This is a project plan document prepared by ECS Midwest Consulting for the Iowa Department of Natural Resources detailing the scaling requirements for the Harmon Tunnel Highwall at Pammel State Park on Pammel Park Road in Winterset, Iowa, Madison County. The project involves the removal of loose, unstable, disjointed, spalled, and exfoliated bedrock fragments and talus from both the northeast and southwest tunnel portal highwalls using manual, mechanical, or chemical non-explosive methods. Work includes disposal of all resulting spoil and loose material located between the zone of influence and tunnel pavement, with blasting explicitly prohibited. The plans consist of four sheets depicting the title sheet/index, northeast entrance details, southwest entrance details, and specifications index, with each entrance showing approximately 15-foot zones of influence marked for scaling operations. Contractors must submit a detailed work plan at least ten working days prior to beginning operations, and the bid closing date is June 25, 2026 at 3:00 PM.
Contractors are required to demonstrate that all rock slope scaling foremen and personnel have completed three similar projects within the last five years and possess a minimum of two years full-time experience in rock slope stabilization including scaling operations. Payment is structured as lump sum costs for three items: mobilization, scaling operations (defined as one qualified foreman and minimum two qualified scalers), and scaled material disposal. The contractor bears all responsibility for equipment, materials, labor, traffic control, personnel and public protection, damage prevention to historic tunnel elements including stacked stone retaining walls and tunnel arches, environmental protection, emergency management, and disposal of all rock debris and scaled materials at an approved site with no designated disposal location provided. All work must follow the approved work plan and comply with Iowa Department of Transportation Temporary Traffic Control Guidelines and Section 8030 special provisions, with the tunnel closed to traffic during construction.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 26-04-61-02 - Bid Package.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TI
TL
E
SH
EE
T
/ I N
D
EX
Sheet:
of 4
Approved By:
Drawn By:
DJH 5/15/26
Date:
Date:
ON 11 X 17 SHEET
DescriptionByDateRev.
H ar m on
T un ne l H ig hw al l (
B lu
ff) S ca lin g R eq ui re m en ts
Pa m m el
P ar k R oa d;
W in te rs et , I ow a
M ad is on C ou nt y, Io w a
Scale: none
1 TITLE SHEET / INDEX
2 NORTHEAST ENTRANCE
3 SOUTHWEST ENTRANCE
4 SPECIFICATIONS
INDEX
Harmon Tunnel Highwall (Bluff) Scaling Requirements Pammel Park Road; Winterset, Iowa 50273
Madison County, Iowa
I HEREBY CERTIFY THAT THIS DOCUMENT WAS
PREPARED BY ME OR UNDER MY DIRECT
PERSONAL SUPERVISION AND THAT I AM A DULY
CERTIFIED REGISTERED ROOF CONSULTANT BY
THE INTERNATIONAL INSTITUTE OF BUILDING
ENCLOSURE CONSULTANTS
DARRELL SMITH, P.E
LICENSE NUMBER 11460 20
PAGES OR SHEETS COVERED BY THIS SEAL
DARRELL L.
SMITH
11460
SHEETS 1 - 4 of 4
06/5/2026
Jason Kruse Text Box 26-04-61-02
SO
U
TH
W
ES
T
EN
TR
A N
C E
Sheet:
of 4
Approved By:
Drawn By:
DJH 5/15/26
Date:
Date:
ON 11 X 17 SHEET
DescriptionByDateRev.
H ar m on
T un ne l H ig hw al l (
B lu
ff) S ca lin g R eq ui re m en ts
Pa m m el
P ar k R oa d;
W in te rs et , I ow a
M ad is on C ou nt y, Io w a
Scale: none
NORTHEAST ENTRANCE
45°
~15 ft ~15 ft
ZONE OF
INFLUENCE
LIMITS
AREA TO BE SCALED IN ACCORDANCE WITH THE
ATTACHED SPECIFICATIONS PREPARED BY ECS
45°
ZONE OF
INFLUENCE
LIMITS
PHOTO 1
EXTEND SCALING AS
NECESSARY ABOVE
TOP OF HIGHWALL
DANGEROUS
FALL ROCK DEBRIS
PHOTO 2
N O
R
TH
EA
ST
E N
TR
A
N C
E
Sheet:
of 4
Approved By:
Drawn By:
DJH 5/15/26
Date:
Date:
ON 11 X 17 SHEET
DescriptionByDateRev.
H ar m on
T un ne l H ig hw al l (
B lu
ff) S ca lin g R eq ui re m en ts
Pa m m el
P ar k R oa d;
W in te rs et , I ow a
M ad is on C ou nt y, Io w a
Scale: none
SOUTHWEST ENTRANCE
45°
~15 ft ~15 ft
ZONE OF
INFLUENCE
LIMITS
AREA TO BE SCALED IN ACCORDANCE WITH THE
ATTACHED SPECIFICATIONS PREPARED BY ECS
45°
ZONE OF
INFLUENCE
LIMITS
PHOTO 3
EXTEND SCALING AS
NECESSARY ABOVE
TOP OF HIGHWALL
DANGEROUS
FALL ROCK DEBRIS
PHOTO 4
SP
EC
IF
IC
A
TI
O N
S
Sheet:
of 4
Approved By:
Drawn By:
DJH 5/15/26
Date:
Date:
ON 11 X 17 SHEET
DescriptionByDateRev.
H ar m on
T un ne l H ig hw al l (
B lu
ff) S ca lin g R eq ui re m en ts
Pa m m el
P ar k R oa d;
W in te rs et , I ow a
M ad is on C ou nt y, Io w a
Scale: none
HARMON TUNNEL HIGHWALL (BLUFF) SCALING REQUIREMENTS
TEMPORARY REPAIRS
Pammel Park Road; Winterset, Iowa 50273 Madison County, Iowa
I. DESCRIPTION - This work includes the removal of loose or potentially unstable disjointed spalled/ exfoliated bedrock fragments and talus above/ around both tunnel portal highwalls (within the zone of influence as depicted in these Drawings) by manual, mechanical or chemical (non-explosive) methods. Includes removal and disposal of all spoil resulting from the highwall scaling operation and all loose material located in the area between the 'zone of influence' and the tunnel pavement. Blasting is not permitted.
II. SUBMITTALS - Prepare and submit a detailed project Work Plan to the Iowa Department of Natural Resources (Owner) and ECS Midwest (Consultant) at least ten (10) working days prior to beginning the scaling work. Include the following information in the Work Plan:
a. Schedule. Outline the proposed construction sequence and schedule.
b. Equipment. List the types of equipment and tools to be used for the work and for accessing the work area. Include any power equipment such as excavators, hydraulic and pneumatic hammers, drills, cranes, and drag scaling systems, etc.
c. Qualifications of Personnel. Provide documentation that each rock slope scaling foreman and all personnel conducting work or activities related to scaling operations have performed satisfactory work on three similar projects within the last five years. All personnel must have a minimum of two years of full-time experience in rock slope stabilization that includes rock scaling.
d. Crews. Indicate the anticipated number of planned scaling crews to be employed on the project. A crew is defined as one scaling foreman and a minimum of two scalers.
e. Material Control and Removal. Describe the scaling sequence for the project, intended direction and fall area for rock debris generated from the slope, frequency and method of rock debris removal, and disposal plan for rock debris generated from the slope scaling work, and any rock debris currently along and adjacent to the toe of the slope. Include provisions to protect adjacent roadway facilities and components, and any local private facilities. The complete and thorough protection of the stacked stone retaining walls, tunnel arches, and all other historic/ architectural elements of the tunnel is imperative for this project.
f. Traffic Control. Follow the Work Zone Traffic Control Plan requirements provided in the contract including any Iowa DOT Section 8030 special provisions. It is our understanding that the tunnel will be closed to traffic during this construction sequence. Existing road signs will be modified as required for construction access and 'Roadway Closed' for other traffic. Any proposed changes or additions to the traffic control plan must meet the current Iowa DOT Temporary Traffic Control Guidelines (including changes) and be approved by the Consultant and Owner.
g. Protection Plan. Describe methods and procedures to be used to protect personnel and the public from all harm, and all adjacent tunnel facilities, and structures from damage.
Include provisions to protect the adjacent roadway and components, and any local private facilities. Protect the environment by minimizing erosion, preventing sedimentation from entering streams or waterways, and any other environmental impacts. Contractor is solely responsible for restoring, repairing, or recompense for any damage or injury caused by this work. Suggested protection methods include wood shoring and use of heavy protection blankets. Protection plan shall be submitted to Consultant and IDNR for review and comments. Contractor is solely responsible for providing protection.
h. Emergency Management Plan. Contractor shall succinctly describe and outline the plan of action for a possible worker injury. Also describe the plan of action for potentially large rocks or rock masses scaled onto the roadway that are not removable within the time limit restrictions.
i. The contractor's proposed Work Plan submission must be approved in writing by the authorized Iowa Department of Natural Resources and/or Iowa DOT representative(s) prior to beginning any scaling work.
CONSTRUCTION - Proceed according to the approved Work Plan and schedule. The work will remove loose, exfoliated or unstable disjointed rocks, boulders, large projecting rock blocks, and overhangs from the slope as indicated on the ECS drawings and as directed by the Consultant and/or Owner. Contractor shall supply all materials, equipment, and labor required to perform the work.
j. Prevent damage to adjacent roadway facilities and tunnel components, any existing rockfall protection structures and appurtenances, and any adjacent or local private facilities. Repair or replace any pavement, guiderail, signage, structures, property or other components, public or private utilities, and any local private properties or facilities damaged due to the scaling work, at no expense to the State of Iowa. The complete protection of the stacked stone retaining walls, tunnel arches, and all other historic architectural elements of the tunnel is imperative for this project. Contractor is solely responsible for providing protection.
k. Provide adequate means to protect all personnel and surrounding property from injury and/or damage during rock scaling and all other activities. Submit methods of protecting workers to the Consultant and Owner for approval two weeks prior to excavation. The Contractor is solely responsible for injury to persons or damage to property that may result from this work. The exercise of (or conversely the failure to exercise) control on the part of the Owner and Consultant shall in no way relieve the Contractor of responsibility for any injury or damage.
l. During rock removal, provide sufficient qualified personnel for fully staffed scaling crews at all times.
m.Conduct slope scaling and prepare finished rock slope surface using manual, mechanical or chemical (non-explosive) methods and equipment including the use of scaling bars, winching, drag scaling, air bags, hydraulic jacks, and chemical expansive agents (non-explosive demolition agents), power equipment, such as excavators, hydraulic and pneumatic hammers, drills, cranes, etc. Blasting is not allowed.
n. Perform scaling as required to provide safe conditions after completion. Provide, operate and maintain telecommunication inspection equipment to allow for both audio and video communication between each rock scaling crew to effectively communicate the slope conditions, or issue alerts regarding unstable conditions.
o. Rock scaling will start at the top of the slope and proceed downward toward the tunnel/ roadway, thereby removing all loose rocks and unstable blocks as the work progresses.
p. Do not excavate material that will disturb intact rock, compromise the stability of the rock face or slope, or disturb or damage the toe of slope unless such work is deemed necessary by the Department to meet project objectives or correct a more serious condition and as directed by the Consultant or Owner. Submit corrective action plan and analysis to Consultant and Owner for review and approval for cases where intact rock has been disturbed, stability of the rock face has been compromised, or toe of slope is damaged. The submission for design and corrective action must satisfactorily demonstrate adequacy to resolve and correct the problem as determined by the Consultant and Owner. All work for corrective action resulting from damages from activities not directed or approved by the Consultant and/or Owner will be conducted at no additional cost to the Owner.
q. Do not remove fragments/ pieces of rock that will result in undercutting of overlying material. Submit a corrective action plan to the Consultant and Owner for review and approval to correct any excessive undercutting,
r. Damage or instability caused by the scaling work. Preparation of the corrective action plan shall be at no cost to the Department and no adjustments in contract time will be allowed as the result of preparation, Owner and Consultant review, and implementation of the plan.
s. Remove any overhanging rock as directed by the Consultant and/or Owner.
t. Trim vegetation on the slope face and top of slope to the limits shown on the drawings or as directed by the Consultant and /or Owner. Cut trees to a height of not more than four inches above the ground line.
u. If chemical expansion agents are used, store securely until use. Handle and use all chemicals according to the manufacturer's instructions.
v. All rocks and debris displaced during scaling must be removed completely from the slope in order to permit inspections by the Consultant and Owner to determine if rock scaling has been completed satisfactorily. Remove additional rock identified during inspections at the direction of the Consultant and/or Owner. All rock scaling activities will cease during any inspections necessary for Consultant or Owner to evaluate scaling activities, check the progress of work or assess stability of the slope or an individual rock block or mass.
w.Remove all rock and debris produced during the rock slope scaling operation as well as existing debris at the base of the slope and dispose of in accordance with IDNR/ IDOT directives. The frequency of removal will not exceed one fifteen-minute period per two hours unless longer or more frequent periods are to maintain a safe and efficient worksite, as directed and/or approved by the Consultant.
x. Any rock on the cut face that is loose, hanging, deemed to be unsafe or unstable, or that creates a potentially dangerous situation, will be removed or stabilized to the satisfaction of the Consultant and/or Owner during or upon completion of each portion of rock scaling.
y. Scaling and/or removal of rock that is required to be carried out below or beyond the grades shown on the plans, below or beyond the limits established by the Consultant shall be provided to Consultant prior to such operations for review and approval. If required a change order for such will be prepared for additional cost to the contract.
Bedrock or other materials removed for the convenience of the contractor are at the contractor's expense.
III. GENERAL
Be advised that rattlesnakes are known to be located near the active construction area and are a protected species in Iowa
IV. MEASUREMENT AND PAYMENT
LUMP SUM COST FOR EACH;
a. Mobilization.
Lump sum price for Mobilization shall include includes preparatory work, operations performed, or costs incurred prior to beginning work on the various items on the project site. Includes
1. The movement of personnel, equipment, and supplies to the project site.
2. The establishment of offices, buildings, and other facilities necessary for the project.
3. Bonding, permits, or other expenses incurred prior to construction.
b. Scaling.
Crew is defined as one qualified scaling foreman and a minimum of two qualified scalers. Payable as Scaling includes time when all crew members are physically on the slope preparing to scale or performing the scaling. Payable as Scaling includes time ascending the slope, descending the slope, actively scaling, and on-slope standby during clean-up or when necessary for the safe conduct of traffic.
Lump sum price for Scaling includes the cost of furnishing all the materials, tools, equipment, labor, and incidentals necessary to complete the scaling work. This Item includes the removal of all scaled rock materials, any on- ground support personnel and equipment actively supporting scaling operations such as Work Zone Traffic Control, means and methods required to protect motorists and property from falling rock, removal of vegetation, and revegetation of disturbed areas as directed.
c. Scaled Material Disposal.
Lump sum price for Scaled Material Disposal includes all costs of excavating, loading, hauling and disposal of existing debris, cut trees, and scaled rock materials to the approved disposal site. Disposal of rock debris form the project will be the contractor's responsibility. There will not be a designated disposal location provided.
| Sheets and Views |
| 39370 ECS Harmon Tunnel-sht1 |
| 39370 ECS Harmon Tunnel-sht2 |
| 39370 ECS Harmon Tunnel-sht3 |
| 39370 ECS Harmon Tunnel-sht4 |
File details come from the government source that posted it. Updated .