This is a Plans and Specifications document from the Iowa Department of Natural Resources for the Clear Lake Fish Hatchery Roof Project (26-03-17-02) located in Cerro Gordo County. The work scope includes removing existing clay tile roofing from the aquarium portion of the hatchery, removing existing dormers and infilling those areas, installing new architectural asphalt shingles, and installing parapet wall flashing. The project includes five line items: mobilization as a lump sum, demolition of existing clay tile roof and dormers as a lump sum, roof decking including dormer infill with an estimated 15 each, architectural asphalt shingles as a lump sum (approximately 17 squares), and flashing as a lump sum (approximately 68 linear feet). Contractors must submit bids electronically by January 29, 2026 at 3:00 PM CST. Site visits are required prior to bidding, and contractors must verify all dimensions and conditions shown on the plans, notifying the DNR Engineer of any discrepancies. Work restrictions include no work from noon Friday through Monday and no work on holidays. All work must conform to applicable codes and ordinances, with grass areas to be protected and minimally disturbed.
The approved architectural shingle options include CertainTeed Landmark Pro in Weathered Wood, Owens Corning Duration Designer in Summer Harvest, and Atlas Pinnacle Pristine in Majestic Strike, with contractors required to submit their intended shingle selection. The contractor is responsible for providing waste disposal areas for excess material and obtaining approval from the DNR Engineer for storage, parking, and service areas. Contractors must notify the DNR Engineer of any utilities or fixtures encountered during construction, and no claims for additional compensation will be allowed for interference or delays. Ice guard, underlayment, ridge, and drip edge installation are incidental to the architectural asphalt shingles. For bid package documentation and additional information, interested parties should contact Ken Howe at 319-240-3553 or kenneth.howe@dnr.iowa.gov.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 26-03-17-02 Clear Lake Fish Hatchery Roof - Bid Package.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Iowa Department of Natural Resources Clear Lake Fish Hatchery, Cerro County 26-03-17-02 Clear Lake Fish Hatchery Roof Project Description:
Work consists of removing existing clay tiles on the aquarium portion of the hatchery. Existing dormers will be removed and areas infilled. Install new architectural shingles and parapet wall flashing.
GENERAL NOTES:
Verify actual locations and elevations with DNR Engineer.
Grass areas around the structures will be protected and minimally disturbed.
No work will be allowed from 12 noon Friday until the following Monday. No work on holidays.
Approval may be allowed per the Iowa DNR Engineer and/or Park Manager.
Road to remain open while work is being performed.
All work shall conform to and be performed in accordance with all applicable codes and ordinances
The contractor shall visit the site and inspect the project area and thoroughly familiarize themselves with the actual job conditions prior to bidding and start of work. Failure to visit the project site shall not relieve contractor from performing the work in accordance to the plans, specifications, special provisions and contract.
The contractor shall verify, at the site, all dimension and conditions shown on the plans and shall notify the DNR Engineer of any discrepancies, omissions, and/or conflicts prior to proceeding with the work.
It shall be the contractor’s responsibility to provide waste areas or disposal sites for excess material (excavated material or broken asphalt/concrete) which is not desirable to be incorporated into the work involved on this project. No material shall be placed within the right-of-way, unless specifically stated in the plans or approved by the DNR Engineer.
The contractor shall not disturb desirable grass areas or desirable trees outside the construction limits.
The contractor shall not be permitted to park or service vehicles and equipment or use these areas for storage of materials. Storage, parking and service areas will be subject to the approval of the DNR Engineer.
Where utilities and fixtures are encountered within the construction area, it shall be the responsibility of the contractor to notify DNR Engineer of those utilities prior to the beginning of any construction. No claims for additional compensation will be allowed to the contractor for any interference or delay.
Ice guard, underlayment, ridge and drip edge installation will be incidental to the Architectural Asphalt Shingles.
Estimated Project Quantities
ITEM NO. ITEM UNIT TOTAL
1 Mobilization L.S. 1 2 Demo-Existing Clay Tile Roof and Dormers. L.S. 1 3 Roof Decking Including Dormer Infill EA 15 4 Architectural Asphalt Shingles L.S. 1
5 Flashing L.S. 1
Estimate Reference Information ITEM No. DESCRIPTION
Item is in case there are spots of existing decking that need to be replaced and infilling dormers. Includes framing to infill area.
Approximately 17 squares
Approximately 68 linear feet
Approved List of Shingles – Contractor Must Submit On the Intended Shingle to Be Used.
Certainteed – Landmark Pro – Weathered Wood Owens Corning – Duration Designer – Summer Harvest Atlas – Pinnacle Pristine – Majestic Strike
Photo 1-Clear Lake Fish Hatchery-South Elevation
Photo 2-Clear Lake Fish Hatchery-North Elevation
Photo 3-Clear Lake Fish Hatchery-Clay Tile Roof and Dormers
Photo 4-Clear Lake Fish Hatchery-Parapet Wall Flashing
File details come from the government source that posted it. Updated .