Technical Specifications Summary
This is a technical specification document prepared by the Palm Beach County Water Utilities Department (PBCWUD) for Project 26-036, covering wet tapping and line stopping services on water, force main, reclaimed water, and raw water pipelines ranging from 4 inches to 54 inches in diameter (with PCCP pipe limited to 24 to 42 inches). The project will be executed through individual Construction Work Authorizations (WAs) issued on an as-needed basis over a 36-month period with no renewal options. The scope of work includes furnishing and installing tapping valves, tapping sleeves, line stops (both single and double), insert valves, mobilization and demobilization, and emergency response services for various pipe materials including PVC, ductile iron pipe (DIP), cast iron pipe (CIP), asbestos cement (AC), and prestressed concrete cylinder pipe (PCCP). The specification document contains 246 line items for bid pricing and identifies various pipe sizes with specific unit price structures for each material type and connection method. The contractor must be licensed in Palm Beach County, certified by the Florida Department of Professional Regulation, and have at least ten years of experience performing similar work in Florida. The Owner provides excavation, dewatering, backfilling, permitting, and notice issuance, while the contractor is responsible for all labor, materials, equipment, utilities, and temporary facilities necessary to complete the work.
Payment is based on actual quantities furnished and installed according to the contract bid prices and approved WAs, with unit pricing serving as full compensation for materials, labor, and installation. Work Authorizations under $99,999 require Water Utilities Director approval, those between $100,000 to $199,999 require Contract Review Committee approval, and those $200,000 or greater require Board of County Commissioners approval. Work Authorizations under $200,000 do not require bonding, while those $200,000 and above require public construction bonds. The contract includes an allowance of $25,000 for miscellaneous items not covered by standard bid items, controlled solely by the Owner. Emergency response services are billed separately with response time requirements ranging from 12 to 24 hours depending on pipe diameter. Night and weekend work outside regular hours (7:00 AM to 6:00 PM) is compensated at separate line item rates. Materials must be delivered new and properly stored, with all submittals including shop drawings requiring Owner approval prior to fabrication or installation, except for emergency work. The specification references Palm Beach County's Minimum Construction and Engineering Standards and requires compliance with AWWA standards, ASTM testing requirements, and traffic control measures in accordance with FDOT regulations and the Manual on Uniform Traffic Control Devices.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Technical Specifications Table of Contents
WUD 26-036
Section Description
Division 1 - General Requirements
01010 Summary of Work 01025 Measurement and Payment 01070 Abbreviations 01090 Reference Standards 01152 Application for Payment 01154 Construction Work Authorizations (WAs) and Work Directive Procedures 01300 Contractor Submittals 01310 Construction Schedule 01340 Shop Drawings, Product Data and Supplies 01400 Quality Control 01505 Mobilization and Demobilization 01535 Protection of Existing Facilities 01571 Traffic Control 01600 Material Equipment and Products 01630 Substitutions and Product Options 01670 Testing Piping Systems 01700 Construction Work Authorization (WA) Close Out
Division 2 - Site Work
02610 Ductile Iron Pipe and Fittings 02614 Polyvinylchloride (PVC) Pressure Pipe 02630 Wet Tapping and Line Stopping for PCCP Pipe 02635 Wet Tapping and Line Stopping for DIP/CIP/PVC Pipe and Associated Valves
Division 9 - Finishes
09900 Painting
Division 15 – Mechanical
15200 Valves, General
01010-1
SECTION 01010
SUMMARY OF WORK
PART 1 – GENERAL
1.1 THE REQUIREMENT
A. The following explanation of work covered by the Contract documents and any other information outlined in this Section is made for explanation and guidance. The omission of reference to any work required by the Contractor to comply with Federal, State, or Local Regulatory Agencies shall not alter the intent of the Bid Form, or relieve the Contractor of the necessity of furnishing same as part of the Contract. All work shall be performed in accordance with current Palm Beach County Water Utilities Department’s Minimum Construction and Engineering Standards, unless stated otherwise in contract documents.
1.2 LOCATION OF WORK
A. The work of this Contract is located within unincorporated Palm Beach County and within municipalities served by Palm Beach County Water Utilities Department.
B. The Contractor shall work within the rights-of-way of Palm Beach County, Florida Department of Transportation, utility easements, and property owned by Palm Beach County or municipalities served by Palm Beach County Water Utilities Department, unless otherwise specified or directed.
1.3 WORK COVERED BY CONTRACT DOCUMENTS
A. The work covered by these specifications consists in general of furnishing all labor, supervision, materials, equipment, supplies, tools and manufactured articles of every kind required to furnish and install single and double line stops and perform wet taps for PVC/DIP/CIP/AC/PCCP* force mains, water mains, reclaimed water mains and raw water mains (4” to 54” pipe size diameter) (*Note: Line stopping and wet tapping of PCCP will be limited to 24” to 42” pipe size diameter), at the Owner's discretion through Construction Work Authorizations (WAs), to be issued on an as-needed basis over a 36-month period, with no option of renewals. (See Section 3 "Renewal Option with No Escalator" of the Supplement General).
B. The Work shall also include all transportation and all temporary services, utilities, systems and construction, including those not expressly shown or called for in the Contract Documents, necessary to properly accomplish and
01010-2 complete the Work in accordance with the requirements of the Contract Documents and as described in each Work Authorization.
C. Except as specifically noted, the Contractor shall provide and pay for:
1. Labor, supervision, materials, and equipment.
2. Tools, equipment and machinery.
3. Water, electricity, and other utilities required to complete project.
4. Other facilities and services necessary for proper execution and completion of the work.
1.4 GENERAL PROVISIONS
A. The OWNER must be notified forty-eight (48) hours prior to the commencement of work at the project site with the exception of emergency work. Please notify the Construction Coordination Department at (561) 493- 6000.
B. The Contractor shall perform all work in accordance with current approved
Federal, State, and Local Laws, Regulations, Codes, Ordinances, Orders, and other legal requirements of Public Authorities, which bear on the performance, and safety of the work. The Contractor will be responsible for providing all necessary equipment and/or material on-site. The County/Owner will not be held responsible or charged extra fees for delays due to lack of material or necessary equipment.
C. The Contractor and/or subcontractors selected for this project must have
Palm Beach County Occupational License, and be certified with the State of Florida Department of Professional Regulation. In addition, the Company shall have at least ten (10) years experience doing similar work, as described in this contract, in the State of Florida (See Section 4 “Qualification of Bidders” of the Supplemental General Conditions).
D. Any damage to existing aboveground or underground utilities occurring during construction shall be repaired by the Contractor at no cost to the
OWNER.
E. All accessories and appurtenances shall be new, manufacturer approved, complete and ready for use.
F. The Contractor shall remove all debris and excess materials brought on site or caused to be on site by the Contractor's activities upon completion of the work.
01010-3
G. The Contractor shall provide the services of a qualified manufacturer's technical representative(s) who shall adequately supervise the installation and testing of all equipment furnished under this Contract.
H. The Owner shall be responsible for excavating, dewatering and backfilling.
I. The Owner shall secure and pay for any necessary permits.
J. The Owner shall bear sole responsibility for issuing required notices.
K. The Contractor shall comply with codes, ordinances, rules, regulations, orders and other legal requirements of public authorities, which bear on performance of work.
1.5 STORAGE OF MATERIALS
A. Suitable storage facilities shall be furnished by the Contractor. All materials, supplies and equipment intended for use in the work shall be suitably stored by the Contractor to prevent damage from exposure, admixture with foreign substances, vandalism or other cause. The Engineer will refuse to accept or sample for testing, materials, supplies or equipment that have been improperly stored, as determined by the Engineer. Materials found unfit for use shall not be incorporated in the work and shall immediately be removed from the construction or storage site. Delivered materials shall be stored in a manner acceptable to the Engineer before any payment for same will be made. Materials strung out along the line of construction will not be allowed unless the materials will be installed within one week from the time of unloading and stringing out.
1.6 SALVAGED EQUIPMENT AND MATERIALS
A. In the absence of special provisions to the Contract, salvaged materials, equipment or supplies that occur are the property of the Contractor and shall be removed from the project site.
1.7 PROGRESS OF WORK
A. If at any time, the material and appliances to be used appear to the Engineer as insufficient or improper for securing the quality of work required or the required rate or progress, he may order the Contractor to increase his efficiency or to improve the character of his work and the Contractor shall conform to such an order. The failure of the Engineer to demand any increase of such efficiency or any improvement shall not release the Contractor from his obligation to secure the quality of work or the rate of progress necessary to complete the work within the limits imposed by each specific project.
01010-4
1.8 INSPECTIONS
A. The Construction Engineer or his designee may inspect all construction and materials and may also inspect preparation, fabrication or manufacture of components, materials and supplies. The Construction Engineer or his designee is not authorized to revoke, alter, or waive any requirements of the approved plans or these specifications unless approved by the Owner. The Construction Engineer or his designee is authorized to notify the Contractor of any failure of work or materials to conform to the plans or specifications.
The Construction Engineer or his designee shall have the authority to reject materials or suspend the work until questions at issue can be decided upon by the Owner. Any advice which the Construction Engineer or his designee may give, shall in no way be construed as binding to the Owner or release the Contractor from performing according to the intent of the plans, specifications, and the Owner’s Minimum Design and Construction Standards.
B. Inspections will be scheduled for regular working hours only, except for emergencies and nights when service interruptions are involved. Work will not be scheduled for weekends or holidays except for emergency work. The Owner should be provided with one (1) full working day notice for scheduled inspections. The Construction Engineer or his designee will make routine passes on call to inspect material on site, and clearances between conflicting lines. Scheduled inspections are also required for pressure testing and connections to the Owner’s facilities. The Contractor shall keep a copy of the current approved plans (if available) on the project site at all times.
1.9 PRESERVATION OF PROPERTY
A. The Contractor shall preserve from damage all property along the line of the work, or which is in the vicinity of or is in any way affected by the work, the removal or destruction of which is not called for, or as shown on available plans. Whenever such property is damaged due to the activities of the Contractor, it shall be immediately restored to its original condition by the Contractor at no cost to the Owner.
B. In case of failure on the part of the Contractor to restore such property, or make good such damage or injury, the Owner may, after 48 hours notice to the Contractor, proceed to repair, rebuild or otherwise restore such property as may be deemed necessary and the cost thereof will be deducted from any monies due or which may become due the Contractor under this Contract.
01010-5
1.10 RESTORATION AND CLEAN UP
A. The Contractor shall keep the construction site free of rubbish and waste materials and restore to their original condition those portions of the site not designated for alteration by the Contract Documents. Clean up and restoration shall be accomplished on a continuing basis throughout each project and in such a manner as to maintain a minimum of nuisance and interference to the general public, commercial facilities and residents in the vicinity of the work.
B. The Contractor shall also remove all temporary structures and equipment used in their operations when no longer needed. It is the intent of this specification that the construction areas and other areas not designated for alteration by the Contract Documents shall be restored to their original condition as nearly as possible immediately after completion of installation.
1.11 SHOP DRAWINGS
A. The Contractor shall submit detailed or shop drawings of equipment and materials he contemplates furnishing under this contract for the approval of the Engineer prior to start of construction. Equipment shall not be fabricated or materials shipped until shop drawings have been approved with the exception of emergency work. Six (6) copies of shop drawings shall be submitted. Shop drawings shall be checked and signed or stamped by the Contractor before submission to the Engineer. Refer to Section 01300 "Contractor Submittal".
1.12 OPERATION OR USE REQUIREMENT
A. Equipment and materials described in these specifications shall be installed in complete accord with the manufacturer's recommendations, and except where otherwise specified, proof must be given by the manufacturer that similar equipment or materials of this make have been in operation or use under comparable conditions for a period of at least five (5) years.
1.13 MATERIAL APPROVAL
A. All materials furnished by the Contractor shall be new, as specified and as shown on the drawings. The Contractor shall furnish satisfactory evidence for the approval of the Engineer as to the kind and quality of materials if required. Copies of specific tests called for in the specifications shall be furnished in three (3) copies. Before beginning work, the Contractor shall advise and shall obtain the approval of the Engineer in writing, for any optional materials allowable under the various headings which he proposes to use.
01010-6
1.14 PROTECTION OF PROPERTY
A. The Contractor shall be responsible for the protection of property in the vicinity of the project, and for the protection of his own equipment, supplies, materials and work against any damage resulting from the elements such as flood, rainstorm, wind or other elemental cause resulting from the project configuration. The Contractor shall take all precautions against any such damage occurrence, and shall be responsible for damage resulting from same. The Contractor shall provide adequate drainage facilities, tie-downs, or other protection during projects throughout the Contract period for the protection of his, the Owner's and other properties from such damage.
1.15 SITE FAMILIARIZATION
A. The Contractor shall check and familiarize himself with the overall general conditions prevailing along the route of construction and at the construction site.
1.16 CONSTRUCTION WORK AUTHORIZATIONS (WAs)
A. The bid quantities shown are estimates only. Actual quantities are to be listed in each individual approved Work Authorization. Contractor must submit estimated quantities for Work Authorization approval on an Excel Spreadsheet within 3 business days after receiving plans or request for work for each Work Authorization. The Contractor shall be responsible for providing all forms for the Work Authorization. The Owner shall provide a written work description, project location map, project number and budget line item number. The Work Authorizations with bonds shall be completed within 7 days of the Owner’s review of the Work Authorization amount. For emergency work the Contractor shall respond to verbal or written direction from designated Owner’s representative and shall begin work within the time frame specified in Bid Item
no. 227-234 of the Schedule of Bid Prices.
B. The Contractor shall be responsible for filling out the forms for each Work Authorization. The Owner shall provide the project number, project title, budget line item numbers and a description of work.
PART 2 – PRODUCTS - NOT USED
END OF SECTION
01025-1
SECTION 01025
MEASUREMENT AND PAYMENT
PART 1 - GENERAL
1.1 SCOPE
A. Payment for various items of the Bid Schedule, as further specified herein, shall be made for the items listed in the Schedule of Prices Bid and shall include all compensation to be received by the Contractor for furnishing all materials, tools, equipment, labor, operations, supplies, manufactured articles, taxes, commissions, transportation, handling, bonds, permit fees, insurance and incidentals appurtenant to the items of work so described or as necessary to actually complete the various items of work, all in accordance with the requirements of the Contract Documents and PBCWUD Minimum Engineering and Construction Standard, including all appurtenances and temporary services thereto, and including all costs of compliance with the regulations of public agencies having jurisdiction, including the Occupational Safety and Health Administration of the U.S. Department of Labor (OSHA).
B. The omission of reference to any item in this description shall not alter the intent of the Bid Form or relieve the Contractor of the necessity of furnishing such as a part of the Contract. No separate payment will be made for any item that is not specifically set forth in the Bid Schedule, and all costs therefore shall be included in the prices named in the Bid Schedule for the various appurtenant items of the Work.
C. The quantities set forth in the Schedule of Prices Bid are approximate and are given to establish a uniform basis for the comparison of Bids. The Owner reserves the right to increase or decrease the quantity of any class or portion of the Work during the progress of the construction in accordance with these Specifications.
D. Unit prices are used as a means of computing final figures for Bid and Contract purposes, for periodic partial payments for Work performed, and for determining the value of additions and/or deletions associated with approved Work Authorizations/Supplements to the Contract.
1.2 RELATED REQUIREMENTS
Section 01010: Summary of Work
Section 01154: Construction Work Authorizations (Was) and Work Directive Procedures
Section 01700: Construction Work Authorizations (Was) Close Out
1.3 MAINTENANCE OF TRAFFIC
A. In the Contractor's use of streets and highways, all work performed shall conform to all
Municipal, County, State and Federal laws and regulations. The Contractor shall provide, erect and maintain effective barricades, danger signals and signs on all affected streets or highways for protection of the Work and safety of the public, and shall remove same upon the completion of work.
B. The Contractor shall conduct the Work to cause minimum disturbance of normal pedestrian and vehicular traffic and is responsible for providing suitable means of access to all public and private
01025-2 properties during all stages of the construction. Other than for an emergency safety condition, the Contractor must contact the Owner and the Engineer for approval prior to completely blocking off any street to vehicular traffic during construction.
C. Maintenance of Traffic shall be in accordance with Technical Specification Section 01571.
1.4 PAYMENT ITEMS:
1. Tapping Valve MJ RW (Bid Items 1 to 7):
a. Measurement for payment will be based upon the actual quantity furnished and installed, in accordance with the requirements of the Contract Documents.
b. Payment for furnishing and installing tapping valve resilient wedge shall be made at the unit price named in the Bid Schedule. The unit price shall constitute full compensation for furnishing and installing the item as shown on the Contract Drawings and Specifications.
2. Tapping Valve MJ x FL (Bid Items 8 to 15):
b. Payment for furnishing and installing tapping valve mechanical joint by flange ends shall be made at the unit price named in the Bid Schedule. The unit price shall constitute full compensation for furnishing and installing the item as shown on the Contract Drawings and Specifications.
3. Flange Kit Hardware for Stainless Steel Tapping Sleeve (Bid Items 16 to 30):
b. Payment for furnishing and installing flange kit hardware for stainless steel tapping sleeve shall be made at the unit price named in the Bid Schedule. The unit price shall constitute full compensation for furnishing and installing the item as shown on the Contract Drawings and Specifications, and shall include nuts, bolts, washers and gaskets.
4. Ductile Iron MJ Tapping Sleeve (Bid Items 31 to 75):
b. Payment for furnishing and installing mechanical joint tapping sleeve shall be made at the unit price named in the Bid Schedule. The unit price shall constitute full compensation for furnishing and installing the item as shown on the Contract Drawings and Specifications.
01025-3
5. Stainless Steel Tapping Sleeve (Bid Items 76 to 91):
a. Measurement for payment will be based upon the actual quantity furnished, and installed, in
b. Payment for furnishing and installing stainless steel tapping sleeve shall be made at the unit price named in the Bid Schedule. The unit price shall constitute full compensation for furnishing and installing the item as shown on the Contract Drawings and Specifications.
6. Epoxy-Coated Steel MJ Tapping Sleeve for PVC/DIP/CIP/AC pipe (Bid Items 92 to 151):
b. Payment for furnishing and installing epoxy –coated steel mechanical joint tapping sleeve shall be made at the unit price named in the Bid Schedule. The unit price shall constitute full compensation for furnishing and installing the item as shown on the Contract Drawings and Specifications.
7. Epoxy-Coated Steel Tapping Sleeve for PCCP pipe (Bid Items 152 to 188):
b. Payment for furnishing and installing epoxy-coated steel tapping sleeve for prestressed concrete cylindrical pipe shall be made at the unit price named in the Bid Schedule. The unit price shall constitute full compensation for furnishing and installing the item as shown on the Contract Drawings and Specifications.
8. Single Line Stop for PVC/DIP/CIP/AC pipe (Bid Items 189, 191, 193, 195, 197, 199, 201, 203, 205, 207, 209, 211, 213, 215 and 217):
Single Line Stop for PCPP pipe (Bid Items 219, 221, 223 225, 225a, and 227):
b. Payment for furnishing and installing line stop shall be made at the unit price named in the Bid Schedule. The unit price shall constitute full compensation for furnishing and installing the item as shown on the Contract Drawings and Specifications.
9. Double Line Stop for PVC/DIP/CIP/AC pipe (Bid Items 190, 192, 194, 196, 198, 200, 202, 204, 206, 208, 210, 212, 214, 216 and 218):
Double Line Stop for PCPP pipe (Bid Items 220, 222, 224, 226, 226b, and 228):
b. Payment for furnishing and installing line stop shall be made at the unit price named in the Bid Schedule. The unit price shall constitute full compensation for furnishing and
01025-4
10. Line Stop Emergency Response Service (Bid Items 229 to 236):
a. Measurement for payment for Line Stop Emergency Response Service shall be based upon the number of emergency requests from Owner.
b. Payment shall be made at the unit price named in the Bid Schedule. The unit price shall constitute full compensation for required mobilization and demobilization to install requested line stop by the owner on an emergency basis. Contractor shall mobilize as follow:
Item Pipe Size Emergency Response Time
Line Stop 4” to 12” pipes 12 hours maximum Line Stop 14” to 20” pipes 12 hours maximum Line Stop 24” pipe 12 hours maximum Line Stop 30” pipe 24 hours maximum Line Stop 36” pipe 24 hours maximum Line Stop 42” pipe 24 hours maximum Line Stop 48” pipe 24 hours maximum Line Stop 54” pipe 24 hours maximum
11. Mobilization/Demobilization (Bid Items 237 to 239):
a. Mobilization/demobilization shall include the cost of the preparatory work and operations to mobilize for beginning Work on the Project, including, but not limited to, those operations necessary for the movement of personnel, equipment, materials, supplies and incidentals to the Project site, NPDES permitting for construction sites greater than one acre, for the establishment of temporary offices, buildings, safety equipment and first aid supplies, sanitary and other facilities, as required by these Specifications, State and local laws and regulations, the costs of bonds, insurance and any other pre-construction expense necessary for the start of the Work. Demobilization shall include removal of all construction equipment, materials and debris from the site of the work and restoration thereof to its preconstruction condition including repair of all damage caused by the construction. Payment shall be made at the unit price named in the Bid Schedule.
12. Insert Valve (Bid Items 240 to 244):
a. Measurement for payment shall be based upon the actual quantity furnished, and installed, in accordance with the requirements of the Contract Documents.
b. Payment for furnishing and installing insert valve shall be made at the unit price named in the Bid Schedule. The unit price shall constitute full compensation for furnishing and
c. Contractor must be an approved installer of insert valves approved in the latest Palm Beach
County Water Utilities Department Minimum Design and Construction Standards.
13. Allowance for Miscellaneous Items (Bid Items 245):
a. The Owner has reserved an allowance of $25,000.00 to pay for work not covered by the bid items or work not incidental to completion of bid item work. This allowance will be used and
01025-5 controlled by the Owner. As the Contractor develops the estimate for an individual Work Authorization (WA), the Contractor shall specifically identify work not covered by the contract, but necessary to complete the work contemplated under the WA. The Contractor shall provide the Owner a schedule of values for the work not covered by the Contract, or incidental to the completion of bid item work. The Owner will review the Contractor's schedule of values and will agree to the prices proposed by the Contractor, or will initiate negotiations with the Contractor regarding any of all of the proposed prices. Once agreement is reached by the Owner and the Contractor, the schedule of values will be incorporated into the WA and the Contractor will be paid in accordance with that document. Any funds remaining in this allowance at the completion of the Contract revert to the Owner and shall not be paid to the Contractor. Payment for this lump sum allowance is totally at the discretion and with the approval of the Owner.
b. Measurement for payment for work performed under this bid item shall be based upon the actual quantities of work performed and delivered as defined by the WA.
c. Payment for work performed under this bid item shall be made at the agreed upon schedule of values incorporated into the WA and the total amount paid to the Contractor for all Work Authorizations performed under the Contract shall not exceed the total value of the allowance.
14. Night/Weekend-Required Work (Bid Item 246):
a. Measurement for payment for Night/Weekend-Emergency shall be based upon the actual total hours worked outside the weekday regular working hours (7:00 AM to 6:00 PM) on an emergency basis.
b. Payment for Night/Weekend-Emergency Work shall be made at the unit price named in Bid Schedule.
1.5 MATERIALS DELIVERED AND SUITABLY STORED
A. Payment for materials delivered and suitably stored either on-site or at an off-site location approved by the Engineer, shall be at least 90% of value of actual inventory on date of Application for Progress Payment, less retainage.
PART 2 - PRODUCTS
Not used.
PART 3 - EXECUTION
01070-1
SECTION 01070
ABBREVIATIONS
1.1 REQUIREMENTS INCLUDED
A. Wherever in these Specifications references are made to the standards, specifications, or other published data of the various national, regional, or local organizations, such organizations may be referred to by their acronym or abbreviation only.
B. As a guide to the user of these Specifications, the following acronyms or abbreviations which may appear in these Specifications shall have the meanings indicated herein.
1.2 ABBREVIATIONS
AA Aluminum Association AAMA Architectural Aluminum Manufacturer's Association AAR Association of American Railroads AASHTO American Association of State Highway and Transportation Officials AATCC American Association of Textile Chemists and Colorists ACI American Concrete Institute ACPA American Concrete Pipe Association AFBMA Anti-Friction Bearing Manufacturer's Association AGA American Gas Association AGC Associated General Contractors AGMA American Gear Manufacturer's Association AHAM Association of Home Appliance Manufacturers AHDGA American Hot Dip Galvanizers Association AI Asphalt Institute AIA American Institute of Architects AIEE American Institute of Electrical Engineers AISC American Institute of Steel Construction AISI American Iron and Steel Institute AITC American Institute of Timber Construction AMCA Air Moving and Conditioning Association ANS American Nuclear Society ANSI American National Standards Institute APA American Plywood Association API American Petroleum Institute APWA American Public Works Association AREA American Railway Engineering Association ASA Acoustical Society of America ASAE American Society of Agricultural Engineers ASCE American Society of Civil Engineers ASHRAE American Society of Heating, Refrigerating and Air Conditioning Engineers ASLE American Society of Lubricating Engineers ASME American Society of Mechanical Engineers
01070-2
ASQC American Society for Quality Control ASSE American Society of Sanitary Engineers ASTM American Society for Testing and Materials AWPA American Wood Preservers Association AWPB American Wood Preservers Bureau AWPI American Wood Preservers Institute AWS American Welding Society AWWA American Water Works Association BBC Basic Building Code, Building Officials and Code Administrators International BHMA Builders Hardware Manufacturer's Association CBM Certified Ballast Manufacturer's CDA Copper Development Association CEMA Conveyors Equipment Manufacturer’s Association CGA Compressed Gas Association CISPI Cast Iron Soil Pipe Institute CLFMI Chain Link Fence Manufacturer's Institute CMA Concrete Masonry Association CMAA Crane Manufacturer's Association of America CRSI Concrete Reinforcing Steel Institute DCDMA Diamond Core Drill Manufacturer’s Association DIPRA Ductile Iron Pipe Research Association EIA Electronic Industries Association ETL Electrical Test Laboratories EPA Environmental Protection Agency FDEP Florida Department of Environmental Protection FDOT Florida Department of Transportation FES Florida Engineering Society FM Factory Mutual System FPL Forest Products Laboratory FS Federal Standards HI Hydraulics Institute HMI Hoist Manufacturer's Institute IAPMO International Association of Plumbing and Mechanical Officials ICBO International Conference of Building Officials ICEA Insulated Cable Engineers Association IEEE Institute of Electrical and Electronics Engineers IES Illuminating Engineering Society IME Institute of Makers of Explosives ITID Indian Trail Improvement District IP Institute of Petroleum (London) IPC Institute of Printed Circuits IPCEA Insulated Power Cable Engineers Association ISA Instrument Society of America ISO International Organization for Standardization ITE Institute of Traffic Engineers JIC Joint Industry Conferences of Hydraulic Manufacturers LWDD Lake Worth Drainage District MBMA Metal Building Manufacturer’s Association MMA Monorail Manufacturers Association MPTA Mechanical Power Transmission Association MSS Manufacturer’s Standardization Society MTI Marine Testing Institute
01070-3
NAAMM National Association of Architectural Metal Manufacturer’s NACE National Association of Corrosion Engineers NBHA National Builders Hardware Association NBS National Bureau of Standards NCCLS National Committee for Clinical Laboratory Standards NEC National Electrical Code NEMA National Electrical Manufacturer's Association NESC National Electric Safety Code NFPA National Fire Protection Association NFPA National Forest Products Association NLGI National Lubricating Grease Institute NLMA National Lumber Manufacturers Association NMA National Microfilm Association NPDES National Pollution Discharge Elimination System NSF National Sanitation Foundation NSPE National Society of Professional Engineers NWMA National Woodwork Manufacturers Association OECI Overhead Electrical Crane Institute OSHA Occupational Safety and Health Administration PBCBC Palm Beach County Building Code PBCDERM Palm Beach County Department of Environmental Resources Management PBCPZB Palm Beach County Planning, Zoning and Building PBCPHU Palm Beach County Public Health Department PBCWUD Palm Beach County Water Utilities Department PCA Portland Cement Association PPI Plastics Pipe Institute PS Product Standards Section - U.S. Dept. of Commerce RCRA Resource Conservation and Recovery Act RIS Redwood Inspection Service RLM RLM Standards Institute RMA Rubber Manufacturers Association RVIA Recreational Vehicle Industry Association RWMA Resistance Welder Manufacturer's Association SAE Society of Automotive Engineers SAMA Scientific Apparatus Makers Association SBC Southern Building Code SDI Steel Door Institute SFBC South Florida Building Code SFWMD South Florida Water Management District SMA Screen Manufacturer's Association SMACCNA Sheet Metal and Air Conditioning Contractors National Association SPI Society of the Plastics Industry SPIB Southern Pine Inspection Bureau SPR Simplified Practice Recommendation SSA Swedish Standards Association SSBC Southern Standard Building Code, Southern Building Code Congress SSPC Steel Structures Painting Council SSPWC Standard Specifications for Public Works Construction TAPPI Technical Association of the Pulp and Paper Industry TCA Tile Council of America TEMA Tubular Exchanger Manufacturers Association TFI The Fertilizer Institute
01070-4
UBC Uniform Building Code UL Underwriters Laboratories, Inc.
WCLIB West Coast Lumber Inspection Bureau WCRSI Western Concrete Reinforcing Steel Institute WEF Water Environment Federation WIC Woodwork Institute of California WRI Wire Reinforcement Institute WWPA Western Wood Products Association
Unless a particular issue is designated, all references to the above specifications, standards, or methods shall, in each instance, be understood to refer to the issue in effect (including all amendments) on the last published date of the Advertisement for Bids.
(Not Used)
(Not Used)
01090-1
SECTION 01090
REFERENCE STANDARDS
A. Abbreviations and acronyms used in Contract Documents to identify reference standards.
1.2 QUALITY ASSURANCE
A. Application: When a standard is specified by reference, comply with requirements and recommendations stated in that standard, except when requirements are modified by the Contract Documents, or applicable codes establish stricter standards.
B. Publication Date: The publication in effect on the date of issue of the Contract
Documents, except when a specified publication date is specified.
1.3 ABBREVIATIONS, NAMES AND ADDRESSES OF ORGANIZATIONS
A. Obtain copies of referenced standards direct from the publication source when needed for proper performance of the Work, or when required for submittal by the Contract Documents.
AASHTO American Association of State Highway and Transportation
Officials 444 North Capitol Street, N.W.
Washington, D.C. 20001
ACI American Concrete Institute Box 19150 Redford Station Detroit, MI 48219
AISC American Institute of Steel Construction 1221 Avenue of the Americas New York, N.Y. 10020
AISI American Iron and Steel Institute
1000 16th Street, N.W.
Washington, D.C. 20036
ANSI American National Standards Institute 1430 Broadway New York, N.Y. 10018
ASME American Society of Mechanical Engineers
345 East 47th Street New York, N.Y. 10017
01090-2
ASTM American Society of Testing and Materials
1916 Race Street Philadelphia, PA 19103
AWWA American Water Works Association 6666 W. Quincy Avenue Denver, CO 80235
AWS American Welding Society 2501 N.W. 7th Street Miami, FL 33125
CRSI Concrete Reinforcing Steel Institute 180 North LaSalle Street, Suite #2110 Chicago, IL 60601
FS Federal Specification General Services Administration Specifications and Consumer Information Distribution Section (WFSIS) Washington Navy Yard, Bldg. 197 Washington, D.C. 20407
MIL Military Specification Naval Publications and Forms Center 5801 Tabor Avenue Philadelphia, PA 19120
NEMA National Electrical Manufacturer's Association 2101 "L" Street, N.W.
Washington, D.C. 20037
PCA Portland Cement Association 5420 Old Orchard Road Skokie, IL 20076
PCI Prestressed Concrete Institute 20 North Wacker Drive Chicago, IL 60606
PS Product Standard U.S. Department of Commerce Washington, D.C. 20203
UL Underwriter's Laboratories, Inc.
333 Pfingston Road Northbrook, IL 60062
PART 2 – PRODUCTS
01090-3
(NOT USED)
PART 3 – EXECUTION
01152-1
SECTION 01152
APPLICATION FOR PAYMENT
A. Submit Applications for Payment to the Owner in accordance with the terms and conditions of the Contract.
A. Agreement between the Owner and the Contractor.
B. General Conditions of the Contract Documents.
C. Appendix A in the Contract for Partial Payments Forms.
D. Section 01154: Construction Work Authorization (WA) and Work Directive
Procedures.
E. Section 01700: Construction Close-out.
1.3 FORMAT AND DATA REQUIRED
A. Submit applications on the form required by and provided by the Owner, with itemized data in an Excel spreadsheet and printed on 8-1/2 inch X 11-inch white paper.
B. Provide itemized data on continuation sheets:
1. Format, schedules, line items and values: Those of the Schedule of Values accepted by the Owner.
PART 2 – PRODUCTS
PART 3 – EXECUTION
01154-1
SECTION 01154
CONSTRUCTION WORK AUTHORIZATIONS (WAs)
AND WORK DIRECTIVE PROCEDURES
A. Upon receipt of scope of work from Owner the Contractor shall promptly complete the Work Authorization (WA) Form:
1. Provide description of scope of work in Attachment A.
2. Include Budget Line Item number (provided by the County) and Commissioner District(s) in which work is to be executed.
3. Include number of calendar days for construction completion or delivery of materials (number of days to be approved by the County).
4. Provide dollar amount for work in accordance with the Contract Bid Prices.
5. Rates for liquidated damages shall be established by the County for each
WA.
6. An officer of the Construction Company or authorized representative shall sign the Work Authorization Form and provide corporate seal.
7. Provide Public Construction and complete Attachments C & D of the Work Authorization Form, if the WA is $200,000 or greater in amount.
8. Complete Attachment E of the Work Authorization Form indicating the Bid Line Items, quantities, unit prices and total price for work included in the
WA.
9. Complete SBE-M/WBE Schedule 1 & 2 forms for subcontractors used (see Attachment F).
10. Complete and update Attachment B – Summary and Status of Authorizations under this Contract.
11. Complete and update Attachment G – Summary of SBE/Minority Business Tracking for Authorizations under this Contract indicating SBE participation under current Work Authorization and cumulative SBE participation.
12. Include County Map and indicate location of work (see Attachment H).
13. In case of Emergency Work the Contractor shall respond to verbal or written direction from designated Owner’s representative and shall begin
01154-2 work within the time frame specified in Bid Item No. 227-234 of the Schedule of Bid Prices. Work Authorization forms shall be completed and signed-off subsequently for Emergency Work.
B. Designate in writing the member of the Contractor's organization:
1. Authorized to accept the approved Work Authorization and any changes in the Work.
2. Responsible for informing others in the Contractor's employ of the approved Work Authorization and any changes in the Work.
C. The Owner will designate in writing the person authorized to execute any changes.
D Bonding shall be provided on a per Work Authorization basis. Work
Authorizations under $200,000 do not require bonding. Refer to Section 5.2.4 "Bond Requirement" of the Instruction to Bidders.
Work Authorizations (WAs) shall be signed and approved by the following based on the respective dollar amounts:
WA up to $99,999 - Water Utilities Director Approval WA $100,000 to $199,999 - Contract Review Committee WA $200,000 or greater - Board of County Commissioners
* These dollar amounts apply to initial Work Authorizations only and not Supplements.
E. A blank copy of the standard Work Authorization Form which shall be utilized for any work under this contract is included in Appendix A of the Front End Documents.
A. Agreement of the Contract Documents.
B. General Conditions of the Contract Documents.
C. Supplemental General Conditions of the Contract Documents.
D. Section 01152: Application for Payment.
E. Section 01310: Construction Schedules.
F. Section 01700: Construction Close-out.
01154-3
1.3 DEFINITIONS
A. Work Supplement: See the General Conditions of the Contract.
B. Field Order: See the General Conditions of the Contract.
C. Work Directive Change: See the General Conditions of the Contract.
D. Construction Work Authorization (WA): See Part 1.1 of this Section.
1.4 CONSTRUCTION CHANGE AUTHORIZATIONS AND WORK DIRECTIVES
A. In lieu of a Proposal Request, the Owner or the Engineer (if applicable) may issue a construction change authorization or a Work Directive for the Contractor to proceed with a change for subsequent inclusion in the next Work Authorization.
B. The Authorization or Directive will describe changes in the Scope of Work, both additions and deletions, with attachments of revisions to define details of the change, and will designate the method of determining any change in the Work Authorization Sum.
1.5 DOCUMENTATION OF PROPOSALS AND CLAIMS
A. Support each quotation for a lump-sum proposal, and for each unit price which has not previously been established, with sufficient substantiating data to allow the Owner and the Engineer to evaluate the quotation.
B. Provide additional data on request to support time and cost computations for:
1. Labor required.
2. Equipment required.
3. Products required:
a. Recommended sources of purchase and unit costs.
b. Quantities required.
4. Taxes, insurance and bonds.
5. Credit for Work deleted from the Contract, similarly documented.
6. Overhead and Profit.
7. Justification for any change in Contract Time.
01154-4
C. Support each claim for additional costs, and for Work done on a time-and-material/force account basis, with documentation as required for a lump sum proposal, plus additional information as follows:
1. Name of Owner's authorized agent who ordered the Work.
2. The date of the order.
3. Dates and times Work was performed and by whom.
4. Time records, summary of hours worked, and hourly rates paid.
5. Receipts and invoices for:
a. Equipment used, listing dates and times of use.
b. Products used, listing quantities.
c. Subcontractors
(Not used)
(Not used)
01300-1
SECTION 01300
CONTRACTOR SUBMITTALS
A. Submit to the Owner, shop drawings and project data required by the Specification
Sections.
B. The Owner's review is for general conformance with the design concept and the
Contract Documents.
C. Miscellaneous submittals related directly to the Work (non-administrative) include warranties, guarantees and maintenance agreements.
A. Section 01310 - Construction Schedules.
B. Section 01340 – Shop Drawings
C. Section 01400 - Quality Control.
D. Section 01700 – Construction Close Out
1.3 SCHEDULE
A. Prepare and submit with the Construction Schedule, a separate schedule listing dates for submission and review of shop drawings, project data and samples that will be needed for each product or piece of equipment.
B. Coordinate and prepare the delivery and processing of submittals with the performance of the Work so that the Work is not delayed by submittals with the exception of emergency work.
C. No extension of time will be allowed because of the Contractor's failure to properly coordinate and sequence submittals.
D. Do not proceed with purchasing, fabrication and delivery of Work related to a submittal until the submittal procedure is successfully complete.
E. Coordinate fabrication and delivery of Owner furnished materials.
2.1 SHOP DRAWINGS
A. Original drawings, prepared by a Contractor, subcontractor, supplier or distributor which illustrate some portion of the Work and showing fabrication, layout, setting or
01300-2 erection details, diagrams, performance curves, data sheets, schedules, templates, patterns, reports, calculations, instructions, dimensions, measurements and other similar information not in standard printed form applicable to other projects.
B. Provide information prepared by a qualified detailer showing dimensions and notes based on field measurements, identifying materials and products in the work shown, indicating compliance with standards and special coordination requirements.
C. Identify details by reference to sheet and detail numbers shown on the Contract Drawings (as applicable) or as described in the scope of work per approved Work Authorization (WA).
2.2 PROJECT DATA
A. Includes standard printed information on materials, products and systems not custom-prepared for this project. Collect the required data into one (1) submittal for each material, product or system; and mark each copy to show which choices and options are applicable to the project.
B. Manufacturer's standard schematic drawings and standard printed recommendations for application and use, compliance with standards, application of labels and seals, notation of field measurements which have been checked, and special coordination requirements:
1. Modify drawings to delete information which is not applicable to the project.
2. Supplement standard information to provide additional information applicable to the project.
C. Manufacturer's catalog sheets, brochures, diagrams, schedules, performance charts, illustrations and other standard descriptive data.
1. Clearly mark each copy to identify pertinent materials, products or models.
2. Show dimensions and clearances required.
3. Show performance characteristics and capacities.
4. Show wiring diagrams and controls.
2.3 WARRANTIES
A. Refer to individual sections, this Specification and Special Terms and Conditions of the contract for requirements on the submittal of warranties and guarantees, which are uniquely prepared and executed for each WA.
3.1 CONTRACTOR RESPONSIBILITIES
01300-3
A. Review shop drawings, project data and samples for compliance with these Specifications prior to submission.
B. Verify:
1. Field measurements.
2. Field construction criteria.
3. Catalog numbers and similar data.
C. Coordinate each submittal with requirements of the Work and of the Contract Documents and as per scope of work for each approved WA.
D. The Contractor's responsibility for errors and omissions in submittals is not relieved by the Engineer's review of submittals.
E. The Contractor's responsibility for deviations in submittals from the requirements of the Contract Documents is not relieved by the Owner's review of submittals, unless the Owner or the gives written acceptance of specific deviations.
F. Notify the Owner, in writing at the time of submission, of deviations in submittals from the requirements of the Contract Documents.
G. Begin no Work requiring submittals until return of submittals with the Owner's stamp and initials or signature indicating review and approval, with the exception of emergency work.
H. Obtain shop drawing approval from Palm Beach County Water Utilities Department.
3.2 SUBMISSION REQUIREMENTS
A. Schedule submissions at least seven (7) days before dates for reviewed submittals will be needed.
B. Submit the number of copies of shop drawings which the Contractor requires (as applicable) for distribution plus four (4) copies which will be retained by the Owner.
C. Accompany submittals with a transmittal letter, in duplicate, containing:
1. Date of submission.
2. Project title and number.
3. Contractor's name and address.
4. The number of each shop drawing submitted.
5. Notification of any deviations from the Contract Documents.
6. Other pertinent data.
D. Submittals must include:
1. Date of submittal and revision dates.
01300-4
2. Project title and number.
3. The names of:
a. Engineer (if applicable).
b. Contractor.
c. Subcontractor (if applicable).
d. Supplier.
e. Manufacturer.
f. Separate detailer, when pertinent.
4. Identification of products or materials.
5. Field dimensions, clearly identified as such.
6. Specification Section Number.
7. Applicable standards, such as ASTM number or Federal Specifications.
8. A blank space, 4" X 4", for the Owner's stamp.
9. Identification of deviations from the Contract Documents.
10. Contractor's stamp, initialed or signed, certifying as to review of the submittal, verification of field measurements and compliance with the Contract
3.3 RESUBMISSION REQUIREMENTS
A. Shop Drawings:
1. Revise initial drawings as required and resubmit as specified for initial submittal.
2. Indicate on drawings any changes made other than those requested by the
Owner.
3.4 DISTRIBUTION OF SUBMITTALS AFTER REVIEW
A. Distribute copies of Shop Drawings which carry the Owner's stamp to as required:
1. Other prime Contractors.
2. Subcontractors.
3. Suppliers.
4. Fabricators.
01300-5
5. Contractor's file.
6. Job site file.
7. Record documents file.
B. Distribute samples as directed.
01310-1
SECTION 01310
CONSTRUCTION SCHEDULES
A. Within five (5) days or less after receipt of written Notice of an approved Construction Work Authorization (WA), prepare and submit to the Engineer/Owner an estimated construction progress schedule for the Work, with sub-schedules of related activities essential to its progress (if applicable).
A. General Conditions of the Contract Documents.
B. Section 01010: Summary of Work.
C. Section 01300: Contractor Submittals.
1.3 FORM OF SCHEDULES
A. Prepare schedules in the form acceptable to the Engineer/Owner.
B. Format of Listings: The chronological order of the start of each item of Work.
1.4 CONTENT OF SCHEDULES
A. Construction Progress Schedule:
1. Show the complete sequence of construction by activity. Include dates for beginning and completing the following:
a. Mobilization
b. Placement of Equipment and Materials Orders.
c. Submission of Shop Drawings.
d. Delivery of Equipment and Materials, including Owner furnished materials.
e. Installation of wet taps and line stops.
f. Pressure Testing.
g. Clean-up and Completion (as applicable).
01310-2
B. For submittals, shop drawings and product data show:
1. The dates for Contractor's submittals.
2. The dates reviewed submittals will be required from the Engineer/Owner.
C. Provide procedures to clearly and satisfactorily define critical portions of the construction schedule.
1.5 DISTRIBUTION
A. Distribute copies of the reviewed schedules to
1. Job site file.
2. Subcontractors (if applicable).
3. Owner.
4. Other concerned parties.
B. Instruct recipients to report promptly to the Contractor, in writing, any problems anticipated by the projections shown in the schedule.
PART 2 – PRODUCTS Not used.
PART 3 – EXECUTION Not used.
01340 - 1
SECTION 01340
SHOP DRAWINGS, PRODUCT DATA AND SAMPLES
A. Submit shop drawings and product data required by the Contract Documents.
A. Section 01015 - Approved Materials
B. Section 01300 - Contractor Submittals.
C. Section 01310 - Construction Schedule.
D. Section 01700 - Construction Close-out.
1.3 SHOP DRAWINGS
A. Materials (including approved equals) selected for construction under this contract shall conform to PBCWUD's Minimum Engineering & Construction Standards. For materials not listed or substitutions provide shop drawings as stated in this Section.
B. Drawings shall be presented in…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .