25RWM46_SYN_ATT2.pdf
PDF 442 KB Posted
- Attached to
- AN/SLQ-32(V)6 ANTENNA SHELTER REFURBISHMENTS
- Solicitation number
- N0016425RWM46
About this file
This document is a Statement of Work (SOW) for the refurbishment of the AN/SLQ-32(V)6 Antenna Shelters. The key requirements include:
The vendor will disassemble the shelters, abrasive blast to remove corrosion, apply chemical conversion coating, primer, and paint per specified military standards. Damaged components will be repaired or replaced. The vendor must have capabilities for large part handling, welding, machining, and threaded insert replacement. A tiered refurbishment approach will be used, with different levels of repair and replacement. The contract will be an Indefinite-Delivery Indefinite-Quantity (IDIQ) with Firm-Fixed-Price line items, with a minimum of 1 and maximum of 125 shelter sets over the 5-year ordering period. Delivery is required FOB Destination NSWC Crane within 6-12 months depending on the repair tier. The solicitation will be a small business set-aside posted on the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Controlled Document – When printed, this document is not controlled.
(V)6 SHELTER REFURBISHMENT STATEMENT OF WORK (SOW)
Statement of Work
1.0 Scope
This SOW covers refurbishment and upgrade of the AN/SLQ-32(V)6 Antenna Shelters. The vendor will recommend level of refurbishment to U.S. Government. The vendor will receive acceptance of level of refurbishment from U.S. Government. The vendor will perform complete disassembly of the enclosure, use of blast media to clear away old paint, coatings and corrosion, reapply chromate chemical conversion, primer and paint. The vendor shall perform reassembly of the shelter including new gaskets and hardware.
The vendor shall be able to handle large material components and be able to perform threaded insert replacement/repair capabilities. The vendor shall be able to perform blast media in accordance with MIL-
STD-1504 or SSPC SP 10 to achieve surface roughness of 0.002 in to 0.004 in per ASTM D4417. Vendor shall be able to chemical coat parts ranging in sizes a minimum of 42 in x 14 in x 1 in to a maximum of 52 in x 103 in x 7 in per MIL-DTL-5541 and MIL-A-8625, TYPE III, CLASS 1. Vendor shall be capable of conforming to priming specifications per MIL-DTL-24441, Type IV, one coat, dry film thickness a minimum of 0.002 in. Vendor shall be capable of conforming to painting specifications per MIL-PRF-
24635 Type V, Class 2, Grade B, color Gray Semigloss (Haze) per FED-STD-595, two coats dry film thickness 0.003 in. min. Vendor shall be capable of conforming to procedures NASM47196, A-A-59158 and NASM33537 for threaded inserts (if damaged) replacement on material sizes ranging from 0.3125 in to
1.25 in. Vendor shall be able to package Government Furnished Equipment (GFE) and transport GFE back to NSWC Crane per Packaging and Marking Guide for DoD via “Level A” packaging.
1.1. Background
SEWIP Block II provides anti-ship missile defense capabilities to the US Navy fleet. Specifically, the
AN/SLQ-32(V)6 electromagnetic warfare (EW) suite has been designed to replace and improve upon
Legacy variants of the AN/SLQ-32 EW suite. As this new system is being fielded, sustainability and maintainability of the above-deck electronics shelters have been key issues. Corrosion occurs due to the marine environment the shelters are exposed to, and coating failure occurs once corrosion begins. This corrosion, and ultimately coating failure, introduces the issue of water intrusion inside the shelters, which can be detrimental to the sensitive internal electronics. Thus, periodic refurbishment of the shelters is necessary to continue providing EW capabilities to the US Navy. This contract will provide the necessary services needed for refurbishment of the outboard shelter structure to extend the lifecycle of the shelter structure.
2.0 Applicable Documents
The following documents of the revision or issue in effect at the date of award, form a part of this SOW for reference. In the event of conflict between the documents referenced herein and the contents of this SOW, the contents of this SOW shall prevail.
2.1. Military, Government, and Industry Standards
Document
Number Document Title Date
Packaging and Marking Guide for DoD 01 March 2014
8493960 Shelter Structure Assembly 16 January 2012
A-A-56032 Ink, Marking, Epoxy Base 7 August 2019
A-A-59158 Tools For Inserting and Extracting Helical Coil
Wire Screw Thread Inserts 30 January 1998
ASTM B209
Standard Specification for Aluminum and
Aluminum-Alloy Sheet and Plate 01 November 2014
ASTM D4417
Standard Test Methods for Field Measurement of
Surface Profile of Blast Cleaned Steel 25 January 2021
AWS D1.2 Structural Welding (Aluminum) 23 June 2008
DI-MGMT-80368 Status Report 30 October 2006
DI-MGMT-80441 Government Property (GP) Inventory Report 09 June 2020
FED-STD-595
Color Gray Semi-Gloss (Haze) Color Number
26270 16 January 2008
MIL-DTL-24441 Paint, Epoxy-Polyamide 27 August 2009
MIL-DTL-5541
Chemical Conversion Coating of Aluminum
Alloys 11 July 2006
MIL-PRF-24635
Coating Systems, Weather-Resistant, Exterior
Use 15 September 2009
MIL-PRF-61002
Labels, Pressure-Sensitive Adhesive, for Bar
Coding 10 January 2023
MIL-PRF-8625
Anodic Coatings for Aluminum and Aluminum
Alloy 23 November 2020
MIL-STD-130 Identification Marking of U.S. Military Property 26 August 2019
MIL-STD-1504 Abrasive Blasting 01 March 2007
NAS63540/1
Concealed-Head Self-Clinching Studs and
Standoffs 27 June 1995
NASM33537
Insert, Screw Tread, Helical Coil, Inch Series, Coarse and Fine Thread, Standard Assembly
Dimensions For
03 July 2002
NASM47196
Preparation For and Installation of Buck-Type
Rivets 06 April 1999
SSPC SP 10 Near White Blasting Cleaning 01 January 2007
WI-WXMR-PNT-
8493960
Work Instruction for Painting AN/SLQ-32(V)6
Shelter Structure Assembly P/N 8493960 04 January 2019
3.0 Performance Requirements
Upon receipt of shelter structures, U.S. Government shall perform inspection and make determination of level of refurbishment to pursue based on the damage, corrosion, and/or degradation of the shelter structure parts. Government shall communicate with contractor to agree on level of refurbishment to be performed.
Government shall have final authority on level of refurbishment. Shelter structures will be disassembled.
Shelter structures will be abrasive media blasted to remove all corrosion and other materials so that piece parts are bare metal. Damaged fasteners will be repaired or replaced. Corroded, pitted, and otherwise degraded parts will be repaired. Parts corroded or damaged beyond repair will be discarded and replaced with new parts. Parts will be chemical coated and painted. Shelter structure will be reassembled with all new hardware and gaskets.
3.1. Refurbishment Level/Tier Determination
The following sections describe the level of refurbishment at each tier. U.S. Government shall have final authority on level of refurbishment.
3.1.1. Tier #1
Complete replacement of both Shelters. Shelter structures are determined to be unsalvageable. Two completely new replacement Shelter Structure Assemblies (P/N 8493960) shall be provided to U.S.
Government as well as both original shelter structures. U.S. Government shall determine disposition of both original shelter structures.
3.1.2. Tier #2
Replace (4) Access Frames 8493964, 8494175, 8494176, and 8493969. Access Frames are determined to be unsalvageable and/or corroded beyond repair. Completely new Access Frames and associated attaching hardware shall be used to replace original Access Frames and attaching hardware. Remaining original shelter structure parts shall be media blasted, conversion coated, and painted in accordance with cited specifications. All original attaching hardware and gasketing shall be replaced with new hardware and gasketing. All components to be reused shall be free of holes and gouges, and shall be repaired IAW 3.6.
3.1.3. Tier #3
Refurbish complete Shelter replacing Hardware and Gasketing as required only. All shelter structure parts shall be media blasted, conversion coated, and painted in accordance with cited specifications. All attaching hardware, gasketing, and adhesives/sealants shall be replaced with new attaching hardware, gasketing, and adhesives/sealants. All components to be reused shall be free of holes and gouges, and shall be repaired
IAW 3.6.
3.2. Abrasive Blast Media
Vendor shall observe the condition of the paint and determine the appropriate abrasive blast media.
Abrasive blasting shall be performed in accordance with MIL-STD-1504 or SSPC SP 10 in order to remove corrosion, existing conversion coating, existing primer, existing paint, and other surface layers and contaminants prior to conversion coating. Abrasive blasting shall be completed to achieve surface roughness of 0.002 in to 0.004 in per ASTM D4417.
3.3. Chemical Coating
Conversion coating shall be performed in accordance with MIL-DTL-5541, Type II, Class IA on the following parts. Following the MIL-DTL-5541, Type II, Class IA chemical coating, masking for EMI gaskets IAW the TDP shall be accomplished on the following parts. Following masking, chemical coating shall be performed in accordance with MIL-A-8625, TYPE III, CLASS 1 on the following parts.
Part Number QTY Nomenclature
8493964 2 Front Frame
8494175 2 Rear Left Access Frame
8494176 2 Rear Right Access Frame
8493969 2 Rear Access Frame
8494098 2 Front Panel
8494173 2 Left Access Panel
8494172 2 Right Access Panel
8493962 2 Center Access Panel
7119776 2 Left RCS Panel
7119775 2 Right RCS Panel
8493968 2 Left Frame
8493967 2 Right Frame
8493965 4 Front Left/Right Frame
8493963 2 Center Left Frame
8493961 2 Center Right Frame
8494178 2 Base Cover
8494179 2 Base
8494184 2 Shelter Base
8494174 2 Top Frame
8494181 6 Top Lift Block
8493978 4 Shim
8494002 2 Frame Center Angle
8494003 16 Bracket
8494034 8 Lattice Bar
8494039 6 Connector Panel
8494097 16 Spacer
8494128 4 Mounting Block
8494180 4 Support Isolator
8494182 2 Center Right Panel
8494183 2 Center Left Panel
8494217 2 Block
8494218 16 Sandwich Plate
8494220 12 Load Share Bracket
8494221 4 Load Share Bracket
3.4. Primer and Paint
Following the conversion coating process, the contractor shall prime and paint the following parts in accordance with WI-WXMR-PNT-8493960.
Primer shall be applied in accordance with MIL-DTL-24441, Type IV, one coat dry film thickness 0.002 in.
min.
Topcoat shall be applied in accordance with MIL-PRF-24635 Type V, Class 2, Grade B, color Haze Gray
6270 per SAE AMS-STD-595, two coats dry film thickness 0.003 in min.
8494175 2 Rear Left Access Frame
8494176 2 Rear Right Access Frame
8493969 2 Rear Access Frame
8494098 2 Front Panel
8494173 2 Left Access Panel
8494172 2 Right Access Panel
8493962 2 Center Access Panel
7119776 2 Left RCS Panel
7119775 2 Right RCS Panel
8493968 2 Left Frame
8493967 2 Right Frame
8493965 4 Front Left/Right Frame
8493963 2 Center Left Frame
8493961 2 Center Right Frame
8494178 2 Base Cover
8494179 2 Base
8494184 2 Shelter Base
8494218 16 Sandwich Plate
8494097 16 Spacer
8494174 2 Top Frame
8494181 6 Top Lift Block
3.5. Material Handling
The Contractor must be capable of handling and transporting material measuring up to 52 in x 103 in x 7 in.
and weighing up to 2500 lbs. Contractor must be able to transport or provide transportation services between U.S. Government facilities and contractor facilities. Should parts be damaged during transportation, contractor assumes responsibility of correcting damage due to failure to properly protect parts during shipment.
3.6. Aluminum Repair Capabilities
The Contractor shall be capable of conforming to procedures NAS63540/1, NASM47196, A-A-59158 and
NASM33537 for threaded insert and captive retainer replacement on material sizes ranging from 0.3125 in to 1.25 in. All retainers (i.e. threaded inserts, captive retainers, threaded holes, etc.) shall be inspected for damage, corrosion or any other defects. If any retainers are damaged, corroded or otherwise defective, the contractor shall remove defective retainer(s) and replace with new retainer(s). Contractor shall be able to perform aluminum welding and repair in accordance with AWS D1.2. This repair capability will correspond to the refurbishment tiers mentioned in (3.1). The contractor shall perform aluminum repairs based on their determination of the condition of the shelter with regard to the tiered refurbishment requirements. Repairs shall be accomplished by welding and/or filling using aluminum putty compatible with 6061 aluminum alloys and the coatings referenced herein.
Welding shall be performed to fill larger holes that penetrate through the aluminum substrate. The contractor shall use welding to fill in holes. Following welding, sanding shall be performed on the weld(s) to ensure surface flatness in accordance with the TDP.
Aluminum filler shall be required to fill smaller holes or imperfections smaller than ¼” that do not penetrate through the aluminum substrate. The contractor shall use aluminum putty to fill in hole(s) and/or imperfection(s). Following filling and curing, sanding shall be performed on the filler to ensure surface flatness in accordance with the TDP.
3.7. Machining Capabilities
The Contractor shall be capable of machining any new shelters components and replacement panel(s) or frame(s) for the enclosure if needed. Parts shall be machined out of aluminum 6061-T651 or equivalent.
Aluminum material shall be in accordance with ASTM B209. The company shall have 5-axis CNC machine(s) capable of machining material up to 159 in x 125 in x 42 in.
3.8. Disassembly and Reassembly of Shelters
Based on evidence observed on systems in the fleet, it is expected that Part Numbers: 8493964, 8494175, 8494176, and 8493969 will be corroded beyond repair and require replacement during some refurbishments.
3.8.1. Disassembly
The Contractor shall receive empty shelter structures from NSWC Crane. The contractor shall disassemble the shelter structures down to their individual frames then begin the refurbishment process. The disassembly process shall consist of removal of all hardware (i.e. screws, washers, and nuts) securing frames to their adjoining frames.
3.8.2. Reassembly
Reassembly shall begin after the frames are inspected, repaired or replaced (if necessary), blasted, and coated and painted. Before reassembly, the contractor shall ensure that all threaded inserts, retainers, and rivets are all in acceptable condition before the contractor reassembles the shelter structures. During reassembly, the contractor shall apply necessary adhesives for reassembly of the shelter structures.
Reassembled shelter structures shall be in accordance with drawing number 8493960.
3.9. Replacement Consumables
The contractor shall purchase all consumables needed for antenna refurbishment. Contractor shall purchase all replacement hardware (i.e. bolts, washers, heli-coils, shims, etc.). Contractor shall purchase all chemicals and adhesives needed for shelter refurbishment. Contractor shall purchase all replacement gaskets needed for shelter refurbishment. Contractor shall purchase or manufacture replacement shims. Contractor shall implement the latest ECOs (Engineering Change Orders) to the shelter during refurbishment upon issuance of the Contract Modification incorporating ECO’s provided by the Government.
3.10. Stenciling
The contractor shall perform stenciling or labeling of all components once components are refurbished and have received their finished paint coating. The stenciling shall be in accordance with the drawing of the corresponding part. Stenciling shall be in accordance with MIL-STD-130 using epoxy ink per A-A-56032
Type I. Labels shall be in accordance with MIL-PRF-61002A, Grade A, Style 1, Composition C. The following parts below shall receive stenciling. Stenciling shall be in accordance to the latest revision of its corresponding part.
8494175 2 Rear Left Access Frame
8494176 2 Rear Right Access Frame
8493969 2 Rear Access Frame
8494098 2 Front Panel
8494173 2 Left Access Panel
8494172 2 Right Access Panel
8493962 2 Center Access Panel
7119776 2 Left RCS Panel
7119775 2 Right RCS Panel
8493968 2 Left Frame
8493967 2 Right Frame
8493965 4 Front Left/Right Frame
8493963 2 Center Left Frame
8493961 2 Center Right Frame
8494178 2 Base Cover
8494179 2 Base
8494184 2 Shelter Base
8494174 2 Top Frame
8494181 6 Top Lift Block
8493978 4 Shim
8494002 2 Frame Center Angle
8494403 16 Bracket
8494034 8 Lattice Bar
8494039 6 Connector Panel
8494097 16 Spacer
8494128 4 Mounting Block
8494180 4 Support Isolator
8494182 2 Center Right Panel
8494183 2 Center Left Panel
8494217 2 Block
8494218 16 Sandwich Plate
8494220 12 Load Share Bracket
8494221 4 Load Share Bracket
3.11. GFP (Government Furnished Property) Transportation
The U.S. Government shall be responsible for shipping GFP to the contractor facility. The vendor shall be able to transport GFP to NSWC Crane and package GFP per Packaging and Marking Guide for DoD via
“Level A” packing.
3.12. Quality Assurance (QA) Requirements.
If any component(s) is/are of unsatisfactory quality to the government, the vendor shall perform corrective actions to correct the unsatisfactory component(s) at no additional cost to the government.
3.12.1. Conversion Coated Components:
Verify conversion coat is in acceptable condition on all components conversion coated. Conversion coated components shall be free of any dirt, debris, or scratches. Then coat in accordance with MIL-A-8625, TYPE III, CLASS 1.
3.12.2. Painted Components:
IAW WI-WXMR-PNT-8493960 verify conversion coat, primer, and top-coat is in acceptable condition on all painted components. Verify paint coating applied is even and uniform and has no paint defects such as runs, blisters, and fish eyes. Verify integrity of coating, no gouges, scratches or any imperfections.
3.12.3. Stenciling:
Stencil in accordance with drawing number 8493960. Verify that the stenciling is the correct color. Check for legibility of the stencil, proper location of the stencil, and adherence to part. Verify correct part number and current revision of the part.
3.12.4. Retainers:
IAW drawing number 8493960 verify that all retainers are installed are free of corrosion or any “white powdery” debris, no visual damage to its internal threads, or show signs of being cross-threaded. Verify that all retainers are installed flush with the surface of the component that receives the retainer. Verify that no retainers spin with touch nor when tightening or loosening screws.
3.12.5. Shelter Structure:
Verify that the shelter structure is free of cracks, dings, dents, scratches, or scrapes. Verify that there are no loose, broken or missing hardware on the shelter structure. Verify that hardware is in good condition and does not show signs of being corroded, damaged, or illegally modified. Shelter structures shall not be missing any captive retainers or heli-coils. Verify that all gaskets on the access frames are properly cut to fit gasket grooves and are properly adherent to the access frames secured by appropriate adhesive. Verify that the paint is free of any defects, has good adherence and shows no signs of chipage, pelage or flakiness.
Verify that the enclosure is assembled and is in accordance to drawing number 8493960 Shelter Structure
Assembly.
3.13. Counterfeit Parts and Materiel
Counterfeit materiel is a serious threat to the safety and operational effectiveness of DoD systems. The
Contractor (and subcontractors at all tiers) shall implement a risk mitigation process when obtaining critical or high risk materiel in accordance with paragraphs (a) and (b) below:
(a) If the materiel is currently in production or currently available, the materiel shall be obtained only from authorized sources. Authorized sources are the original manufacturer, a source with the express written authority of the original manufacturer or current design activity, or an authorized aftermarket manufacturer.
(b) If the materiel is not in production or currently available from authorized sources, the materiel shall be obtained from suppliers that meet appropriate counterfeit avoidance criteria. Counterfeit avoidance criteria can be found in the following Industry Standards - SAE AS5553A; SAE AS6462; SAE AS6081; SAE
ARP6178; SAE AS6174A; and SAE AS6301.
Contractors shall notify the contracting officer when critical or high risk materiel cannot be obtained from an authorized source. The contractor shall take mitigating actions to authenticate the materiel if purchased from another source.
The contractor shall report instances of counterfeit and suspect counterfeit materiel to the Contracting
Officer and the Government-Industry Data Exchange Program (GIDEP) as soon as the contractor becomes aware of the issue.
3.14. Monthly Status Reports
The Contractor shall prepare and deliver a Contractor’s Progress and Status Report on a monthly basis to document progress and status of deliverables (CDRL A001). The Contractor shall conduct progress review teleconference meetings, as requested by the Government, after the delivery of the Monthly Progress and
Status Reports (CDRL A001).
4.0 Government Furnished Property / Government Furnished Information (GFI)
GFP and GFI may be required for completion of tasks under this SOW. The Government will provide all applicable program technical documentation and information to the contractor as GFI. This includes technical manuals, training materials and information, drawings, specifications, procedures, processes, and quality system documents required for the performance of engineering, logistics, and technical support.
Additional GFI will be provided as required or at the request of the contractor.
4.1. Procurement Integrated Enterprise Environment (PIEE) GFP Module Reporting &
Accountability
All Government Furnished Property is property of the U.S. Government and shall not be transferred to any individual or agency, public or private, without the express written approval of the originating Contracting
Officer except as required for the specific performance of tasks under this contract/order. Accountability for
Government Property under this contract/order shall be managed in accordance with FAR Part 45, DFARS
Part 245 and DFARS PGI Part 245 as well as the Government Property clauses in the contract/order whether acquired by the prime or subcontractors (Contractor Acquired Property), provided by the
Government, or received directly from another commercial source as a deliverable from a Government issued contract. Additional Government Property accountability requirements are outlined in the following
Directives and Instructions and shall be adhered to as applicable:
DoDI 4161.02, Accountability & Management of Government Contract Property
DoDM 4140.01, DoD Supply Chain Material Management Procedures: Material Returns, Retention and Disposition
DoDI 5000.64, Accountability & Management of DoD Equipment and Other Accountable Property
OPNAVINST 4440.26C, Operating Materials & Supplies and Government Furnished Material
Management
SECNAVINST 5200.43A, Government Furnished Property, Accountability and Management
NAVSEAINST 5200.15, General Equipment Accountability
4.1.1. Receipt Reporting: FAR 52.245-1(f)(1)(ii) requires the contractor to report receipt of all
GFP. Reporting of Government Furnished Property (DFARS 252.245-7005) and DoDI
4161.02, Accountability and Management of Government Contract Property Instruction requires that contractors, as part of the required receipt of any Government property, report to the DoD IUID Registry using WAWF, DLMS transactions, or direct update of the registry.
Contractors shall ensure appropriate accountable property records are maintained utilizing the data reported in the DoD IUID Registry and its integral GFP Module in the Procurement
Integrated Enterprise Environment (PIEE). At the time of reporting receipt of GFP in the GFP
Module, the contractor will also send an email notification to cran_gfpaccounta.fct@navy.mil to ensure the NSWC Crane Property Management Division is notified.
4.1.2. Shipping Notification: DoDI 4161.02 requires use of electronic transactions when transferring Government property to a contractor and upon return of property to DoD. The contractor shall use the GFP Module in PIEE when returning GFP back to the Government.
At the time of creating the shipping document to return GFP using the GFP Module, the contractor will also send an email notification to cran_gfpaccounta.fct@navy.mil to ensure the NSWC Crane Property Management Division is notified.
4.1.3. Lost, Damaged or Stolen GFP Reporting: FAR clause 52.245-1 requires the contractor to investigate and report to the Government all incidents of property loss as soon as the facts become known. DFARS 252.245-7005 further requires the contractor to report lost, damaged or stolen government property using the Property Loss functionality within the PIEE GFP
Module.
4.1.4. Excess Property Reporting: SECNAVINST 5200.43A requires unused or excess GFP be properly dispositioned as soon as the excess is identified without waiting for formal contract closeout processing. Recovering excess property from the contractor will be completed by the return of GFP back to the government via a DD-1149 or utilizing the GFP Module Plant
Clearance capability as soon as possible to ensure the property is available to fill other requirements and can potentially reduce the administrative costs of the contract. The
Government-appointed Plant Clearance Officer (PLCO) will accept or reject the request to excess GFP using the GFP Module Plant Clearance capability.
4.2. Inventory Reporting:
FAR 52.245-1 requires the contractor to periodically perform, record, and disclose physical inventory results. While the FAR clause does not define “periodically,” frequency of on-hand inventory count are in the Contract Data Requirements List (CDRL) A002 identified in this contract.
4.2.1. GFP Reporting: The contractor shall provide data deliverables IAW the listed CDRL A002 by contract and contract order number (if applicable) to provide accountability for all
Government furnished property that has been provided in support of the contract. The report shall include the fields required by the Data Item Description noted in CDRL A002, DFARS
252.245-7005, and DFARS PGI 245.103-72 for the purpose of accountability.
5.0 Technical Data Deliverables
CDRL: A001
DID Number: DI-MGMT-80368
DID Title: GOVERNMENT PROPERTY INVENTORY REPORT
Applicable SOW Para.: 4.2
CDRL: A002
DID Number: DI-MGMT-80441
DID Title: STATUS REPORT
Applicable SOW Para.: 3.14
6.0 Special Conditions
6.1. Place of Performance
Place of performance shall take place at the Contractor Facility.
File details come from the government source that posted it. Updated .