About this file

This is a Navy solicitation (N0016425RGP86) for a sole-source procurement of various connector types for submarine hydrophone systems, including Hydrophone/Thermistor Connectors, Hydrophone/Transducer Connectors, Thermistor Cable Connectors, and related components. The contract is an Indefinite-Delivery, Indefinite-Quantity (IDIQ) Firm-Fixed-Price agreement with a 5-year ordering period, covering multiple specific part numbers for the TR-333 Hydrophone Program and TRIDENT Navigation Subsystem.

Key procurement details include a contract ceiling between $150,000 and $2,500,000, with an initial delivery date of 120 days after each delivery order award. The solicitation requires a step-ladder pricing approach with different unit prices based on quantity ranges, and contractors must provide detailed cost/pricing proposals, historical cost data, and a Small Business Subcontracting Plan with a 5% goal for small disadvantaged business concerns. The procurement is managed by the Naval Surface Warfare Center Crane Division, with electronic proposal submissions due by the specified closing date.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

unt il 04:00 PM local time 23 May 2025

X

A X B X C X D

EX

X

G F 50 - 61

62 - 69 H timothy .w.kinder.civ@us.navy .mil

RATING PAGE OF PAGES

7. ISSUED BY

(Dat e)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other aut horized official writt en not ice.

Previous Ed ition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

DX-A7 1 69

(If other t han Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

N00164 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and 1 copies for furnishing the supplies or services in t he Schedule will be received at t he place specified in Item 8, or if handcarried, in the depository locat ed in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all t erms and conditions contained in t his solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

TIMOTHY W. KINDER 812-854-5703

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

2 - 7

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

8 - 16 17 - 19

J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

20 - 21

X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 23 - 31 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if t he solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within t he time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to t he SOLICITATION for offerors and related documents numbered and dat ed):

FACILITY

12. In compliance with the above, t he undersigned agrees, if this offer is accept ed within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Cont ract ing Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copi es unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIONS AND INSTRUCTIONS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

32 - 48

PART II - CONTRACT CLAUSES

NAVAL SURFACE WARFARE CENTER CRANE DIV

T. KINDER (812-854-5703)

BLDG 3373

300 HWY 361

CRANE IN 47522- 5001

812-854-5703

FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicita tions "off er" and "off eror" m ean "bid" and "bidder ".

SOLICITATION

6. REQUISITION/PURCHASE NO.5. DATE ISSUED

23 Apr 2025

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

N0016425RGP86

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES MAX QTY U/I UNIT PRICE MAX AMOUNT

0001 Hydrophone/Thermistor

Connector

UNDEFINED Each

P/N 6933107-201. Hydrophone/Thermistor Connector is to be manufactured In Accordance With the Statement of Work (SOW) and Drawing 6933107-201.

PSC: 5845

FOB: Destination

FFP

0002 FMS Hydrophone/Thermistor

P/N 6933107-201. FMS Hydrophone/Thermistor Connector is to be manufactured In Accordance With the Statement of Work (SOW) and Drawing 6933107-201.

0003 Thermistor Cable Connector

P/N 6933108-201. Thermistor Cable Connector is to be manufactured is to be manufactured In Accordance With the Statement of Work (SOW) and Drawing 6933108-201.

0004 FMS Thermistor Cable

P/N 6933108-201. FMS Thermistor Cable Connector is to be manufactured In Accordance With the Statement of Work (SOW) and Drawing 6933108-201.

0005 Hydrophone/Transducer

P/N 6933108-202. Hydrophone/Transducer Connector is to be manufactured In Accordance With the Statement of Work (SOW) and Drawing 6933108-202.

0006 FMS Hydrophone/Transducer

P/N 6933108-202. FMS Hydrophone/Transducer Connector is to be manufactured In Accordance With the Statement of Work (SOW) and Drawing 6933108-202.

0007 Transducer Cable Connector UNDEFINED Each

P/N 6933109-201. Transducer Cable Connector is to be manufactured In Accordance With the Statement of

Work (SOW) and Drawing 6933109-201.

0008 FMS Transducer Cable

P/N 6933109-201. FMS Transducer Cable Connector is to be manufactured In Accordance With the Statement of Work (SOW) and Drawing 6933109-201.

0009 Hydrophone Connector

P/N 6029162-203. Hydrophone Connector is to be manufactured In Accordance With the Statement of Work (SOW) and Drawing 6029162-203.

0010 FMS Hydrophone Connector

P/N 6029162-203. FMS Hydrophone Connector is to be manufactured In Accordance With the Statement of Work (SOW) and Drawing 6029162-203.

0011 DATA

UNDEFINED Lot

Technical Data Requirements for CLINs 0001-0010 In Accordance With the Statement of Work (SOW) CDRLs A001 through A005 provided in Section J, and applicable DIDs. The price/costs for all technical data generated by the Contractor directly or indirectly in its performance of this procurement effort is included in the price/costs paid by the Government under CLINs 0001 through 0010. The Government shall have unlimited data rights to all data/Tech data generated In Accordance With DFARS 252.227-7013 unless an assertion is provided and accepted by the Government with the offer In Accordance With DFARS 252.227-7017.

0012 Contract Ceiling

This CLIN is only utilized to populate the contract ceiling. No orders shall be placed against this CLIN.

IDC CONSTRAINTS

CONTRACT MINIMUM/MAXIMUM QUANTITY AND CONTRACT VALUE

The minimum quantity and contract value for all orders issued against this contract shall not be less than the minimum quantity and contract value stated in the following table. The maximum quantity and contract value for all orders issued against this contract shall not exceed the maximum quantity and contract value stated in the following table.

MINIMUM MINIMUM MAXIMUM MAXIMUM

QUANTITY AMOUNT QUANTITY AMOUNT

$150,000.00 $2,500,000.00

STEP LADDER PRICING

For purposes of determining the unit price on delivery orders, the total quantities of CLIN 0001 & 0002, 0003 & 0004, 0005 & 0006, 0007 & 0008, and 0009 & 0010 respectively shall be used. For example, if 79 each of CLIN 0001 and 22 each of CLIN 0002 are ordered the combined quantity is 101 each of the Hydrophone/Thermistor P/N 6933107-201.

For purposes of funding CLINs 0001 to 0010, all odd numbers are for U.S. and all even numbers are for FMS.

PRICING TABLE: Hydrophone/Thermistor Connector (P/N 6933107-201) - CLINs 0001 & 0002

Quantity Range Unit Price:

Year 1

Unit Price:

Year 2

Unit Price:

Year 3

Unit Price:

Year 4

Unit Price:

Year 5

1-10

11-20

21-50

51+

PRICING TABLE: Thermistor Cable Connector (P/N 6933108-201) - CLINs 0003 & 0004

Year 1

Unit Price:

Year 2

Unit Price:

Year 3

Unit Price:

Year 4

Unit Price:

Year 5

1-6

7-25

26+

PRICING TABLE: Hydrophone/Transducer Connector (P/N 6933108-202) - CLINs 0005 & 0006

Year 1

Unit Price:

Year 2

Unit Price:

Year 3

Unit Price:

Year 4

Unit Price:

Year 5

1-5

6-15

16-35

36-95

96+

PRICING TABLE: Transducer Cable Connector (P/N 6933109-201) - CLINs 0007 & 0008

Year 1

Unit Price:

Year 2

Unit Price:

Year 3

Unit Price:

Year 4

Unit Price:

Year 5

1-4

5-8

9+

PRICING TABLE: Hydrophone Connector (P/N 6029162-203) - CLINs 0009 & 0010

Year 1

Unit Price:

Year 2

Unit Price:

Year 3

Unit Price:

Year 4

Unit Price:

Year 5

1-25

26-50

51+

Pricing Tables to be completed by Offeror

Year 1 Ordering Period: Date of Award to 12 Months After Award* Year 2 Ordering Period: 12 Months After Award to 24 Months After Award* Year 3 Ordering Period: 24 Months After Award to 36 Months After Award* Year 4 Ordering Period: 36 Months After Award to 48 Months After Award* Year 5 Ordering Period: 48 Months After Award to 60 Months After Award*

*Actual dates will be included in the award document.

Section C - Descriptions and Specifications

STATEMENT OF WORK (SOW)

MANUFACTURE OF

HYDROPHONE CONNECTORS, HYDROPHONE/THERMISTOR CONNECTORS, THERMISTOR

CONNECTORS, HYDROPHONE/TRANSDUCER CONNECTORS, AND TRANSDUCER CONNECTORS

1.0 SCOPE

This Statement of Work (SOW) sets forth the requirements for the manufacture of Hydrophone/Thermistor Connectors Drawing 6933107-201, Thermistor Cable Connectors Drawing 6933108-201, Hydrophone/Transducer Connectors Drawing 6933108-202, Transducer Cable Connectors Drawing 6933109-201, and Hydrophone Connectors Drawing 6029162-203 for the TR-333 Hydrophone Program, TR-333 Hydrophone Cables, Thermistor Cables, and Transducer cables for Strategic Systems Program (SSP), SP24 Navigation Subsystem, under the cognizance of Naval Surface Warfare Center, Crane Division (NSWC Crane).

1.1 Background

Hydrophone/Thermistor Connectors Drawing 6933107-201, Thermistor Cable Connectors Drawing 6933108-201, Hydrophone/Transducer Connectors Drawing 6933108-202, Transducer Cable Connectors Drawing 6933109-201, and Hydrophone Connectors Drawing 6029162-203, are critical components required in the manufacture and repair of the SP24 TR-333 Hydrophones, TR-333 Hydrophone Cables, Thermistor Cables, and Transducer cables currently deployed in the TRIDENT Submarine Fleet. They are to be used as replacement assets during normal refit/replenish/replacement operations for the TRIDENT Navigation Subsystem Sonar on the TR-333 Hydrophone, TR-143 Transducer and the Thermistor sensors.

2.0 APPLICABLE DOCUMENTS

The following documents are applicable to this effort and will be provided to the Contractor as Government Furnished Information (GFI). In the event of conflict between the drawing and this SOW, the drawing shall take precedence.

Drawing 6933107-201, Hydrophone/Thermistor Connectors Drawing 6933108-201, Thermistor Cable Connectors Drawing 6933108-202, Hydrophone/Transducer Connectors Drawing 6933109-201, Transducer Cable Connectors Drawing 6029162-203, Hydrophone Connectors

3.0 REQUIREMENTS

3.1 Production and Fabrication

The Contractor shall furnish equipment, tools, material, and labor necessary to manufacture Hydrophone/Thermistor Connectors, Thermistor Cable Connectors, Hydrophone/Transducer Connectors, Transducer Cable Connectors, and Hydrophone Connectors as noted herein.

3.2 Production Test and Inspection

The Contractor shall provide inspection data for each connector. (CDRL A001)

3.3 Source Inspection for Connectors

Trident Program Source Surveillance inspection is required for Hydrophone/Thermistor Connectors Drawing 6933107-201, Thermistor Cable Connectors Drawing 6933108-201, Hydrophone/Transducer Connectors Drawing 6933108-202, Transducer Cable Connectors Drawing 6933109-201, and Hydrophone Connectors Drawing 6029162-203. Preliminary inspection performed by Lockheed Martin as SSP Prime Contractor source inspection is required prior to shipment from the Contractor facility. Contact Lockheed Martin NE&SS Mitchell Field Quality Department at 516-228-2997 at least five (5) days prior to when material will be ready for source inspection.

Product acceptance or rejection shall be designated by a Lockheed Martin Quality Representative on a Vendor Quality Audit/Acceptance Report (VQAAR form UC603). A copy of the acceptance report shall be included in each shipment (CDRL A002).

3.4 Certificate of Compliance

The Contractor shall generate and submit Certificates of Compliance to the Government with each shipment of connectors. (CDRL A003)

3.5 Technical Report–Study/Services

Any change in material, change in manufacturing processes and procedures, or plant location shall be reported.

(CDRL A004)

4.0 TECHNICAL DATA

All data deliverables shall be submitted to the referenced address stated on the DD Form 1423, Contract Data Requirements List (CDRL). All CDRL data files shall be accessible by one or more of the following applicable programs: MS Office - Word, Excel, and PowerPoint format. The CDRLs for this procurement are as follows:

CDRL: A001

DID Number: DI-MISC- 80508B DID Title: Technical Report-Study/Services (Production Test and Inspection Report) Applicable SOW Paragraph: 3.2

CDRL: A002

DID Number: DI-MISC-80508B DID Title: Technical Report-Study/Services (VQAAR) Applicable SOW Paragraph 3.3

CDRL: A003

DID Number: DI-MISC-81356A DID Title: Certificate of Compliance Applicable SOW Paragraph: 3.4

CDRL: A004

DID Number: DI-MISC-80508B DID Title: Technical Report-Study/Services (Material and Manufacturing Changes) Applicable SOW Paragraph: 3.5

CDRL: A005

DID Number: DI-MGMT-80061A NOT 2 DID Title: Engineering and Technical Services Accomplishment Report (Accomplishment Report) Applicable SOW Paragraph: 5.3

5.0 SPECIAL CONDITIONS/REQUIREMENTS

5.1 Shipping Quantity Preference

NSWC Crane prefers received shipping quantity totals to be greater than 25 each if possible.

5.2 Operations Security (OPSEC)

The Contractor shall protect critical information associated with this contract to prevent unauthorized disclosure.

Public Release of Information: DoD policy that a security and policy review will be performed on all official DoD information intended for public release that pertains to military matters, national security issues, or subjects of significant concern to the DoD. Proposed public releases shall be submitted to the Government’s Contracting Officer for review and approval prior to release.

5.3 Wide Area Workflow (WAWF) Submittal Notification

Prior to each WAWF submittal, the Contractor shall communicate via email to Requiring Technical Activity (RTA)/Technical Point of Contact (TPOC) the contract number, delivery order number, CLIN, and quantities for the WAWF submittal. (CDRL A005)

5.4 Inspection Allotment

NSWC Crane requires a 45-day allotment to complete inspection once received at NSWC Crane.

5.5 Place of Performance

The place of performance shall be the Contractor’s facility. The period of performance shall be as indicated in the contract.

CLAUSES INCORPORATED BY FULL TEXT

C-202-H001 ADDITIONAL DEFINITIONS–BASIC (NAVSEA) (OCT 2018)

(a) Department - means the Department of the Navy.

(b) Commander, Naval Sea Systems Command - means the Commander of the Naval Sea Systems Command of the Department of the Navy or his duly appointed successor.

(c) References to The Federal Acquisition Regulation (FAR) - All references to the FAR in this contract shall be deemed to also reference the appropriate sections of the Defense FAR Supplement (DFARS), unless clearly indicated otherwise.

(d) National Stock Numbers - Whenever the term Federal Item Identification Number and its acronym FIIN or the term Federal Stock Number and its acronym FSN appear in the contract, order or their cited specifications and standards, the terms and acronyms shall be interpreted as National Item Identification Number (NIIN) and National Stock Number (NSN) respectively which shall be defined as follows:

(1) National Item Identification Number (NIIN). The number assigned to each approved Item Identification under the Federal Cataloging Program. It consists of nine numeric characters, the first two of which are the National Codification Bureau (NCB) Code. The remaining positions consist of a seven digit non-significant number.

(2) National Stock Number (NSN). The National Stock Number (NSN) for an item of supply consists of the applicable four-position Federal Supply Class (FSC) plus the applicable nine-position NIIN assigned to the item of supply.

(End of text)

C-204-H001 USE OF NAVY SUPPORT CONTRACTORS FOR OFFICIAL CONTRACT FILES (NAVSEA)

(OCT 2018)

(a) NAVSEA may use a file room management support contractor, hereinafter referred to as "the support contractor", to manage its file room, in which all official contract files, including the official file supporting this procurement, are retained. These official files may contain information that is considered a trade secret, proprietary, business sensitive or otherwise protected pursuant to law or regulation, hereinafter referred to as “protected information”. File room management services consist of any of the following: secretarial or clerical support; data entry; document reproduction, scanning, imaging, or destruction; operation, management, or maintenance of paper-based or electronic mail rooms, file rooms, or libraries; and supervision in connection with functions listed herein.

(b) The cognizant Contracting Officer will ensure that any NAVSEA contract under which these file room management services are acquired will contain a requirement that:

(1) The support contractor not disclose any information;

(2) Individual employees are to be instructed by the support contractor regarding the sensitivity of the official contract files;

(3) The support contractor performing these services be barred from providing any other supplies and/or services, or competing to do so, to NAVSEA for the period of performance of its contract and for an additional three years thereafter unless otherwise provided by law or regulation; and,

(4) In addition to any other rights the contractor may have, it is a third party beneficiary who has the right of direct action against the support contractor, or any person to whom the support contractor has released or disclosed protected information, for the unauthorized duplication, release, or disclosure of such protected information.

(c) Execution of this contract by the contractor is considered consent to NAVSEA's permitting access to any information, irrespective of restrictive markings or the nature of the information submitted, by its file room management support contractor for the limited purpose of executing its file room support contract responsibilities.

(d) NAVSEA may, without further notice, enter into contracts with other contractors for these services. Contractors should enter into separate non-disclosure agreements with the file room contractor. Contact the Procuring Contracting Officer for contractor specifics. However, any such agreement will not be considered a prerequisite before information submitted is stored in the file room or otherwise encumber the government.

C-211-H016 SPECIFICATIONS AND STANDARDS (NAVSEA) (OCT 2018)

(a) Definitions.

(i) A "zero-tier reference" is a specification, standard, or drawing that is cited in the contract (including its attachments).

(ii) A "first-tier reference" is either: (1) a specification, standard, or drawing cited in a zero-tier reference, or (2) a specification cited in a first-tier drawing.

(b) Requirements. All zero-tier and first-tier references, as defined above, are mandatory for use. All lower tier references shall be used for guidance only unless specifically identified below.

None

C-211-H017 UPDATING SPECIFICATIONS AND STANDARDS (NAVSEA) (DEC 2018)

The contractor may request that this contract be updated to include the current version of the applicable specification or standard if the update does not affect the form, fit or function of any deliverable item or increase the cost/price of the item to the Government. The contractor should submit update requests to the Procuring Contracting Officer with copies to the Administrative Contracting Officer and cognizant program office representative for approval. The contractor shall perform the contract in accordance with the existing specifications and standards until notified of approval/disapproval of its request to update by the Procuring Contracting Officer. Any approved alternate specifications or standards will be incorporated into the contract.

C-211-H018 APPROVAL BY THE GOVERNMENT (NAVSEA) (JAN 2019)

Approval by the Government as required under this contract and applicable specifications shall not relieve the Contractor of its obligation to comply with the specifications and with all other requirements of the contract, nor shall it impose upon the Government any liability it would not have had in the absence of such approval.

C-223-H003 EXCLUSION OF MERCURY (NAVSEA) (MAR 2019)

(a) Definitions. As used in this text:

Article means a manufactured item other than a fluid or particle: (i) which is formed to a specific shape or design during manufacture; (ii) which has end use function(s) dependent in whole or in part upon its shape or design during end use; and (iii) which under normal conditions of use does not release more than very small quantities, e.g., minute or trace amounts of a hazardous chemical, and does not pose a physical hazard or health risk to employees.

Boundary of containment means a continuous tight seal (barrier) to prevent the release of functional mercury during normal operation and maintenance. Examples include the exterior of a fluorescent lamp, glass capsule of a mercury switch, and container for mercury reagents. A double boundary of containment consists of two independent seals.

Functional mercury means mercury or mercury compound(s) contained in equipment that is required for the equipment to operate properly, such as that found in mercury switches, fluorescent lamps, flat-panel monitors, thermostats, thermostat probes, small coin type batteries, barometers, and dental amalgams.

Hardware means any article, container, piece of material, individual part, subassembly, assembly, component, or system to which mercury control requirements apply.

Mercury-free means hardware that does not contain functional mercury and is not contaminated by mercury or mercury compounds.

Portable means items that are frequently transported during normal operation. Desk lamps, shop lights, and hand-held instruments are considered portable, while bulbs in stationary light fixtures are not. In general, items that require transport only during maintenance, installation, and removal of the items are not considered portable.

(b) The Contractor, and all subcontractors and vendors, shall ensure that mercury or mercury containing compounds are not intentionally added to, or come in direct contact with, hardware or supplies furnished under this contract.

(1) The Contractor shall ensure that mercury and mercury compounds are not taken onboard naval vessels by Contractor, subcontractor, or vendor personnel except for functional mercury used in batteries, dental amalgams, fluorescent lamps, flat-panel monitors, required instruments, sensors or controls, weapon systems, and chemical analysis reagents specified by the Naval Sea Systems Command (NAVSEA).

(2) Portable fluorescent lamps and portable instruments containing elemental mercury must be shock-proof in accordance with MIL-DTL-901E entitled Requirements for Shock Tests, H.I. (High Impact) Shipboard Machinery, Equipment, and Systems and have mercury enclosed by a double boundary of containment. Some devices with liquid crystal display (LCD) screens utilize a fluorescent bulb backlight to illuminate the LCD screen.

No additional restrictions or controls apply to devices with LCD screens; however, the Contractor shall remove the LCD screen and seal it in plastic following any evidence that the backlight failed.

(3) For Submarines, any use of mercury containing items must be approved as required by the Nuclear Powered Submarine Atmosphere Control Manual (S9510-AB-ATM-010/U) Volume 1.

(4) The Contractor shall ensure that mercury and mercury compounds do not contact hardware surfaces in systems covered by NAVSEA Manual NAVSEA 0989-064-3000 entitled Cleanliness Requirements for Nuclear Propulsion Plant Maintenance and Construction, submarine air systems, level I systems per NAVSEA Publication 0948-LP-045-7010, NAVSEA Material Control Standard, or the submarine safety program (SUBSAFE) surfaces during maintenance or repair. Such hardware is designated as mercury-free. The Contractor shall ensure that all other hardware that could be structurally degraded by contamination with elemental mercury or reactive mercury compounds is separated from it by sufficient distance, or boundaries of containment that effectively prevents contact in all but the most extreme circumstances.

(5) The Contractor shall check any hardware surfaces in the above systems which are known or suspected to have come in contact with mercury or mercury compounds for evidence of structural degradation and external mercury contamination. The existence of external mercury contamination can be determined following MIL-STD- 2041D entitled Control of Detrimental Materials.

(6) The presence of mercury in a product may be determined by checking product labeling on material safety data sheets or safety data sheets. Chemical analysis is not required.

(7) The Contractor shall dispose of any mercury and mercury compounds in accordance with OPNAV Manual (OPNAV M-5090.1) entitled Environmental Readiness Program Manual of 10 January 2014.

(8) If the use of mercury or mercury compounds cannot be avoided, a risk assessment and waiver request, if required, must be performed and submitted per the NAVSEA Hazardous Material Avoidance Process (T9070-AL- DPC-020/077-2). For systems covered by the NAVSEA Manual NAVSEA 0989-064-3000 entitled Cleanliness Requirements for Nuclear Propulsion Plant Maintenance and Construction, submit the risk assessment and waiver request, if required to Nuclear Propulsion (NAVSEA 08).

(c) In all cases where mercury or a mercury compound has contacted hardware surfaces required to be mercury-free the Contractor shall immediately provide a report to the NAVSEA Dry Environmental Systems and Hazardous Materials (NAVSEA 05P5) via the cognizant contract administration safety office. Reports concerning systems covered by NAVSEA Manual 0989-064-3000 must include NAVSEA Nuclear Propulsion Directorate (SEA 08) in the distribution. Reports must be in letter form and include the date and details of the contact, the surfaces contacted, the recovery actions taken, and the status of the affected surfaces.

(End of Text)

C-227-H006 DATA REQUIREMENTS (NAVSEA) (OCT 2018)

The data to be furnished hereunder shall be prepared in accordance with the Contract Data Requirements List, DD Form 1423, Exhibit(s) A, attached hereto.

C-233-H001 DOCUMENTATION OF REQUESTS FOR EQUITABLE ADJUSTMENT--BASIC (NAVSEA) (OCT 2018)

(a) For the purposes of this special contract requirement, the term "change" includes not only a change that is made pursuant to a written order designated as a "change order" but also (1) an engineering change proposed by the Government or by the Contractor and (2) any act or omission to act on the part of the Government in respect of which a request is made for equitable adjustment.

(b) Whenever the Contractor requests or proposes an equitable adjustment of $100,000 or more per vessel in respect to a change made pursuant to a written order designated as a "change order" or in respect to a proposed engineering change and whenever the Contractor requests an equitable adjustment in any amount in respect to any other act or omission to act on the part of the Government, the proposal supporting such request shall contain the following information for each individual item or element of the request:

(1) A description (i) of the work required by the contract before the change, which has been deleted by the change, and (ii) of the work deleted by the change which already has been completed. The description is to include a list of components, equipment, and other identifiable property involved. Also, the status of manufacture, procurement, or installation of such property is to be indicated. Separate description is to be furnished for design and production work.

Items of raw material, purchased parts, components and other identifiable hardware, which are made excess by the change and which are not to be retained by the Contractor, are to be listed for later disposition;

(2) Description of work necessary to undo work already completed which has been deleted by the change;

(3) Description of work not required by the terms hereof before the change, which is substituted or added by the change. A list of components and equipment (not bulk materials or items) involved should be included. Separate descriptions are to be furnished for design work and production work;

(4) Description of interference and inefficiencies in performing the change;

(5) Description of each element of disruption and exactly how work has been, or will be disrupted:

(i) The calendar period of time during which disruption occurred, or will occur;

(ii) Area(s) aboard the vessel where disruption occurred, or will occur;

(iii) Trade(s) disrupted, with a breakdown of manhours for each trade;

(iv) Scheduling of trades before, during, and after period of disruption;

(v) Description of measures taken to lessen the disruptive effect of the change;

(6) Delay in delivery attributable solely to the change;

(7) Other work attributable to the change;

(8) Supplementing the foregoing, a narrative statement of the direct "causal" relationship between any alleged Government act or omission and the claimed consequences therefor, cross-referenced to the detailed information provided as required above; and

(9) A statement setting forth a comparative enumeration of the amounts "budgeted" for the cost elements, including the material costs, labor hours and pertinent indirect costs, estimated by the Contractor in preparing its initial and ultimate proposal(s) for this contract, and the amounts claimed to have been incurred and/or projected to be incurred corresponding to each such "budgeted cost" elements.

(c) Each proposal in excess of $100,000 submitted in support of a claim for equitable adjustment under any requirement of this contract shall, in addition to the information required by paragraph (b) hereof, contain such information as the Contracting Officer may require with respect to each individual claim item.

(d) It is recognized that individual claims for equitable adjustment may not include all of the factors listed in paragraph

(b) above. Accordingly, the Contractor is required to set forth in its proposal information only with respect to those factors which are comprehended in the individual claim for equitable adjustment. In any event, the information furnished hereunder shall be in sufficient detail to permit the Contracting Officer to cross-reference the claimed increased costs, or delay in delivery, or both, as appropriate, submitted pursuant to paragraph (c) of this requirement, with the information submitted pursuant to paragraph (b) hereof.

C-242-H001 EXPEDITING CONTRACT CLOSEOUT (NAVSEA) (OCT 2018)

(a) As part of the negotiated fixed price or total estimated amount of this contract, both the Government and the Contractor have agreed to waive any entitlement that otherwise might accrue to either party in any residual dollar amount of $1,000 or less at the time of final contract closeout. The term "residual dollar amount" shall include all money that would otherwise be owed to either party at the end of the contract, except that, amounts connected in any way with taxation, allegations of fraud and/or antitrust violations shall be excluded. For purposes of determining residual dollar amounts, offsets of money owed by one party against money that would otherwise be paid by that party may be considered to the extent permitted by law.

(b) This agreement to waive entitlement to residual dollar amounts has been considered by both parties. It is agreed that the administrative costs for either party associated with collecting such small dollar amounts could exceed the amount to be recovered.

C-245-H005 INFORMATION AND DATA FURNISHED BY THE GOVERNMENT--ALTERNATE I

(NAVSEA) (MAY 2019)

(a) Contract Specifications, Drawings and Data. The Government will furnish, if not included as an attachment to the contract, any unique contract specifications or other design or alteration data cited or referenced in Section C.

(b) Government Furnished Information (GFI). GFI is defined as that information essential for the installation, test, operation, and interface support of all Government Furnished Material identified in an attachment in Section J. The Government shall furnish only the GFI identified in an attachment in Section J. The GFI furnished to the contractor need not be in any particular format. Further, the Government reserves the right to revise the listing of GFI as follows:

(1) The Contracting Officer may at any time by written order:

(i) delete, supersede, or revise, in whole or in part, data identified in an attachment in Section J; or

(ii) add items of data or information to the attachment identified in Section J; or

(iii) establish or revise due dates for items of data or information in the attachment identified in Section J.

(2) If any action taken by the Contracting Officer pursuant to subparagraph (1) immediately above causes an increase or decrease in the costs of, or the time required for, performance of any part of the work under this contract, the contractor may be entitled to an equitable adjustment in the contract amount and delivery schedule in accordance with the procedures provided for in the "CHANGES" clause of this contract.

(c) Except for the Government information and data specified by paragraphs (a) and (b) above, the Government will not be obligated to furnish the Contractor any specification, standard, drawing, technical documentation, or other publication, notwithstanding anything to the contrary in the contract specifications, the GFI identified in an attachment in Section J, the clause of this contract entitled "Government Property" (FAR 52.245-1) or "Government Property Installation Operation Services" (FAR 52.245-2), as applicable, or any other term or condition of this contract. Such referenced documentation may be obtained:

(1) From the ASSIST database via the internet at https://assist.dla.mil/online/start/; or

(2) By submitting a request to the

Department of Defense Single Stock Point (DoDSSP) Building 4, Section D

700 Robbins Avenue Philadelphia, Pennsylvania 19111-5094 Telephone (215) 697-6396 Facsimile (215) 697-9398.

Commercial specifications and standards, which may be referenced in the contract specification or any sub-tier specification or standard, are not available from Government sources and should be obtained from the publishers.

C-247-H001 PERMITS AND RESPONSIBILITIES (NAVSEA) (DEC 2018)

The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits for complying with any applicable Federal, State, and Municipal laws, codes, and regulations for shipping and transportation including, but not limited to, any movement over public highways of overweight/over dimensional materials.

Section D - Packaging and Marking

D-211-H001 PACKAGING OF DATA (NAVSEA) (FEB 2022)

Data to be delivered by Integrated Digital Environment (IDE) or other electronic media shall be as specified in the contract.

All unclassified data to be shipped shall be prepared for shipment in accordance with best commercial practice.

Classified reports, data, and documentation shall be prepared for shipment in accordance with National Industrial Security Program Operating Manual (NISPOM), 32 CFR Part 117.

D-211-H004 IDENTIFICATION MARKING OF PARTS--BASIC (NAVSEA) (OCT 2018)

For all parts not subject to the marking requirements in DFARS 252.211-7003 – Item Unique Identification and Valuation, marking shall be accomplished in accordance with the following:

(1) Parts shall be marked in accordance with generally accepted commercial practice.

(2) In cases where parts are so small as not to permit identification marking as provided above, such parts shall be appropriately coded so as to permit ready identification.

D-246-H002 WARRANTY NOTIFICATION FOR ITEM(S) 0001 TO 0010 —BASIC (NAVSEA) (OCT 2018)

The Contractor shall apply a permanent warranty notification stamping or marking on each warranted deliverable end item and its container. The notification shall be placed in close proximity to other required stamping or markings so as to be easily readable by personnel. The warranty notification shall read:

THIS ITEM WARRANTED UNDER CONTRACT TBD AT TIME OF AWARD TO CONFORM TO

DESIGN, MANUFACTURING, AND PERFORMANCE REQUIREMENTS AND BE FREE FROM

DEFECTS IN MATERIAL AND WORKMANSHIP FOR TBD AT TIME OF AWARD FROM DATE

OF ACCEPTANCE. IF ITEM IS DEFECTIVE NOTIFY TBD AT TIME OF AWARD AND PCO.

D-247-H001 ADDITIONAL MARKING REQUIREMENTS FOR FMS ITEMS (NAVSEA) (OCT 2018)

(a) The following identifying marks shall appear on the outside of each box, parcel and/or crate and all shipping papers included in each shipment:

NAVY

FMS CASE UZ-P-BAR

REQUISITION NO. TBD at time of the individual delivery order level (ERP PR Number) ITEM DESCRIPTION TBD at time of the individual delivery order level

If a consolidated shipment of several items in one container is forwarded, add to the above information

"CONSOLIDATED SHIPMENT, CONTAINS ____ ITEMS".

(b) The inscription "UNITED STATES OF AMERICA" shall be affixed in a suitable size indelible stencil, label or printed form on all external shipping containers or the exterior surface of uncrated items.

(c) All invoices, correspondence, reports and other documents shall be identified with the appropriate FMS case designator, requisition number(s), and item description(s).

D-247-H002 PACKAGING OF SUPPLIES—BASIC (NAVSEA) (DEC 2020)

Item(s) 0001 through 0010 The supplies furnished hereunder shall be packaged in accordance with ASTM-D-3951-18, Standard Practice for Commercial Packing.

D-247-H004 MARKING AND PACKING LIST(S) – BASIC (NAVSEA) (FEB 2022)

(a) Marking. Shipments, shipping containers and palletized unit loads shall be marked in accordance with ASTM- D-3951-18 approved 1 May 2018, Standard Practice for Commercial Packing.

(b) Packing List(s). A packing list (DD Form 250 Material Inspection and Receiving Report may be used) identifying the contents of each shipment, shipping container or palletized unit load shall be provided by the Contractor with each shipment. When a contract line item identified under a single stock number includes an assortment of related items such as kit or set components, detached parts or accessories, installation hardware or material, the packing list(s) shall identify the assorted items. Where assortment of related items is included in the shipping container, a packing list identifying the contents shall be furnished.

(c) Master Packing List. In addition to the requirements in paragraph (b) above, a master packing list shall be prepared where more than one shipment, shipping container or palletized unit load comprise the contract line item being shipped. The master packing list shall be attached to the number one container and so identified.

(d) Part Identification. All items within the kit, set, installation hardware or material shall be suitably segregated and identified within the unit pack(s) or shipping container by part number and/or national stock number.

D-247-W001 PROHIBITED PACKING MATERIALS (NAVSEA) (OCT 2018)

The use of asbestos, excelsior, newspaper or shredded paper (all types including waxed paper, computer paper and similar hygroscopic or non-neutral material) is prohibited. In addition, the use of yellow wrapping or packaging material is prohibited except where used for the containment of radioactive material. Loose fill polystyrene is prohibited for shipboard use.

Section E - Inspection and Acceptance

INSPECTION NOTE

Inspection and Acceptance of Data under CLIN 0011 shall be in accordance with CDRLs A001 through A005 provided as Exhibit A to this Solicitation.

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Origin Contractor Destination Government 0002 Origin Contractor Destination Government 0003 Origin Contractor Destination Government 0004 Origin Contractor Destination Government 0005 Origin Contractor Destination Government 0006 Origin Contractor Destination Government 0007 Origin Contractor Destination Government 0008 Origin Contractor Destination Government 0009 Origin Contractor Destination Government 0010 Origin Contractor Destination Government 0011 Origin Contractor Destination Government 0012 Origin Contractor Destination Government

INSPECTION NOTE

Source Inspection is to be performed by Lockheed Martin in accordance with Statement of Work (SOW) paragraph 3.3.

CLAUSES INCORPORATED BY REFERENCE

52.246-2 Inspection Of Supplies--Fixed Price AUG 1996 52.246-4 Inspection Of Services--Fixed Price AUG 1996 52.246-15 Certificate of Conformance APR 1984 52.246-16 Responsibility For Supplies APR 1984

E-246-H013 INSPECTION AND ACCEPTANCE OF DATA (NAVSEA) (OCT 2018)

Inspection and acceptance of all data shall be as specified on the attached Contract Data Requirements List(s), DD Form 1423.

E-246-H022 INSPECTION AND TEST RECORDS (NAVSEA) (JAN 2019)

Inspection and test records shall, as a minimum, indicate the nature of the observations, number of observations made, and the number and type of deficiencies found. Data included in inspection and test records shall be complete and accurate, and shall be used for trend analysis and to assess corrective action and effectiveness. The data shall, on request, be identified and made available for on-site review by the Contracting Officer or designated Government representative.

Section F - Deliveries or Performance

DELIVERY NOTE

CLINs 0001 through 0010 per each individual Delivery Order has an initial delivery date of 120 days after date of contract (ADC). In this case, ADC means 120 days after the date of each Delivery Order award. The monthly quantities after the initial delivery may vary by CLIN.

CLIN Item Description Delivery Date Quantity 0001 & 0002 Hydrophone/Thermistor Connector 120 Days TBD at Delivery Order Level 0003 & 0004 Thermistor Cable Connector 120 Days TBD at Delivery Order Level 0005 & 0006 Hydrophone/Transducer Connector 120 Days TBD at Delivery Order Level

0007 & 0008 Transducer Cable Connector 120 Days TBD at Delivery Order Level 0009 & 0010 Hydrophone Connector 120 Days TBD at Delivery Order Level

All data delivered under CLIN 0011 shall be delivered in accordance with the applicable DD1423s.

52.242-15 Stop-Work Order AUG 1989 52.242-17 Government Delay Of Work APR 1984 52.247-34 F.O.B. Destination JAN 1991

F-242-H001 CONTRACTOR NOTICE REGARDING LATE DELIVERY (NAVSEA) (OCT 2018)

In the event the contractor anticipates or encounters difficulty in complying with the contract delivery schedule or date, the contractor shall immediately notify, in writing, the Contracting Officer and the cognizant Contract Administration Services Office, if assigned. The notice shall give the pertinent details; however, such notice shall not constitute a waiver by the Government of any contract delivery schedule, or of any rights or remedies provided by law or under this contract.

F-247-H001 DELIVERY OF DATA (NAVSEA) (OCT 2018)

All data to be furnished under this contract shall be delivered prepaid to the destination(s) and at the time(s) specified on the Contract Data Requirements List(s), DD Form 1423.

Section G - Contract Administration Data

252.204-7006 BILLING INSTRUCTIONS—COST VOUCHERS (MAY 2023)

When submitting a request for payment using a cost voucher, the Contractor shall--

(a) Identify the contract line item(s) on the payment request that reasonably reflect contract work performance; and

(b) Separately identify a payment amount for each contract line item included in the payment request.

(End of clause)

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)

(a) Definitions. As used in this clause—

“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.

“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.

“Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232- 7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall—

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:

(1) Document type. The Contractor shall submit payment requests using the following document type(s):

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items—

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

(Contracting Officer: Insert either “Invoice 2in1” or the applicable invoice and receiving report document type(s) for fixed price line items for services.)

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial financing, submit a commercial financing request.

(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

[Note: The Contractor may use a WAWF “combo” document type to create some combinations of invoice and receiving report in one step.]

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF

Pay Official DoDAAC *

Issue By DoDAAC *

Admin DoDAAC** *

Inspect By DoDAAC *

Ship To Code *

Ship From Code *

Mark For Code *

Service Approver (DoDAAC) *

Service Acceptor (DoDAAC) *

Accept at Other DoDAAC *

LPO DoDAAC *

DCAA Auditor DoDAAC *

Other DoDAAC(s) *

(*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert “See Schedule” or “Not applicable.”)

(**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)

(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.

(Contracting Officer: Insert applicable information or “Not applicable.”)

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

*TO BE COMPLETED BY THE GOVERNMENT AT CONTRACT AWARD

G-216-H002 ORDERS--BASIC (NAVSEA) (JUL 2024)

(a) General. Orders for supplies or services specified in Section B of the Schedule may be issued by the Contracting Officer at any time during the effective period of this agreement. Except as otherwise provided in paragraph (c) below, the Contractor agrees to accept and perform orders issued by the Contracting Officer within the scope of this agreement. It is understood and agreed that the Government has no obligation under the terms of this agreement to issue any orders. Except as otherwise provided in any order, the Contractor shall furnish all materials and services necessary to accomplish the work specified in each order issued hereunder. In the event of any inconsistency between any order and this agreement, this agreement shall take precedence. All requirements of this agreement shall be applicable to all orders issued hereunder. Each order shall be considered a separate binding contract as of its effective date. The Contractor shall segregate the costs incurred in the performance of any order issued hereunder from the costs of all other orders issued under this agreement.

(b) Ordering. Orders and revisions thereto shall be…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .