26-02_Notice_to_Contractors.pdf
PDF 139 KB Posted
- Solicitation number
- 0000038583
- Issued by
- California
About this file
This is a Notice to Contractors document issued by the California Department of Water Resources for Specification No. 26-02 (Contract C51691), a Full Pipe Penetration Replacement Deferred Maintenance Program project located in Glenn County, California. The project involves the replacement of existing corrugated metal pipes with reinforced concrete pipes at four designated sites: three sites (22922, 22924, and 22928) require replacement of 24-inch diameter pipes, while one site (22925) requires replacement of a 48-inch diameter pipe. In addition to pipe replacement, the project includes replacement of existing concrete headwalls, outlet structures, and gates at each culvert location. Contractors must possess a California Class A contractor's license to bid on this work. Interested parties may register as planholders or bidders by emailing DOE_Specs@water.ca.gov for additional project documentation and specifications.
The estimated project cost ranges from $1,600,000 to $2,100,000. The notice establishes the formal bidding process and requirements for interested contractors to participate in this deferred maintenance program. No specific response deadline, bid due date, site visit schedule, or bidders' conference information is detailed in this notice excerpt, though these details would typically be provided in the associated specification documents available through the Department of Water Resources.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 26-02_Notice_of_Inspection_Trip.pdf | ||
| Safety_Prequal_2024.pdf | ||
| 26-02_Bid_Set_Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Notice to Contractors
00002-1 G-25
DOCUMENT 00002
NOTICE TO CONTRACTORS
STATE OF CALIFORNIA
CALIFORNIA NATURAL RESOURCES AGENCY
DEPARTMENT OF WATER RESOURCES
Sealed bids for
FULL PIPE PENETRATION REPLACEMENT
DEFERRED MAINTENANCE PROGRAM (DMP)
LEVEE DISTRICT 1 – SITES 22922, 22924, 22925 AND 22928
STATE PLAN OF FLOOD CONTROL FACILITIES
DIVISION OF FLOOD MANAGEMENT
GLENN COUNTY
CALIFORNIA
SPECIFICATION NO. 26-02
CONTRACT NO. C51691
will be received by the Department of Water Resources at the California Natural Resources Headquarters, 715 P Street, main floor, Sacramento, California 95814, between 12:00 P.M. and no later than 2:00 P.M. on WEDNESDAY, APRIL 22, 2026. A public bid opening will be conducted live at an announced location in the vicinity of such office and via webinar.
NOTE: Bidders/Visitors shall allow sufficient time for checking in with
Security upon entering main floor of the California Natural Resources Headquarters. Bids will be accepted and timestamped in the main lobby of the California Natural Resources Headquarters.
Please refer to Document 00200 – Instructions to Bidders, for additional information.
Bid forms for this work are included in a separate booklet titled BID FORM.
00002-2 G-25
Bids will be considered only if submitted for all the work required for the above project. The work is defined in Section 01110 – Summary of Work, and includes but is not limited to the following principal features:
A. This project includes the following principal features:
1. Selective demolition of existing Corrugated Metal Pipe (CMP), flap gates, slide gates, headwalls, wingwalls, risers, concrete slab, shotcrete, gate, gravel road, and subgrade materials.
2. Earthwork included excavation, levee embankment fill, earthwork testing, gravel filter material, rock slope protection, temporary turnaround ramps, and temporary cofferdam.
3. Dewatering and bypass pipes.
4. Furnishing and installing Reinforced Concrete Pipe (RCP).
5. Furnishing and installing flap gates, slide gates, concrete risers, headwalls, wingwalls, concrete slab and concrete rock slope protection.
6. Furnishing and placing aggregate base.
7. Furnishing and placing flowable concrete in the abandoned CMP and at the location shown.
8. Miscellaneous metalwork.
9. Furnishing and placing seedings and Erosion Control.
10. Hazardous material and waste removal, handling, and disposal.
Quantities of work, materials, and equipment required for completion of the work are specified in Document 00410 – Bid Schedule, which is subject to change.
1. LICENSING
Bidders shall be licensed for the work as required by the Business and Professions Code. Contractor’s license classification(s) for this work:
A .
2. BIDDING
Submit requests for drawings and specifications for the project by e-mail to doe_specs@water.ca.gov.
00002-3 G-25
Submit questions or requests for clarification by email to doe_specs@water.ca.gov at least 5 days before the scheduled opening of bids. Responses, if appropriate, will be sent to all prospective bidders.
3. PREQUALIFICATION
All bidders shall be prequalified by the Department. Bid forms will be furnished only to prequalified bidders who meet the requirements of the State Contract Act and Document 00040 – Prequalification.
4. SITE INSPECTION TRIP
An inspection trip for prospective bidders will be conducted at the work site, as per Document 00003 – Notice of Inspection Trip.
5. DVBE AND SMALL BUSINESS PARTICIPATION
Participation by Disabled Veteran Business Enterprises (DVBE) and qualification for Small Business Preference shall be as provided by Document 00206 – Instructions for DVBE Goal and Incentive and Document 00201 – Instructions for Small Business Preference. A DVBE incentive will be applied during bid evaluation in accordance with Document 00206, Paragraph 2 – DVBE Incentive.
In addition, the Department has set a 25 percent Small Business Enterprise (SBE) participation goal in its contracting and is tracking Small Business participation in its contracts. The Department encourages bidders to explore certification as a Small Business and/or Disabled Veteran Business Enterprise and to utilize certified Small Business and Disabled Veteran Business Enterprises during the contract term.
Certification information may be obtained from the Department of General Services, Procurement Division, Office of Small Business and DVBE Services:
The Department of General Services, Procurement Division, Office of Small Business and DVBE Services:
Certification information:
https://caleprocure.ca.gov/pages/sbdvbe-index.aspx
Database of certified SB/DVBE Firms:
https://caleprocure.ca.gov/pages/PublicSearch/supplier-search.aspx mailto:doe_specs@water.ca.gov https://caleprocure.ca.gov/pages/sbdvbe-index.aspx https://caleprocure.ca.gov/pages/PublicSearch/supplier-search.aspx https://caleprocure.ca.gov/pages/PublicSearch/supplier-search.aspx
00002-4 G-25
6. PREBID BRAND AND TRADE NAME REQUESTS
Pursuant to Public Contract Code section 10129, alternatives to a designated material, product, thing, or service by specific brand or trade name that are of equal quality and of required characteristics for the purpose intended may be proposed during the bidding period, provided the bidder complies with the following:
A. Proposals for alternatives to a designated material, product, thing, or service, requested during the bidding period, shall be furnished in writing to the Department’s contract coordinator, not later than 14 days prior to the date and time of the bid opening. Proposals requested after issuance of the Notice to Begin Work, shall be submitted pursuant to Document 00706 – Control of Work, Paragraph 4 and Section 01330 – Submittals.
B. Proposals shall be accompanied by complete information and descriptive data necessary to determine equality of the material, product, thing or service. Samples shall be provided when requested by the Department. Burden of proof as to availability, comparative quality, suitability, and performance of the material, product, thing, or service shall be upon the bidder. The Department will be the sole judge as to such matters. If the proposal is accepted, bidders will be notified by information letter or addenda pursuant to Document 00200 – Instructions to Bidders, Paragraphs 3 and 4 respectively.
C. Refer to Document 00706 – Control of Work, Paragraph 5, for substitution requests after issuance of Notice to Begin Work.
7. SUBSTITUTION OF SECURITIES
Pursuant to Public Contract Code section 10263, the successful bidder will be permitted to substitute securities for any moneys withheld by the Department as provided by Public Contract Code section 10261.
8. DEPARTMENT OF INDUSTRIAL RELATIONS REGISTRATION AND
PREVAILING WAGE MONITORING AND ENFORCEMENT
A. Department of Industrial Relations (DIR) registration and prevailing wage monitoring and enforcement shall comply with Document 00703 – Compliance with Applicable Laws and Regulations.
00002-5 G-25
B. Prevailing Wage Rate Determinations rates are on file for inspection at the office of the Department of Water Resources, Contract Coordination Section, 715 P Street, Room 4-407, Sacramento, California 95814 and posted on the website listed on Document 00300 – Information Available.
KARLA NEMETH
Director of Water Resources
Dated: March 25, 2026 (Advertisement)
File details come from the government source that posted it. Updated .