26_039 Power Conduit and Wire Installation Ph.pdf
PDF 13 MB Posted
- Attached to
- 26-039 Power Conduit & Wire Installation Phase 3
- Solicitation number
- PE-64750-NONST-2026-000000180
- Issued by
- Dooly County, Georgia
About this file
This is a Scope of Work document for the City of Albany, Georgia, pertaining to Phase 3 of the Power Conduit and Wire Installation project. The project involves labor-only installation services for high voltage primary power conduit and 12KV underground primary cable to replace existing direct buried cable. The work will be executed using directional bore methodology in accordance with City of Albany specifications. Sealed bids will be received by the City of Albany Procurement Division at 222 Pine Avenue, Suite 260, Albany, Georgia 31701, with a bid deadline of 2:30 p.m. on March 19, 2026. The City will furnish all power conduit, wire, and termination materials; the contractor is responsible solely for installation labor according to provided drawings, specifications, and work scope documents.
The contract scope does not specify pricing terms, contract duration, renewal options, or site visit and pre-bid meeting requirements in the available documentation. No information regarding set-asides, incumbent contractors, funding sources, or award dates is detailed in this file. All materials will be provided by the City of Albany, with the contractor's responsibilities limited to labor installation services.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .