25TTD004_RFP_FINAL.pdf
PDF 4 MB Posted
- Attached to
- C25900009 Rock Art Condition Assessment
- Solicitation number
- 0000038513
- Issued by
- Kern County, Kernville CDP, California
About this file
RFP 25TTD004 - Vessel Feasibility Review Summary
This is a Request for Proposal (RFP) issued by the California Air Resources Board (CARB) for technical support services related to the Commercial Harbor Craft Regulation implementation. CARB seeks a qualified marine or naval architect contractor to evaluate technical feasibility assessment reports submitted by vessel owners and operators applying for compliance extensions under the amended CHC Regulation, which took effect January 1, 2023. The contractor will review third-party feasibility analyses demonstrating that suitable Tier 4 engines or Diesel Particulate Filters cannot physically fit within existing vessel structures or be installed without compromising structural integrity. The primary deliverable consists of analysis reports for each reviewed feasibility assessment, with CARB estimating approximately 25 reports requiring review over the 34-month contract period from June 1, 2026, through March 31, 2029. Written questions must be submitted by March 27, 2026, with proposals due by April 10, 2026, at 12:00 p.m. PST. The contract is expected to be executed by June 1, 2026, with a Notice of Proposed Award to be posted for five business days prior to final award.
The total contract budget is $70,000.00, with proposals exceeding this amount deemed non-responsive and ineligible for award. Minimum qualifications require proposers to demonstrate completion of at least six repower or new vessel build projects involving design, stability, and USCG review processes (with at least one involving Tier 4 marine engine certification and one completed within the past ten years); five years of proven knowledge and work experience with harbor craft vessel design; and three years of experience working with the U.S. Coast Guard or other marine industry-related agencies. Proposals will be evaluated on a 100-point scale comprising Methodology/Approach (50 points), Personnel/Experience (15 points), Management Plan (5 points), and Cost (30 points). The contract includes provisions for Disabled Veteran Business Enterprise (DVBE) participation incentives ranging from 1% to 5% of the bid price. Contractors must maintain insurance coverage including $1,000,000 general liability, $1,000,000 motor vehicle liability, statutory workers' compensation, and $1,000,000 professional liability. Payment will be made upon task completion and State approval, with 10 percent of each invoice withheld pending final contract completion.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR PROPOSAL (SECONDARY METHOD)
Notice to Prospective Proposers RFP No. 25TTD004
March 20, 2026
You are invited to review and respond to this Request for Proposal (RFP) No. 25TTD004, titled, “Vessel Feasibility Review for the California Commercial Harbor Craft Regulation”. In submitting your proposal, you must comply with the instructions found herein.
This RFP is published online in the California State Contracts Register (CSCR) at https://caleprocure.ca.gov/pages/index.aspx. To ensure receipt of any addenda to this RFP that may be issued, interested parties are encouraged to register online at:
https://caleprocure.ca.gov.
The California Air Resources Board’s (CARB) deadline for receipt of proposals is April 10, 2026, no later than 12:00 p.m. PST. All proposals received late will be rejected. File size cannot exceed 50 Mega Bytes (MB). The naming convention of the proposal must be in the following format: “RFP 25TTD004 [Insert vendor name] Proposal”. Proposals must be received on or before the date and time specified herein at email addresses provided below:
EMAIL RFP Proposal to:
Purchasing@arb.ca.gov CC: desiree.lee@arb.ca.gov CC: vikki.dyachuk@arb.ca.gov
You are advised that you are responsible for ensuring that your proposal is received by the above listed contact person by the time and date required. Any proposal reaching the contact person after the deadline date and time will be rejected.
In the opinion of CARB, this RFP is complete and without need of explanation. However, if you have questions, notice any discrepancies or inconsistencies, or need any clarifying information, contact the person listed below. All questions must be submitted in accordance with the RFP instructions contained herein and sent via email directly to the below listed contact person and not through the Cal eProcure system.
Contact: Desiree Lee Email: desiree.lee@arb.ca.gov
We appreciate your interest in this project and hope to receive a proposal from you if this is within your area of expertise.
California Air Resources Board RFP No. 25TTD004
Table of Contents
SECTION PAGE
I. PURPOSE / BACKGROUND / SCOPE OF WORK 3
A. Purpose 4 B. Background 4 C. Scope of Work 4
II. PROPOSAL REQUIREMENTS (GENERAL) AND
INFORMATION
A. RFP Key Action Dates 5 B. Questions Regarding RFP Requirements 5 C. General Proposal Requirements 6 D. Submission of Proposals 6 E. Modification and/or Withdrawal of Proposals 7 F. Proposer Responsibilities 7 G. Signature 10 H. Disposition of Proposals 10 I. Socio-Economic and Preference Programs 11
III. PROPOSAL REQUIREMENTS (TECHNICAL) 13
A. Technical Proposal Requirements 13
1. Minimum Qualifications 13
2. Title Page 13
3. Cover Letter / Letter of Commitment 14
4. Table of Contents 14
5. Summary 14
6. Minimum Qualifications Response 14
7. Required Attachments 14
8. References 15
9. Conflict of Interest and Confidentiality Statement 15
10. Subcontracts / Subcontractors 15
11. Technical Portion 15
a. Management Plan 15
b. Methodology (Approach to Work) 16
c. Work Plan and Work Schedule 16
d. Personnel / Experience 17
e. Page Headers and Page Numbering 17
B) Cost Proposal Requirements 17
1. Cost Detail 17
2. Page Headers and Page Numbering 17
IV. EVALUATION, SELECTION, AND AWARD 18
A) Administrative Evaluation (Phase 1) 18 B) Technical Evaluation (Phase 2) 18
1. Scoring Criterion Guidelines 18
2. Cost Points 18
3. Proposal Evaluation Form 20 C. Proposal Rejection 22 D. Selection 22 E. Notice of Proposed Award 23 F. Standard Conditions of Service 23 G. Post Award Requirements 24
ATTACHMENTS
1. Required Attachment Checklist 25
2. Draft Standard Agreement (STD 213) 26
Exhibit A, Scope of Work 28 Exhibit A, Attachment 1 – Technical Proposal 31 Exhibit B, Budget Detail and Payment Provisions 32 Exhibit B, Attachment 1 – Contractor Cost Sheet 34 Exhibit C, General Terms and Conditions (GTC 02/2025) 35 Exhibit D, Special Terms and Conditions 36 Exhibit E, Additional Provisions 43
Exhibit F, Final Report Format 46
3. Proposer References Form 51
4. Payee Data Record (STD 204) 52
5. Payee Data Record (STD 205) 54
6. Contractor Certification Clauses (CCC 04/2017) 56
7. Darfur Contracting Act Certification 60
8. Bidder Declaration Form 61
9. CA DVBE Bid Incentive Instructions 63
10. Contractor Cost Sheet 66
11. Detailed Response for Minimum Qualifications 67
12. COVID-19 Prevention Contractor Self-Certification 68
13. Conflict of Interest and Confidentiality Statement
I. PURPOSE / BACKGROUND / SCOPE OF WORK
A. Purpose
This request for proposal (RFP) is to solicit competitive proposals to provide technical support to California Air Resources Board (CARB) staff during the implementation of the amended Commercial Harbor Craft Regulation (CHC Regulation) that took effect on January 1, 2023.
The amended CHC Regulation provides a compliance extension E3 for vessel owners/operators who cannot meet performance standard requirements by the specified compliance dates. To apply for E3, applicants must submit a technical feasibility study conducted by a third-party naval architect. The feasibility study must demonstrate that no suitable engines or Diesel Particulate Filters (DPFs) can physically fit within the existing vessel structure, and that no amount of structural modifications can be made without compromising the vessel’s structural integrity or stability, to meet the performance standard requirements of the CHC Regulation.
CARB is seeking a contract with a third-party marine or naval architect to evaluate technical feasibility assessments for E3 applications. The selected Contractor would be required to review feasibility assessment reports and present findings with explanations and descriptions in a final analysis for each review and provide general consulting hours on vessel design questions. For a detailed description of the Scope of Work, please refer to Attachment 2, Draft Standard Agreement.
The work of this contract is expected to require thirty-four (34) months; no work shall begin until all required signatures and approvals are obtained, and the CARB project manager provides direction. The project has a budget of $70,000.00. Proposals exceeding this amount may be deemed non-responsive and ineligible for award. CARB reserves the right to amend this Agreement through a formal written amendment, signed by the parties, for additional time only.
B. Background
The CHC Regulation was adopted in 2007 and amended in 2010 to reduce diesel particulate matter (PM) and criteria pollutant emissions from diesel powered engines on commercial harbor craft vessels. The regulation applies to all commercial harbor craft vessels including, but not limited to, ferries, excursion vessels, tugboats (including ocean-going tugs), towboats, push boats, crew and supply vessels, barge and dredge vessels, work boats, pilot vessels, and commercial passenger fishing vessels, and commercial fishing boats. To further reduce emissions, CARB staff amended the CHC Regulation again in 2022. More information regarding the CHC amendments can be found at: https://ww2.arb.ca.gov/our-work/programs/commercial-harbor-craft/chc-regulatory-documents.
The CHC amendments require all CHC except for commercial fishing vessels to meet performance standards equivalent to the most stringent Tier 4 PM marine standard plus a DPF. However, there are some challenges for some vessel categories to meet the performance standards. To address the challenge in case of the lack of feasibility of repowering and installing engines or DPF aftertreatment, the CHC amendments allow the vessel owners or operators who claim that they are not able to comply with the performance standards to apply for compliance extensions by submitting an application along with a technical feasibility analysis provided by a third-party naval architect demonstrating that no modifications are feasible to repower and retrofit the vessel for extensions to repowering engines or installing DPFs.
The CHC regulation amendments took effect on January 1, 2023. During the implementation of the amendments, technical feasibility assessment reports need to be reviewed and a determination needs to be made for the compliance extension applications.
C. Scope of Work
The Contractor would provide technical support to assist CARB staff in implementing the amended CHC regulation by reviewing third-party analyses submitted by applicants.
For a detailed description of the work to be performed, please refer to Attachment 2, Draft Standard Agreement.
II. PROPOSAL REQUIREMENTS (GENERAL) AND INFORMATION
This section contains instructions for the submission of your proposal. It is the responsibility of the proposer to carefully read and follow all proposal requirements within this RFP.
Compliance with the RFP instructions is mandatory for your proposal to be considered for award. Failure to comply with the RFP instructions may cause your proposal to be deemed non-compliant and non-responsive, thus ineligible for award.
A. RFP Key Action Dates
Below is the tentative time schedule for this RFP. CARB reserves the right to modify the RFP and/or change dates and times at its sole discretion, prior to the date fixed for submission of proposals, by the issuance of an addendum that will be posted on the California State Contracts Register (CSCR) at: https://caleprocure.ca.gov.
1. CARB reserves the right to modify or cancel in whole or any part of this solicitation.
2. Clarifications to the solicitation will only be provided in the form of a written addendum to all Proposers.
RFP Key Actions Dates Time RFP available to prospective Proposers 03/20/2026 N/A Written Questions Submittal Deadline 03/27/2026 12:00 p.m.
Question and Answers Addendum Posted 04/03/2026 N/A Final Date for Proposal Submission/Receipt by CARB
04/10/2026 12:00 p.m.
Complete Evaluation of Proposals 04/21/2026 N/A Posting of Intent to Award Notice(s) (Notice is posted for five [5] business days) 04/23/2026 N/A
Agreement sent to successful Proposer 05/08/2026 N/A Signed Agreement returned to CARB for counter-signature
05/15/2026 N/A
Agreement Approved and Executed – work begins
06/01/2026 N/A
RFP Key Action Dates listed above are estimates only, and subject to change at CARB’s sole discretion. No work shall begin until all required approvals and signatures, including the Department of General Services (DGS) Office of Legal Services, if applicable, are obtained.
B. Questions Regarding RFP Requirements
All questions or concerns related to the RFP requirements must be directed electronically to:
Fiscal Services Division Acquisitions Branch Contact: Desiree Lee Email: desiree.lee@arb.ca.gov
Questions must be received by the date and time specified under Section II, A. RFP Key Action Dates. Answers to all questions submitted will be in the form of an addendum posted to the DGS California State Contracts Register (CSCR) website https://caleprocure.ca.gov/pages/index.aspx by the date and time specified under Section II, A. RFP Key Action Dates. Please note that no verbal information given will be binding upon the State unless such information is issued in writing as an official addendum to all parties/participants. All questions must be submitted referencing the RFP number in the subject line, directly to the above listed contact person and not through the Cal eProcure system.
C. General Proposal Requirements
1. Proposals should provide straightforward and concise descriptions of the Proposer’s ability to satisfy the requirements of this RFP. The proposal must be complete and accurate. Omissions, inaccuracies or misstatements will be sufficient cause for rejection of a proposal.
2. Proposals must be submitted for the performance of all services described herein.
Any deviation from the work specifications (Section Ill, Proposal Requirements, and Attachment 2, Draft Standard Agreement) may cause a proposal to be rejected.
D. Submission of Proposals
1. Proposals must be submitted no later than the date and time indicated in Section II, RFP A. Key Action Dates and must be addressed as follows in Item 2.
Proposals received after this date and time will not be considered and will be rejected.
2. Delivery Instructions
Responses to this RFP shall be submitted to CARB at the following email addresses provided below in Section 2.b. in PDF format, cannot exceed 50 Mega Bytes (MB) and include:
a. One (1) copy containing the Technical Proposal and all other required elements along with the Cost Proposal.
b. Submit to the following email addresses and reference the RFP number in the subject line.
Purchasing@arb.ca.gov CC: desiree.lee@arb.ca.gov
3. Each proposal will be reviewed to determine if it meets the proposal requirements contained in Section lV, Proposal Requirements (Technical). Failure to meet the requirements for the RFP may be cause for rejection of the proposal.
4. A proposal may be rejected if it is conditional or incomplete, or if it contains any alterations of form or other irregularities of any kind. The State may reject any or all proposals and may waive any immaterial deviation in a proposal. The State’s waiver of immaterial defect shall in no way modify the RFP document or excuse the
Proposer from full compliance with all requirements if the Proposer is awarded the Agreement.
5. CARB may modify the RFP up to the specified time of the date fixed listed for submission of proposals by the issuance of an addendum to all parties who received a proposal package. Any addendum(s) will be issued through the Cal eProcure system.
6. The State reserves the right to reject all proposals.
7. More than one (1) proposal from an individual, firm, partnership, corporation or association under the same or different name will not be considered. Reasonable grounds for believing that any Proposer has submitted more than one proposal for the work contemplated herein will cause the rejection of all proposals submitted by that Proposer. If there is reason to believe that collusion exists among the Proposers, none of the participants in such collusion will be considered in this or future procurements.
E. Modification and/or Withdrawal of Proposals
1. A Proposer may modify a proposal after its submission by withdrawing its original proposal and resubmitting a new proposal prior to the proposal submission deadline.
The Proposer modifications offered in any other manner, oral or written, will not be considered.
2. A Proposer may withdraw its proposal by submitting a written withdrawal request to CARB signed by the Proposer or an agent authorized in accordance with Section II, G., titled “Signature”. A Proposer may thereafter submit a new proposal prior to the proposal submission deadline. Proposals may not be withdrawn without cause subsequent to proposal submission deadline.
F. Proposer Responsibilities
1. Proposers should carefully examine the entire RFP, with special attention to the tasks and deliverables found in Attachment 2, Draft Standard Agreement.
Proposers shall investigate obstacles that might be encountered. No additions or increases to the agreement amount will be made due to a lack of careful examination of the requirements.
2. Before submitting a response to this RFP, the Proposer should review their response, correct all errors, and confirm compliance with the RFP requirements. It is the Proposer’s responsibility to complete and submit all required attachments as listed on Attachment 1, Required Attachment Checklist.
3. Costs incurred for developing proposals and in anticipation of award of the Agreement are entirely the responsibility of the Proposer and shall not be charged to
CARB.
4. It is the Proposer’s responsibility to promptly notify CARB’s contract analyst identified in the solicitation, in writing, by e-mail, if the Proposer believes that the solicitation is unfairly restrictive, contains errors or discrepancies, or is otherwise unclear. Notification must be done immediately upon receipt of the solicitation in order that the matter may be fully considered, and appropriate action taken by CARB prior to the closing time set to receive solicitation responses. Such notification must be submitted no later than the question-and-answer period referenced in Section II, A. RFP Key Action Dates. All such correspondence received after the question-and-answer deadline will not be considered.
5. Proposer is responsible to review, read, understand, and comply in full with the
State’s General Terms and Conditions along with the Contractor’s Certification Clauses (CCC) as listed at: https://www.dgs.ca.gov/OLS/Resources/Page- Content/Office-of-Legal-Services-Resources-List-Folder/Standard-Contract- Language.
6. Each proposal must constitute an irrevocable offer for a period of at least 180 working days after proposal submission.
7. The Proposer must provide evidence to show that members of the team possess the specific qualifications, competence, experience, resources, and business integrity necessary to carry out the work under the contract as expected. Examples of evidence include, but are not limited to: résumés, letters of reference, and project summaries that highlight the team’s specific experience. Proposers must complete Attachment 3, Proposer References Form.
8. The Proposer must own and operate a legitimate business. If required by law, the
Proposer must be registered and in good standing with the California Secretary of State. All businesses that are required to be registered with the California Secretary of State must be registered prior to date of Agreement award. Evidence of registration shall be submitted with the proposal.
9. In the event that any license(s) and/or permit(s) expire at any time during the term of this agreement, Proposer agrees to provide CARB with a copy of the renewed license(s) and/or permit(s) within thirty (30) days following the expiration date. In the event the Proposer fails to keep in effect at all times all required license(s) and permit(s), the State may, in addition to any other remedies it may have, terminate this Agreement upon occurrence of such event.
10. It is unlawful for any person engaged in business within this state to sell or use any article or product as a “loss leader” as defined in Section 17030 of the Business and Professions Code.
11. The Proposer must complete and submit to CARB, the Payee Data Record (STD
204), Attachment 4, to determine if the selected proposer is subject to state income tax withholding, pursuant to California Revenue and Taxation Code, Section 18662.
This form can be found on the Internet at http://www.documents.dgs.ca.gov/dgs/fm c/pdf/std204.pdf. No payment shall be made unless a completed STD 204 and/or Payee Data Record Supplemental STD 205 (if applicable) Attachment 5, has been returned to CARB. This form can be found on the Internet at https://www.documents.dgs.ca.gov/dgs/fmc/pdf/std205.pdf
12. The Proposer must sign and submit to CARB, page one (1) of the Contractor
Certification Clauses (CCC 04/2017), Attachment 6, or the form can be obtained via the Internet at: https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of- Legal-Services-Resources-List-Folder/Standard-Contract-Language.
13. The Proposer must sign and submit to CARB, the California Civil Rights Laws
Certification, Attachment 7.
14. The Proposer must sign and submit to CARB, the Darfur Contracting Act Certification, Attachment 8.
15. The Proposer must sign and submit to CARB, the Bidder Declaration Form, Attachment 9.
16. The Proposer must complete and submit to CARB, the Contractor Cost Sheet, Attachment 11. Failure to fully complete and return this attachment with your proposal will cause your bid to be rejected and deemed non-responsive.
17. The Proposer must complete and submit to CARB, the Detailed Response for Minimum Qualifications, Attachment 12. Failure to fully complete and return this attachment with your proposal will cause your bid to be rejected and deemed non-responsive.
18. As part of CARB’s ongoing efforts to protect the health and safety of its employees, CARB is requesting all vendors / Contractors who perform work in person or on site to provide certification that the vendor’s / Contractor’s employees and subcontractors have provided documentation to the vendor / Contractor that the employees are either fully vaccinated against COVID-19 (as defined by the CDC), or have obtained a negative COVID-19 test result within seventy-two (72) hours of in-person or on-site work. The vendor / Contractor does not need to provide the documentation of employees’ or subcontractors’ vaccination status or negative test result to CARB. If no employees or subcontractors of the vendor / Contractor will interact with any CARB employees or perform work on site, CARB requests the vendor / Contractor certify to this effect.
Additionally, all Contractors who perform services under a contract with CARB are expected to, at their own expense, comply with all applicable health and safety laws and regulations. This includes, but is not limited to, all laws, regulations, and public health orders related to the COVID-19 pandemic. The Proposer must sign and submit to CARB, the COVID-19 Prevention Contractor Self-Certification, Attachment 13.
19. The Proposer must sign and submit to CARB, the Conflict of Interest and Confidentiality Statement, Attachment 14. The Proposer shall require each of its employees or officers who will be involved in the performance of this Agreement to agree to the terms and the terms of the Conflict of Interest and Confidentiality Statement.
20. Generative Artificial Intelligence (GenAI)
The State of California seeks to realize the potential benefits of GenAI, through the development and deployment of GenAI tools, while balancing the risks of these new technologies.
Bidder / Offeror must notify the State in writing if it: (1) intends to provide GenAI as a deliverable to the State; or (2), intends to utilize GenAI, including GenAI from third parties, to complete all or a portion of any deliverable that materially impacts: (i) functionality of a State system, (ii) risk to the State, or (iii) Contract performance. For avoidance of doubt, the term “materially impacts” shall have the meaning set forth in State Administrative Manual (SAM) § 4986.2 Definitions for GenAI.
Failure to report GenAI to the State may result in disqualification. The State reserves the right to seek any and all relief to which it may be entitled to as a result of such non-disclosure.
Upon notification by a Bidder / Offeror of GenAI as required, the State reserves the right to incorporate GenAI Special Provisions into the final contract or reject bids/offers that present an unacceptable level of risk to the State.
Government Code 11549.64 defines “Generative Artificial Intelligence (GenAI)” as an artificial intelligence system that can generate derived synthetic content, including text, images, video, and audio that emulates the structure and characteristics of the system’s training data.
21. Executive Order N-6-22 – Russia Sanctions
On March 4, 2022, Governor Gavin Newsom issued Executive Order N-6-22 (the EO) regarding Economic Sanctions against Russia and Russian entities and individuals. “Economic Sanctions” refers to sanctions imposed by the U.S.
government in response to Russia’s actions in Ukraine, as well as any sanctions imposed under state law. By submitting a bid or proposal, Contractor represents that it is not a target of Economic Sanctions. Should the State determine Contractor is a target of Economic Sanctions or is conducting prohibited transactions with sanctioned individuals or entities, that shall be grounds for rejection of the Contractor’s bid/proposal any time prior to contract execution, or, if determined after contract execution, shall be grounds for termination by the State.
G. Signature
1. All documents requiring signatures contained in the original proposal package must have original or electronic signatures.
2. Only an individual who is authorized to bind the proposing firm contractually shall sign the required Cover Letter for the proposal. The signature must indicate the title or position that the individual holds in the firm. An unsigned proposal may be rejected.
H. Disposition of Proposals
Upon proposal opening, all documents submitted in response to this RFP will become the property of the State of California and will be regarded as public records under the California Public Records Act (Government Code Section 6250 et seq.) and subject to review by the public. The State cannot prevent the disclosure of public documents.
I. Socio-Economic and Preference Programs
1. Disabled Veteran Business Enterprise (DVBE) Incentive – Optional This solicitation does not require a minimum amount of DVBE participation.
However, you are strongly encouraged to either become certified, if eligible, or to subcontract a portion of the work to a certified DVBE. If a prime proposer is a certified DVBE or commits to subcontracting with DVBE(s), the proposal may be eligible to receive a proposal preference provided that the DVBE provides a commercially useful function as defined in California Code of Regulations, Title 2, Section 1896.61(l). For evaluation purposes only, the State shall apply an incentive to proposals that propose California certified DVBE participation as identified on Attachment 10, titled California Disabled Veteran Business Enterprise (DVBE) Bid Incentive Instructions and confirmed by the State. Proposers claiming the DVBE incentive must complete and return the Disabled Veteran Business Declarations form found at: http://www.documents.dgs.ca.gov/dgs/fmc/gs/pd/pd_843.pdf
The incentive amount varies in conjunction with the percentage of DVBE participation offered. The minimum requirement is 1% with a maximum of 5% DVBE participation and the incentive will be equal to the participation offered as defined below:
Confirmed DVBE Participation of:
DVBE
Incentive:
1% to 1.99% inclusive 1% 2% to 2.99% inclusive 2% 3% to 3.99% inclusive 3% 4% to 4.99% inclusive 4%
5% or Over 5%
2. Small Business (SB) or Microbusiness (MB) Preference – Optional
If Proposer is claiming the 5% certified SB or MB preference or is committing to subcontract 25% or more of their net proposal price to one or more certified SB or MB (Non-small business preference [NSB]), list firm names on Attachment 9 (GSPD-05-105 Bidder Declaration) and attach a copy of the certification. Additional References: http://www.dgs.ca.gov/PD/.
https://www.documents.dgs.ca.gov/dgs/FMC/PDF/STD817.pdf
Questions regarding the certification approval process or the SB program should be directed to the Department of General Services, Procurement Division at (800) 559- 5529 or (916) 375-4400. For the 24-Hour Recording & Mail Request call (916) 322- 5060.
SB, MB or NSB proposers using the SB preference shall be granted a preference consisting of 5% of the highest responsible proposal’s total score.
3. Preference and Incentive Application – Optional
a. DVBE Incentive Points are factored by multiplying a Proposer’s DVBE participation commitment percentage (%) by the total possible points that could be awarded (see Table 1 below). This amount is then added to the Proposer’s total points. In the Table 2 sample below, Proposer B received a 60-point incentive (.05% commitment x 1200 total points available), which was added to its total points resulting in its proposal ranking as first in line for award. Proposer C’s 2% commitment resulted in its receiving 24 incentive points and making its proposal rank as second in line for award.
b. Preference is calculated by multiplying 5% of the highest scoring NSB proposer, and adding those points to SB proposers and NSBs subcontracting 25% or more to a SB. In the Table 2 sample below, the calculation is based on Proposer B’s 1155 points x .05 resulting in 57.75 additional points added to the certified SBs (A and C).
c. Under the High Score Method, it is possible to displace a high point certified SB with the application of the DVBE Incentive.
TABLE 1: HIGH SCORE METHOD SAMPLE
Available points example using sliding scale:
Administrative: 200 points Technical: 400 points
Cost: 600 points Total: 1200 points
Possible Maximum 60 points DVBE incentive calculated as follows:
Confirmed DVBE Participation Possible Points Calculation:
1% - 1.99% inclusive 1% X 1200 = 12 2% - 2.99% inclusive 2% X 1200 = 24 3% - 3.99% inclusive 3% X 1200 = 36 4% - 4.99% inclusive 4% X 1200 = 48
5% and Higher 5% X 1200 = 60
TABLE 2: HIGH SCORE METHOD SAMPLE RESULTS
Proposer A B C Responsive/Responsible Yes Yes Yes
Total Points 1050 1155 1125 Eligible Preference SB None SB
SB Preference Points Applied
57.75 0 57.75
Subtotal 1107.75 1155 1182.75
Rank 3 2 1 Confirmed DVBE
Participation No (0%) Yes (5%) Yes (2%)
Incentive Points Applied None 60 24 Adjusted Points 1107.75 1215 1206.75
New Rank 3 1 2
III. PROPOSAL REQUIREMENTS (TECHNICAL)
A. Technical Proposal Requirements
The proposal must contain the following components, information and documents outlined below. Each requirement’s location must be listed in the Proposal’s Table of Contents. Also see Section II, D. Submission of Proposal, for general submittal details.
1. Minimum Qualifications
The Proposer must provide a detailed response, outlining information as to how the Proposer meets each of the minimum qualifications listed below. The Proposer must provide their detailed response on Attachment 12, Detailed Response for Minimum Qualifications. Proposals that do not meet the minimum qualifications will be determined non-responsive and ineligible for award.
a. Proposer must demonstrate that they have performed the design, stability, and the United States Coast Guard (USCG) review process for at least six (6) repower or new vessel build projects, one of which should have involved an engine certified to the marine Tier 4 standards. The Proposer must include one
(1) example of a completed project within the past ten (10) years.
b. Proposer must have proven knowledge and five (5) years of work related to harbor craft vessels design.
c. Proposer must have proven knowledge and three (3) years of experience in working with U.S. Coast Guard or other marine industry related agencies.
2. Title Page
The purpose of this page is to provide information needed by CARB administrative staff. It must contain the following items:
a. The title of the proposal, which must be the same as the title of the RFP;
b. The number of the RFP, 25TTD004; and
c. The date of proposal.
3. Cover Letter / Letter of Commitment
The cover letter must not be more than two (2) pages, in Arial size 11-point font or similar, and must include the following paragraph and the signature of the representative authorized to make the proposal on behalf of the firm:
“The enclosed proposal is submitted in response to the above referenced Request for Proposal 25TTD004, including any addenda. Through submission of this proposal, we agree to all of the terms and conditions of the Request for Proposal and agree that any inconsistent provisions in our proposal may result in a lower score, up to and including disqualification. We have carefully read and examined the Request for Proposal and have conducted such other investigations as were prudent and reasonable in preparing the proposal. We agree to be bound by statements and representations in our proposal.”
The cover letter must be provided on the company’s letterhead and include the following information and statements:
a. The name and address of your company [NOTE: You may use a Post Office box, but please provide your company's street address];
b. The name, title, and signature of a company official authorized to bind the proposal; and
c. Name, email and/or phone number for the Proposer’s contact for CARB inquiries related to the proposal.
4. Table of Contents
5. Summary
The abstract shall be no longer than one (1) page. Include a brief description of the proposed project briefly summarizing the main point of the various sections of the proposal, including the features and benefits of the proposal.
6. Minimum Qualifications Response
Provide a response, outlining detailed information demonstrating how the Proposer meets each of the minimum qualifications listed in Section III, A. Submit applicable documentation on Attachment 12, Detailed Response for Minimum Qualifications.
7. Required Attachments
The Technical Proposal must include all of the completed attachments listed in Attachment 1, Required Attachment checklist.
8. References
Each proposer, if they choose to do so, may provide references for detailing previous experience related to the goals and objectives outlined in the RFP.
References must be provided using Attachment 3, Proposer References Form.
Submission of this attachment is optional. Attachment 3 may be copied for additional references.
9. Conflict of Interest and Confidentiality Statement
Proposer and each member of Proposer’s technical staff proposed to work on this project must sign and submit Attachment 14, Conflict of Interest and Confidentiality Statement with your proposal.
10. Subcontracts/Subcontractors
If subcontractors are to be used, the Proposer must include in the Technical Proposal a description of each person or firm and the work to be done by each subcontractor. Please use Attachment 9, Bidder Declaration Form (GSPD 05-105), to list all subcontractors used for this project. All subcontracts must be approved by CARB, and no work shall be subcontracted without the prior written approval of the State. The cost of the subcontract work is to be itemized in the Cost Proposal as described below in the section entitled Cost Proposal Requirements, and not in the Technical Proposal.
11. Technical Portion
The proposer shall demonstrate their understanding of the questions, or needs, that CARB is seeking to have addressed. The technical approach and work plan are considered the heart of the proposal and will receive a high level of scrutiny. This part of the proposal will be evaluated to ensure all tasks and deliverables, listed in the Scope of Work, are included and responsive. The technical portion of the Proposal must include a written response to all scoring elements listed in the sample Proposal Evaluation form, Section IV, B.3, and must include the following:
a. Management Plan
The Proposer shall provide a project management plan including the management structure and project organization. The Proposer shall designate, by name, the Contract Manager to be employed. The selected Proposer shall not cause the substitution of the Contract Manager without prior written approval of the State. Proposers should include methods to measure project progress against the project management plan to maintain project schedule.
b. Methodology (Approach to Work)
The Proposer shall describe their methodology and approach to the work, identify specific techniques and methodologies that will be used and specific administrative and operational management expertise that will be employed in order to accomplish the tasks listed in this RFP under Attachment 2, Draft Standard Agreement. The Proposer shall indicate how skills developed in previous related work will be applied to the work described in this RFP.
The Proposer shall demonstrate their knowledge in the subject of the RFP and lay the groundwork for the actual work to be performed for this project. The Proposer shall provide a detailed description of the overall approach and methodologies utilized to accomplish the tasks listed in Attachment 2, Draft Standard Agreement, Exhibit A.
c. Work Plan and Work Schedule
The Proposer shall develop a Work Plan and Work Schedule that allows all tasks to be completed within the timeframes outlined in the Scope of Work. The Work Plan and Work Schedule shall identify each major task, necessary subtasks, and milestones by which progress can be measured and payments made. The Work Plan shall specify the estimated hours to accomplish each task and the Work Schedule shall provide the responsible party for performing the task, and anticipated dates of completion.
The Work Plan and Work Schedule must reflect the total project timeline of thirty-four (34) months.
The Work Plan shall indicate how the supervision and oversight will be conducted for ensuring that the project will remain on schedule and that the distribution of workload is appropriate.
See Attachment 2, Draft Standard Agreement, for details on the tasks required.
A work plan schedule format is provided below:
TASK RESPONSIBLE PARTY
(Prime or Subcontractor)
DATE OF
COMPLETION
Review Feasibility Assessment Report and Complete an Analysis for Each Review
Analysis Report for Feasibility Assessment Report Review
March 31, 2029
d. Personnel / Experience
For this criterion, reviewers will rate the Proposer’s experience in conducting similar or related work described in the Scope of Work, and how skills developed in previous related work will be applied to this project as outlined in Attachment 2, Draft Standard Agreement. The Proposer shall indicate how previous experience will be applied to the development of this project.
The Proposer shall list technical staff (specify staff name) who will be working on the project. Include their titles, qualifications, a summary of similar work or studies performed, a resume for each technical staff person, a statement indicating how many hours each professional will be assigned to the Agreement and what tasks each professional will perform. The selected Proposer shall not cause key members of the project team to be substituted without prior written approval of the State.
The Proposer shall demonstrate experience and breadth of knowledge in performing the services described in the Scope of Work, and how skill developed in previous related work will be applied to this project as described in Attachment 2, Draft Standard Agreement.
e. Page Headers and Page Numbering
All pages of the Technical Proposal, including cover pages, Table of Contents, references and resumes, and the Bidder Declaration Form GSPD-05-105 (Attachment 9) shall have the following header and page numbering format in the upper right-hand corner:
Technical Proposal
Exhibit A, Attachment 1 Page ## of ##
B. Cost Proposal Requirements
The cost breakdown (Cost Proposal) shall be included in the Technical Proposal. Cost Proposals shall include the following required information: Budget, and Preference Program Documents (See Section lI, I. Socio-Economic and Preference Programs) and at a minimum, all information listed in Cost Detail (below). Proposers must use the Attachment 11, Contractor Cost Sheet.
All costs must be provided for each task and deliverable. The proposed costs should be broken down into the outline in the Work Plan and Work Schedule for the purpose of this cost proposal submittal.
CARB’s budget for the proposed contract is limited to $70,000.00. Any cost proposals exceeding this amount will be disqualified and ineligible for award. Proposers shall submit a cost proposal for all tasks described in Attachment 2, Draft Standard
1. Cost Detail
a. Itemized Tasks – Using Attachment 11, Contractor Cost Sheet, provide firm-fixed costs for specific tasks listed in Attachment 2, Draft Standard Agreement.
For all tasks, the Proposer must include all items such as labor, personnel, subcontractors, travel, meetings, materials, reports, and tax, if applicable, as necessary to perform and complete the tasks on the Contractor Cost Sheet, Attachment 11.
b. Subcontracts / Subcontractors – If subcontractors are to be used, the Proposer must include in the Technical Proposal, a description of each person or firm and the work to be done by each subcontractor. Additionally, all subcontractors proposed to be used for this project must be identified on Attachment 9, Bidder Declaration Form.
2. Page Headers and Page Numbering
All pages of the Cost Proposal; the Bidder Declaration Form GSPD-05-105 (Attachment 9); https://www.documents.dgs.ca.gov/dgs/fmc/GS/PD/GSPD05- 105.pdf and, if applicable, any forms pertaining to socio-economic preferences (SB, MB, or DVBE), shall have the following header and page numbering format in the upper right-hand corner:
Cost Proposal
Exhibit B, Attachment 1 Page # of ##
IV. EVALUATION, SELECTION, AND AWARD
A. Administrative Evaluation (Phase 1)
CARB will conduct an administrative evaluation in accordance with the RFP requirements to determine a Proposer’s responsiveness and responsibility. Each proposal will be checked for completeness and/or absence of all required information and to ensure that the Proposer meets the minimum qualifications in conformance with the submission requirements. During the evaluation period, if an item is unclear, or needs further clarification, Proposers may be requested to provide additional documentation.
B. Technical Evaluation (Phase 2)
CARB will also conduct an evaluation of the Technical Proposal by an evaluation panel consisting of CARB employees. If deemed necessary, independent academic, technical or policy experts may be called upon to answer any specific questions regarding the responses to the RFP. These individuals will not participate in the scoring process.
1. Scoring Criterion Guidelines
Note: There will be no individual sheets, no written scores, and no written notes. There will be one final score for each Proposer.
The Proposal Evaluation Form in Section IV, B.3 contains the scoring criteria that will be used by reviewers evaluating proposals submitted in response to this RFP. The evaluation team shall determine a consensus score for each item, based on the team's verbal discussion of each Proposer's responses. To determine the consensus score, evaluators will meet either in person or by teleconference to discuss in detail the strengths, weaknesses, and ratings of each proposal to determine scores. The evaluation team will carefully review and discuss the completeness of the Proposer's response, as well as clarity of documentation presented in the proposals submitted in response to this RFP.
2. Cost Points (30 points)
Proposers may achieve a maximum of thirty (30) cost points. This criterion allows staff to evaluate and compare the budgets of each proposal relative to those of its competitors. The budgeted amount is the maximum allowable amount by CARB for this Agreement (Section III, B.). Any proposals submitted that are over the expected expenditure / budgeted amount may be disqualified.
The technically qualified proposal that has the lowest cost will be given a maximum score of thirty (30) for this criterion.
All other technically qualified proposals will be calculated based on the ratio of the lowest cost proposal to the proposer’s cost, multiplied by the maximum number of cost points available thirty (30), as shown in the example below:
Lowest Total Cost Proposal X Total Cost Points Available Proposer Total Cost
Example: To help illustrate this process, refer to the Cost Evaluation Methodology Example table below for the cost score calculation process. Cost figures in this example explain the cost calculations and have no other significance.
Cost Evaluation Methodology Example
Proposer Grand Total
Cost Calculation
Cost Points Awarded
A $350,000 $300,000 X 30 $350,000
B $325,000 $300,000 X 30 $325,000
C $300,000 $300,000 X 30 $300,000
Final Scoring Methodology Example
Proposer Technical Score Cost Score Total Points
Awarded A 81 26 107 B 86 28 114 C 92 30 122
In this case, the highest scored proposal from Proposer C would be the intended awardee.
Preferences will be applied as required to eligible proposals. Please see Section II, I.
Socio-Economic and Preference Programs.
The evaluation team will abide by the following Scoring Criterion Guidelines for the Technical Evaluation Scoring Criteria below:
Possible Points
Interpretation Explanation for Percentage Points
0% Inadequate Response does not include or fails to address the requirements being scored. The omission(s), flaw(s), or defect(s) are significant and unacceptable.
Possible Points
Interpretation Explanation for Percentage Points
30% Barely Adequate
Response addresses the requirements being scored, but there are one or more omissions, flaws, or defects or the requirements are addressed in such a limited way that it results in a low degree of confidence in the proposed solution.
80% Good
Response fully addresses the requirements being scored with a good degree of confidence in the Applicant’s response or proposed solution. No identified omission(s), flaw(s), or defect(s). Any identified weaknesses are minimal, inconsequential, and acceptable.
100% Excellent or Outstanding
Response fully addresses the requirements being scored with a high degree of confidence in the Applicant’s response or proposed solution. Applicant offers one or more enhancing features, methods or approaches exceeding basic expectations.
The Proposal Evaluation criteria listed specifies the total number of points available for each requirement. Using the Scoring Criterion Guidelines, the evaluation team will determine the percentage of points to be awarded to each requirement and multiply that percentage by the total number of points available for that requirement to determine the score.
3. Proposal Evaluation Form
MINIMUM QUALIFICATIONS Yes No
Proposer must demonstrate that they have performed the design, stability, and USCG review process for at least six (6) repower or new vessel build projects, one of which should have involved an engine certified to the marine Tier 4 standards. The Proposer must include one (1) example of a completed project within the past ten (10) years.
Proposer must have proven knowledge and five (5) years of work related to harbor craft vessels design.
Proposer must have proven knowledge and three (3) years of experience in working with U.S. Coast Guard or other marine industry related agencies.
If any minimum qualifications are NOT met, STOP HERE
Scoring Items
2. METHODOLOGY (APPROACH TO WORK), WORK PLAN, AND WORK
SCHEDULE
Points Available
Awarded
Proposer shall describe their methodology and approach to the work, identify specific techniques and methodologies that will be used and specific administrative and operational management expertise that will be employed in order to accomplish the tasks listed in this RFP under Attachment 2, Draft Standard Agreement. Proposer shall indicate how skills developed in previous related work will be applied to the work described in this RFP.
Proposer shall demonstrate their knowledge in the subject of the RFP and lay the groundwork for the actual work to be performed for this project. The Proposer shall provide a detailed description of the overall approach and methodologies utilized to accomplish the tasks listed in Attachment 2, Draft Standard Agreement, Exhibit A. The Proposer must demonstrate the expertise in analysis of harbor craft vessel design.
Proposer shall develop a Work Plan and Work Schedule that allows all tasks to be completed within the timeframes outlined in the Scope of Work. The Work Plan and Work Schedule shall identify each major task, necessary subtasks, and milestones by which progress can be measured and payments made. The Work Plan shall specify the estimated hours to accomplish each task and the Work Schedule shall provide the responsible party for performing the task, and anticipated dates of completion.
Proposer shall develop a Work Plan and Work Schedule that must reflect the total project timeline of thirty-four (34) months. The Work Plan shall indicate how the supervision and oversight will be conducted for ensuring that the project will remain on schedule and that the distribution of workload is appropriate.
3. PERSONNEL / EXPERIENCE
Available
Proposer demonstrates experience and breadth of knowledge in performing the services described in the Scope of Work, and how skill developed in previous related work will be applied to this project as outlined in Attachment 2, Draft Standard Agreement. The Proposer shall indicate how previous experience will be applied to the development of this project.
Proposer shall list technical staff (specify staff name) who will be working on the project. Include their titles, qualifications, a summary of similar work or studies performed, a resume for each technical staff person, a statement indicating how many hours each professional will be assigned to the Agreement and what tasks each professional will perform.
4. MANAGEMENT PLAN
Points
Available
Points Awarded
The Proposer shall provide a project management plan including the management structure and project organization. The Proposer shall designate, by name, the Project Manager to be employed. The selected Proposer shall not cause the substitution of the Project Manager without prior written approval of the State. Proposers should include methods to measure project progress against the project management plan to maintain project schedule.
6. COST
Available
This criterion allows staff to evaluate and compare the budgets of each proposal relative to those of its competitors. The technically qualified proposal that has the lowest cost will be given a maximum score of 30 for this criterion.
TOTAL POINTS
Maximum Available
SCORE
C. Proposal Rejection
1. Proposals must be submitted for the performance of all the services as described herein. Any material deviation from the RFP will not be considered and may cause a proposal to be rejected.
2. Proposals must be complete in all respects as required by the RFP. A proposal may be rejected if it is conditional or incomplete, or if it contains any alterations of form or other irregularities of any kind. The State does not accept alternate contract language from a prospective contractor. A proposal with such language will be considered a counter proposal and may be rejected.
3. CARB reserves the right to reject any or all proposals for any reason.
4. Proposals that contain false or misleading statements, or which provide references, that do not support an attribute or condition claimed by the proposal, may be rejected. If, in the opinion of the State, such information was intended to mislead the State in its evaluation of the proposal, and the attribute, condition, or capability is a requirement of this RFP, it will be the basis for rejection of…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .