This file comprises construction plans and technical documents prepared by the Iowa Department of Natural Resources (DNR) Engineering Section for the Hodge Wildlife Protection Area (WPA) Wetland Restoration project located in Dickinson County, Iowa. The project involves the construction of four dikes with associated water control structures, emergency spillways, and drainage tile systems to restore four wetland pool areas on the property. Work scope includes embankment construction, excavation for spillways and borrow material, tile investigation and breaks, installation of in-line water control structures (WCS) tied to existing drainage district tile, fireproof covers, and erosion control measures. The project is designed to enable water-level manipulation for wetland restoration while providing water quality and wildlife habitat benefits. Contractors are required to conduct site visits prior to bidding to verify existing conditions, dimensions, and utility locations. The bid closing date is June 11, 2026, at 3:00 PM, with electronic submission required as directed in the bidding instructions.
The construction plans designate four separate dike locations (North, Southwest, Middle, and East) with specific elevation requirements ranging from 1470.0 to 1485.0 feet at dike tops. Each dike features 5:1 side slopes, 12-foot top widths, and associated emergency spillways with varying configurations. Contractors must obtain an NPDES Permit #2 for stormwater discharge and develop a required Stormwater Pollution Prevention Plan (SWPPP) with completion of required inspections. The Iowa DNR will supply certain materials including specific water control structures and tiles, with contractors responsible for providing 1-inch clean stone and other construction materials as detailed in the line items. The contractor must locate and accommodate existing drainage district tile infrastructure, which has been plotted from available surveys but is considered approximate only. Responsibility for identifying and avoiding interference with unknown utilities and infrastructure lies entirely with the contractor, with no claims for additional compensation allowed.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 26-01-30-01 - Bid Package.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Capital Manager Authorization - Wildlife
This project includes construction of four dikes to restore wetlands on the Hodge WPA. One of the dikes has in-line water control structures tied into existing Drainage District tile to allow for water-level manipulation. Wetland restoration, water quality, and wildlife habitat benefits are the main objectives of this project.
Iowa DNR
TJ Herrick
515-250-3715 tj.herrick@dnr.iowa.gov
3120 330th Avenue
Ruthven, IA, USA
Iowa Department of Natural Resources Construction Documents for
Great Lakes Wildlife unit Dickinson County, Iowa
T100N, R37W, Section 23 Hodge WPA Wetland Resto.
Project No. 26-01-30-01
Project Location Map
N
Sheet Index
Cover Sheet Project Vicinity Project Overview Quantities & General Information N Dike & Spillway Plan & Profile SW Dike & Spillway Plan & Profile Middle Dike & Spillway Plan & Profile E Dike & Spillway Plan & Profile Dike & Spillway Section Views Fire Proof Cover & Pipe Detail Typ. In-Line WCS w/ Intake Plan & Profile DD TIle Profiles (FG)
Iowa DNR
Jeff Felts
515-250-3712 jeff.felts@dnr.iowa.gov
951 Starview Dr.
Hinton, IA 51024 Engineering Bureau Chief
Authorization to Bid
Date
Date
Directory Project Manager
Organization
Contact
Phone
Address
City, State, Zip
District Engineer Organization
Contact
Phone
Address
City, State, Zip
Project Description
Project Number:
26-01-30-01
Bid Date:
mm/dd/yyyy
Iowa Department of Natural Resources Engineering Section - 6200 Park Ave., Suite 200 Des Moines, IA 50321-1270
Hodge WPA Wetland Restoration T100N, R37N, Sec. 23 Dickison County
Sheet No:Drawn by: xx
G:
\S ha re d dr iv es
\D N
R
LW
B
EN
G Pr oj ec ts \3
0_ Di ck in so n\
-0
1-
-0
Ho dg e W
PA
W et la nd R es to ra tio n\ 5_
De sig n\ C3
D\
-0 1-
-0
Ho dg e
W
PA
W et la nd
R es to .d w g
5/
/2
2:
P
M Pl ot D at e:
Revision 90% Final
Date 2/3/26
5/27/26
Cover Sheet
Project Area
© 2026 Microsoft Corporation © 2026 Maxar ©CNES (2026) Distribution Airbus DS © 2026 TMAP MOBILITY Earthstar Geographics SIO
© 2026 Microsoft Corporation © 2026 Maxar ©CNES (2026) Distribution Airbus DS © 2026 TMAP MOBILITY Earthstar Geographics SIO
Source: Esri, Vantor, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community Powered by Esri
N
Project Number:
26-01-30-01
Bid Date:
mm/dd/yyyy
Iowa Department of Natural Resources Engineering Section - 6200 Park Ave., Suite 200 Des Moines, IA 50321-1270
Hodge WPA Wetland Restoration T100N, R37N, Sec. 23 Dickison County
Sheet No:Drawn by: xx
G:
\S ha re d dr iv es
\D N
R
LW
B
EN
G Pr oj ec ts \3
0_ Di ck in so n\
-0
1-
-0
Ho dg e W
PA
W et la nd R es to ra tio n\ 5_
De sig n\ C3
D\
-0 1-
-0
Ho dg e
W
PA
W et la nd
R es to .d w g
5/
/2
2:
P
M Pl ot D at e:
Revision 90% Final
Date 2/3/26
5/27/26
Project Vicinity
West Lake Okoboji
Project Location
Big Spirit Lake
HW
Y 86
130th St
12'
12'
0' 86' 172'
N
Project Number:
26-01-30-01
Bid Date:
mm/dd/yyyy
Iowa Department of Natural Resources Engineering Section - 6200 Park Ave., Suite 200 Des Moines, IA 50321-1270
Hodge WPA Wetland Restoration T100N, R37N, Sec. 23 Dickison County
Sheet No:Drawn by: xx
G:
\S ha re d dr iv es
\D N
R
LW
B
EN
G Pr oj ec ts \3
0_ Di ck in so n\
-0
1-
-0
Ho dg e W
PA
W et la nd R es to ra tio n\ 5_
De sig n\ C3
D\
-0 1-
-0
Ho dg e
W
PA
W et la nd
R es to .d w g
5/
/2
2:
P
M Pl ot D at e:
Revision 90% Final
Date 2/3/26
5/27/26
Project Overview
New Perf 5"
New Non-Perf 8"
In-Line 10" x 6' WCS w/ Intake, Fireproof Cover & Tile Break
In-Line 12" x 8' WCS w/ Intake, Fireproof Cover
& Tile Break
Intake
Tile Break
Tile Break
E Emergency Spillway
N Emergency Spillway
SW Emergency Spillway
Middle Emergency Spillway
Intake
DD Tile HW Y 86DD Tile
Middle Dike
E Dike
N Dike
SW Dike
New Non-Perf 10"
Access from HWY 86
Coupler for new 5" to DD Tile
Full Pool
Full Pool
Full Pool
Full Pool
Project Number:
26-01-30-01 Bid Date:
mm/dd/yyyy Iowa Department of Natural Resources
Engineering Section - 6200 Park Ave., Suite 200 Des Moines, IA 50321-1270
Hodge WPA Wetland Restoration T100N, R37N, Sec. 23 Dickison County
Sheet No:Drawn by: xx
G:
\S ha re d dr iv es
\D N
R
LW
B
EN
G Pr oj ec ts \3
0_ Di ck in so n\
-0
1-
-0
Ho dg e W
PA
W et la nd R es to ra tio n\ 5_
De sig n\ C3
D\
-0 1-
-0
Ho dg e
W
PA
W et la nd
R es to .d w g
5/
/2
2:
P
M Pl ot D at e:
Revision 90% Final
Date 2/3/26
5/27/26
Quantities & General Information
General Information
1. Verify actual locations and elevations with DNR Engineer.
2. All work shall conform to and be performed in accordance with all applicable codes and ordinances.
3. The contractor shall visit the site and inspect the project area and thoroughly familiarize themselves with the actual job conditions prior to bidding and the start of work. Failure to visit the project site shall not relieve the contractor from performing the work in accordance to the plans, specification, special provisions and contract.
4. The contractor shall verify, at the site, all dimensions and conditions shown on the plans and shall notify the DNR Engineer of any discrepancies, omissions, and/or conflicts prior to proceeding with the work.
5. It shall be the contractor's responsibility to provide waste areas or disposal sites for excess material (excavated material or broken concrete) which is not desirable to be incorporated into the work involved on this project. No payment for overhaul will be allowed for material hauled to these sites.
No material shall be placed within the right-of-way, unless specifically stated in the plans or approved by the DNR Engineer.
6. The contractor shall not disturb desirable grass areas and desirable trees outside the construction limits. The contractor will not be permitted to park or service vehicles and equipment or use these areas for storage of materials. Storage, parking and service areas will be subject to the approval of the DNR Engineer.
7. Where utilities and fixtures are shown as Existing on the plans or encountered within the construction area, it shall be the responsibility of the contractor to notify the DNR Engineer of those utilities prior to the beginning of any construction. The contractor shall be afforded access to these facilities for necessary modification of services. Underground facilities, structures and utilities have been plotted from available surveys and records and therefore their locations must be considered approximate only. It is possible there may be others, the existence of which is presently not known or shown. It is the contractor's responsibility to determine their existence and exact location and to avoid damage thereto. No claims for additional compensation will be allowed to the contractor for any interference or delay caused by such work.
8. The contractor shall shape graded area to maintain surface drainage. All elevations are to finish grade.
9. The contractor is expected to have materials, equipment, and labor available on a daily basis to install and maintain erosion control features on the project. This may involve seeding, silt fence, rock ditch checks, silt basins or silt dikes.
Estimate Reference Information 1.
2.
3.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
24.
Site is accessible form Hwy 86
Stripped topsoil shall be stockpiled at location identified by DNR Field Engineer.
Excavated material must be obtained from within the wetland pool area and originate no closer than 30' to footprint of dike.
Tile break shall be preformed with excavator and be a minimum of 100' in length
DNR Supplied (Contractor to supply the 1" clean stone under line item #22)
DNR Supplied (Contractor to supply the 1" clean stone under line item #22)
DNR Supplied
DNR Supplied
Drainage tile shall meet ASTM F 405-13 and AASHTO M 252-09 specifications.
Perforated 4' 18ga galvanized CMP. Contractor to include connection to HDPE tile below grade. HDPE riser to be paid under the 8" dual wall non-perf tile line item. Steel rod stop to be incidental to construction.
Tile coupler shall meet ASTM F 405-13 and AASHTO M 252-09 specifications and size shall be determined based on what is encountered during tile search.
DNR Supplied
Two anti-seep collars are required, one will be DNR supplied
Agri Drain HD Bar Guard or DNR Engineer approved equivalent
Agri Drain HD Bar Guard or DNR Engineer approved equivalent
Agri Drain HD Bar Guard or DNR Engineer approved equivalent
Two 10" tees are required, one will be DNR supplied. Tee shall meet ASTM F 405-13 and AASHTO M 252-09 specifications
Tee shall meet ASTM F 405-13 and AASHTO M 252-09 specifications
The contractor shall obtain an NPDES Permit #2 for stormwater discharge, develop the required SWPPP, and complete the required inspections.
0' 28' 56'
N
Project Number:
26-01-30-01
Bid Date:
mm/dd/yyyy
Iowa Department of Natural Resources Engineering Section - 6200 Park Ave., Suite 200 Des Moines, IA 50321-1270
Hodge WPA Wetland Restoration T100N, R37N, Sec. 23 Dickison County
Sheet No:Drawn by: xx
G:
\S ha re d dr iv es
\D N
R
LW
B
EN
G Pr oj ec ts \3
0_ Di ck in so n\
-0
1-
-0
Ho dg e W
PA
W et la nd R es to ra tio n\ 5_
De sig n\ C3
D\
-0 1-
-0
Ho dg e
W
PA
W et la nd
R es to .d w g
5/
/2
2:
P
M Pl ot D at e:
Revision 90% Final
Date 2/3/26
5/27/26
N Dike & Spillway Plan & Profile
Tile Break & New 10" Non-Perf Tile
In-Line 10" x 6' WCS w/ Fireproof Cover & Intake
20'
3:13:1
Notes:
1. Top of dike elev. 1470.0'
2. 5:1 side slopes on dike
3. Dike top width 12'
4. 6" of topsoil to be stripped under foot print of dike
5. WCS Intake elev. 1467.0'
6. Spillway elev. 1469.0'
7. Spillway bottom width 20'
8. Spillway side slopes 3:1
9. No borrow w/in 30' of dike footprint
10. Seepage tile >50' north of centerline of dike
"Blister" Berm
Coupler to DD Tile
Coupler to DD Tile
Intake
5" Seepage Tile > 50' from centerline of dike
Undisturbed DD Tile
40' of 12" Straw Wattle
0' 18' 36'
N
Project Number:
26-01-30-01
Bid Date:
mm/dd/yyyy
Iowa Department of Natural Resources Engineering Section - 6200 Park Ave., Suite 200 Des Moines, IA 50321-1270
Hodge WPA Wetland Restoration T100N, R37N, Sec. 23 Dickison County
Sheet No:Drawn by: xx
G:
\S ha re d dr iv es
\D N
R
LW
B
EN
G Pr oj ec ts \3
0_ Di ck in so n\
-0
1-
-0
Ho dg e W
PA
W et la nd R es to ra tio n\ 5_
De sig n\ C3
D\
-0 1-
-0
Ho dg e
W
PA
W et la nd
R es to .d w g
5/
/2
2:
P
M Pl ot D at e:
Revision 90% Final
Date 2/3/26
5/27/26
SW Dike & Spillway Plan & Profile
Tile Break
8'
3:
Notes:
1. Top of dike elev. 1472.8'
2. 5:1 side slopes on dike
3. Dike top width 12'
4. 6" of topsoil to be stripped under foot print of dike
5. Spillway elev. 1471.8'
6. Spillway bottom width 8'
7. Spillway side slopes 3:1
8. No borrow w/in 30' of dike footprint
Dike Emergency Spillway
0' 11' 22'
N
Project Number:
26-01-30-01
Bid Date:
mm/dd/yyyy
Iowa Department of Natural Resources Engineering Section - 6200 Park Ave., Suite 200 Des Moines, IA 50321-1270
Hodge WPA Wetland Restoration T100N, R37N, Sec. 23 Dickison County
Sheet No:Drawn by: xx
G:
\S ha re d dr iv es
\D N
R
LW
B
EN
G Pr oj ec ts \3
0_ Di ck in so n\
-0
1-
-0
Ho dg e W
PA
W et la nd R es to ra tio n\ 5_
De sig n\ C3
D\
-0 1-
-0
Ho dg e
W
PA
W et la nd
R es to .d w g
5/
/2
2:
P
M Pl ot D at e:
Revision 90% Final
Date 2/3/26
5/27/26
Middle Dike & Spillway Plan & Profile
Tile Break
8'
3:1
3:1
Emergency Spillway
Dike
Notes:
1. Top of dike elev. 1485.0'
2. 5:1 side slopes on dike
3. Dike top width 12'
4. 6" of topsoil to be stripped under foot print of dike
5. Spillway elev. 1484.0'
6. Spillway bottom width 8'
7. Spillway side slopes 3:1
8. No borrow w/in 30' of dike footprint
0' 22' 45'
N
Project Number:
26-01-30-01
Bid Date:
mm/dd/yyyy
Iowa Department of Natural Resources Engineering Section - 6200 Park Ave., Suite 200 Des Moines, IA 50321-1270
Hodge WPA Wetland Restoration T100N, R37N, Sec. 23 Dickison County
Sheet No:Drawn by: xx
G:
\S ha re d dr iv es
\D N
R
LW
B
EN
G Pr oj ec ts \3
0_ Di ck in so n\
-0
1-
-0
Ho dg e W
PA
W et la nd R es to ra tio n\ 5_
De sig n\ C3
D\
-0 1-
-0
Ho dg e
W
PA
W et la nd
R es to .d w g
5/
/2
2:
P
M Pl ot D at e:
Revision 90% Final
Date 2/3/26
5/27/26
E Dike & Spillway Plan & Profile
In-Line 12" x 8' WCS w/ Fireproof Cover & Intake See Details Sheet 12
Intake & Coupler to DD Tile
12'
3:1 3:1
Emergency Spillway
Dike
"Blister" Berm
Notes:
1. Top of dike elev. 1479.0'
2. 5:1 side slopes on dike
3. Dike top width 12'
4. 6" of topsoil to be stripped under footprint of dike
5. Spillway elev. 1478.0'
6. Spillway bottom width 12'
7. Spillway side slopes 3:1
8. No borrow w/in 30' of dike footprint
9. WCS Intake elev. 1476.0'
Coupler to DD Tile
500' of 12" Straw Wattle
8" Dual Wall
26-01-30-01 Bid Date:
mm/dd/yyyy Iowa Department of Natural Resources
Engineering Section - 6200 Park Ave., Suite 200 Des Moines, IA 50321-1270
Hodge WPA Wetland Restoration T100N, R37N, Sec. 23 Dickison County
Sheet No:Drawn by: xx
G:
\S ha re d dr iv es
\D N
R
LW
B
EN
G Pr oj ec ts \3
0_ Di ck in so n\
-0
1-
-0
Ho dg e W
PA
W et la nd R es to ra tio n\ 5_
De sig n\ C3
D\
-0 1-
-0
Ho dg e
W
PA
W et la nd
R es to .d w g
5/
/2
2:
P
M Pl ot D at e:
Revision 90% Final
Date 2/3/26
5/27/26
Dike & Spillway Section Views
6" Stripping
Existing Ground
Dike
12'
Typ. Dike Section
Varies
Typ. Spillway Section
Tile Search
Notes:
1. Tile search shall be performed along entire length of dike
2. Tile search depth to a minimum of 5'
3. Tile search shall be conducted with an excavator.
4. Tile search will be located along wetland side of dike at location approved by DNR Field Engineer
Va rie s
Existing Ground
1'
5'
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
Hinge Bracket Piece
6"
20"
2' 2'
Corrugated Metal Pipe 36" Diam. - 16 guage w/ 3"x1" Corr.
WELD EVERY
CORRUGATION
2-2"X1 4"
Plates w/
2" diam hole welded to lid and cmp riser
AP
PO
X.
AGRIDRAIN WCS
1'-8"
4'
1' -8
4'
3'
1 12"X1 4" Bars welded to plate
2"X1
4" Steel bar
2' 21 2"X1
4" Steel Bar
2 -1/4"
/2
1" Chamfer
A-A
B-B
36"
2'
6"
8" Steel Plate
2" Stainless steel bolt w/ stainless steel nylock nut
2"X1
4" Steel Bar
Hinge Bracket Piece
Weld
INCLUDE CHAIN TO
SECURE LID AS
APPROVED BY DNR
INSPECTOR.
CMP
Project Number:
26-01-30-01 Bid Date:
mm/dd/yyyy Iowa Department of Natural Resources
Engineering Section - 6200 Park Ave., Suite 200 Des Moines, IA 50321-1270
Hodge WPA Wetland Restoration T100N, R37N, Sec. 23 Dickison County
Sheet No:Drawn by: xx
G:
\S ha re d dr iv es
\D N
R
LW
B
EN
G Pr oj ec ts \3
0_ Di ck in so n\
-0
1-
-0
Ho dg e W
PA
W et la nd R es to ra tio n\ 5_
De sig n\ C3
D\
-0 1-
-0
Ho dg e
W
PA
W et la nd
R es to .d w g
5/
/2
2:
P
M Pl ot D at e:
Revision 90% Final
Date 2/3/26
5/27/26
Fire Proof Cover & Pipe Anchor Detail
Fire Proof Cover Detail
1" Clean Stone
AutoCAD SHX Text
HINGE BRACKET PIECE 2 TOTAL NO SCALE
3.0207
26-01-30-01 Bid Date:
mm/dd/yyyy Iowa Department of Natural Resources
Engineering Section - 6200 Park Ave., Suite 200 Des Moines, IA 50321-1270
Hodge WPA Wetland Restoration T100N, R37N, Sec. 23 Dickison County
Sheet No:Drawn by: xx
G:
\S ha re d dr iv es
\D N
R
LW
B
EN
G Pr oj ec ts \3
0_ Di ck in so n\
-0
1-
-0
Ho dg e W
PA
W et la nd R es to ra tio n\ 5_
De sig n\ C3
D\
-0 1-
-0
Ho dg e
W
PA
W et la nd
R es to .d w g
5/
/2
2:
P
M Pl ot D at e:
Revision 90% Final
Date 2/3/26
5/27/26
Typ. In-Line WCS w/ Intake Plan & Profile
Tee to DD Tile & Intake
In-Line WCS w/ Fireproof Cover & Intake
Intake Set 3' Below Top of Dike
40' of Dual Wall Non-Perf Tile
"Tee" 4'x4' Anti-Seep Collar
"Blister" Berm with Erosion Stone
12'
6'
1" Clean Stone w/in 36" CMP
1' Depth of Erosion Stone
60' of Dual Wall Non-Perf Tile
Heavy Duty Bar Guard Inlet elev. 3' below top of dike
Dual Wall Non-Perf Riser Height Determined On Site by DNR Field Engineer
6" Stripping
Existing Ground
Coupler to DD Tile
Dual Wall Non-Perf Tile
Agri Drain WCS
1.
0'
Erosion stone extends 1' down slope of intake
Revetment Stone Filter
6" Heavy Duty Bar Guard
6" Perforated CMP
8" Heavy Duty Bar Guard
Ø6'
4'
2'
Intake Plan View
8" Plastic tile
Nest 6" CMP into 8" HDPE tile.5
Revetment Stone Filter
Existing Ground
Intake Connection Detail WCS Plan View
WCS Plan View
1' x 38" steel rod stop
1' x 38" steel rod stop
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
26-01-30-01 Bid Date:
mm/dd/yyyy Iowa Department of Natural Resources
Engineering Section - 6200 Park Ave., Suite 200 Des Moines, IA 50321-1270
Hodge WPA Wetland Restoration T100N, R37N, Sec. 23 Dickison County
Sheet No:Drawn by: xx
G:
\S ha re d dr iv es
\D N
R
LW
B
EN
G Pr oj ec ts \3
0_ Di ck in so n\
-0
1-
-0
Ho dg e W
PA
W et la nd R es to ra tio n\ 5_
De sig n\ C3
D\
-0 1-
-0
Ho dg e
W
PA
W et la nd
R es to .d w g
5/
/2
2:
P
M Pl ot D at e:
Revision 90% Final
Date 2/3/26
5/27/26
Tile Profiles
WCS & Fire Proof Cover
Intake to 5" Tile
Top Dike Elev 1470.0'
Intake Elev. 1467.0'
Coupler to DD Tile
Tee to DD Tile & Intake
New 8" Tile - Match Existing Grade
WCS & Fire Proof Cover
Intake
Top Dike Elev 1479.0'
Intake Elev. 1476.0'
Coupler to DD Tile
Tee to DD Tile & Intake
Branch 83-7-31-B
Branch 63
DD Tile
DD Tile
Roadway