect will forward each submittal to appropriate party.
F. Submittals not required by the Contract Documents will not be reviewed and may be discarded.
Contract No. 4676
Submittal Procedures Page 1 of 7
END OF SECTION 01330
THIS PAGE INTENTIONALLY LEFT BLANK
Contract No. 4676
Product Substitutions Page 1 of 6
SECTION 01631 - PRODUCT SUBSTITUTIONS
PART 1 - GENERAL
1.1 DESCRIPTION OF WORK
A. Work Specified This Section:
1. This Section specifies administrative and procedural requirements for handling requests as a substitution request made after the Notice to Proceed or award of the Contract as a
CPR.
1.2 SUBMITTALS
A. Substitution Request Submittal:
1. Submit 3 copies of each request for substitution for consideration.
2. Submit each request on the attached form and in accordance with procedures required for Change Proposal Requests (CPR). See Section 01250 for additional information.
3. Identify the product, or the fabrication or installation method to be replaced in each request. Include related Specification Section and Drawing numbers.
4. Provide complete documentation showing compliance with the requirements for substitutions, and the following information, as appropriate:
a) Original copies of Product Data, including Drawings and descriptions of products, fabrication and installation procedures.
b) Samples, where applicable or requested.
c) A detailed point by point comparison of the proposed substitution and the specified product detailing the significant qualities of both products.
1) Significant qualities may include elements such as size, weight, durability, performance and visual effect.
d) Coordination information, including a list of changes or modifications needed to other parts of the Work and to construction performed by the Owner and separate Contractors that will become necessary to accommodate the proposed substitution.
e) A statement indicating the substitutions effect on the Contractor's Construction Schedule.
f) Cost information, including a proposal of the net deduct change in the Contract Sum.
g) Certification by the Contractor that the substitution proposed is equal-to or better in every significant respect to that required by the Contract Documents, and that it will perform adequately in the application indicated.
1) Include the Contractor's waiver of rights to additional payment or time that may subsequently become necessary because of the failure of the substitution to perform adequately.
B. Architect's Action:
1. After receipt of the request for substitution, the Architect may request additional information or documentation necessary for evaluation of the request.
2. If a decision on use of a proposed substitute is not made or obtained within sufficient time to have no adverse impact on the construction schedule, the Contractor shall use the product specified in the Contract Documents.
Contract No. 4676
Product Substitutions Page 1 of 6
PART 2 - PRODUCTS (NOT APPLICABLE)
PART 3 - EXECUTION
3.1 SUBSTITUTIONS:
A. Conditions:
1. No substitution will be considered unless such request include the name of the material or equipment for which it is to be substituted and a complete description of the proposed substitution including drawings, performance and test data, and other information necessary for a complete comparison with the specified products or materials and an evaluation of the proposed products or materials.
2. A statement setting forth changes in other materials, equipment or other portions of the Work including changes in the work of other contracts that incorporation of the proposed substitution would require shall be included.
3. Savings or Credit to Owner for accepting substitution
4. The burden of proof of the merit of the proposed substitution is upon the proposer.
5. In addition to the requirements in the Supplemental General Conditions, the following items will apply:
a) The substitution is in compliance with subsequent interpretations of code or insurance requirements.
b) The manufacturer or fabricator shall certify or guarantee the specified product as required by the Contract Documents.
c) Product shall perform properly and fit in the designated space.
B. The Contractor shall bear all expenses resulting from substitutions including the cost of work in general, structural, plumbing, mechanical and electrical trades required due to the substitution and the cost of any Architect's services made necessary by the substitution.
C. The Architect's decision of approval or disapproval of a proposed substitution shall be final.
3.2 SUBMITTAL FORMS:
A. All proposed substitutions shall use the following form.
Contract No. 4676
Product Substitutions Page 1 of 6
SUBSTITUTION
REQUEST
Project: Substitution Request No
CPR No. (After Bid)
From:
To: Date:
A/E Project No.
Re: Contract For:
Specification Title/or Drawing Sheet:
Section No.: Page No.: Article/Paragraph:
Proposed Substitution:
Manufacturer: Address: Phone #:
Trade Name: Model #:
Installer: Address: Phone #:
History: New Product: 2 -5 years old 5-10 years old More than ten years old
Briefly explain differences between proposed substitution and specified product
Point-by-Point comparative data attached - REQUIRED BY A/E
Reason for not providing specified item:
Contract No. 4676
Product Substitutions Page 1 of 6
Similar Installation:
Project: Architect:
Address: Owner:
Owner Representative:
Telephone:
Date Installed:
Proposed substitution affects other parts of Work: No Yes; explain
Savings or Credit to Owner for accepting substitution: ($ )
(MUST BE FILLED OUT TO RECEIVE REVIEW.)
Proposed substitution changes Contract Time: No Yes; Add/Deduct days.
Supporting Data Attached:
Product Data Drawings Tests Reports Samples
Fire Tests Acoustical Tests
ASTM Tests UL, FM or WHI listed: provide copy of test reports.
Undersigned certifies:
Proposed substitution has been fully investigated and determined to be equal or superior in all respects to specified product.
Same or better warranty will be furnished for proposed substitution as for specified product.
Same or better maintenance service and source of replacement parts, as applicable is available.
Proposed substitution will not affect or delay Progress Schedule.
Cost data as stated above is complete. Contractor (s) claims for additional costs related to accepted substitution, which may subsequently become apparent are to be waived.
Proposed substitution does not affect dimensions and functional clearances.
Payment will be made for A/E changes to building design, including architectural or engineering design, detailing, and construction costs caused by the requested substitution.
Coordination, installation, and changes in the Work as necessary for accepted substitution will be complete in all respects.
Submitted By:
Signature:
Firm:
Contract No. 4676
Product Substitutions Page 1 of 6
Address:
Telephone: Approved By:
Contract No. 4676
Product Substitutions Page 1 of 6
General Contractor Date
Attachments:
ARCHITECT�S REVIEW AND ACTION
Substitution approved - Make submittals in accordance with Division One.
Substitution approved as noted - Make submittals in accordance with Division One.
Substitution rejected - Use specified materials.
Signed by: Date:
Additional Comments Contractor Subcontractor Supplier Manufacturer A/E
END OF SECTION 01631
Contract No. 4676
Execution Requirements Page 1 of 6
SECTION 01700 - EXECUTION REQUIREMENTS
PART 1 - GENERAL
1.1 SUMMARY
A. This Section includes general procedural requirements governing execution of the Work including, but not limited to, the following:
1. Construction layout.
2. Field engineering and surveying.
3. General installation of products.
4. Progress cleaning.
5. Starting and adjusting.
6. Protection of installed construction.
7. Correction of the Work.
B. See Division 1 Section "Closeout Procedures" for submitting final property survey with Project Record Documents, recording of Owner-accepted deviations from indicated lines and levels, and final cleaning.
1.2 QUALITY ASSURANCE
A. Land Surveyor Qualifications: A professional land surveyor who is legally qualified to practice in jurisdiction where Project is located and who is experienced in providing land-surveying services of the kind indicated.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION
3.1 EXAMINATION
A. Existing Conditions: The existence and location of site improvements, utilities, and other construction indicated as existing are not guaranteed. Before beginning work, investigate and verify the existence and location of mechanical and electrical systems and other construction affecting the Work.
1. Before construction, verify the location and points of connection of utility services.
B. Existing Utilities: The existence and location of underground and other utilities and construction indicated as existing are not guaranteed. Before beginning sitework, investigate and verify the existence and location of underground utilities and other construction affecting the Work.
1. Furnish location data for work related to Project that must be performed by public utilities serving Project site.
Contract No. 4676
Execution Requirements Page 1 of 6
C. Acceptance of Conditions: Examine substrates, areas, and conditions, with Installer or Applicator present where indicated, for compliance with requirements for installation tolerances and other conditions affecting performance. Record observations.
1. Verify compatibility with and suitability of substrates, including compatibility with existing finishes or primers.
2. Examine roughing-in for mechanical and electrical systems to verify actual locations of connections before equipment and fixture installation.
3. Proceed with installation only after unsatisfactory conditions have been corrected.
Proceeding with the Work indicates acceptance of surfaces and conditions.
3.2 PREPARATION
A. Existing Utility Information: Furnish information to local utility that is necessary to adjust, move, or relocate existing utility structures, utility poles, lines, services, or other utility appurtenances located in or affected by construction. Coordinate with authorities having jurisdiction.
B. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Owner or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated:
1. Notify Owner not less than 7 days in advance of proposed utility interruptions.
2. Do not proceed with utility interruptions without Owner's written permission.
C. Field Measurements: Take field measurements as required to fit the Work properly. Recheck measurements before installing each product. Where portions of the Work are indicated to fit to other construction, verify dimensions of other construction by field measurements before fabrication. Coordinate fabrication schedule with construction progress to avoid delaying the Work.
D. Space Requirements: Verify space requirements and dimensions of items shown diagrammatically on Drawings.
E. Review of Contract Documents and Field Conditions: Immediately on discovery of the need for clarification of the Contract Documents, submit a request for information to Architect. Include a detailed description of problem encountered, together with recommendations for changing the Contract Documents.
3.3 CONSTRUCTION LAYOUT
A. Verification: Before proceeding to lay out the Work, verify layout information shown on Drawings, in relation to the property survey and existing benchmarks. If discrepancies are discovered, notify Architect promptly.
B. General: Engage a land surveyor to lay out the Work using accepted surveying practices.
1. Establish benchmarks and control points to set lines and levels at each story of construction and elsewhere as needed to locate each element of Project.
2. Establish dimensions within tolerances indicated. Do not scale Drawings to obtain required dimensions.
3. Inform installers of lines and levels to which they must comply.
4. Check the location, level and plumb, of every major element as the Work progresses.
Contract No. 4676
Execution Requirements Page 1 of 6
5. Notify Architect when deviations from required lines and levels exceed allowable tolerances.
6. Close site surveys with an error of closure equal to or less than the standard established by authorities having jurisdiction.
C. Site Improvements: Locate and lay out site improvements, including pavements, grading, fill and topsoil placement, utility slopes, and invert elevations.
D. Building Lines and Levels: Locate and lay out control lines and levels for structures, building foundations, column grids, and floor levels, including those required for mechanical and electrical work. Transfer survey markings and elevations for use with control lines and levels. Level foundations and piers from two or more locations.
E. Record Log: Maintain a log of layout control work. Record deviations from required lines and levels. Include beginning and ending dates and times of surveys, weather conditions, name and duty of each survey party member, and types of instruments and tapes used. Make the log available for reference by Architect.
3.4 FIELD ENGINEERING
A. Reference Points: Locate existing permanent benchmarks, control points, and similar reference points before beginning the Work. Preserve and protect permanent benchmarks and control points during construction operations.
B. Benchmarks: Establish and maintain a minimum of two permanent benchmarks on Project site, referenced to data established by survey control points. Comply with authorities having jurisdiction for type and size of benchmark.
1. Record benchmark locations, with horizontal and vertical data, on Project Record Documents.
3.5 INSTALLATION
A. General: Locate the Work and components of the Work accurately, in correct alignment and elevation, as indicated.
1. Make vertical work plumb and make horizontal work level.
2. Where space is limited, install components to maximize space available for maintenance and ease of removal for replacement.
3. Conceal pipes, ducts, and wiring in finished areas, unless otherwise indicated.
B. Comply with manufacturer's written instructions and recommendations for installing products in applications indicated.
C. Install products at the time and under conditions that will ensure the best possible results.
Maintain conditions required for product performance until Substantial Completion.
D. Conduct construction operations so no part of the Work is subjected to damaging operations or loading in excess of that expected during normal conditions of occupancy.
E. Anchors and Fasteners: Provide anchors and fasteners as required to anchor each component securely in place, accurately located and aligned with other portions of the Work.
Contract No. 4676
Execution Requirements Page 1 of 6
1. Mounting Heights: Where mounting heights are not indicated, mount components at heights directed by Architect.
2. Allow for building movement, including thermal expansion and contraction.
F. Joints: Make joints of uniform width. Where joint locations in exposed work are not indicated, arrange joints for the best visual effect. Fit exposed connections together to form hairline joints.
G. Hazardous Materials: Use products, cleaners, and installation materials that are not considered hazardous.
3.6 PROGRESS CLEANING
A. General: Clean Project site and work areas daily, including common areas. Coordinate progress cleaning for joint-use areas where more than one installer has worked. Enforce requirements strictly. Dispose of materials lawfully.
1. Comply with requirements in NFPA 241 for removal of combustible waste materials and debris.
2. Do not hold materials more than 7 days during normal weather or 3 days if the temperature is expected to rise above 80 deg F (27 deg C).
3. Containerize hazardous and unsanitary waste materials separately from other waste. Mark containers appropriately and dispose of legally, according to regulations.
B. Site: Maintain Project site free of waste materials and debris.
C. Work Areas: Clean areas where work is in progress to the level of cleanliness necessary for proper execution of the Work.
1. Remove liquid spills promptly.
2. Where dust would impair proper execution of the Work, broom-clean or vacuum the entire work area, as appropriate.
D. Installed Work: Keep installed work clean. Clean installed surfaces according to written instructions of manufacturer or fabricator of product installed, using only cleaning materials specifically recommended. If specific cleaning materials are not recommended, use cleaning materials that are not hazardous to health or property and that will not damage exposed surfaces.
E. Concealed Spaces: Remove debris from concealed spaces before enclosing the space.
F. Waste Disposal: Burying or burning waste materials on-site will not be permitted. Washing waste materials down sewers or into waterways will not be permitted.
G. During handling and installation, clean and protect construction in progress and adjoining materials already in place. Apply protective covering where required to ensure protection from damage or deterioration at Substantial Completion.
H. Clean and provide maintenance on completed construction as frequently as necessary through the remainder of the construction period. Adjust and lubricate operable components to ensure operability without damaging effects.
Contract No. 4676
Execution Requirements Page 1 of 6
I. Limiting Exposures: Supervise construction operations to assure that no part of the construction, completed or in progress, is subject to harmful, dangerous, damaging, or otherwise deleterious exposure during the construction period.
3.7 STARTING AND ADJUSTING
A. Start equipment and operating components to confirm proper operation. Remove malfunctioning units, replace with new units, and retest.
B. Adjust operating components for proper operation without binding. Adjust equipment for proper operation.
C. Test each piece of equipment to verify proper operation. Test and adjust controls and safeties.
Replace damaged and malfunctioning controls and equipment.
3.8 PROTECTION OF INSTALLED CONSTRUCTION
A. Provide final protection and maintain conditions that ensure installed Work is without damage or deterioration at time of Substantial Completion.
B. Comply with manufacturer's written instructions for temperature and relative humidity.
3.9 CORRECTION OF THE WORK
A. Repair or remove and replace defective construction. Restore damaged substrates and finishes.
Comply with requirements in Division 1 Section "Cutting and Patching."
1. Repairing includes replacing defective parts, refinishing damaged surfaces, touching up with matching materials, and properly adjusting operating equipment.
B. Restore permanent facilities used during construction to their specified condition.
C. Remove and replace damaged surfaces that are exposed to view if surfaces cannot be repaired without visible evidence of repair.
D. Repair components that do not operate properly. Remove and replace operating components that cannot be repaired.
E. Remove and replace chipped, scratched, and broken glass or reflective surfaces.
END OF SECTION 01700
Contract No. 4676
Cutting and Patching Page 1 of 4
SECTION 01731 - CUTTING AND PATCHING
PART 1 - GENERAL
1.1 SUMMARY
A. This Section includes procedural requirements for cutting and patching.
B. See Divisions 2 through 16 Sections for specific requirements and limitations applicable to cutting and patching individual parts of the Work.
C. Requirements in this Section apply to mechanical and electrical installations. See Divisions 15 and 16 Sections for other requirements and limitations applicable to cutting and patching mechanical and electrical installations.
1.2 SUBMITTALS
1.3 QUALITY ASSURANCE
A. Structural Elements: Do not cut and patch structural elements.
B. Operational Elements: Do not cut and patch operating elements and related components in a manner that results in reducing their capacity to perform as intended or that results in increased maintenance or decreased operational life or safety.
C. Visual Requirements: Do not cut and patch construction in a manner that results in visual evidence of cutting and patching. Do not cut and patch construction exposed on the exterior or in occupied spaces in a manner that would, in Architect's opinion, reduce the building's aesthetic qualities. Remove and replace construction that has been cut and patched in a visually unsatisfactory manner.
1.4 WARRANTY
A. Existing Warranties: Remove, replace, patch, and repair materials and surfaces cut or damaged during cutting and patching operations, by methods and with materials so as not to void existing warranties.
PART 2 - PRODUCTS
2.1 MATERIALS
A. General: Comply with requirements specified in other Sections of these Specifications.
B. Existing Materials: Use materials identical to existing materials. For exposed surfaces, use materials that visually match existing adjacent surfaces to the fullest extent possible.
Contract No. 4676
Cutting and Patching Page 1 of 4
1. If identical materials are unavailable or cannot be used, use materials that, when installed, will match the visual and functional performance of existing materials.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine surfaces to be cut and patched and conditions under which cutting and patching are to be performed.
1. Compatibility: Before patching, verify compatibility with and suitability of substrates, including compatibility with existing finishes or primers.
2. Proceed with installation only after unsafe or unsatisfactory conditions have been corrected.
3.2 PREPARATION
A. Temporary Support: Provide temporary support of Work to be cut.
B. Protection: Protect existing construction during cutting and patching to prevent damage. Provide protection from adverse weather conditions for portions of Project that might be exposed during cutting and patching operations.
C. Adjoining Areas: Avoid interference with use of adjoining areas or interruption of free passage to adjoining areas.
D. Existing Services: Where existing services are required to be removed, relocated, or abandoned, bypass such services before cutting to avoid interruption of services to occupied areas.
3.3 PERFORMANCE
A. General: Employ skilled workers to perform cutting and patching. Proceed with cutting and patching at the earliest feasible time, and complete without delay.
1. Cut existing construction to provide for installation of other components or performance of other construction, and subsequently patch as required to restore surfaces to their original condition.
B. Cutting: Cut existing construction by sawing, drilling, breaking, chipping, grinding, and similar operations, including excavation, using methods least likely to damage elements retained or adjoining construction. If possible, review proposed procedures with original Installer; comply with original Installer's written recommendations.
1. In general, use hand or small power tools designed for sawing and grinding, not hammering and chopping. Cut holes and slots as small as possible, neatly to size required, and with minimum disturbance of adjacent surfaces. Temporarily cover openings when not in use.
2. Existing Finished Surfaces: Cut or drill from the exposed or finished side into concealed surfaces.
Contract No. 4676
Cutting and Patching Page 1 of 4
3. Concrete: Cut using a cutting machine, such as an abrasive saw or a diamond-core drill.
4. Excavating and Backfilling: Comply with requirements in applicable Division 2 Sections where required by cutting and patching operations.
5. Mechanical and Electrical Services: Cut off pipe or conduit in walls or partitions to be removed. Cap, valve, or plug and seal remaining portion of pipe or conduit to prevent entrance of moisture or other foreign matter after cutting.
6. Proceed with patching after construction operations requiring cutting are complete.
C. Patching: Patch construction by filling, repairing, refinishing, closing up, and similar operations following performance of other Work. Patch with durable seams that are as invisible as possible.
Provide materials and comply with installation requirements specified in other…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .