This is a Request for Proposal (RFP) issued by Madison District Public Schools in Madison Heights, Michigan, for contractor services to replace three rooftop HVAC units (RTUs) at Wilkinson Middle School as part of the district's 2024 Sinking Fund program. The project involves the complete replacement of heating rooftop units including all labor, materials, equipment, controls, mechanical, electrical, roofing, and flashing work. A non-mandatory pre-proposal meeting and walk-through is scheduled for Tuesday, June 24, 2026, at 2:00 PM EST at Wilkinson Middle School. The deadline for clarifications is Tuesday, June 26, 2026, at 2:00 PM EST, and sealed proposals are due Tuesday, July 1, 2026, at 2:00 PM EST, submitted to Mr. Ricky Malak, Safety, Security, and Facilities Manager. Bidder interviews are anticipated for July 3, 2026, by invitation only. The project schedule requires completion in a block of time not exceeding one week, with flexibility for scheduling around school operations. Work will preferably occur prior to the school year start on September 2, 2026, with provisions for off-hours work if equipment delivery occurs during the school year.
Minimum qualifications require firms to have been in business for at least five consecutive years, be licensed to perform work in Michigan, have experience with public sector clients, and have completed at least five RTU replacement projects of $250,000 or more for public sector clients within the last ten years. A bid security of five percent of the bid amount is required, with performance and payment bonds required for work exceeding $50,000. The district intends to prepurchase the three rooftop units prior to procuring installation labor, and the successful contractor will assume responsibility for material purchase payment, all applicable taxes, receipt, installation, and warranty. All labor and materials must be warranted for a minimum of one year from completion. The project uses the AIA A105-2017 standard form of agreement as modified, and proposals will be evaluated based on overall best value considering responsiveness, relevant experience, capacity, contract exceptions, and proposed pricing. There are no prevailing wage requirements for this program, and all proposals must include applicable taxes and fees.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| 26-0622 md rtu labor rfp addendum no 1 unabridged.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Plante Moran Realpoint 3000 Town Center, Suite 100
Southfield, MI 48075
Tel: 248.223.3500 | Fax: 248.223.3150 pmrealpoint.com
Request for Proposal (RFP)
2024 Sinking Fund: 2026 RTU Replacements CLIENT: Madison District Public Schools DATE: June 15, 2026
SUBMISSION INFORMATION
PROJECT DESCRIPTION: Contractor Services for Rooftop HVAC Unit Replacements Work for
Madison District Public Schools Sinking Fund Program OWNER/CLIENT: Madison District Public Schools
26550 John R. Road
Madison Heights, MI 48071
NON-MANDATORY PRE-PROPOSAL
MEETING AND WALK THRU:
Tuesday, June 24, 2026, at 2:00 PM EST at:
Wilkinson Middle School
26524 John R Road
Madison Heights, Michigan 48071
CLARIFICATIONS TO OWNER’S
REPRESENTATIVE:
Ron.zuhorski@plantemoran.com
LAST DATE FOR CLARIFICATIONS: Tuesday, June 26, 2026 @ 2:00PM EST PROPOSAL DUE DATE: Tuesday, July 1, 2026@ 2:00PM EST SUBMIT HARD COPY PROPOSAL TO: Mr. Ricky Malak
Safety, Security, and Facilities Manager
Madison District Public Schools
26550 John R. Road
Madison Heights, Michigan 48071 BIDDER INTERVIEWS: Anticipated for July 3, 2026 as required and by invitation only. Exact time and date to be confirmed.
RFP — 2026 RTU Replacements
Madison District Public Schools
2024 Sinking Fund
Page 2 June 15, 2026
PROPOSAL DETAILS
Madison District Public Schools (MD) located in Madison Heights, Michigan provides a standard, traditional curriculum to a student body ranging from pre-kindergarten through the 12th grade.
On November 5, 2024, the District’s voters passed a Sinking Fund which will run for 10 years until
December 1, 2034. The funds levied will be used to improve facilities and infrastructure over life of the Sinking Fund program. This project is a part of those Sinking Fund improvements.
Madison District Public Schools (hereafter referred to as “Owner”) has engaged Plante Moran
Realpoint (hereafter referred to as “PMR” or “Owner’s Representative”) to provide owner’s representation services for this project. Your firm is invited to submit a proposal for the services required in this request for proposal (RFP).
This RFP is being publicly advertised and includes minimum qualifications that must be met or exceeded. This RFP includes the following attachments:
A. Project Scope
1. Project Description
B. Contract Documents
1. Drawings and Specifications as prepared by Strategic Energy Solutions:
i. Wilkinson Middle School (eight drawing sheets)
ii. Project Manual (62 pages)
2. Equipment prepurchase shop drawings (0000 pages – to be issued in forthcoming addendum)
3. Standard Form of Agreement AIA A105-2017, as modified
C. Proposal Forms
1. Proposal Form
2. Familial Disclosure Statement
3. Iran Disclosure Statement
4. Non-Collusive Affidavit
5. Criminal Background Disclosure Affidavit
This RFP does not commit Owner to award a contract or to undertake any financial obligation whatsoever with respect to the requirement referred to herein. Owner reserves the right to reject any proposal with or without cause, to not award a contract, or to award one or more contracts.
Page 3 June 15, 2026
Owner further reserves the right to waive any irregularity or informality in this RFP process or any proposal. Owner reserves the right to accept or reject, without consideration, any proposal which arrives late. Owner reserves the right to request additional information from any or all firms. In addition, notice is hereby given of the possibility that award may be made without discussion of the proposal. In the event a firm’s proposal is accepted by Owner and the firm asserts exceptions, special considerations, or conditions after acceptance, Owner, in its sole and absolute discretion, reserves the right to thereafter reject the proposal and award another firm. Therefore, the firms should submit their best proposal initially from both technical and cost standpoints.
A. PRE-PROPOSAL
a. CONFIDENTIALITY — From the issue date of the RFP until a firm is selected and selection is announced, a prospective firm shall not communicate about the subject of the RFP or a firm’s proposal with Owner, its board, or employees, except as permitted by the requests for clarifications paragraph. Your proposal and any modifications thereto shall be submitted only to the person(s) listed on the front page. Failure to comply strictly with Owner’s instructions regarding the content and manner of submission of a proposal including, without limitation, disclosure of any information in the proposal or modifications thereof to any third party or other Owner’s staff without the express, prior written approval of the
Owner’s Representative, shall result, at owner’s sole discretion, in the immediate disqualification of the firm.
b. RFP documents may be obtained at the e-Builder website created by PMR and noted on front page. Please contact Kathryn Newkirk at (248) 223-3070 or via email at kathryn.newkirk@plantemoran.com for e-Builder access instructions should you encounter any difficulties.
B. ADDENDA
Any addendum to this RFP will be issued in writing by PMR on behalf of Owner. No information or representation other than that contained in such an addendum, whether received from an employee of Owner or other person, will be considered to have been modified or be grounds for deviation from any stipulation or requirement of this RFP.
C. PROPOSAL FORMAT
Prepare and submit three (3) copies of your proposal package to the designee listed on the first page. Packages should be in 8.5" x 11" format.
Page 4 June 15, 2026
The following proposal format is required:
Section 1 – Proposal Forms
Section 2 - Project Schedule for Defined Work Scope
Section 3 – Bid Bonds Information
Section 4 – Clarifications and Exceptions
Section 5 – Additional Information (if any)
SECTION 1 – PROPOSAL
• Utilize the proposal forms provided as attachments to this RFP. Editable electronic versions of these forms may be obtained at the location indicated on front page.
SECTION 2 – PROJECT SCHEDULE FOR DEFINED WORK SCOPE
• Provide three proposed project schedules as requested in Project Details attachment.
SECTION 3 – BID BONDS INFORMATION
• A bid security, cashier’s check or certified check in the amount of five percent (5%) of the bid amount is required to be included with your proposal submission and shall be made payable to Madison District Public Schools.
SECTION 4 - CLARIFICATIONS AND EXCEPTIONS
• Detail any clarifications, exceptions, or exclusions to this RFP (scope, schedule, fee, etc.)
• List any and all exceptions taken to the contract documents provided. For each exception, alternative language must be proposed. Owner reserves the right to reject any proposed alternative language.
• The prevalence of these exceptions will be considered in reviewing the proposal and in the final selection of the firm for the project. Proposals that do not acknowledge these agreements or do not provide specific alternative language may be rejected.
SECTION 5 – ADDITIONAL INFORMATION
• Please include any additional relevant information.
D. PROPOSAL SUBMISSION
Sealed proposals for the work as described by the RFP package will be received as noted on the front page. Please mark the envelope of all proposals with “Madison District Public Schools -
Page 5 June 15, 2026
Proposal for Rooftop Replacement Contracting Services” and include your firm’s name as well.
Please also follow the specific instructions related to electronic submission.
E. RESPONSIVENESS
To be responsive, the proposal must set forth full, accurate, and complete information as required by this RFP and all attachments.
F. MINIMUM QUALIFICATIONS
In addition to the other requirements of this RFP, the following minimum qualifications must be met by your firm in order to submit a proposal:
• Firm has been in business for at least the last five (5) consecutive years.
• Firm is licensed to perform the required work in the State of Michigan.
• Firm is familiar with and has experience in the public sector, including have at least five (5)
Public sector clients in the last five (5) years.
1. Firm has completed RTU replacement projects of at least $250,000 for at least five (5) Public sector clients within the last ten (10) years.
G. FORM OF AGREEMENT
This is a request for proposal only. Proposals will be treated as offers to enter into contract with
Owner. Owner and successful firm shall memorialize their contractual relationship and obligations using the form of contract attached to this RFP (“Contract”). The Contract contains many details regarding the services required under this RFP, as well as the terms and conditions under which the services shall be provided by the successful firm. The Contract should be reviewed carefully by each firm prior to submitting a proposal. Any exceptions to the terms and conditions contained in the Contract, or any other special considerations or conditions requested or required by the firm relative to this RFP or the form of Contract, shall be expressly and specifically enumerated by the firm and be submitted as part of its proposal, together with an explanation as to the reason such terms and conditions cannot be met by, or, in the firm’s opinion are not applicable to, the firm, provided however, that exceptions or special conditions of the firm will not be binding upon Owner unless those exceptions or special conditions are expressly accepted by Owner and incorporated into the final Contract. Following the selection of the successful firm, if any, by Owner, the
Contract will be finalized by the parties. The final Contract shall be subject to the review and approval by Owner’s legal counsel.
Page 6 June 15, 2026
H. DATA CONFLICTS
Where conflicts occur within this RFP, its contents, and addendum (including but not limited to the Standard Form of Agreement; general, supplemental, and other conditions; etc.) the more restrictive requirements shall govern — all in favor of the Owner.
I. UNSOLICITED TERMS AND CONDITIONS
Proposals which take exception to Owner’s terms and conditions as a whole and substitute the firm’s standard terms and conditions may be rejected.
J. EVALUATION OF PROPOSALS
Proposals will be evaluated based on overall best value to the District considering responsiveness, relevant experience, capacity, contract exceptions, and proposed pricing, and while price is an important factor and may be determinative where proposals are otherwise equal, the District reserves the right to award to the proposer whose proposal is determined to be most advantageous and in the District’s best interest.
Some considerations in the District’s best interest:
• Responsiveness and completeness
• Relevant experience with public-sector work
• Proposed pricing (lump sum and unit prices) is not the main determinate
• Capacity to perform work within required timeframes
• Number and scope of contract exceptions
Although issued as a Request for Proposal, this procurement is price-focused. Award may be made to the lowest responsive and responsible proposer, or otherwise in the best interest of the District as permitted by law.
K. FEES/TAXES
All proposals shall include all applicable taxes, including Social Security, unemployment, sales or use taxes, and any other taxes specifically levied on the work or on wages by local, city, state, or federal government, except real property taxes on the site. Proposals shall also include all premiums, assessments, and other like payments, charges, and costs incidental to the work covered by the contract documents.
L. PROPOSAL COSTS
Any recipient of this RFP, or any firm who chooses to respond to this RFP, is responsible for any and all costs and liabilities incurred by it, or others acting on its behalf, in (1) preparing or
Page 7 June 15, 2026 submitting a proposal, (2) otherwise responding to this RFP, or (3) negotiating any Contract incidental to its proposal.
M. IRREVOCABILITY OF PROPOSALS
All proposals submitted may not be withdrawn and shall be irrevocable for a minimum period of ninety (90) calendar days following the due date for receipt of proposals set forth on the front page.
N. AUTHORITY TO SIGN
Proposals must be signed by an officer of the firm who is authorized to enter into binding agreements.
O. OPENING OF PROPOSALS
At the specified location and due date stated on the first page, all submitted proposals shall be publicly opened, read aloud and dated. Any interested parties may attend. No immediate decision will be rendered.
Page 8 June 15, 2026
Attachment A1: Project Details
PROJECT
DESCRIPTION:
To support the District's endeavor to provide a quality learning environment, the
District requires an immediate replacement of three (3) heating rooftop HVAC units at their Wilkinson Middle School building. Contractor to include, but not limited to all labor, materials, equipment, controls and handling for all mechanical, electrical, roofing and flashing, roof curbs, etc. for a complete scope of Work.
Some work will require contractors to work within or adjacent to occupied spaces dependent on the needs of each specific unit. Contractor may be required to erect temporary barricades to perform work in occupied spaces to meet assignment schedule or objectives. Contractor is expected to provide protection of adjacent surfaces/equipment to the work area and must properly clean areas of work and adjacent or impacted areas.
Contractor shall furnish all necessary labor, materials, equipment, transportation, supplies, travel, tools, insurance and waste removal
(disposal/removal/recycling/toilet provisions) rental for the work. Contractor must furnish adequate personnel as required to perform an assignment in a timely fashion. Contractor must include a bid bond of 5% of any one work scope package proposed. A Performance and Payment Bond will be required for any work exceeding $50,000.00 for either the Defined Work Scope or IDIQ work packages.
The District, in its sole discretion, may award one or multiple Contractors, to accept or reject any bid in whole or part, to waive any informalities in the bidding process, and to award to a contract to other than the lowest bidder.
Selected Contractor will be required to submit to background screening and comply with Madison District badging policies for all Contractor personnel who will work on District property.
All labor and materials/equipment as furnished and installed for the work must be warranted for a minimum of one-year from the assignment completion date.
Page 9 June 15, 2026
Construction will comply with all applicable codes, ordinances, regulations, etc., as enforced by the local, county, state, or relevant federal agencies.
Selected Contractors will need to work with the District and District's other
Contractors and consultants, including District's Representative, A/E partners, etc.
in order to coordinate and integrate the different portions of the Project.
Where a conflict exists between any code and the design or standard, the
Contractor shall consult with the District and their A/E for clarification of conflicts.
There are no Prevailing Wage requirements for this program.
ASSIGNMENT
OF CONTRACT
It is the District’s intent to prepurchase the three rooftop units prior to procuring the labor for installation. The successful contractor shall assume the contract for that material purchase, payment to manufacturer, all applicable taxes and be responsible for its receipt and installation and warrantee.
SCHEDULES: Due to the currently unknown date of RTU delivery, no defined schedule can be specified. The successful contractor shall perform and close out the work in a
“block of time” not more than one week in duration. This block of time will be negotiated with the successful contractor. If equipment manufacturer’s production and delivery schedule permits, it will be prior to the start of school on September 2, 2026. If school is in session prior to delivery, work must be done in a manner not to interrupt the normal business operations of the school.
The District is amenable to allowing “make ready” work to be done prior to delivery during off hours, weekends, off school days/vacations/breaks, etc.
Ron.Zuhorski Text Box
ATTACHMENT B1:
Drawings and Specifications as prepared by Strategic Energy Solutions:
i. Wilkinson Middle School (eight sheets)
ii. Project Manual (sixty two pages)
M
BFP
WCO
CO
CO
S
H
T
CO2
M
R
R
D
D
GAL GALLON
FFE FINISHED FLOOR ELEVATION
CIRC CIRCULATING
T & P TEMPERATURE AND PRESSURE
SP STAIR PRESSURE
SQUARE FOOT/SQUARE FEET
SERVICE SINK
SHOWER
SS
SqFt / SF
SH
POUNDS PER SQUARE INCH - GAUGEPSIG
REVOLUTIONS PER MINUTE
REDUCED PRESSURE ZONE
SUPPLY AIR
ROOF SUMP
RELIEF AIR
RETURN AIR
RPM
SA
RS
RPZ
REL.A
RA
POUNDS PER SQUARE INCH - ABSOLUTE
PRESSURE REDUCING VALVE
PRESSURE DROP (FEET OF WATER)
OPPOSED BLADE DAMPER
OPEN ENDED DUCT
OUTSIDE DIAMETER
ON CENTER / CENTER TO CENTER
OUTSIDE AIR
PD
PSIA
PRV
OBD
OED
OD
OC
OA
MANUAL AIR VENT
NOT IN CONTRACT
NORMALLY CLOSED
NOMINAL
NORMALLY OPEN
NOISE CRITERIA
MINIMUM
MISCELLANEOUS
MANHOLE
MANUFACTURER
MECHANICAL
NOM
NIC
N.C.
NO
NC
MAV
MIN
MISC
MFR
MECH
MH
1000 BRITISH THERMAL UNITS PER HOUR
POUNDS PER HOUR
LOCKED ROTOR AMPS
LEAVING WET BULB TEMPERATURE
LEAVING DRY BULB TEMPERATURE
MAXIMUM
LAVATORY
LEAVING AIR TEMPERATURE
INTERNAL STATIC PRESSURE
KILOWATT
INDIRECT WASTE
INCHES
INVERT
LRA
MAX
MBH
LWB
LDB
LBS/HR
LAV
ISP
INV
KW
LAT
IW
IN WALL HYDRANT
WATER GAUGE
VENT THRU ROOF
WATER CLOSET
WET BULB TEMPERATURE
WASTE AND VENT
WG
WH
W
WC
WB
W&V
VTR
WASTE
HOUR
INVERT ELEVATION
HERTZ
INSIDE DIAMETER
HYDRANT
HEATING
HYD
HZ
IE
ID
HTG
HR
VOLUME DAMPER (MANUALLY ADJUSTABLE)
UNDERWRITERS LABORATORY
TEMPERATURE CONTROL
TOTAL STATIC PRESSURE
UNDERGROUND
VD
UR
UL
URINAL
TSP
TYP
UG
TC
TYPICAL
SMOKE DETECTOR
MOTORIZED DAMPER
VOLUME DAMPER (MANUALLY ADJUSTABLE)
CO2 SENSOR
CROSS SECTION OF SUPPLY AIR DUCT
FLEXIBLE CONNECTION
LINEAR SLOT DIFFUSER
SUPPLY DIFFUSER
RETURN OR EXHAUST GRILLE
TRANSFER GRILLE
FLEXIBLE DUCT CONNECTION TO SUPPLY
CONCENTRIC TRANSITION (DOUBLE LINE)
CONCENTRIC TRANSITION (SINGLE LINE)
ECCENTRIC TRANSITION (SINGLE LINE)
ECCENTRIC TRANSITION (DOUBLE LINE)
RADIUS RECTANGULAR ELBOW
RADIUS ROUND ELBOW
ROUND ELBOW UP
RECTANGULAR ELBOW UP
RECTANGULAR ELBOW DOWN
ROUND ELBOW DOWN
RECTANGULAR TAKE-OFF (SINGLE LINE)
RECTANGULAR TAKE-OFF (DOUBLE LINE)
ROUND TAKE-OFF (SINGLE LINE)
ROUND TAKE-OFF (DOUBLE LINE)
SPIN-IN FITTING (WITH VOLUME DAMPER)
ELBOW (WITH TURNING VANES)
FULL LOAD AMPSFLA
GALLONS PER HOUR
GALLONS PER MINUTE
FLOOR
FEET
FEET PER MINUTE
FUNNEL FLOOR DRAIN
FLOOR SINK
FACE VELOCITY
FIRE VALVE CABINET
GPM
GPH
FVC
FV
FT
FS
FFD
FPM
FLR
FLEXIBLE CONNECTION
FIRE HOSE VALVE
FLOOR DRAIN
FACE AREA (COIL) / FREE AREA (LOUVER)
DEGREES FAHRENHEIT
FD
FHV
FC
FA
°F
ELECTRIC WATER COOLER
EXTERNAL STATIC PRESSURE
ELEVATION
ENTERING AIR TEMPERATURE
EXHAUST AIR
EXPANSION JOINT
EXHAUST FAN
ENERGY MANAGEMENT SYSTEM
ELECTRICALELECT
EWC
EWB
ESP
EMS
EJ
EL
EF
EAT
EDB
EA/EXH
DEGREES
DRY BULB TEMPERATURE
DOWN
EXISTING
DOMESTIC WATER HEATER
DRAIN TILE CONNECTION
DIRECT DIGITAL CONTROL
CABINET UNIT HEATER
CONTROL VALVE
CONVECTOR
DWH
(E)
DTC
DDC
DN
CV
DB
DEG
CUH
CONV
COOLING
CONTINUATION OR CONTINUED
CLEAN OUT
CAPACITY
BRITISH THERMAL UNIT
CUBIC FEET PER HOUR
CONSTANT AIR VOLUME
BACKWATER VALVE
CUBIC FEET PER MINUTE
CO
CONT
CLG
CFM
CFH
CAV
CAP
BWV
BTUH
BTU
ACCESS DOOR
AIR EXTRACTOR
BRAKE HORSEPOWER
BOTTOM OF DUCT
BACKFLOW PREVENTER
AUTOMATIC SPRINKLER RISER
ABOVE FINISHED FLOOR
AIR PRESSURE DROP
AUTOMATIC AIR VENT / AIR ADMITTANCE VALVE
ASR
BOD
BHP
BFP
APD
AFF
AAV
AE
AD
ENTERING WET BULB TEMPERATURE
ENTERING DRY BULB TEMPERATURE
BRITISH THERMAL UNITS PER HOUR
DESCRIPTION
MECHANICAL ABBREVIATIONS
ABBREV. DESCRIPTIONABBREV.
MECHANICAL ABBREVIATIONSMECHANICAL ABBREVIATIONS
ABBREV. DESCRIPTION
MECHANICAL SYMBOLS
ABBREV. DESCRIPTION
SD
INCLINED DROP IN DIRECTION OF AIR FLOW
(SINGLE LINE)
INCLINED DROP IN DIRECTION OF AIR FLOW
(DOUBLE LINE)
INCLINED RISE IN DIRECTION OF AIR FLOW
(SINGLE LINE)
INCLINED RISE IN DIRECTION OF AIR FLOW
(DOUBLE LINE)
DIFFUSER
DUCT
CROSS SECTION OF EXHAUST OR RETURN AIR
ORS OVERFLOW ROOF SUMP
RELATIVE HUMIDITYRH
OS&Y OUTSIDE SCREW AND YOKE
REQD REQUIRED
EXISTING DEVICES OR EQUIPMENT
NEW OR MODIFIED DEVICES OR EQUIPMENT
M5.2
M5.2
SHEET M5.2 ON WHICH
SECTION IS DRAWN
SHEET M5.2 ON WHICH SECTION IS CUT
EXISTING SYSTEM COMPONENT TO BE REMOVED
DRAWING NOTATION
(ENLARGED PARTIAL PLAN SIMILAR)
SCALE: 1/4" = 1' - 0"
SECTION
SECTION NO. 6
POINT OF NEW CONNECTION
SECTION NO. 4
SYMBOL
NEW WORK KEY NOTE NO. 1
(IE: EXHAUST FAN NO. 1)
DEMOLITION KEY NOTE NO. 1
EQUIPMENT DESIGNATION,
DESCRIPTION
NEW
EXISTING
SMOKE DAMPER
FIRE DAMPER (HORIZONTAL)
FIRE DAMPER (VERTICAL)
NEW
EXISTING
EXISTING
NEW
EXISTING
NEW
EXISTING
NEW
HB HOSE BIBB
PT PRESSURE / TEMPERATURE PORT
FIRE HYDRANT
FIRE HOSE CABINET
FIRE HOSE RACK
FIRE DEPARTMENT CONNECTION
FHR
FHC
FDC
FH
YEAR CODE
MICHIGAN BUILDING CODE
MICHIGAN REHABILITATION CODE
MICHIGAN PLUMBING CODE
MICHIGAN MECHANICAL CODE
INTERNATIONAL FIRE CODE
INTERNATIONAL FUEL GAS CODE
MICHIGAN ACCESSIBILITY CODE2017
APPLICABLE CODES
AND REGULATIONS
AMERICANS WITH DISABILITIES ACT ACCESSIBILITIES
GUIDELINE (ADA-AG)
AIR TERMINAL TAG:
IE: DIFFUSER TYPE = S-1
NECK SIZE = 8ø
CFM = 100-(TYPICAL FOR 2)
MICHIGAN ENERGY CODE2021
COMBINATION FIRE/SMOKE DAMPER
(HORIZONTAL)
COMBINATION FIRE/SMOKE DAMPER
(VERTICAL)
ECCENTRIC REDUCER
DESCRIPTION
MECHANICAL PIPING SYMBOLS
ABBREV.
PIPE ELBOW DOWN
DIRECTION OF FLOW
PIPE ELBOW UP
UNION
CONCENTRIC REDUCER
FLEXIBLE CONNECTION
PIPE GUIDE
PIPE ANCHOR
EXPANSION JOINT
CIRCULATING PUMP
BUTTERFLY VALVE
GLOBE VALVE
ANGLE VALVE
BALL VALVE
ISOLATION VALVE
PIPE CAP OR PLUG
TRAP (PLAN VIEW)
FAN
CHECK VALVE (SPRING)
PLUG VALVE
NEEDLE VALVE
FLOOR DRAIN / FUNNEL FLOOR DRAIN (ELEVATION)
CLEAN OUT (IN FLOOR)
ROOF SUMP
FLOOR DRAIN / FUNNEL FLOOR DRAIN (PLAN VIEW)
AUTOMATIC GAS SHUT-OFF VALVE
CHECK VALVE (SWING)
BACKFLOW PREVENTER
DIRECTION OF PIPE PITCH
HOSE BIBB, WALL HYDRANT
SPRINKLER HEAD (SIDEWALL)
SIAMESE CONNECTION (YARD)
FIRE HYDRANT
FLOW SWITCH
SPRINKLER HEAD (UPRIGHT)
SIAMESE CONNECTION (WALL MOUNTED)
OUTSIDE SCREW AND YOKE VALVE (OS&Y)
CLEAN OUT (IN LINE)
FLOW MEASURING DEVICE
COMBINATION FLOW MEASURING AND BALANCING DEVICE
BALANCING VALVE
AUTOMATIC AIR VALVEAAV
MANUAL AIR VALVEMAV
S = SUPPLY
R = RETURN
E = EXHAUST
MINIMUM CIRCUIT AMPACITYMCA
MAXIMUM OVER-CURRENT PROTECTIONMOP/MOCP
UNIT HEATERUH
PIPE TEE DOWN
STRAINER
CLEAN OUT (WALL)
WATER METER ASSEMBLY
PRESSURE REGULATING VALVE
SOLENOID VALVE
CONTROL VALVE (2-WAY / 3-WAY)
RETURN OR EXHAUST AIR FLOW / SUPPLY AIR FLOW
MOTOR OPERATED DAMPER (AUTOMATIC)MOD
DESCRIPTION
PIPING LEGEND
ABBREV.
THERMOSTAT OR
TEMPERATURE SENSOR
HUMIDISTAT OR
HUMIDITY SENSOR
EF-1
S-1
8ø
100-2
DESCRIPTION
DRAWING INDEX
SHEET
NO
FS
X-#
S:
D:
H:
SP:
V:
E:
SANITARY / VENT
DOMESTIC WATER
HVAC PIPING
VENTILATION
EXHAUST
STAIRWELL PRESSURIZATION
SYSTEM RISER
DESIGNATION
RISER NUMBER
FURNISHEDFURN
INSTALLEDINST
T = TRANSFER
BACKWATER VALVE
COMBUSTION AIRCA
FLUEFL
SP STATIC PRESSURE
UNLESS NOTED OTHERWISEUNO
HORSEPOWERHP
EXISTING PIPING UNDERGROUND
BUILDING AUTOMATION SYSTEMBAS
BUILDING MANAGEMENT SYSTEMBMS
GRADE CLEAN OUTGCO
YARD CLEAN OUTYCO
HO HUB OUTLET
BCW BOOSTED DOMESTIC COLD WATER PIPING
DI DEIONIZED WATER PIPING
CW DOMESTIC COLD WATER PIPING
NPCW NON POTABLE COLD WATER PIPING
RO REVERSE OSMOSIS WATER PIPING
SCW SOFTENED COLD WATER
HW
HWR
DOMESTIC HOT WATER PIPING
DOMESTIC HOT WATER RECIRCULATION PIPING
NPHW NON POTABLE HOT WATER PIPING
TW TEMPERED WATER PIPING
F (DRY) FIRE PROTECTION DRY PIPING
F FIRE PROTECTION WET PIPING
F (PRE) FIRE PROTECTION PRE-ACTION PIPING
CHWR CHILLED WATER RETURN PIPING
CWR CONDENSER WATER RETURN PIPING
GHXR GROUND HEAT EXCHANGE RETURN PIPING
HPLR HEAT PUMP LOOP RETURN PIPING
HHWR HEATING HOT WATER RETURN PIPING
HPC HIGH PRESSURE CONDENSATE RETURN PIPING
LPC LOW PRESSURE CONDENSATE RETURN PIPING
MV MEDICAL VACUUM PIPING
RHWR RADIANT HEATING WATER RETURN PIPING
PCR STEAM CONDENSATE PUMPED RETURN PIPING
CR STEAM CONDENSATE RETURN PIPING
VAC VACUUM PIPING
WAGD WASTE ANESTHESIA GAS DISPOSAL PIPING
CO2 CARBON DIOXIDE PIPING
CHWS CHILLED WATER SUPPLY PIPING
CA COMPRESSED AIR PIPING
CWS CONDENSER WATER SUPPLY PIPING
GHXS GROUND HEAT EXCHANGE SUPPLY PIPING
HPLS HEAT PUMP LOOP SUPPLY PIPING
HHWS HEATING HOT WATER SUPPLY PIPING
H HELIUM PIPING
HPS HIGH PRESSURE STEAM PIPING
IA INSTRUMENT AIR PIPING
LPS LOW PRESSURE STEAM PIPING
MA MEDICAL AIR PIPING
G NATURAL GAS PIPING
N NITROGEN PIPING
NO NITROUS OXIDE PIPING
O2 OXYGEN PIPING
RHWS RADIANT HEATING WATER SUPPLY PIPING
STM STEAM PIPING
OTHER OTHER PIPING
R REFRIGERANT PIPING
RL REFRIGERANT LIQUID PIPING
RS REFRIGERANT SUCTION PIPING
AW ACID WASTE PIPING
CD CONDENSATE DRAIN PIPING
PCD CONDENSATE DRAIN PUMPED PIPING
DT DRAIN TILE
GW GREASE WASTE PIPING
IW INDUSTRIAL WASTE PIPING
RC
ORC
RAIN CONDUCTOR PIPING
RAIN CONDUCTOR OVERFLOW PIPING
PSAN
SAN
SANITARY PUMPED PIPING
SANITARY PIPING
ST
PST
STORM PIPING
STORM PUMPED PIPING
AV ACID VENT PIPING
V VENT PIPING
TEMPERATURE CONTROLS CONTRACTORTCC
NEW PIPING UNDERGROUND
GROUND HEAT EXCHANGERGHX
SES
Strategic Energy Solutions
4000 W. Eleven Mile Road Berkley, MI 48072
Phone 248.399.1900 Fax 248.399.1901 www.sesnet.com
© 2025 SES, INC.
SES Project # 25 0927 01
PROJECT:
DRAWN:
CHECKED:
x
P
LO
T T
E D
O N
CLIENT:
Seal
Keyplan
SHEET TITLE:
SHEET NUMBER:
ISSUED FOR:
/2
/2
:4
:3
P M
C
U se rs \r ru ff in \D o cu m e n ts
\2
M D
P S
R T
U R e p la ce m e n ts
M
E P rr u ff in Q
LB
.r vt
M000
AK
MH
MDPS RTU
Replacements
MECHANICAL
GENERAL
INFORMATION
Madison District Public Schools Madison Heights, Michigan
M000 MECHANICAL GENERAL INFORMATION
MD106 ROOF MECHANICAL DEMOLITION PLAN
M106 ROOF MECHANICAL PLAN
M600 MECHANICAL SCHEDULES & DETAILS
ISSUED DATE
CONSTRUCTION DOCUMENTS 1/30/2025
A
AP
P T
TU
U
UU
UUVV
VVEX
EX
QX
QXRX
RX
WX
WX
33 33
35 35
3_3_
38 38
40 40
43 43
47 47
57 57
61 61
(E)RTU-9
(E )R
T U
-1
(E )R
T U
-6
(E)2 1/2" G (E)1 1/2" G
(E)1 1/4" G
(E)2 1/2" G
DN
(E)3" G DN
(E)2 1/2" G
(E)1 1/2" G
(E)1 1/2" G
(E)2 1/2" G
DN
(E)2" G (E)1 1/2" G
EXISTING RTU
CURB TO REMAIN
EXISTING RTU
CURB TO REMAIN
EXISTING RTU
CURB TO REMAIN
(E)RA 21x56
(E)SA 15x45
(E)RA 21x56
(E)SA 15x45
(E)RA 24x55
(E)SA 32x70
Z1
Z2 Z2
Z4
Z1
Z1
Z3
Z2
Z4
Z5
Z5
Z5
EXISTING
ROOF ACCESS
HATCH
17' - 8 1/4"
EXIST. CURB
LENGTH
E X
IS
T
C
U R
B
L E
N G
T H
E X
IS
T
C
U
N G
T H
5' - 1"
5' - 1"
/4
EXIST.
CURB
WIDTH
EXIST.
CURB
WIDTH
E X
IS
T
C
U
W
ID
T H
R T
U -1
R T
U -7
RTU-5
SES
Strategic Energy Solutions
4000 W. Eleven Mile Road Berkley, MI 48072
Phone 248.399.1900 Fax 248.399.1901 www.sesnet.com
© 2025 SES, INC.
SES Project # 25 0927 01
PROJECT:
DRAWN:
CHECKED:
x
T T
E D
Keyplan
SHEET TITLE:
SHEET NUMBER:
ISSUED FOR:
/2
/2
:4
:3
P M
C
U se rs \r ru ff in \D o cu m e n ts
\2
M D
P S
R T
U R e p la ce m e n ts
M
E P rr u ff in Q
LB
.r vt
MD106
AK
MH
MDPS RTU
Replacements
ROOF
MECHANICAL
DEMOLITION PLAN
Madison District Public Schools Madison Heights, Michigan
SCALE: 1/16" = 1'-0"
ROOF MECHANICAL DEMOLITION PLAN
MECHANICAL DEMOLITION NOTES
1. THESE DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE GENERAL EXTENT OF WORK TO
BE PERFORMED. THE EXACT EXTENT OF DEMOLITION SHALL BE AS REQUIRED BY THE NEW
WORK.
2. PRIOR TO COMMENCEMENT OF WORK, CONTRACTOR SHALL VISIT THE SITE AND BECOME
FAMILIAR WITH EXISTING SITE CONDITIONS, SYSTEMS, AND UTILITIES. NOTIFY ARCHITECT
OF ANY INTERFERENCES OR DISCREPANCIES.
3. REFER TO SHEET M000 MECHANICAL GENERAL INFORMATION.
4. THE CONTRACTOR SHALL BRACE ALL EXISTING STRUCTURES AND ALL STRUCTURAL
ELEMENTS AS NECESSARY DURING ENTIRE CONSTRUCTION PROCESS. CONTRACTOR
SHALL NOT CUT STRUCTURAL WORK IN A MANNER RESULTING IN A REDUCTION IN LOAD
BEARING CAPACITY OR LOAD DEFLECTION RATIO. COORDINATE WITH STRUCTURAL
ENGINEER AS NECESSARY.
5. VERIFY DEPTH, SIZE, LOCATIONS AND CONDITION OF EXISTING UTILITIES IN THE FIELD, INCLUDING POINTS OF CONNECTION PRIOR TO STARTING ANY WORK.
6. ANY INTERRUPTIONS OF EXISTING SERVICES AND/OR EQUIPMENT SHALL BE PERFORMED
AT A TIME APPROVED IN ADVANCE BY THE OWNER'S REPRESENTATIVE SO AS NOT TO
INTERFERE WITH THE PRESENT BUILDING'S OPERATION.
7. ALL ITEMS ON DEMOLITION PLANS SHALL BE CONSIDERED EXISTING UNLESS OTHERWISE
NOTED. ALL WORK INDICATED ON PLANS HAS BEEN LOCATED PER EXISTING DRAWINGS
AND/OR FIELD OBSERVATION AND REQUIRES FIELD VERIFICATION.
8. ALL ITEMS INDICATED WITH BROKEN LINES SHALL BE REMOVED COMPLETE, WITH ALL
RELATED ITEMS INCLUDING HANGERS, SUPPORTS, INSULATION, CONTROLS, ETC. CAP ALL
OPEN ENDED PIPES AND DUCTS.
9 ALL EXISTING WORK TO REMAIN SHALL BE PROTECTED FROM DAMAGE. WHERE DUCT OR
PIPE INSULATION HAS BEEN DAMAGED DURING DEMOLITION, THE CONTRACTOR SHALL
REPAIR INSULATION AS REQUIRED TO MATCH EXISTING.
10 THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL EQUIPMENT BEING REMOVED.
ALL ITEMS REMOVED SHALL BE LEGALLY DISPOSED OF. GENERAL CONTRACTOR SHALL BE
RESPONSIBLE FOR ALL EXISTING RELOCATED AND OWNER PROVIDED EQUIPMENT.
MECHANICAL DEMOLITION KEYNOTES
Z1 REMOVE THE EXISTING ROOFTOP UNIT (RTU) AND ALL ASSOCIATED CONTROLS AND
ACCESSORIES. EXISTING ROOF CURB SYSTEM AND BELOW-ROOF DUCTWORK TO REMAIN;
REPAIR AS REQUIRED TO MAINTAIN WEATHERPROOFING AND INTEGRITY. ALSO REMOVE THE
EXISTING INDOOR SPACE TEMPERATURE SENSOR SERVING THIS UNIT.
Z2 COORDINATE THE NEW RTU SO SUPPLY AND RETURN OPENINGS ALIGN WITH THE EXISTING
LOCATIONS. FIELD-VERIFY EXISTING DUCT OPENINGS/SIZES; REPORT ANY DISCREPANCIES
BETWEEN THE DRAWINGS AND FIELD CONDITIONS TO THE ENGINEER PRIOR TO ORDERING
THE NEW RTUS.
Z3 REMOVE EXISTING NATURAL GAS PIPING UP TO POINT INDICATED. CAP EXISTING PIPING AND
PREPARE FOR CONNECTION TO NEW GAS PIPING
Z4 REMOVE EXISTING NATURAL-GAS PIPING UP TO POINT INDICATED. INSTALL NEW SHUT-OFF
VALVE TO EXISTING PIPING AND PREPARE FOR CONNECTION TO NEW GAS PIPING SERVING
RTU-7 & 12.
Z5 BEFORE DEMO, CONTRACTOR SHALL FIELD-MEASURE, RECORD & MATCH: TOTAL SUPPLY
CFM, TOTAL RETURN CFM, MINIMUM OA CFM, AND EXTERNAL STATIC PRESSURE (ESP) OF
THE EXISTING RTU & REPORT THEM TO THE ENGINEER PRIOR TO ORDERING THE NEW RTUS.
P
P T
T U
U
UU
UUVV
VVEX
EX
QX
QXRX
RX
WX
WX
3 3
4 4
27 27
28 28
33 33
35 35
3_3_
38 38
40 40
43 43
47 47
57 57
61 61
EXISTING ROOF
ACCESS HATCH
(E)RTU-9
(E )R
T U
-1
(E)2 1/2" G
DN
(E)2" G
(E)1 1/2" G
(E)3" G DN
(E)1 1/2" G
(E)2 1/2" G
DN
(E)2 1/2" G
(E)1 1/4" G
RTU-5
R T
U -1
R T
U -7
1 1/2" G
(E)SA 32x70
(E)RA 21x56
(E)SA 15x45
(E)RA 21x56
(E)SA 15x45
(E)RA 24x55
(E )R
T U
-6
(E)1 1/2" G
1 1/2" G
1 1/2" G
1 1/2" G
H1
H1
H1
H2
H2
H3
H3
H3 H4
H4
H4H4
H4
H4
EXIST. CURB
LENGTH
E X
IS
T
C
U
N G
T H
E X
IS
T
C
U
N G
T H
EXIST.
CURB
WIDTH
EXIST.
CURB
WIDTH
E X
IS
T
C
U
W
ID
T H
5' - 1"
5' - 1"
17' - 8 1/4"
/4
PIPE
SUPPORT
(TYP.)
PIPE
SUPPORT
(TYP.)
PIPE
SUPPORT
(TYP.)
H5
H6
H6
H6
SES
Strategic Energy Solutions
4000 W. Eleven Mile Road Berkley, MI 48072
Phone 248.399.1900 Fax 248.399.1901 www.sesnet.com
© 2025 SES, INC.
SES Project # 25 0927 01
PROJECT:
DRAWN:
CHECKED:
x
T T
E D
Keyplan
SHEET TITLE:
SHEET NUMBER:
ISSUED FOR:
/2
/2
:4
:3
P M
C
U se rs \r ru ff in \D o cu m e n ts
\2
M D
P S
R T
U R e p la ce m e n ts
M
E P rr u ff in Q
LB
.r vt
M106
AK
MH
MDPS RTU
Replacements
ROOF
MECHANICAL
PLAN
Madison District Public Schools Madison Heights, Michigan
SCALE: 1/16" = 1'-0"
ROOF MECHANICAL PLAN
HVAC GENERAL NOTES
1. THESE DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE GENERAL EXTENT OF THE
WORK. PROVIDE HVAC SYSTEMS COMPLETE PER SPECIFICATION, SMACNA STANDARDS,
AND PER APPLICABLE CODES INCLUDING ALL NECESSARY OFFSETS, FITTINGS, SPECIAL
RADIUS OR MITERED ELBOWS WHICH ARE REQUIRED DUE TO SPACE CONSTRAINTS OR
STRUCTURAL CONDITIONS OR OTHER CONDITIONS.
2. REFER TO SHEET M000 MECHANICAL GENERAL INFORMATION.
3. CONTRACTOR SHALL COORDINATE THEIR WORK WITH THE WORK OF ALL OTHER TRADES.
ALL DUCTWORK IS TO BE ROUTED AS HIGH AS POSSIBLE. PROVIDE ACCESS AROUND ALL
NEW EQUIPMENT PER MANUFACTURER'S RECOMMENDATIONS. VERIFY ALL CLEARANCES
PRIOR TO THE FABRICATION OF ANY W
4. DUCTWORK/PIPING SHALL BE ROUTED AS HIGH AS POSSIBLE AND SHALL NOT BE LOCATED
OVER ELECTRICAL EQUIPMENT/PANELS. PROVIDE REQUIRED CLEARANCE IN FRONT OF
ELECTRICAL EQUIPMENT. DUCTWORK/PIPING SHALL NOT INTERFERE WITH ELECTRICAL
EQUIPMENT CLEARANCE.
5. DUCTWORK/PIPING SHALL NOT BE INSTALLED IN A LOCATION THAT RESTRICTS THE
ACCESS TO MECHANICAL DEVICES REQUIRING ACCESS.
6. THE CONTRACTOR SHALL PROVIDE ALL MISCELLANEOUS SUPPORTING STEEL, ETC. FOR
THE PROPER INSTALLATION OF ALL MECHANICAL SYSTEMS.
7 COORDINATE FLOOR, WALL, ROOF PENETRATIONS, LOUVER SIZES, PAD LOCATIONS ETC.
WITH ARCHITECTURAL TRADES. SEAL ALL PIPING AND DUCT PENETRATIONS.
8. FOR EQUIPMENT VALVING, COMPONENT, AND PIPING ARRANGEMENT, REFER TO PIPING
DIAGRAMS AND DETAILS.
9. PAINT ALL VISIBLE INTERIOR SURFACES OF EXHAUST/RETURN GRILLES, REGISTERS AND
VISIBLE ASSOCIATED DUCTWORK FLAT BLACK.
10. THE CEILING SPACE IS USED AS A RETURN AIR PLENUM. NO PLASTIC MATERIALS
INCLUDING PVC PIPING, CONDUIT, WIRING, ETC. SHALL BE USED. ALL MATERIAL IN THE
CEILING SPACE IS TO BE PLENUM RATED.
11. CONNECTION TO EQUIPMENT SHALL BE VERIFIED WITH MANUFACTURER'S CERTIFIED
DRAWINGS. TRANSITIONS TO ALL EQUIPMENT SHALL BE VERIFIED AND PROVIDED FOR
EQUIPMENT FURNISHED.
12 ROOF MOUNTED EQUIPMENT REQUIRING SERVICE SHALL BE LOCATED A MINIMUM OF 10
FEET FROM ROOF EDGES. WHERE EQUIPMENT CAN'T BE LOCATED AWAY FROM ROOF
EDGE AND GUARD RAILS ARE NOT PROVIDED, PROVIDE PERMANENT FALL ARREST
ANCHORAGE CONNECTION DEVICE THAT COMPLIES
HVAC KEYNOTES
H1 CONTRACTOR SHALL FIELD-VERIFY THE EXISTING CURB DIMENSIONS AND BELOW-ROOF
OPENING SIZES PRIOR TO ORDERING THE NEW RTU. MANUFACTURER SHALL SUBMIT
DIMENSIONED SHOP DRAWINGS THAT MATCH THE VERIFIED DIMENSIONS, SHOWING
UNIT BOTTOM VIEW, OPENING SIZES AND CURB DIMENSIONS. ANY DISCREPANCY
GREATER THAN 1″ SHALL BE REPORTED TO THE ENGINEER BEFORE FABRICATION FOR
DIRECTION. NO BELOW-ROOF DUCT MODIFICATIONS ARE PERMITTED. FOR
PLENUM-RETURN INSTALLATIONS, THE RTU RETURN OPENING SHALL SIT FULLY WITHIN
THE CURB PLENUM AND PROVIDE THE SAME EXISTING FREE AREA.
H2 CONTRACTOR SHALL INSTALL A NEW GAS REGULATOR, PIPE UNION, TEE AND 6" LONG
DIRT LEG WITH CAP FOR ALL RTU'S AND A MANUAL SHUTOFF VALVE (FOR RTU-7 & 12
ONLY) ON THE NEW GAS LINE SERVING THE RTU. VERIFY FINAL GAS CONNECTION SIZE
AND LOCATION WITH THE RTU MANUFACTURER. SUPPORT NEW PIPING ON MIRO PILLOW
BLOCK (OR APPROVED EQUAL) POLYCARBONATE, UV-RESISTANT ROOF PIPE SUPPORTS
(TYP.). WEATHERPROOF PAINT ALL GAS PIPING. REFER TO DETAILS ON SHEET M600.
H3 INSTALL NEW INDOOR ZONE TEMPERATURE SENSOR(S) AND CONNECT TO ASSOCIATED
NEW ROOF TOP UNIT. NEW TEMPERATURE SENSORS TO BE PLACED IN SAME LOCATION
AS EXISTING. COORDINATE FINAL LOCATION WITH OWNER PRIOR TO INSTALLATION.
H4 CONNECT NEW UNITS TO EXISTING SUPPLY AND RETURN DUCTS.
H5 RECONNECT EXISTING 1-1/2" GAS LINE TO EXISTING RTU-6 UNIT.
H6 GENERAL CONTRACTOR SHALL COORDINATE A TIME WITH OWNER/OWNER
REPRESENTATIVE FOR ACCESS TO CEILING SPACE FOR INSTALLATION OF SMOKE
DETECTORS. PROVIDE/ENSURE REQUIRED ACCESSIBILITY FOR TESTING, SERVICE, AND
MAINTENANCE.
PLUGGED 1/8" NPT TEST
GAUGE CONNECTION
CONNECT TO UNIT GAS CONTROLS
WITH GROUND JOINT UNION PROVIDE
GROMMET FOR WATER-TIGHT SEAL
SIZE AS NOTED ON PLAN
DIRT LEG
PIPE SUPPORT (TYP)
GAS PIPE ADJUSTMENT AT
ROOF OBSTRUCTIONS (TYP)
ROOF
TYP PIPE OR
CONDUIT, ETC
GAS PIPING RUN ON
ROOF
ROOFTOP UNIT
ISOLATION VALVE
GROUND JOINT UNION
VENT ELBOW DOWN
GAS PRESSURE REGULATOR
2" MIN (TYP)
18" MIN
PLUGGED 1/8" NPT TEST
GAUGE CONNECTION
PIPING SHALL NOT BE RUN
WITHIN REQUIRED UNIT
ELECTRICAL CLEARANCES
SET SUPPORTS 8'-0" ON CENTER
AND AT EACH CHANGE OF
DIRECTION
UV RATED, FLEXIBLE, CLOSED CELL
POLYETHYLENE FOAM, PIPE PIER
HEIGHT OF PIPE PIER VARIES TO
MAINTAIN 1/8" PER FOOT SLOPE
ROOF
6" MAX
PIPING - SEE PLAN
FOR SIZES
CLAMP PIPING TO INTEGRAL
METAL STRUT, CLAMP TO BE
LOOSE FIT SO PIPING CAN
MOVE DURING EXPANSION
AND CONTRACTION
S U
P P
L Y
A
IR
R E
T U
R N
A
IR
EXISTING ROOF STRUCTURE
ROOFTOP UNIT PROVIDE NEW CONTINUOUS CURB
GASKET PER RTU MANUFACTURER
BETWEEN UNIT BASE AND EXISTING
CURB
EXISTING CURB
SMOKE DETECTOR
(AS APPLICABLE BY LOCAL
AHJ'S REQUIREMENT)
EXISTING SUPPLY
AND RETURN DUCTS
SMOKE DETECTOR
(AS APPLICABLE BY LOCAL
AHJ'S REQUIREMENT)
SES
Strategic Energy Solutions
4000 W. Eleven Mile Road Berkley, MI 48072
Phone 248.399.1900 Fax 248.399.1901 www.sesnet.com
© 2025 SES, INC.
SES Project # 25 0927 01
PROJECT:
DRAWN:
CHECKED:
x
T T
E D
Keyplan
SHEET TITLE:
SHEET NUMBER:
ISSUED FOR:
/2
/2
:4
:3
P M
C
U se rs \r ru ff in \D o cu m e n ts
\2
M D
P S
R T
U R e p la ce m e n ts
M
E P rr u ff in Q
LB
.r vt
M600
AK
MH
MDPS RTU
Replacements
MECHANICAL
SCHEDULES &
DETAILS
Madison District Public Schools Madison Heights, Michigan
CUSTOM ROOFTOP UNIT SCHEDULE - (HEATING ONLY - GAS)
UNIT ID
TOTAL SUPPLY
(CFM) MIN OA (CFM)
SUPPLY FAN RETURN FAN NATURAL GAS HEATING SECTION
FILTER TYPE
ELECTRICAL DISCONNECT UNIT
WEIGHT
(LBS)
MANUFACTURER / MODEL
NO. REMARKS
ESP
(IN WG)
FAN
TYPE DRIVE TYPE BHP HP
ESP
(IN WG)
FAN
TYPE DRIVE TYPE HP INPUT (MBH) OUTPUT (MBH) GAS PRESS. MIN.(IN WG) STAGES OR MODULATION TURNDOWN BURNER TYPE
EAT
(°F)
LAT
(°F) MOCP (TD FUSES) MCA FLA VOLTS PHASE
FURN.
BY
INST.
BY
RTU-5 11500 NOTE 2 2.00 CENTRIFUGAL PLENUM FAN DIRECT 11.9 15 0.50 CENTRIFUGAL EC PLUG DIRECT 6 HP EACH (12 HP TOTAL) 488 400 7 35:1 MOD INDIRECT 55.0 87.2 2" MERV 8 50 38.22 31.0 460 3 MFR. MFR. 5500 ICE WESTERN HTDM600 SEE NOTES
RTU-7 7500 NOTE 2 1.70 CENTRIFUGAL PLENUM FAN DIRECT 6 7.5 0.50 CENTRIFUGAL EC PLUG DIRECT 2.3 HP EACH (4.6 HP TOTAL) 312 256 7 35:1 MOD INDIRECT 55.0 86.6 2" MERV 8 30 23.01 18.4 460 3 MFR. MFR. 4900 ICE WESTERN HTDM400 SEE NOTES
RTU-12 7500 NOTE 2 1.70 CENTRIFUGAL PLENUM FAN DIRECT 6 7.5 0.50 CENTRIFUGAL EC PLUG DIRECT 2.3 HP EACH (4.6 HP TOTAL) 312 256 7 35:1 MOD INDIRECT 55.0 86.6 2" MERV 8 30 23.01 18.4 460 3 MFR. MFR. 4900 ICE WESTERN HTDM400 SEE NOTES
NOTES:
1. MANUFACTURER SHALL SUBMIT DIMENSIONED SHOP DRAWINGS (UNIT BOTTOM VIEW, CURB O.D., OPENING SIZES & CL OFFSETS FROM TWO CURB EDGES) TO ENGINEER FOR REVIEW BEFORE RELEASING EQUIPMENT FOR FABRICATION.
2. SET MINIMUM OA TO MATCH THE EXISTING VENTILATION RATE.
3. CONTRACTOR SHALL FIELD-MEASURE, RECORD AND MATCH: TOTAL SUPPLY CFM, TOTAL RETURN CFM, MINIMUM OA CFM, AND EXTERNAL STATIC PRESSURE (ESP) OF THE EXISTING RTU & REPORT THEM TO THE ENGINEER PRIOR TO ORDERING THE NEW RTUS.
4. COORDINATE THE NEW RTU SO SUPPLY AND RETURN OPENINGS ALIGN WITH THE EXISTING LOCATIONS. FIELD-VERIFY EXISTING DUCT OPENINGS/SIZES; REPORT ANY DISCREPANCIES BETWEEN THE DRAWINGS AND FIELD CONDITIONS TO THE ENGINEER PRIOR TO ORDERING THE NEW RTUS. NO BELOW-ROOF DUCT MODIFICATIONS ARE PERMITTED WITHOUT WRITTEN DIRECTION.
5. CONTROLS: PROVIDE FACTORY-INSTALLED UNIT CONTROLS CAPABLE OF INTEGRATION WITH THE EXISTING BUILDING MANAGEMENT SYSTEM (BMS). FACTORY-INSTALLED CONTROL DEVICES SHALL INCLUDE: SA & RA TEMPERATURE SENSORS, FREEZE-STAT/LOW-LIMIT THERMOSTAT, PHASE MONITOR/RELAY, UNIT STATUS LIGHTS, GFCI SERVICE RECEPTACLE WITH CONVENIENCE OUTLET, AND
UNIT-MOUNTED FUSED DISCONNECT. ALSO INCLUDE A SMOKE DETECTOR INTERLOCK INPUT FOR FIELD-INSTALLED DUCT SMOKE DETECTORS. PROVIDE A COMPLETE CONTROL POINTS LIST FOR BMS INTEGRATION.
6. DUCT SMOKE DETECTORS ON SUPPLY & RETURN SHALL BE FIELD INSTALLED ACCORDING TO LOCAL AHJ'S REQUIREMENTS AND MUST BE COMPATIBLE WITH BOTH THE EXISTING NOTIFIER FIRE ALARM PANEL AND THE RTU CONTROLS. DETECTORS SHALL BE PROVIDED UNDER DIVISION 28. TCC SHALL PROVIDE INTERLOCK WIRING FROM THE SMOKE DETECTOR TO THE RTU UNIT SHUTOFF.
7. INSTALL NEW RTU ON EXISTING ROOF CURBS. MAINTAIN PROPER WORKING CLEARANCES (REFER TO MANUFACTURERS REQUIREMENTS). CURB ADAPTERS ARE PERMITTED BUT MUST BE SPECIFICALLY REVIEWED AND APPROVED IN WRITING BY THE ENGINEER PRIOR TO FABRICATION/ORDERING.
8. PROVIDE SUPPLY FAN VFD FOR SOFT-START AND AIR BALANCING;
9. UNITS SHALL HAVE BOTTOM DISCHARGE AND RETURN. FOR PLENUM-RETURN INSTALLATIONS, THE RTU RETURN OPENING SHALL LAND FULLY WITHIN THE CURB PLENUM AND PROVIDE THE SAME AS THE EXISTING FREE AREA.
10. ECONOMIZER DAMPERS: PROVIDE LOW-LEAK OA, RA, AND RELIEF (EA) DAMPERS WITH MODULATING BELIMO-TYPE ACTUATORS;
11. CASING: PROVIDE 18-GA EXTERIOR CASING AND 20-GA ALUMINUM INTERIOR SOLID LINER FOR ALL RTU'S.
12. HEATING: PROVIDE INTEGRAL GAS PRESSURE REGULATOR;
NO SCALE
GAS CONNECTION DETAIL - ROOFTOP UNIT
NO SCALE
GAS PIPING ON ROOF SUPPORT DETAIL
NO SCALE
RTU - CURB MOUNTING DETAIL
250N
300N
225N
200N
175N
150N
125N
110N
350N
30N
35N
40N
45N
50N
60N
70N
80N
90N
100N
450N
400N
25N
20N
15N
800N
700N
600N
500N
1000N
1200N
1600N
2000N
2500N
3000N
4000N
5000 5000N
6000 6000N
30S
35S
40S
45S
50S
60S
70S
80S
90S
100S
25S
20S
15S
3 WIRE WITH GROUND 4 WIRE WITH GROUND
COND.
SIZE
FEEDER
(AMPS)
1/0
2/0
3/0
4/0
2-4/0
2-250
2-350
2-500
2-600
3-500
3-600
4-600
5-600
7-500
8-500
10-600
3#12, 1#12 GND IN 3/4"C
3#12, 1#12 GND IN 3/4"C
3#10, 1#10 GND IN 3/4"C
3#10, 1#10 GND IN 3/4"C
3#8, 1#10 GND IN 3/4"C
3#8, 1#10 GND IN 3/4"C
3#6, 1#10 GND IN 3/4"C
3#6, 1#10 GND IN 3/4"C
3#4, 1#10 GND IN 1"C
3#4, 1#8 GND IN 1"C
3#3, 1#8 GND IN 1"C
3#2, 1#8 GND IN 1 1/4"C
3#1, 1#8 GND IN 1 1/4"C
3#2, 1#6 GND IN 1 1/4"C
3#1, 1#6 GND IN 1 1/4"C
3#1/0, 1#6 GND IN 1 1/2"C
3#2/0, 1#6 GND IN 1 1/2"C
3#3/0, 1#6 GND IN 2"C
3#4/0, 1#4 GND IN 2"C
3-250 KCMIL, 1#4 GND IN 2"C
3-350 KCMIL, 1#4 GND IN 2 1/2"C
3-500 KCMIL, 1#3 GND IN 3"C
3-600 KCMIL, 1#3 GND IN 3 1/2"C
(2) 3#4/0, 1#2 GND IN 2"C
(2) 3-250 KCMIL, 1#2 GND IN 2 1/2"C
(2) 3-350 KCMIL, 1#1 GND IN 2 1/2"C
(2) 3-500 KCMIL, 1#1/0 GND IN 3"C
(2) 3-600 KCMIL, 1#1/0 GND IN 3 1/2"C
(3) 3-500 KCMIL, 1#2/0 GND IN 3"C
(3) 3-600 KCMIL, 1#3/0 GND IN 4"C
(4) 3-600 KCMIL, 1#4/0 GND IN 4"C
(5) 3-600 KCMIL, 1-250 KCMIL GND IN 4"C
(7) 3-500 KCMIL, 1-350 KCMIL GND IN 3 1/2"C
(8) 3-500 KCMIL, 1-400 KCMIL GND IN 3 1/2"C
(10) 3-600 KCMIL, 1-500 KCMIL GND IN 4"C
1/0
2/0
3/0
4/0
2-4/0
2-250
2-350
2-500
2-600
3-500
3-600
4-600
5-600
7-500
8-500
10-600 (10) 4-600 KCMIL, 1-500 KCMIL GND IN 4"C
(8) 4-500 KCMIL, 1-400 KCMIL GND IN 3 1/2"C
(7) 4-500 KCMIL, 1-350 KCMIL GND IN 3 1/2"C
(5) 4-600 KCMIL, 1-250 KCMIL GND IN 4"C
(4) 4-600 KCMIL, 1#4/0 GND IN 4"C
(3) 4-600 KCMIL, 1#3/0 GND IN 4"C
(3) 4-500 KCMIL, 1#2/0 GND IN 3 1/2"C
(2) 4-600 KCMIL, 1#1/0 GND IN 4"C
(2) 4-500 KCMIL, 1#1/0 GND IN 3 1/2"C
(2) 4-350 KCMIL, 1#1 GND IN 3"C
(2) 4-250 KCMIL, 1#2 GND IN 2 1/2"C
(2) 4#4/0, 1#2 GND IN 2 1/2"C
4-600 KCMIL, 1#3 GND IN 4"C
4-500 KCMIL, 1#3 GND IN 3 1/2"C
4-350 KCMIL, 1#4 GND IN 3"C
4-250 KCMIL, 1#4 GND IN 2 1/2"C
4#4/0, 1#4 GND IN 2 1/2"C
4#3/0, 1#6 GND IN 2"C
4#2/0, 1#6 GND IN 2"C
4#1/0, 1#6 GND IN 2"C
4#1, 1#6 GND IN 1 1/2"C
4#2, 1#6 GND IN 1 1/4"C
4#1, 1#8 GND IN 1 1/2"C
4#2, 1#8 GND IN 1 1/2"C
4#3, 1#8 GND IN 1 1/4"C
4#4, 1#8 GND IN 1 1/4"C
4#4, 1#10 GND IN 1 1/4"C
4#6, 1#10 GND IN 1"C
4#6, 1#10 GND IN 1"C
4#8, 1#10 GND IN 3/4"C
4#8, 1#10 GND IN 3/4"C
4#10, 1#10 GND IN 3/4"C
4#10, 1#10 GND IN 3/4"C
4#12, 1#12 GND IN 3/4"C
4#12, 1#12 GND IN 3/4"C
COPPER FEEDER SCHEDULE
COND.
SIZE
FEEDER
(AMPS)
12-600 (12) 3-600 KCMIL, 1-700 KCMIL GND IN 4"C 12-600 (12) 4-600 KCMIL, 1-700 KCMIL GND IN 4"C
15-600 (15) 3-600 KCMIL, 1-500 KCMIL GND IN 4"C 15-600 (15) 4-600 KCMIL, 1-800 KCMIL GND IN 4"C
2 WIRE WITH GROUND
COND.
SIZE
FEEDER
(AMPS)
2#12, 1#12 GND IN 3/4"C
2#12, 1#12 GND IN 3/4"C
2#10, 1#10 GND IN 3/4"C
2#10, 1#10 GND IN 3/4"C
2#8, 1#10 GND IN 3/4"C
2#8, 1#10 GND IN 3/4"C
2#6, 1#10 GND IN 3/4"C
2#6, 1#10 GND IN 3/4"C
2#4, 1#10 GND IN 1"C
2#4, 1#8 GND IN 1"C
2#3, 1#8 GND IN 1"C
2#2, 1#8 GND IN 1"C
2#1, 1#8 GND IN 1 1/4"C
NOTES:
1. AMPACITIES FOR FEEDER SIZES ARE BASED ON N.E.C. CODE 110-14. (TERMINATION PROVISIONS FOR EQUIPMENT RATED 100A OR LESS ARE RATED FOR USE WITH CONDUCTORS RATED 60°C. TERMINATION PROVISIONS FOR EQUIPMENT RATED GREATER THAN
100A ARE RATED FOR USE WITH CONDUCTORS RATED 75°C.).
2. CONDUIT FILL IS BASED ON 40% FILL USING SINGLE CONDUCTOR BUILDING WIRE OF INSULATION TYPES THHN, THWN, THWN-2, XHH, XHHW, AND XHHW-2 IN RMC. FOR OTHER RACEWAY TYPES REFER TO APPROPRIATE N.E.C. APPENDIX C TABLES.
3. EQUIPMENT GROUND SIZING BASED ON N.E.C. TABLE 250.122.
DEMOLITION KEYNOTE NUMBER 1
CONSTRUCTION KEYNOTE NUMBER 1
SECTION NUMBER 4
DRAWING NOTATION
SHEET E300 ON WHICH
SECTION VIEW IS PLACED
E300
DRAWING INDEX
SHEET
NO
APPLICABLE CODES
AND REGULATIONS
CODEYEAR
MICHIGAN BUILDING CODE2021
NATIONAL ELECTRICAL CODE (NFPA 70)
MICHIGAN RESIDENTIAL CODE
MICHIGAN ENERGY CODE
NFPA 20
NFPA 72
NFPA 101
NFPA 110
MICHIGAN ACCESSIBILITY CODE
DETROIT ELEVATOR CODE
MICHIGAN REHABILITATION CODE
MICHIGAN ELECTRICAL CODE RULES, PART 8
J
F
M
FACP
TS
CR
FAA
JUNCTION BOX
ELECTRICAL PANEL
T TRANSFORMER
RECEPTACLE - DUPLEX TYPE
RECEPTACLE - SIMPLEX TYPE
RECEPTACLE - QUADRUPLEX TYPE
RECEPTACLE - DUPLEX TYPE 6" ABOVE COUNTER
RECEPTACLE - SPECIALTY TYPE
METER
GROUNDING BAR
DISCONNECT SWITCH - NON-FUSED
DISCONNECT SWITCH - FUSED
DISCONNECT SWITCH - COMBINATION MOTOR STARTER
POWER SYMBOL LIST
FIRE ALARM SYMBOL LIST
GROUND
GROUNDING ROD
TECHNOLOGY SYMBOL LIST
M MOTOR RATED SWITCH
WAP
RECEPTACLE - DUPLEX/USB COMBINATION TYPEUSB
NOTES:
1. DRAWINGS INDICATE DESIGN INTENT ONLY, FINAL LOCATIONS AND DEVICE
SPECIFICATIONS SHALL BE PROVIDED BY FIRE ALARM MANUFACTURER. REFER
TO PROJECT SPECIFICATIONS FOR APPROVED MANUFACTURERS.
2. FIRE DETECTION AND SIGNALING DEVICES ARE SHOWN FOR COORDINATION
PURPOSES. FINAL SYSTEM DESIGN TO BE PERFORMED BY CONTRACTOR AND
SUPPLIER FOR OFFICIAL SUBMISSION. COORDINATE ALL DEVICE QUANTITIES
AND LOCATIONS WITH SUPPLIER PRIOR TO INSTALLATION. ELECTRICAL
CONTRACTOR SHALL PROVIDE ALL NECESSARY PATHWAYS, POWER SUPPLIES
AND DEVICES PER SUPPLIER CONTRACT DOCUMENTS.
CO
NOTES:
1. ALL DEVICE RATINGS/SIZES SHALL BE COORDINATED WITH PLANS AND
SCHEDULES.
NOTES:
1. ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR BOX AND CONDUIT FOR
ALL DEVICES INDICATED.
2. LOW VOLTAGE CONTRACTOR SHALL PROVIDE EXACT SPECIFICATIONS AND
LOCATIONS OF ALL DEVICES.
MOTOR - SINGLE PHASE
MOTOR - THREE PHASE
CONDUIT DOWN
CONDUIT UP
ELECTRICAL ABBREVIATIONS
DESCRIPTION
LIGHTING CONTROLS LEGEND
SYMBOL
(E)
FACP
FA
AIC
CB
EMT
EWC
AFF
A
AF
AWG
AT
ATS
C
CU
CT
DIA
DISC
EPO
EQUIPMENT
I
TV
DH
DESCRIPTIONSYMBOL
DESCRIPTIONSYMBOL
DESCRIPTIONSYMBOL
DESCRIPTIONSYMBOL
DESCRIPTIONABBREV. DESCRIPTION
E100
SHEET E100 ON WHICH SECTION IS CUT
(ENLARGED PARTIAL PLAN SIMILAR)
SCALE: 1/4" = 1' - 0"
SECTION
SECTION NUMBER 4
S
S S
S
F
F
F
F
CS
FLA
F
G/GND
GFCI/GFI
HOA
HP
IG
KV
KVA
KW
KWH
LP
MCB
MDP
MLO
MAX
MIN
NEC
NEMA
N/NEU
NF
NC
NO
NIC
PH/Ø
P
PF
PVC
(R)
(RR)
RMC
RP
TBB
TYP
UC
UL
UPS
USB
V
VA
W
WG
WP
XFMR
SL
BELL OUTLET
CAMERA
CARD READER
LOW VOLTAGE PANEL
TELEVISION OUTLET
PUSH BUTTON
INTERCOM
SPEAKER - WALL MOUNTED, CEILING MOUNTED
WALL CLOCK - SINGLE FACE
WALL CLOCK - DOUBLE FACE
WALL CLOCK AND SPEAKER UNIT
WIRELESS ACCESS POINT
AUDIBLE DEVICE - WALL MOUNTED
COMBINATION AUDIBLE/VISUAL DEVICE - WALL MOUNTED
AUDIBLE DEVICE - CEILING MOUNTED
COMBINATION AUDIBLE/VISUAL DEVICE - CEILING MOUNTED
COMBINATION CARBON MONOXIDE ALARM/SMOKE DETECTOR
CARBON MONOXIDE ALARM
EXISTING
NEW
COMBINATION FIRE/SMOKE DAMPER
(VERTICAL)
EXISTING
NEW
COMBINATION FIRE/SMOKE DAMPER
(HORIZONTAL)
MAGNETIC DOOR HOLDER
MANUAL PULL STATION
TAMPER SWITCH
FIRE ALARM ANNUNCIATOR PANEL
FIRE ALARM CONTROL PANEL
COPPER FEEDER SIZE TAG
(REFER TO FEEDER SCHEDULE)
ALUMINUM FEEDER SIZE TAG
(REFER TO FEEDER SCHEDULE)
EQUIPMENT TAG
EXISTING DEVICES OR EQUIPMENT
NEW OR MODIFIED DEVICES OR EQUIPMENT
NEW OR MODIFIED UNDERGROUND WIRING
EXISTING SYSTEM COMPONENT TO BE REMOVED
POINT OF NEW CONNECTION.
LIGHT CONTROL LOCATION
ABOVE FINISHED FLOOR
AMPERE
AMPERE FUSE/AMPERE FRAME
AMERICAN WIRE GAUGE
AMPERE TRIP
AUTOMATIC TRANSFER SWITCH
AVAILABLE INTERRUPTING CURRENT (AMPS)
CONDUIT OR CEILING MOUNTED
CIRCUIT BREAKER
COPPER
CURRENT TRANSFORMER
DIAMETER
DISCONNECT
ELECTRICAL METALLIC TUBING
ELECTRIC WATER COOLER
EMERGENCY POWER OFF
EXISTING ELECTRICAL EQUIPMENT/WORK TO REMAIN
FIRE ALARM
FIRE ALARM CONTROL PANEL
FULL LOAD AMPS
FUSE
GROUND
GROUND FAULT CIRCUIT INTERRUPTER
HAND-OFF-AUTO
HORSEPOWER
ISOLATED GROUND
KILOVOLT
KILOVOLT AMPERE
KILOWATT
KILOWATT HOUR
LIGHTING PANEL
MAIN CIRCUIT BREAKER
MAIN DISTRIBUTION PANEL
MAIN LUG ONLY
MAXIMUM
MINIMUM
NATIONAL ELECTRICAL CODE
NATIONAL ELECTRICAL MANUFACTURERS ASSOC.
NEUTRAL
NON-FUSIBLE
NORMALLY CLOSED
NORMALLY OPEN
NOT IN CONTRACT
PHASE
POLE
POWER FACTOR
POLYVINYL CHLORIDE (PLASTIC)
RELOCATED EXISTING ELECTRICAL EQUIPMENT
REMOVE AND REINSTALL
RIGID METALLIC CONDUIT
RECEPTACLE PANEL
TELEPHONE BACKBOARD
TYPICAL
UNDERCOUNTER
UNDERWRITERS LABORATORIES
UNINTERRUPTIBLE POWER SUPPLY
UNIVERSAL SERIAL BUS
VOLT
VOLT AMPERE
WATT
WIRE GUARD
WEATHERPROOF
TRANSFORMER
PT POKE-THRU
VFD VARIABLE FREQUENCY DRIVE
FB FLOOR BOX
TECHNOLOGY OUTLET - 6" ABOVE COUNTER
TECHNOLOGY OUTLET - FLOOR
TECHNOLOGY OUTLET - WALL
CORD REELC
C CARBON DIOXIDE ALARM
FD
FIRE DEPARTMENT COMMUNICATION OUTLET
S DUCT MOUNTED SMOKE DETECTOR
FS FLOW SWITCH
HEAT DETECTORH
I/O INPUT/OUTPUT CONTROL MODULE
S
S
SMOKE DETECTOR - WALL MOUNTED, CEILING MOUNTED
SMOKE DETECTOR WITH AUDIO
S
F VISUAL DEVICE - CEILING MOUNTED
F VISUAL DEVICE - WALL MOUNTED
S
3S
S4
SWITCH - SINGLE POLE
SWITCH - THREE WAY
SWITCH - FOUR WAY
UON UNLESS OTHERWISE NOTED
INV INVERTER
EC ELECTRICAL CONTRACTOR
1A
Z1 DAYLIGHTING CONTROL ZONE '1'
(MAY NOT APPEAR ON EVERY
TAG)
SCENE SCHEDULE ID 'A' (MAY
NOT APPEAR ON EVERY TAG) LIGHTING CONTROL
SPACE TYPE '1'
LIGHTING CONTROL TAG
NOTE: THE TAG DOES NOT REFLECT THE QUANTITY OF CONTROL DEVICES
REQUIRED IN AREA.
LIGHTING FIXTURE TAG
FIXTURE MOUNTING HEIGHT (MAY
NOT APPEAR ON EVERY TAG)
NORMAL CIRCUIT, EMERGENCY
LIGHTING INVERTER, OR
GENERATOR CIRCUIT (MAY NOT
APPEAR ON EVERY TAG)
LIGHTING FIXTURE TYPE
L1
INV1
13'-0"
SES
Strategic Energy Solutions
4000 W. Eleven Mile Road Berkley, MI 48072
Phone 248.399.1900 Fax 248.399.1901 www.sesnet.com
© 2025 SES, INC.
SES Project # 25 0927 01
PROJECT:
DRAWN:
CHECKED:
x
T T
E D
Keyplan
SHEET TITLE:
SHEET NUMBER:
ISSUED FOR:
/2
/2
:4
:3
P M
C
U se rs \r ru ff in \D o cu m e n ts
\2
M D
P S
R T
U R e p la ce m e n ts
M
E P rr u ff in Q
LB
.r vt
E000
BAG
GBS
MDPS RTU
Replacements
ELECTRICAL
GENERAL
INFORMATION
Madison District Public Schools Madison Heights, Michigan
E000 ELECTRICAL GENERAL INFORMATION
ED102 ROOF POWER DEMOLITION PLAN
EP102 ROOF POWER PLAN
E700 ELECTRICAL RISER DIAGRAM
S
S S
S
S S
A
A P
P T
T U
U
UU
UUVV
VVEX
EX
QX
QXRX
RX
WX
WX
3 3
4 4
27 27
28 28
33 33
35 35
3_3_
38 38
40 40
43 43
47 47
57 57
61 61
(E )R
T U
-6
(E)RTU-9
D1
RTU-7
(E )R
T U
-1
RTU-5
RTU-12
D1 D1
D2
D2
D2
FROM DP-3.
REFER TO ONE-LINE.
FROM DP-3.
REFER TO ONE-LINE.
FROM DP-1.
REFER TO ONE-LINE.
SEE THIS SHEET FOR AREA OF ELECTRICAL
PANELS IN ELECTRICAL ROOM ON FIRST FLOOR
SEE THIS SHEET FOR AREA OF
ELECTRICAL PANELS IN
RECEIVING ROOM ON FIRST
FLOOR
U
U
(E) 45KVA DRY TYPE
TRANSFORMER
(E) LP"AA"
277/480V-3ø-4W.
(E) DP"1"
277/480V-3ø-4W.
QX
QXRX
RX
43 43
47 47
(E) LP"CC" 277/480V-3ø-4W.
(E) RP"J" 120/208V-3ø-4W.
(E) RP"C" 120/208V-3ø-4W.
(E) DP"4" 120/208V-3ø-4W.
(E) 112.5 KVA TYPE TRANSFORMER
(E) DP"3" 277/480V-3ø-4W.
(E) "MSB" 120/208V-3ø-4W.
SES
Strategic Energy Solutions
4000 W. Eleven Mile Road Berkley, MI 48072
Phone 248.399.1900 Fax 248.399.1901 www.sesnet.com
© 2025 SES, INC.
SES Project # 25 0927 01
PROJECT:
DRAWN:
CHECKED:
x
T T
E D
Keyplan
SHEET TITLE:
SHEET NUMBER:
ISSUED FOR:
/2
/2
:4
:3
P M
C
U se rs \r ru ff in \D o cu m e n ts
\2
M D
P S
R T
U R e p la ce m e n ts
M
E P rr u ff in Q
LB
.r vt
ED102
BAG
GBS
MDPS RTU
Replacements
ROOF POWER
DEMOLITION PLAN
Madison District Public Schools Madison Heights, Michigan
SCALE: 1/16" = 1'-0"
ROOF POWER DEMOLITION PLAN
ELECTRICAL DEMOLITION NOTES
1. VISIT THE SITE PRIOR TO SUBMISSION OF BID TO EXAMINE THE EXISTING CONDITIONS AND
THE EXTENT OF DEMOLITION WORK.
2. EXAMINE THE DRAWINGS OF OTHER TRADES, BE FAMILIAR WITH THE DEMOLITION
REQUIRED BY OTHER TRADES.
3. PERFORM ALL INCIDENTAL ELECTRICAL DEMOLITION AND/OR RELOCATION OF DEVICES
AND EQUIPMENT REQUIRED TO FACILITATE THE DEMOLITION WORK OF OTHER TRADES.
4. COORDINATE WITH NEW WORK PLANS, ONE LINE, AND RISER DIAGRAMS FOR EXTENT OF
DEMOLITION WORK.
5. COORDINATE ANY SHUTDOWN OF EXISTING SERVICES AND EQUIPMENT REMAINING IN USE
WITH OWNERS' REPRESENTATIVE. WHERE EXISTING BUILDING SERVICE IS REQUIRED TO
BE SHUT DOWN, INCLUDE ALL ASSOCIATED OVERTIME COST TO PERFORM THIS WORK