26-031.pdf

PDF 387 KB Posted

Attached to
STP-7302(690) Main Street Ph 3
Solicitation number
26-031
Issued by
St. Charles County, Missouri

About this file

This is a project specification document for the City of Springfield, Missouri, detailing infrastructure improvements along Main Street (Project STP-7302(690) Main Street Ph 3). The project encompasses roadway resurfacing, construction of a roundabout intersection, storm sewer replacement, sidewalk and curb ramp improvements, and decorative lighting along Main Street between the NSRR tracks and St. Joseph Avenue. The document outlines the technical requirements, design standards, and construction specifications necessary for contractors to prepare competitive bids. The scope includes detailed plans for pavement design, traffic control during construction, utility coordination, and final site restoration to meet city standards and ADA compliance requirements.

The project is funded through state transportation funds and represents a phased improvement to Main Street infrastructure. Contractors must comply with all federal and state prevailing wage requirements, equal employment opportunity regulations, and Missouri Department of Transportation standards. The specification document establishes minimum qualifications for bidders, including bonding requirements, insurance coverage, and experience with similar-scale municipal infrastructure projects. Payment terms follow standard progress billing based on percentage of work completed and verified by the project engineer, with final payment upon project completion and acceptance by the city.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .