26-2564R Pioneer Park Bathhouse Contstruction Bid Sheet.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
Pioneer Park Bathhouse Construction
Solicitation number
26-2564R
Issued by
Muskegon County, Michigan

About this file

This is a bid sheet for the Pioneer Park Bathhouse Construction project, a new bathhouse facility in Michigan serving as a replacement for an existing structure. The project encompasses comprehensive construction work organized into multiple categories: site work including clearing, tree removal, demolition, and rough grading; footings and foundations; concrete masonry for exterior and interior walls; exposed wood ceiling installation; roof framing systems; exterior doors and windows (10 doors and 8 windows); interior bathhouse fixtures including water closets, urinals, lavatories (23 total), 6 showers, 2 countertops, and toilet stall partitions; mechanical and electrical systems; and final exterior site work. The exterior site work includes finished grading, concrete sidewalks, ADA and regular parking, asphalt paving, rain gardens, site restoration, native landscaping, site amenities (3 benches, 6 bike racks accommodating 18 bikes), water service, septic systems, an 85-linear-foot wooden boardwalk, a footwash station, and 8 concrete parking bumpers.

The bid sheet requires contractors to complete company information and provide unit costs for each line item, with extended prices calculated automatically. All major categories are priced on a lump-sum (LSUM) basis except for discrete items such as doors, windows, fixtures, and site amenities, which are priced per unit. The bid sheet does not specify pricing thresholds, set-asides, incumbent contractor information, contract term details, response deadlines, or funding sources in the provided documentation. Bidders are instructed to submit unit costs with the understanding that total project pricing will be derived from the completed cost schedule.

View the file

Other files

File Type Posted
26-2564R Pioneer Park Bathhouse Construction.pdf PDF
W9 BLANK.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cost Schedule

Revised 26-2564R Pioneer Park Bathhouse Construction Bid Sheet
Company Name
Instructions for using Bid Sheet

Fill in Company information.

Complete the Unit cost portion, the Extended Price will calculate.Street
City/State
Contact Name
Phone #
Email Address
Line #ProductUnitQuantityUnit CostExtended Price
SITE WORK
1Sit ClearingLSUM1$ - 0
2Tree and Stump RemovalLSUM1$ - 0
3Site DemolitionLSUM1$ - 0
4Site Rough GradingLSUM1$ - 0
FOOTINGS & FOUNDATIONS
5Concrete FootingsLSUM1$ - 0
6Concrete Floor SlabsLSUM1$ - 0
CONCRETE MASONRY - EXTERIOR/INTERIOR WALLS
7Echelon Concrete Masonry Units, or Similar or Equal. 8" Exterior Walls Rough Face and Ground Smooth High Polished, Sealed. All Interior Walls 8" Groud Smooth, High Polished, Sealed.LSUM1$ - 0
EXPOSED WOOD CEIILING
9Exposed 1X8 Western Red Cedar, Smooth Face; 'A' Clear; Kiln-Dried; Tongue and Groove; 'V' Joint One Side; WRCLA, VG-1
Exposed 1X6 Western Red CedarLSUM1$ - 0
ROOF FRAMING SYSTEM
10Roof Trusses @ 2'-0" o.c.; 7/16" OSB Roof Deck SheathingLSUM1$ - 0
EXTERIOR DOORS & WINDOWS
11DoorsEACH10$ - 0
12WindowsEACH8$ - 0
INTERIOR BATHHOUSE
13Polished Concrete FloorsLSUM1$ - 0
14Water Closets, Urinals, & LavitoriesEACH23$ - 0
15ShowersEACH6$ - 0
16CountertopsEACH2$ - 0
17Toilet Stall Partitions - wallsEACH8$ - 0
18Toilet Stall Partitions - doorsEACH9$ - 0
19Accessories (Grab Bars, Soap Dispensers, Toilet Paper Dispensers, Sanitary Napkin Disposal)EACH45$ - 0
MECHANICAL
20Interior & ExteriorLSUM1$ - 0
ELECTRICAL
21Interior & ExteriorLSUM1$ - 0
FINAL EXTERIOR SITE WORK
22Finished Exterior GradesLSUM1$ - 0
23Exterior Finished Concrete SidewalksLSUM1$ - 0
24ADA Parking and Regular ParkingLSUM1$ - 0
25Asphalt Paving-Camper Drives and CirculationLSUM1$ - 0
26Rain Gardens - Connect to Storm and Rain Water DischargeLSUM1$ - 0
27Site RestorationLSUM1$ - 0
28Site Landscaping - Native Planting(s)LSUM1$ - 0
29Site Benches, Bicycle Racks - Non ParticipatingEACH3$ - 0
30Bike Racks, 6 bikes each - Non ParticipatingEACH3$ - 0
31Water Service ( abandon existing, reconnect, and new water line)LSUM1$ - 0
32Septic Tanks, Dosing Tank, Pumps, Controls, piping and tile field systemLSUM1$ - 0
33Wooden Boardwalk, 5 feet wide - Non ParticipatingLF85$ - 0
34Footwash stationEACH1$ - 0
35Concrete Parking bumpersEACH8$ - 0

Total $ - 0