This Invitation for Bid (IFB) 26-144 is issued by the California State Transportation Agency, Department of Motor Vehicles (DMV), Administrative Services Division, for the installation of modular turnstiles with clear swinging glass barriers at DMV Headquarters, Building East in Sacramento, California. The project involves installing six lanes of eight-pedestal Gunnebo OptiStile 1080 turnstiles in the South Lobby and two lanes of three-pedestal turnstiles in the North Lobby, along with associated desktop remote touchscreen controllers, card readers, emergency egress wiring, and tempered glass panel work. The scope includes removal of existing turnstile components, installation of new equipment with specific dimensional requirements for ADA compliance, electrical and data conduit work, integration with existing access control and fire safety systems, tile repair, and comprehensive technical support services. The mandatory pre-bid conference is scheduled for December 2, 2026, at 10:00 AM, with written questions due by December 4, 2026, at 4:00 PM. Bids must be submitted via email by December 15, 2026, at 10:00 AM, with bid opening at 2:30 PM on the same date. The contract term is sixty calendar days, with a proposed start date of January 1, 2027, or upon contract approval. The contract is awarded on a lowest responsible responsive bid basis.

Bidders must possess a valid California B contractor license and minimum three years of experience providing Gunnebo turnstile installation and maintenance services to government entities or private sector businesses with at least 3,500 employees, more than five facilities, and large geographic deployment. Contractors must maintain a Standard Service Agreement (SSA) with Gunnebo and be manufacturer-certified resellers. The DMV requires bidder security equal to ten percent of the total bid amount if the bid exceeds $461,000. Prevailing wage requirements apply to bids exceeding $1,000, and public works contractor registration with the Department of Industrial Relations is required for bids exceeding $25,000. Insurance requirements include commercial general liability of $1,000,000 per occurrence and workers compensation with $1,000,000 employer liability limits. A payment bond equal to 100 percent of the contract amount is required if the bid exceeds $25,000. The contract includes a three-year factory warranty on all parts and one preventive maintenance visit within one year. Technical support consists of unlimited toll-free telephone support with one business day response time and on-site support within three hours of approval. Small Business Enterprise (SBE) preference and Disabled Veteran Business Enterprise (DVBE) participation incentives are applicable to this IFB. Travel reimbursement is not provided.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CALIFORNIA STATE TRANSPORTATION AGENCY GAVIN NEWSOM, Governor

DEPARTMENT OF MOTOR VEHICLES

ADMINISTRATIVE SERVICES DIVISION

P.O. BOX 932382

SACRAMENTO, CA 94232-3820

California Relay Telephone Service for the deaf or hard of hearing from TDD Phones: 1-800-735-2929; from Voice Phones: 1-800-735-2922

ADM 668 (REV. 1/2019) DMVWeb A Public Service Agency

26-144

INVITATION FOR BID

Notice to Prospective Bidders

November 17, 2026

You are invited to review and respond to this Invitation for Bid (IFB) entitled 26-144 – Installation of modular turnstiles with clear swinging glass barriers at the DMV Headquarters, Building East. This IFB is advertised in the California State Contracts Register through Cal eProcure at:

http://www.caleprocure.ca.gov or http://www.dgs.ca.gov

Please note that you must register with Cal eProcure in order to download IFB packages and any other provided documents from the Cal eProcure website.

Bidders are advised to check the Cal eProcure website for addendums, modifications, and updates to the bid documents. The Department of Motor Vehicles (DMV) is not responsible for failure of the prospective bidder to check for any bid document updates, changes, or answers to questions posted on Cal eProcure. Failure to periodically check the website will be at the bidder's sole risk.

In submitting your bid, you must comply with the instructions found herein. Your bid must be submitted via email (the DMV will not accept a mailed or hand-delivered bid).

Note that all agreements entered into with the State of California will include by reference General Terms and Conditions and Contractor Certification Clauses that may be viewed and downloaded at Internet site:

http://www.dgs.ca.gov

In the opinion of the DMV, this IFB package is complete and without need of explanation. The contact person for this IFB is:

Julie Phang Department of Motor Vehicles

Phone: (916) 818-2855 Email: julie.phang@dmv.ca.gov

Please note that no verbal information given will be binding upon the state unless such information is issued in writing as an official addendum.

Julie Phang Contract Administrator http://www.dgs.ca.gov/

TABLE OF CONTENTS

SECTION

BIDDER REQUIREMENTS AND INFORMATION

1. Purpose and Description of Services

2. Bidder Qualifications

3. Bidder Security

4. Prevailing Wage

5. Pre-Approved Equal Manufacturers/Brands

6. Schedule of Events

7. Mandatory Pre-Bid Conference

8. Written Questions

9. Submission of Bid

10. Bid Opening

11. Disposition of Bids

12. Evaluation and Selection

13. Notice of Contract Award

14. Standard Conditions of Service

15. Required Documents (Awarded Contractor)

16. Bid Preference(s)

17. Bid Incentive(s)

18. Generative Artificial Intelligence (GenAI)

STANDARD AGREEMENT FORM (SAMPLE)

EXHIBIT A – Scope of Work EXHIBIT B – Budget Detail and Payment Provisions EXHIBIT C – General Terms and Conditions EXHIBIT D – Special Terms and Conditions EXHIBIT E – Additional Provisions EXHIBIT F – Noncollusion Declaration EXHIBIT G – Standard California Nondiscrimination Construction Contract EXHIBIT H – Drawing(s) APPENDIX A The United States Department of Transportation Standard Title VI/Non-Discrimination

Assurances DOT Order No. 1050.2A APPENDIX E The United States Department of Transportation Standard Title VI/Non-Discrimination

Assurances DOT Order No. 1050.2A

REQUIRED BID DOCUMENTS CHECKLIST

ATTACHMENT 1 – Bid/Bidder Certification Sheet

ATTACHMENT 2 – Cost Sheet ATTACHMENT 3 – Payee Data Record ATTACHMENT 4 – Bidder Declaration & Subcontractor/Supplier List ATTACHMENT 5 – Darfur Contracting Act ATTACHMENT 6 – California Disabled Veteran Business Enterprise Participation Requirement and

Incentive ATTACHMENT 7 – California Civil Rights Laws Certification

ATTACHMENT 8 – Bidder’s Bond

1. Purpose and Description of Services

A. Installation of modular turnstiles with clear swinging glass barriers at the DMV Headquarters, Building East. Term: Sixty (60) calendar days (see Schedule of Events for proposed start date of contract). See Exhibit A, Scope of Work, for a complete description of services.

2. Bidder Qualifications

A. On March 4, 2022, Governor Gavin Newsom issued Executive Order N-6-22 regarding Economic Sanctions against Russia and Russian entities and individuals. “Economic Sanctions” refers to sanctions imposed by the U.S. government in response to Russia’s actions in Ukraine, as well as any sanctions imposed under state law. By submitting a bid, the bidder represents that it is not a target of Economic Sanctions. Should the State determine, at any time prior to the execution of a contract, that the bidder is a target of Economic Sanctions or is conducting prohibited transactions with sanctioned individuals or entities, that shall be grounds for rejection of the bidder’s bid by the DMV.

B. The bidder shall possess a valid B contractor license issued by the California Department of Consumer Affairs, Contractors State License Board (CSLB). All subcontractors that the bidder intends to utilize to perform work under the contract shall possess all applicable contractor licenses for the work they shall perform under the contract. The bidder’s contractor license number shall be indicated on the Bid/Bidder Certification Sheet (Attachment 1). The names of all subcontractors that the bidder intends to utilize and their contractor license number (if applicable) shall be indicated on the Bidder Declaration & Subcontractor/Supplier List (Attachment 4). All bidder and subcontractor contractor licenses shall be in good standing from the time of the bid opening through the term of the contract.

C. The Contractor must have a minimum of three (3) years of experience providing Gunnebo turnstile hardware component installation and maintenance services to a government entity or private sector business of similar scale and complexity to the California DMV. Similar scale and complexity is defined as:

(1). Equal to or greater than thirty-five hundred (3,500) employees.

(2). More than five (5) facilities; and

(3). Large geographic deployment.

D. The Contractor shall provide references upon request and the DMV has a right to contact the references provided before the DMV finalizes this agreement. Failure to meet the minimum experience or scale and complexity requirements are subject to being disqualified from the bidding process.

E. The Contractor must have a Standard Service Agreement (SSA) with Gunnebo, fully authorizing the installation of turnstile hardware products, including turnstile controllers. The Contractor must maintain their SSA for the duration of this agreement.

F. The Contractor personnel performing work onsite shall have knowledge of the components being installed, and they shall have such knowledge to modify, program, make changes to, or work with the DMV Project Manager to identify any issues with potential failure of the turnstile system or its components.

G. The Contractor shall be a manufacturer certified partner with a qualification as a certified reseller of Gunnebo turnstile products.

H. Proof of these certifications must be provided to the DMV with their bid and must be maintained during the term of this agreement.

I. The Contractor shall give permission to the DMV to verify such certifications with the manufacturer.

3. Bidder Security

A. Bidder shall submit one of the following forms of bidder security (equal to 10% of the total bid amount) at the time of bid submittal if total bid amount exceeds $461,000.00:

(1). Bid bond executed by an admitted surety insurer and made payable to the DMV. Utilize the Bidder’s Bond form in Attachment 8.

(2). Cash

(3). Cashier’s check

(4). Certified check

4. Prevailing Wage

A. In accordance with the provisions of Labor Code Sections 1770 - 1776, the bidder and their proposed subcontractor(s) shall adhere to the payment of prevailing wages as determined by the California Department of Industrial Relations (DIR) if the bidder’s total bid amount exceeds $1,000.00. The prevailing wage rate determinations can be downloaded from the DIR’s internet website at: http://www.dir.ca.gov. Copies of the DIR’s downloadable prevailing wage rate determinations are also on file at DMV Headquarters, and are available to any interested party on request. Additional questions regarding prevailing wage determinations shall be referred to the DIR’s Division of Labor Statistics and Research, Prevailing Wage Unit, at:

http://www.dir.ca.gov.

B. In the event the bidder’s total bid amount exceeds $25,000.00, the bidder and all subcontractors that the bidder intends to utilize to perform work under the contract, shall be a registered public works contractor with the DIR. The bidder shall provide proof of DIR registration for the bidder and all subcontractors that the bidder intends to utilize to perform work under the contract with their bid. All bidder and subcontractor public works contractor registrations with the DIR shall be active from the time of the bid opening through the term of the contract, and shall remain active following the term of the contract until all certified payroll records in connection with the contract have been submitted to the DIR Labor Commissioner.

5. Pre-Approved Equal Manufacturers/Brands

A. For all materials, products, and/or items identified in Exhibit A, Scope of Work, that allow for a pre-approved equal manufacturer/brand, a bidder may submit a maximum of one (1) alternative manufacturer/brand per material/product/item identified for the DMV’s consideration. The bidder shall email alternative manufacturer/brand requests to the contact person identified on the cover page of this IFB no later than the date and time specified in the Schedule of Events for submitting written questions regarding this IFB. The DMV’s consideration of any alternative manufacturer/brand shall not be deemed as advance acceptance by the DMV. The DMV shall be the sole judge whether or not an alternative manufacturer/brand is considered equal, and may reject any submittal it deems inappropriate. The DMV’s decision shall be final.

The remainder of this page is intentionally left blank.

http://www.dir.ca.gov/

6. Schedule of Events

Event Date Time

(1). IFB available to prospective bidders: 11/17/2026 N/A

(2). Mandatory pre-bid conference:

(Note: See additional info in Section 7.)

12/02/2026 10:00AM

(3). Written questions regarding IFB are due by:

(Note: See additional info in Section 8.)

12/04/2026 4:00PM

(4). Written responses to questions released by: 12/09/2026 4:00PM

(5). Final date for bid submission:

(Note: See additional info in Section 9.)

12/15/2026 10:00AM

(6). Date of bid opening:

(Note: See additional info in Section 10.)

12/15/2026 2:30PM

(7). Proposed start date of contract: 1/1/2027 or Upon Contract

Approval

N/A

7. Mandatory Pre-Bid Conference

A. A mandatory pre-bid conference is scheduled at the DMV HQ Building East, south lobby (meet at the main entrance reception), located at 2415 First Ave, Sacramento, CA 95818, for the purpose of discussing concerns regarding this IFB.

B. Potential bidders must be present at the designated meeting location notated above, at the time specified in the Schedule of Events. Potential bidders who are not at the designated meeting location at the specified time shall not be allowed to participate in the pre-bid conference.

C. Potential bidders must be present at the meeting location notated above, at the time specified in the Schedule Events, to sign in on the pre-bid conference sign in sheet at the mandatory pre-bid conference in order to be eligible to submit a bid. Signing in on the pre-bid conference sign in sheet shall be the only acceptable proof that a potential bidder attended the pre-bid conference.

Signing in on a building security/visitor log, providing a business card, or providing any other type of proof shall not be considered as acceptable proof of attending the pre-bid conference. If a bid is submitted by a potential bidder who failed to sign in on the pre-bid conference sign in sheet, the bid shall remain unopened and be returned to the bidder.

D. In the event a potential bidder is unable to attend the mandatory pre-bid conference, an authorized representative may attend on their behalf. The representative may only sign in for one (1) company. Subcontractors may not represent a potential bidder at a mandatory pre-bid conference. No bid shall be accepted unless the potential bidder or their authorized representative signed in on the pre-bid conference sign in sheet at the mandatory pre-bid conference.

E. Potential bidders who need assistance to attend the pre-bid conference due to a physical impairment, a reasonable accommodation shall be provided by the DMV upon request. The potential bidder must contact the contact person indicated on the cover page of this IFB package no less than five (5) DMV business days prior to the scheduled date and time of the pre-bid conference to arrange for a reasonable accommodation.

8. Written Questions

A. Submit all written questions via email to the contact person indicated on the cover page of this IFB package no later than the date and time specified in the Schedule of Events. Written responses to IFB questions will be released by the date and time specified in the Schedule of Events and viewable in the online project advertisement in Cal eProcure at:

http:/www.caleprocure.ca.gov.

9. Submission of Bid

A. Bids must be received via email no later than the date specified in the Schedule of Events. The DMV will not accept any bids that are mailed or hand-delivered.

(1). Bids shall be emailed in non-fillable PDF format (one [1] file that includes all required bid documents) to DMVBIDS@dmv.ca.gov. Only bids sent to this email will be considered.

Bids that contain any bid information in the body of the email may be rejected. Bids shall be sent to the email address listed above and contain the following information in the Subject Line only:

a. Bid # 26-144 for JULIE PHANG for the installation of modular turnstiles with swinging glass barriers. Due: December 15, 2026 By 10:00AM

1. Bids may be deemed non-responsive if the subject line does not contain the above information.

(2). Emails shall not exceed one hundred (100) megabytes (MB) in size.

(3). Emailed bids will not be opened until after the date specified in the Schedule of Events.

(4). Bidders that send bid submission emails that are successfully received by the DMV at the above email address will receive an automated confirmation of bid received email response (the response will only acknowledge the receipt of an email and not identify the bid number or service/project description). In the event a bidder does not receive an automated confirmation of bid received email response after sending a bid submission email to the above email address, the bidder shall be responsible for confirming the DMV’s receipt of their bid with the contact person indicated on the cover page of this IFB package.

B. Bids must be received by the DMV no later than the specified in the Schedule of Events. Any bid received after the specified due date shall be rejected.

C. Bids shall include all required bid documents identified in the Required Bid Documents Checklist. Only submit the required bid documents with your bid, not the entire IFB package. Bids not including the required bid documents shall be deemed non-responsive. A non-responsive bid is one that does not meet the basic bid requirements.

D. Bidders are responsible for ensuring the accessibility and legibility of the submitted documents.

Bids that are not accessible or legible may be rejected.

E. All documents requiring a signature must bear an original signature of a person authorized to bind the bidding firm.

F. Bids must be submitted for the performance of all the services described herein. Any deviation from the work specifications shall not be considered and shall cause a bid to be rejected.

G. Costs for developing bids in anticipation of award of the contract are entirely the responsibility of the bidder and shall not be charged to the DMV.

mailto:DMVBIDS@dmv.ca.gov

H. An individual who is authorized to bind the bidding firm contractually shall sign the Bid/Bidder Certification Sheet (Attachment 1). The signature must indicate the title or position that the individual holds in the firm. An unsigned bid may be rejected.

I. A bidder may modify a bid after its submission by withdrawing its original bid and resubmitting a new bid prior to the bid submission deadline. Bidder modifications offered in any other manner, oral or written, shall not be considered.

J. A bidder may withdraw their bid by submitting a written withdrawal request to the DMV, signed by the bidder or an authorized agent. A bidder may thereafter submit a new bid prior to the bid submission deadline. Bids may not be withdrawn without cause subsequent to bid submission deadline.

K. The DMV may modify this IFB prior to the date fixed for submission of bids by the issuance of an addendum to all parties who received a bid package.

L. Bidders are cautioned to not rely on the DMV during the evaluation to discover and report to the bidder any defects and errors in the submitted documents. Bidders, before submitting their documents, should carefully proof them for errors and adherence to the IFB requirements.

M. Where applicable, bidders should carefully examine work sites and specifications. Bidders shall investigate conditions, character, and quality of surface or subsurface materials or obstacles that might be encountered. No additions or increases to the contract amount shall be made due to a lack of careful examination of work sites and specifications.

N. All documents submitted in response to this solicitation will become the property of the State of California and may be subject to the California Public Records Act (Government Code section 6250 et seq.). This includes any contact information within the documents, including that of references. Additionally, to the extent that a bidder believes its bid contains trade secret or proprietary information intended to be confidential, it is the bidder’s responsibility to identify and redact such information. A separate redacted copy of the bid must be submitted along with the original unredacted bid, and it will be the bidder’s responsibility to defend any redactions should a requester dispute them under the Public Records Act. In the absence of a pre-redacted bid, the DMV will treat the entire bid as a public record, except any information the DMV is required to redact under California law.

10. Bid Opening

A. If you plan to attend the public bid opening, you must email the contact person indicated on the cover page of this IFB no less than 24 hours prior to the bid opening date and time. The contact person will email the bid opening information, held virtually through Microsoft Teams.

11. Disposition of Bids

A. All documents submitted in response to this IFB shall become the property of the State of California, and shall be regarded as public records under the California Public Records Act (Government Code Section 6250 et seq.). However, the contents of all proposals, draft bids, correspondence, agenda, memoranda, working papers, or any other medium which discloses any aspect of a bidder's bid, shall be held in the strictest confidence until notice of award is released. The content of all working papers and discussions relating to a bid shall be held in confidence indefinitely, unless the public's interest is best served by an item’s disclosure because of its direct pertinence to a decision, agreement, or evaluation of a bid.

12. Evaluation and Selection

A. Each bid shall be checked for the presence or absence of required information in conformance with the submission requirements of this IFB.

B. The DMV shall put each bid through a process of evaluation to determine its responsiveness to the DMV's needs.

C. A bidder may be deemed not responsible and their bid may be rejected if they have previously been terminated for cause/breach for the same or similar services at the location designated in this IFB.

D. All bids may be rejected whenever the DMV determines that the cost is not reasonable or otherwise in the best interest of the DMV. There is no requirement to award a contract if, in the opinion of the DMV, no bids were received containing a reasonable contract price or if there is another business-based reason not to make an award.

E. Following the time of the bid opening, and prior to award of the contract, the DMV reserves the right to request that any bidder submit substantiation data to verify that the materials, products, items, and equipment to be incorporated into the work by the bidder shall equal or exceed the class or quality of the materials, products, items, and equipment that are designated within Exhibit A. When requested by the DMV, a bidder shall provide the DMV with all requested substantiation data within two (2) calendar days following DMV’s request. The DMV reserves the right to reject any bidder proposed materials, products, items, and equipment that the DMV has determined does not equal or exceed the class or quality of the materials, products, items, and equipment that are designated in Exhibit A.

F. Bids that contain false or misleading statements, or which provide references that do not support an attribute or condition claimed by the bidder, may be rejected. If, in the opinion of the DMV, such information was intended to mislead the DMV in its evaluation of the bid, and the attribute, condition, or capability is a requirement of this IFB, it shall be the basis for rejection of the bid.

G. A bid may be rejected if it is conditional or incomplete. The DMV may reject any or all bids and may waive any immaterial deviation in a bid. The DMV's waiver of immaterial defect shall in no way modify the IFB document or excuse the bidder from full compliance with all requirements if awarded the contract.

H. A bid may be rejected if it contains any alterations of form or other irregularities of any kind. The DMV does not accept alternate contract language from prospective contractors. Bids with such language shall be considered a counter proposal and shall be rejected. The State’s General Terms and Conditions (GTC) are not negotiable. The GTC may be viewed on the internet at:

http://www.dgs.ca.gov.

I. The final selection shall be made on the basis of the lowest responsible responsive bid. In the event there is tie, each of the tied bidders shall be contacted by the contact person indicated on the cover page of this IFB regarding a date and time for a flip of a coin. The bidder whose bid was received first shall make the call. Bidders or their authorized representative(s) are allowed to be present for the flip of the coin.

13. Notice of Contract Award

A. The DMV shall email or mail bidding contractors a written notice of contract award.

14. Standard Conditions of Service

A. Following the release of the written notice of contract award, the DMV shall email or mail the awarded contractor a prepared contract for signature that includes a cover letter instructing the awarded contractor on how to proceed. The cover letter may request that additional information and/or required documents be provided by the awarded contractor before the contract can be fully executed.

B. Services shall be available on the expressed date set by the DMV and the awarded contractor after all approvals have been obtained and the contract is fully executed.

C. All performance under the contract shall be completed on or before the termination date of the contract.

D. No oral understanding or agreement shall be binding on either party.

15. Required Documents (Awarded Contractor)

A. Prior to approval of the contract, unless otherwise specified below, the awarded contractor shall provide the DMV with all of the following required documents within five (5) calendar days after the contract has been forwarded to the awarded contractor for signature. If the awarded contractor fails to provide the DMV with all of the following required documents within the above specified number of calendar days after the contract has been forwarded to the awarded contractor for signature, the DMV may deem the awarded contractor as non-responsive and may rescind the contract award:

(1). Contractor Certification Clauses

a. The awarded contractor shall sign and submit to the DMV, page one (1) of the Contractor Certification Clauses (CCC) which can be found on the Internet at:

http://www.dgs.ca.gov.

(2). Insurance Requirements

a. When requested by the DMV, the awarded contractor shall provide the DMV with all of the following certificate(s) of insurance (Note: The DMV shall not be responsible for any premiums or assessments on insurance policies):

1. Commercial General Liability

A. Coverage shall provide limits of not less than $1,000,000.00 per occurrence for bodily injury and property damage liability combined. The policy shall include coverage for liabilities arising out of premises operations, independent contractors, products/completed operations, personal and advertising injury and liability assumed under an insured contract. This insurance shall apply separately to each insured against whom claim is made or suit is brought subject to the Contractor’s limit of liability.

B. The insurance policy shall include the following additional insured endorsement that shall be under form acceptable to DGS, Office of Risk and Insurance Management (ORIM):

(1). The State of California, its officers, agents and employees are included as additional insured, but only with respect to work performed for the State of California.

2. Worker’s Compensation

A. Employer liability limits of not less than $1,000,000.00 are required if the awarded contractor employs any person, in any manner, that is subject to the Workers Compensation Laws of California. The awarded contractor shall maintain statutory workers compensation and employer’s liability coverage for all of its employees who will be engaged in the performance of the contract. If the awarded contractor does not employ any person, in any manner, so as to not become subject to the Workers’ Compensation laws of California, the awarded contractor shall contact the DMV Contract Administrator to request a Workers’ Compensation Exemption Certification form. This form shall be completed by the awarded contractor and submitted to the DMV prior to approval of the contract.

B. The awarded contractor’s workers compensation insurance policy shall be endorsed with a waiver of subrogation in favor of the State of California in the event the awarded contractor employs any person, in any manner, that is subject to the Workers Compensation Laws of California.

(3). Payment Bond

a. Per Public Contract Code Section 7103, the awarded contractor shall provide a payment bond equal to one-hundred-percent (100%) of the total amount payable under the contract if the awarded contractor’s total bid amount exceeds $25,000.00. The payment bond must be printed on Standard Form 807 (STD 807), and must include the contract number and the description of work to be performed under the contract. The payment bond must be executed by the Contractor and a corporate surety authorized to transact a general surety business in the State of California.

16. Bid Preference(s)

A. The following preferences are applicable to this IFB:

(1). Small Business Enterprise (SBE) Preference

a. SBE Program info can be found at the following internet web site:

http://www.dgs.ca.gov.

(2). Non-Small Business (Non-SB) Preference

a. Non-SB preference info can be found at the following internet web site:

http://www.dgs.ca.gov (Note: Non-SB Preference cannot displace a direct award to a California certified Small Business or a California certified Micro Business).

17. Bid Incentive(s)

A. The following incentive is applicable to this IFB:

(1). Disabled Veteran Business Enterprise (DVBE) Participation Incentive

a. See Attachment 6 for DVBE Participation Incentive information (Note: DVBE Participation Incentive cannot displace a direct award to a California certified Small Business or a California certified Micro Business).

18. Generative Artificial Intelligence (GenAI)

A. The State of California seeks to realize the potential benefits of GenAI, through the development and deployment of GenAI tools, while balancing the risks of these new technologies.

B. Bidder must notify the State in writing if it: (1) intends to provide GenAI as a deliverable to the State; or (2), intends to utilize GenAI, including GenAI from third parties, to complete all or a portion of any deliverable that materially impacts: (i) functionality of a State system, (ii) risk to the State, or (iii) Contract performance. For avoidance of doubt, the term “materially impacts” shall have the meaning set forth in State Administrative Manual (SAM) § 4986.2 Definitions for GenAI.

C. Failure to report GenAI to the State may result in disqualification. The State reserves the right to seek any and all relief to which it may be entitled to as a result of such nondisclosure.

D. Upon notification by a Bidder of GenAI as required, the State reserves the right to incorporate GenAI Special Provisions into the final contract or reject bids that present an unacceptable level of risk to the State.

E. Government Code 11549.64 defines “Generative Artificial Intelligence (GenAI)” as an artificial intelligence system that can generate derived synthetic content, including text, images, video, and audio that emulates the structure and characteristics of the system’s training data.

DO NOT COMPLETE OR SUBMIT WITH YOUR BID!

EXHIBIT A

SCOPE OF WORK

1. Contractor’s Full Business Name (to be completed by the DMV), hereinafter referred to as the Contractor, agrees to provide the Department of Motor Vehicles (DMV) all labor, tools, materials, equipment, and travel necessary to install new devices and components for modular turnstiles with swinging glass barriers and desktop remote touchscreen controllers, for entrance and exit capabilities, for DMV Building East, South and North lobbies for the term of this Agreement. The Contractor is responsible for field verifying all dimensions and existing site conditions pertinent to this Agreement.

2. The services shall be performed at:

DMV Headquarters, Building East, 2415 First Ave., Sacramento, CA 95818.

3. Commencement and Completion of Work

A. The Contractor shall commence work under this Agreement on the specified start date provided by the DMV Project Manager following the execution of this Agreement by the state. The DMV Project Manager shall provide the Contractor with written notification of the start date prior to the Contractor commencing work under this Agreement.

B. The Contractor shall complete all work under this Agreement within sixty (60) calendar day(s) from the specified start date provided by the DMV Project Manager, no later than the expiration date of this Agreement.

4. The services shall be performed during normal DMV business hours, Monday – Friday, 6:00AM to 4:00PM, or non-DMV business hours, Monday – Friday, 6:00PM to 2:00AM, except State holidays, unless prior approval is obtained from the DMV Project Manager. Any drilling, imaging, cutting, or coring of tiles, metal, or concrete, etc., requires the Contractor to perform these services during non- DMV business hours, Sundays, between 6:00AM and 4:00PM, except State holidays. Work shall begin within thirty (30) calendar days of the execution of this agreement. All work dates and times must be approved by the DMV Project Manager before work is performed.

5. The Project Managers during the term of this Agreement shall be:

Department of Motor Vehicles Contractor Name (TBD)

Name: TBD Name: TBD

Phone: TBD Phone: TBD

Email: TBD Email: TBD

6. Any questions or issues regarding the management of this Agreement shall be directed to the following Contract Coordinators:

Department of Motor Vehicles Contractor Name (TBD)

Name: TBD Name: TBD

Address:

TBD Address:

TBD

Phone: TBD Phone: TBD

Email: TBD Email: TBD

7. In the event of any changes to the name, address, and/or contact information for the Project Managers and/or Contract Coordinators identified in this Exhibit, the party making the changes shall notify the other party in writing.

8. Detailed description of work to be performed and duties of all parties:

A. Summary of Work

(1). The Contractor shall comply with the scope of work as identified in Exhibit A.

(2). The Contractor shall assume responsibility for completion of work identified in this Statement of Work.

(3). The Contractor’s personnel must read and provide written agreement to DMV’s Information Security Policy prior to connecting to the DMV Network.

(4). If requested, the Contractor shall attend project meetings and periodic briefings as requested by the DMV Project Manager.

(5). Contractor personnel shall perform their duties on the premises of the DMV, during DMV’s regular workdays and normal work hours, except as specifically agreed to otherwise in writing by the DMV Project Manager. There will be no increase in hourly rates for extended hours or days.

(6). While working on the DMV HQ Campus, the Contractor and its employees shall wear appropriate clothing with their company logo, wear safety vests or high visibility clothing while working outside (weather permitting), maintain a professional image at all times, and shall wear DMV issued access badges or temporary badges issued by the DMV Project Manager.

(7). Building East South Lobby (Main Entrance Reception)

a. The Contractor shall remove the existing six (6) lane, eight (8) pedestal, turnstile components in a methodical fashion, not all at once, as determined by the DMV Project Manager to facilitate the right of way for staff when the turnstiles are not operational.

b. The Contractor shall install a new six (6) lane, eight (8) pedestal Gunnebo OptiStile 1080 turnstile with clear swinging glass barriers, stainless steel in color, and with black glass face plates, with the following minimum opening width dimensions. The Contractor shall count each lane, from right to left (East to West) when referring to the lane numbers (see Exhibit A3):

1. Lane one (1) shall have a non-obstructed opening of no more than thirty inches (30”) within the barriers.

2. Lane two (2) shall have a non-obstructed opening of no more than thirty inches (30”) within the barriers.

3. Lane three (3) shall have a non-obstructed opening of at least thirty-six inches (36”) within the barriers for ADA access.

4. Lane four (4) shall have a non-obstructed opening of at least thirty-six inches (36”) within the barriers for ADA access.

5. Lane five (5) shall have a non-obstructed opening of no more than thirty inches (30”) within the barriers.

6. Lane six (6) shall have a non-obstructed opening of no more than thirty inches (30”) within the barriers.

c. All turnstiles for the main entrance lobby location shall be measured by the Contractor to match existing mounting locations from the previous turnstiles.

The Contractor shall conduct onsite measurements and provide exact recommended turnstile lengths to the DMV Project Manager for the turnstile locations that are being installed prior to submitting the order to the manufacturer. Failure of the Contractor to provide proper measurements to the manufacturer shall be the responsibility of the Contractor; the DMV shall not be liable for any additional costs associated with obtaining new turnstiles with the proper measurements (See Exhibit A6).

d. The Contractor shall identify all existing electrical and data conduit runs and determine what can be utilized for the new installation and follow the recommended electrical schematic from the manufacturer (See Exhibit A8). The Contractor shall utilize the existing conduit within the floor to install new data and electrical wiring that are required per the turnstile manufacturer specifications that meet current building and electrical code standards. The Contractor shall install, as needed, additional conduit and wire for any electrical or data needs to the appropriate junction boxes, electrical panels, access control panels, and network closets. The Contractor shall remove any unused or obsolete wires.

The Contractor is responsible for any imaging, coring, drilling, cutting, etc. for installation.

e. The Contractor shall work with the DMV Project Manager’s current security and access control vendor to install multi-class card readers that will work with DMV’s current HID proxy cards on the DMV’s CCURE 9000 access control system for each turnstile pedestal, and install all wiring required from each pedestal, to be connected to the access control panel that is currently installed within one-hundred and fifty feet (150’) from the turnstile installation area. The Contractor shall terminate the wire run inside the access control panel cabinet and identify each wire for each specific turnstile pedestal by labeling them with appropriate and identifiable language (i.e., Lane 1 entry reader). Location of the panel shall be disclosed when the project begins.

f. The Contractor shall work with DMV Project Manager’s fire safety system vendor to install all wiring (red wire) per the turnstile manufacturers specification for emergency egress. The Contractor shall install and provide all conduit, wire, junction boxes, relays, etc. and terminate the wire at the specified fire control panel within two hundred feet (200’) from the turnstile installation location. The Contractor shall assist the fire safety system vendor in testing and ensuring the turnstiles work as required per manufacturer specifications. If necessary, any relay(s) installed per the manufacturers specifications or fire safety system vendor recommendations, shall require the Contractor to install a battery back-up device provided by the manufacturer at time of delivery, at the location of the relay junction box installation, in the event of a power outage and fail-safe purposes.

Piceno, Kelly D.@DMV Check numbering/lettering sequancing

g. The Contractor shall measure, remove and reinstall four (4) interior clear tempered glass panels, half inch (½”) overall with beveled exposed edges, including any drilling for mechanical fastening to the building structure to match existing conditions. The Contractor shall perform field measurements for exact dimensions prior to taking the glass to a glass shop to cut down to proper length including frame and support base. The Contractor shall ensure all vinyl gaskets are in place, and they shall match existing gaskets or replace with matching vinyl gaskets as needed. See Exhibit A5 for locations and approximate dimensions.

h. The Contractor shall remove all glass from the turnstile window frames and dispose of all glass in an appropriate manner.

i. The Contractor shall set up protective pedestrian barriers to prevent access into the project area while working.

j. The Contractor shall connect all turnstiles to a new MP Touch 2 control module at the East Reception desk identified in Exhibit A3.

(8). Building East North Lobby

a. The Contractor shall remove the existing two (2) lanes, three (3) pedestal, turnstile components in a methodical fashion, not all at once, as determined by the DMV Project Manager to facilitate proper right of way for staff when the turnstiles are not operational.

b. The Contractor shall install a new two (2) lanes, three (3) pedestal Gunnebo OptiStile 1080 turnstile with clear swinging glass barriers and with black glass face plates, with the following minimum opening width dimensions. The Contractor must count each lane from right to left (East to West) when referring to the lane numbers (see Exhibit A4):

1. Lane seven (7) shall have a non-obstructed opening of at least thirty-six inches (36”) within the barriers.

2. Lane eight (8) shall have a non-obstructed opening of at least thirty-six inches (36”) within the barriers.

c. All turnstiles for the main entrance lobby location shall be measured by the Contractor to match existing mounting locations from the previous turnstiles.

The Contractor shall conduct onsite measurements and provide exact recommended turnstile lengths to the DMV Project Manager for the turnstile locations that are being installed prior to submitting the order to the manufacturer. Failure of the Contractor to provide proper measurements to the manufacturer shall be the responsibility of the Contractor; the DMV shall not be liable for any additional costs associated with obtaining new turnstiles with the proper measurements (See Exhibit A7).

d. The Contractor shall identify all existing electrical and data conduit runs and determine what can be utilized for the new installation and follow the recommended electrical schematic from the manufacturer (See Exhibit A9). The Contractor shall utilize the existing conduit within the floor to install new data and electrical wiring that are required per the turnstile manufacturer specifications that meet current building and electrical code standards. The Contractor shall install, as needed, additional conduit and wire for any electrical or data needs to the appropriate junction boxes, electrical panels, access control panels, and network closets. The Contractor shall remove any unused or obsolete wires.

The Contractor is responsible for any imaging, coring, drilling, cutting, etc. for installation.

e. The Contractor shall work with the DMV Project Manager’s current security and access control vendor to install multi-class card readers that will work with DMV’s current HID proxy cards on the DMV’s CCURE 9000 access control system for each turnstile pedestal, and install all wiring required from each pedestal, to be connected to the access control panel that is currently installed within one-hundred and fifty feet (150’) from the turnstile installation area. The Contractor shall terminate the wire run inside the access control panel cabinet and identify each wire for each specific turnstile pedestal by labeling them with appropriate and identifiable language (i.e., Lane 1 entry reader, etc.) Location of the panel shall be disclosed when the project begins.

f. The Contractor shall work with DMV Project Manager’s fire safety system vendor to install all wiring (red wire) per the turnstile manufacturers specification for emergency egress. The Contractor shall install and provide all conduit, wire, junction boxes, relays, etc. and terminate the wire at the specified fire control panel within three hundred feet (300’) from the turnstile installation location. The Contractor shall assist the fire safety system vendor in testing and ensuring the turnstiles work as required per manufacturer specifications. If necessary, any relay(s) installed per the manufacturers specifications or fire safety system vendor recommendations, shall require the Contractor to install a battery back-up device, at the location of the relay junction box installation, in the event of a power outage and fail-safe purposes.

g. The Contractor shall measure, remove and reinstall two (2) interior clear tempered glass panels, half inch (½”) overall with beveled exposed edges.

Including any drilling for mechanical fastening to the building structure to match existing conditions. The Contractor shall perform field measurements for exact dimensions prior to taking the glass to a glass shop to cut down to proper length including frame and support base. The Contractor shall ensure all vinyl gaskets are in place, and they shall match existing gaskets or replace with matching vinyl gaskets as needed. See Exhibit A5 for locations and approximate dimensions.

h. The Contractor shall remove all glass from the window frame and dispose of all glass in an appropriate manner.

i. The Contractor shall set up protective pedestrian barriers to prevent access into the project area while working.

j. The Contractor shall connect all turnstiles to a new MP Touch 2 control module at the North Lobby Reception desk identified in Exhibit A4.

(9). Turnstile Controllers

a. The Contractor shall remove the existing turnstile controllers, and all its existing wiring not needed from the security reception desks located in the main lobby and the north tower locations for preparation of new touchscreen controllers. All removed equipment shall be disposed of according to local and state ordinances.

b. The Contractor shall install:

1. Two (2) new Gunnebo MP Touch 2 desktop remote touchscreen controllers for the main lobby security reception desk and north tower reception desk. This includes all wiring and programming. The Contractor shall utilize the existing conduit runs in the floor that runs to the reception counter and install new wiring as needed. All touchscreens shall control the lanes at its installed location. The controller must not be required to install software on any external device and be considered a stand-alone controller. If the MP Touch 2 controller system requires a network connectivity, the Contractor shall adhere to DMV network policy guidelines and work with the DMV Project Manager and the DMV Network Team to ensure proper connectivity to all two (2) devices is carried out. The controller shall have the following features:

A. Small Built in UPS

B. Web Configure interface

C. Alarm Fault Monitoring

D. Captive touchscreen

E. 10” hi resolution color screen

F. Track passage counts entry and exit

G. Time profile capable

H. Control up to 30 lanes

I. Control each lane individually

(10). Tile Work

a. The Contractor shall repair any light-colored granite tile or dark-colored slate tile squares if removed or damaged for this project at the main lobby reception turnstile area and the North Tower reception turnstile area. The DMV will supply the Contractor with the appropriate tile squares and the Contractor shall be responsible for grout and grout color matching. The Contractor shall supply all tools, grout, and adhesive materials to perform the work and shall be required to perform tile repair work after hours, Monday through Friday, except State holidays.

(11). Manufacturer Requirements

a. The Contractor, after all turnstile pedestals are installed, shall notify the GUNNEBO manufacturer representative to inspect and complete the final portion of the installation as part of this agreement at no additional cost to the DMV.

This is mandated per the manufacturer to ensure the installation is to manufacturer standards and to preserve the warranty of the equipment. The Contractor shall also validate all turnstiles are working and connected properly to turnstile management controllers after the manufacturer representative has completed their portion of the installation.

(12). Safety

a. Work area shall be maintained in a safe and orderly manner during all work. The Contractor shall be responsible for providing safety barriers, signs, etc. and the necessary controls to protect all persons and the State’s property. The Contractor shall place barricades, as required, to maintain a safe work environment.

(13). Dust Control

a. The Contractor shall provide a floor to ceiling dust barrier to keep the surrounding DMV work areas free from dust and debris. The existing tiled work area shall be covered securely to protect the tiles. The job site shall be clean and operational for DMV business needs during the project.

(14). Debris Control

a. Waste materials, both new and old, shall be removed from the work area daily and disposed of, off State property, in accordance with local and state guidelines.

(15). Factory Warranty and Preventive Maintenance

a. Factory warranty shall be three (3) years on all parts for the turnstiles and touch controls, and a one-time preventive maintenance visit within one (1) year after installation.

(16). Technical Support Services

a. Technical Support

1. Telephone

A. The Contractor shall provide the DMV with unlimited toll-free telephone technical support services for the Gunnebo Turnstiles and touch screen controllers. The Contractor shall respond to all DMV service calls within one (1) DMV business day. The Contractor shall attempt to resolve all system issues over the telephone before requesting approval to provide on-site technical support services from the DMV Project Manager or their authorized representative.

2. On-site

A. Upon approval by the DMV Project Manager or their authorized representative, the Contractor shall provide unlimited on-site technical support services for the Gunnebo Turnstiles and touch screen controllers in the event a system issue cannot be resolved over the telephone. The Contractor shall send a qualified technician within three (3) hours following the DMV’s initial service call.

B. When performing on-site technical support services, the Contractor shall notify the DMV Project Manager or their authorized representative of all turnstile system components that are determined to be defective and shall be replaced at no additional cost to the DMV during the term of this agreement. If repairs are not warranty-related, the Contractor shall perform the service at the hourly cost identified in Exhibit B when requested by the DMV Project Manager or their authorized representative.

C. Upon approval and direction from the DMV Project Manager or their authorized representative, the Contractor shall replace defective turnstile components with new components provided by the Contractor at no additional cost to the DMV for the term of this agreement. The Contractor shall coordinate all warranty replacement parts with the manufacturer in an expeditious and professional manner. In the event the Contractor replaces a component that was previously provided by the Contractor under this agreement, the Contractor shall replace the component with a new component at no additional cost to the DMV.

(1). Replacement components provided by the Contractor shall meet the manufacturer standards of the existing manufacture’s components. Upon request by the DMV Project Manager or their authorized representative, the Contractor shall provide photographic or written proof that Contractor provided replacement components meet or exceed the quality of the existing manufacturer components.

(2). All new components provided by…