This is a Request for Proposals (RFP N3220525R4025) issued by the Military Sealift Command Norfolk seeking one Jones Act qualified U.S. flag vessel to support submarine rescue requirements. The vessel must be capable of installing both the NATO Submarine Rescue System (NSRS) and Submarine Rescue Diving Recompression System (SRDRS) for submarine rescue operations, though not simultaneously. The vessel will operate out of Joint Expeditionary Base Little Creek in Virginia Beach throughout the Western Atlantic Ocean and must be capable of worldwide deployment within 24 hours of notification.
The charter period is 183 days with one 182-day option period, with laydays commencing February 18, 2025. Offers are due by December 30, 2024 at 1000 Eastern Time. The vessel must have minimum capabilities including IMO Class 2 Dynamic Positioning System, 6,000 sq ft of contiguous open deck space, ability to support up to 31 additional personnel, and capability to conduct operations in up to Sea State 4. The contract will be awarded on a lowest price technically acceptable basis. The RFP includes fuel evaluation factors of 146 days underway laden, 146 days underway loitering, and 73 days in port idle, with MGO/MDO priced at $1,299.04 per metric ton for evaluation purposes.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Shipyard Data Template.xlsx | XLSX spreadsheet | |
| SPECIALTIME PART XII FAR 52.212-3.pdf | ||
| SPECIALTIME Fuel Consumption Temp.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
23 December 2024
This is the Military Sealift Command Norfolk, Strategic Sealift Program Support Office
SOURCES SOUGHT NOTICES, RFP’S, AMENDMENTS AND CONTRACT AWARDS
WILL BE POSTED TO THE SAM.GOV WEBSITE (ONLY) UNTIL FURTHER NOTICE.
HTTPS://SAM.GOV
PROFORMA DOCUMENTS WILL BE MADE AVAILABLE UPON REQUEST.
Subj: RFP N3220525R4025
Ref: (a) SF1449
(b) MSC SPECIALTIME 2023 (11-23)
This procurement is a FAR Part 12 acquisition being conducted under FAR 15 Contracting by Negotiation. Per FAR 52.216-1, the Government contemplates award of up to two, firm-fixed-price contracts resulting from this solicitation.
MSC Strategic Sealift Program Support Office, N103A, requests proposals for vessel(s) capable of meeting the transportation requirements described below. The paragraph numbers below apply to the box layout of references (a) and (b), which are incorporated herein by reference (available on the MSC web site at https://www.msc.usff.navy.mil, under “Business “Opportunities”, select “Contracts”, then “Proforma”, or upon request), and shall be the charter form of any contract resulting from this solicitation. By submission of a proposal, the owner/offeror confirms agreement with all terms and conditions of this solicitation and the charter form, unless otherwise identified therein.
NOTE:
1. DUE TO INCREASED E-MAIL SECURITY, IT MAY TAKE LONGER FOR E-MAILS
TO BE RECEIVED IN THE APPROPRIATE IN-BOX, ESPECIALLY WHEN AN E-MAIL
IS HOSTED IN A FOREIGN COUNTRY; SOME E-MAILS ARE DELAYED IN EXCESS
OF HOURS. OFFERORS ARE ENCOURAGED TO SUBMIT OFFERS AS SOON AS
POSSIBLE. NO JPEG FILES.
THIS IS A SPOT CHARTER; AS SUCH, ALL PROFORMA SECTIONS THAT ADDRESS
LONG TERM CHARTERS ARE NOT APPLICABLE.
STANDARD FORM 1449 BOXES:
I. Standard Form 1449 Boxes
2. Contract No.: Will be provided upon award
5. Solicitation No.: N3220525R4025
6. Solicitation Issue Date: 23 December 2024
7. For Solicitation Information: Email Matthew Price at matthew.r.price40.civ@us.navy.mil 757-443-3974
8. Offer Due Date: Monday, 30 December 2024, at 1000 Eastern Time
9. Issued By: Military Sealift Command Norfolk, 471 East C Street, Bldg. SP-64, Naval Station Norfolk, Norfolk, VA 23511-2419 (Code: N32205)
10. This Acquisition is: Unrestricted; NAICS Code: 483112
14. Method of Solicitation: RFP 18a. Payment will be made by: ERP DFAS-CL (Pay DoDAAC N50082). Submit electronic invoices IAW Part VIII(6) DFARS 252.232-7006 Wide Area Work Flow Payment Instructions 18b. Submit invoices to: See Part VIII(C)(7) MSC Wide Area Work Flow (WAWF) Instructions 27a. Solicitation incorporates by full text FAR 52.212-1, 52.212-3 Alt I, 52.212-4 and 52.212-5, tailored as indicated and appropriate.
PART I - SPECIALTIME BOXES:
1. Vessel(s) Required:
A. The Military Sealift Command (MSC) requests one, Jones Act qualified, U.S. flag vessel to support submarine rescue requirements in support of submarine sea trials and other fleet mission support as required. vessel will be capable of installing the NATO Submarine Rescue System (NSRS) and Submarine Rescue Diving Recompression System (SRDRS) (though not simultaneously) which are used for submarine rescue.
B. The vendor shall permit US Government and contractor personnel to visit the ship no less than 5 days and no more than 45 days prior to delivery date to conduct a Pre-delivery Ship Survey (PDSS). The purpose of this survey shall be to at a minimum, validate that the ship meets the minimum requirements in accordance with the Mothership (MOSHIP) Criteria Manual for US Navy Submarine Rescue, REV E, identify lay-down locations of GFE equipment, identify locations of required utilities, and conduct operations planning. The vessel must be validated as a submarine rescue Vessel of Opportunity (VOO) at delivery and capable of installing the NATO Submarine Rescue System (NSRS) and Submarine Rescue Diving Recompression System (SRDRS) (though not simultaneously) to support submarine rescue.
C. The vessel will support in port and underway operations in accordance with assigned tasking as necessary on a continuous 24-hour basis. The vessel will also support loading, storage and discharge of Government materials and equipment, arranging for any shore-side equipment if required for load/discharge operations. The vessel shall be prepared and equipped to carry up to 31 additional personnel.
D. The vessel will be required to carry various pieces of government equipment based on mission requirements. This equipment will be loaded aboard and removed upon completion of the mission. Some examples of potential equipment are listed below:
(1) NAVSEA certified Standard Navy Double-Lock Recompression Chamber System
(SNDLRCS) including an Air Supply Rack Assembly (ASRA): consists of a standard 20’x 8’x 8’ ISO shipping container (25,000 lbs fully loaded).
(2) FMGS (Fly-Away Mixed Gas System) consisting of:
(a) One (1) Mixed-Gas Control Console Assembly 80”x66”x38” (870 lbs)
(b) One (1) Air Rack Assembly (ASRA) 80”x64”x75” (3,500 lbs)
(3) Three (3) Helium-Oxygen Supply Rack Assemble (HOSRA) 80”x64”x75” (3,200 lbs) each, 9,600lbs total)
(a) One (1) Oxygen Supply Rack Assembly (OSRA) 80”x64”x75” (3300 lbs)
(b) Two (2) Booster Assemblies 48”x48”x36” (550 lbs each, 1,100 lbs total)
(4) Recompression Chamber Life Support Skid (10’ x 8’; 14,000 lbs)
(5) Two (2) MILVANs (20’ x 9’ x 8.5’; weighing up to 15,000 lbs each) for storing and charging the lithium batteries of the MK 18 FOS Unmanned Underwater Vehicle (UUVs). These UUVs require 12’ feet clearance on one end to facilitate removal of the
UUV.
(6) ESAMS (Expandable Small Air Mobile Shelter) (22’ x 9’x 8’; 10,000 lbs).
(7) Combat Rubber Raiding Craft (CRRCs) (12’ x 6’ x 2.5’; 265 lbs each).
(8) 11-meter Rigid Hull Inflatable Boats (RHIBs) (36’x 12’; 13,000 lbs each)
(9) 9-meter RHIBs (30’ x 10’; 12,000lbs each)
(10) 7-meter RHIBs (24’ x 11’; 9,000lbs each)
(11) RHIB cradles (20’ x 8’; 1,500lbs each)
(12) Air Compressor for Chamber Support and Scuba Charging (6’x 4’, approximately 2,300lbs)
(13) Explosive Ready Service Lockers (RSLs) (5’x 5’, 2,000lbs each)
E. All deck stored equipment shall be griped or stowed to support open ocean transit in sea states equaling vessel’s sea state capability, via installed tiedown points/assemblies or contractor furnished cargo securing mechanisms.
F. MSC intends to utilize this ship as a training platform for qualified government civilian mariners (CIVMARS) to obtain Class A, Dynamic Positioning Officer (DPO) certification from the Offshore Vessel Dynamic Positioning Authority (OSVDPA). All deck watch officers (including the Master) of the assigned crew will hold a Class A OSVDPA or Nautical Institute (NI) DPO-Unlimited certification. The crew will observe and assist federal government CIVMARS who will stand DPO watches under observation to gain sea time to meet certification requirements. The Contractor’s certified DPO’s will validate whether CIVMARS under observation meet the sea time and practical experience requirements while the vessel is in dynamic positioning (DP) mode. During these training iterations, the Contractor’s certified DPO’s will oversee the CIVMARS undergoing DPO training and sign off in the CIVMARS’ task books when they successfully complete tasks.
The Government’s intention is to obtain Class A OSVPDA DPO certification for those CIVMARS who demonstrate the required degree of proficiency. This training will occur at the discretion (with concurrence of the ship’s Master) of the government and could be accomplished during transit or station keeping, 24 hours per day.
G. Fuel oil reports (Monitoring and Consumption) shall be recorded daily and submitted monthly using the Navy Energy Usage Reporting System (NEURS), per ALMSC 192334ZNOV03 (provided upon request). The Contractor shall include, with the submitted reports, a statement certifying the accuracy of the data contained therein as a true and exact copy of Vessel deck and engine log books. NEURS reports shall be submitted in the required format by email to MSCHQ-NEURS@NAVY.MIL on a monthly basis, no later than the third day after the end of the reporting period. The inventory report shall include the following information:
(1) Bunkers at the beginning of each month.
(2) Bunkers at the end of each month.
(3) Fuel received during the month and source, receipt, document number and date of receipt.
(4) Fuel consumed during the month.
H. At the end of each voyage/mission, a summary shall be submitted giving a brief synopsis of the mission. The report shall be submitted to PM4 within five (5) calendar days after completion of mission. At a minimum, it should contain the following information as applicable:
(1) Daily fuel oil consumption
(2) Speed made good over the ground
(3) Speed made good through the water
(4) Average propeller RPM per day
(5) Vessel draft
(6) Sea and weather states
(7) Hours run during the day (noon – noon)
(8) Hours in DP and reason for being in DP
(9) Number of divers in the water / number of dives
(10) Other pertinent information (as required)
I. Area of Operations: The vessel will operate out of the Joint Expeditionary Base Little
Creek in Virginia Beach, Virginia, throughout the Western Atlantic Ocean, and the Vessel shall be capable of deployment to worldwide locations within 24 hours of notification by the Operational Commander designated by the U.S. Navy and will also be required to pull into military and civilian ports as needed in support of specific evolutions. The operational areas will be discussed with vessel operator prior to conducting ship load out.
J. The vessel shall have the following minimum characteristics:
Minimum Vessel / Operational Requirements Table
Flag U.S. Flag, Jones Act qualified vessel Vessel Certifications The vessel shall be United State Coast Guard (USCG) certified under 46 Subchapter I and American Bureau of Shipping (ABS) classified or an International Association of Classifications Societies (IACS) member society. At a minimum, the vessel shall be permitted to conduct manned diving operations. The vessel, launch and recovery systems, cranes, weight handling equipment and unique shipboard storage appliances shall be maintained and shall be classed by the ABS (or equivalent society).
Operating Endurance, Messing and Berthing
The vessel must be capable of supporting at-sea operations for up to 10 days without resupply (or replenishment of critical stores).
The contractor shall provide three galley-prepared cafeteria-style meals and hotel services for up to 31 embarked personnel (not including vessel crew) when personnel are embarked (in port / underway).
The vessel shall support berthing for up to 31 embarked personnel in addition to vessel crew. Berthing shall be provided with no more than six per stateroom and per head equipped with shower.
Curtained off bunks are acceptable. Clean linens (fitted bed sheet, top sheet, bath towel, hand towel, washcloth) shall be provided weekly.
Clean linens and access to 24hr self-service laundry shall also be provided.
This includes provision for potable water requirements and waste disposal (sanitary).
Transducer Pole Installation Contractor vessel shall provide sufficient access on the PORT or STBD side of the VOO to mount a 32 ft. (9.7 m) Transponder Pole (GFE) wherein when the pole is deployed it will extend a minimum of 10 ft. (3 m) below the Vessel keel.
Vessel Freeboard / Over- Boarding Access
Maximum freeboard of 10 ft. (3.1M).
Contractor vessel shall provide sufficient opening of any stern wall to provide for the unobstructed over-boarding of the launch and rescue system (LARS). A minimum of a 36 ft. (11 m) opening is required to clear the LARS winches.
Speed Minimum 10 knots transit speed.
Dynamic Positioning Be equipped with an International Maritime Organization (IMO)
Equipment Class 2 Dynamic Positioning System (DPS).
The location of any moving DPS machinery (thrusters, propellers, etc.) shall not be within 15 ft (4.6 m) of an umbilical. The DPS shall be able to maintain the vessel ±60 ft. and ± 10 degrees from a given position/heading once the DPS has stabilized. The DPS position reference systems shall not be taut wire or a laser system.
The vessel shall be crewed with an adequate number of qualified, certified Dynamic Positioning Officers, in order to support 24/7 operations.
Deck Space At a minimum, the vessel shall have 6,000 sq. ft. of contiguous open deck space, (minimum clear deck area of 98 ft. (29.9M) in length and 36 ft. (11M) in width.)
The deck shall be coplanar with a maximum vertical deviation of 2 in (5.08cm) when measured from the transom to 64 ft (19.5 m) forward of the transom. Deck hardware shall be removed in way of Sponsor equipment Bases if vertical height is 2 in (5.08 cm) or greater from the deck.
The vessel shall have a minimum cargo loading capacity of 1025 lb/ft² (5 tonnes/M²), and a minimum deck load capacity of 838,000 lbs. (380 tonnes) and stability to support 380 tonnes to a CG of 4 meters (13.1234 ft) above the deck.
The contractor shall provide specific detail on all bulkheads supporting the aft deck from the transom to 50 feet forward of the transom. Details shall include: frame location, construction, stiffener spacing, and include detailed drawings of each bulkhead.
Minimum unobstructed opening (or removable bulwark) at the stern of a 34 ft.
Any vessel requirement that is met with a removable or portable (i.e. berthing modules or to meet a requirement in support of Submarine Rescue) solution must meet ABS / USCG requirements and the contractor will maintain all supporting documentation. All storage, maintenance, transportation and mobilization/demobilization costs for removable or portable solutions will be at the expense of the contractor.
Sea-Keeping Capability / Vessel Stability
Contractor shall be able to conduct aft deck, launch and recovery operations with a 419 short ton (380 tonnes) system (SRSRCS) installed in up to Sea State 4.
The vessel shall maintain ship survivability with a 380 short ton (419 tonnes) system installed in up to Sea State 6.
For all operating scenarios, the VOO with the LAUNCH AND RECOVERY SYSTEM (LARS) and pressurized rescue module (PRM) installed, shall comply with all intact and damage stability criteria required by the VOO's Flag Administration and Classification Society's Rules.
Provision for Small Boat and Associated Launch and Recovery Equipment
Contractor shall provide a small boat and associated launch and recovery equipment for use during emergency recovery of the Pressurized Rescue Module. The boat will be equipped with an 80 HP (approx.) motor with a tow point forward of the engine for the small boat.
Diesel Fuel Capacity Contractor shall have the ability to provide up to 20,500 gallons (77,600 L) of cleaned and polished No. 2 Diesel fuel, accessible on the working deck, for the Generator Van (GV).
Emergency Power Supply Capability
The Contractor vessel shall provide 350 kW of 480 VAC, 3-phase, Delta, 60 Hz, 400 A electric power per bus to Sponsor equipment in event of engine failure.
Fresh Water Contractor shall provide up to 2000 gallons (7570.8 liters) of freshwater to the fantail for wash down of PRM and equipment, as well as for filling PRM ballast bags.
This requirement can be met through onboard water production capability, potable water storage capacity or a combination of both.
If production capability does not exist, onboard storage must be sufficient for the endurance period (10 days).
Port Services The contractor shall have to employ an agent to arrange for all port services on a reimbursable basis during this charter. Port services shall include tugs, pilots, potable water, shore power, trash, garbage removal, sewage removal, line handlers, dedicated telephone service and liberty launch services. Additionally, the contractor shall coordinate with appropriate offices onboard military installations to ensure pier-side services are scheduled and all employees are granted base access.
Communication Equipment The Contractor shall provide a Very Small Aperture Terminal (VSAT) or equivalent installed broadband internet capability with a minimum bandwidth of 1 megabyte (bi-directional) and allow embarked personnel internet connectivity while underway.
Bandwidth should have the ability to be increased based on mission requirements to a minim of 3 megabytes (bidirectional).
The contractor will provide points of contact to satellite communications service provider to assist in the configuration and troubleshooting of government provided communication equipment.
The vessel shall carry marine VHF and a ship’s cell phone and shall accommodate the integrations of Mission Equipment communications equipment and antennas including secure
HF/VHF/UHF/SATCOM.
Navigation Equipment The vessel shall be equipped with gyrocompass with repeaters, GPS and a radar. The radar shall be capable of surface search to a minimum of 25 NM.
Ship Sanitation Exemption Control Certificate
(SSECC)
The Owner is responsible for ensuring that the Ship is SSECC certified at all times in compliance with guidelines delineated in the World Health Organization, International Health Regulations (IHR) of 2005 and BUMEDNOTE 6210 dated Nov 2007. This certification is required to be completed every 6 months, in lieu of the obsolete DERAT Certificate. The Owner shall make arrangements to procure the necessary SSECC Inspection Certification.
Laundry Services The Contractor shall provide a 24-hour laundry facility for up to 31 embarked personnel in addition to vessel crew.
Contractor Furnished Equipment (CFE)
Contractor shall furnish the below listed equipment. All deck stored equipment shall be griped or stowed to support open ocean transit in sea states equaling vessel’s sea state capability.
A. Two FDA approved Automated External Defibrillators (AEDs) unit stored in a location that is accessible to trained responders. One shall be located in the vicinity of the rear deck, and the other must be located in the vicinity of berthing spaces.
B. Deck lighting to support nighttime launch and recovery deck operations.
C. Deck lighting to support on deck maintenance during transit without interfering with safe navigation and bridge observation.
Remote Monitoring Station Capacity
Contractor shall provide sufficient space on the bridge to accommodate the Remote VOO Monitoring Control Station.
Working Deck Fire Protection Capability
Contractor shall provide fire-fighting coverage of all mission equipment on deck using the VOO’s existing firefighting equipment, as well as a 2.5 in (63.5 mm) fire hose connection for the portable foam firefighting unit that is used if foam capability does not exist on board (GFE).
Gas (Workshop Quality Air)
Contractor shall provide workshop-quality compressed air to entire fantail for tools such as air driven wrenches.
Sick Bay Contractor vessel shall provide a well-equipped sick bay;
Contractor will provide detail of vessel onboard capability.
Surface Dive Launch and Recovery System (LARS) Install/Removal
The operator shall provide support for the Surface Dive LARS install/removal (as required).
A. Remove interferences and prepare hot work areas.
B. Test fit LARS, weld pad-eyes or plates as required to deck.
C. Welding must be in accordance with welding and brazing procedures, NAVSEA S9074-AQ-GOB-010/248 or American Welding Society (AWS) D1.1 Structural Welding Code – Steel (minimum) conducts all welds for installation on the vessel.
D. Complete NDT Inspection IAW MIL-STD 2035 or NAVSEA guidance.
E. Complete static and dynamic load test. (Sponsor will perform testing.)
F. Post NDT Inspection IAW MIL-STD 2035 or NAVSEA guidance upon completion of static and dynamic load test.
Vessel Owner/Contractor will assume responsibility for restoration of the deck area upon completion of training and evaluation.
Dive Staging Area The vessel shall be equipped with a Diver’s Staging Area for launching and recovering divers. At a minimum, staging area must consist of water access by ladder and removable bulkhead for use of a Diving LARS system. The equipment used to handle the over-the-side divers should meet the requirements of U.S.
Navy Diving and Manned Hyperbaric System Safety Certification Manual, NAVSEA (SS521-AA-MAN-010, Revision 2, 1 NOV 2006) and U.S. Navy Diving Manual.
2. Place / Range of Delivery: Joint Expeditionary Base Little Creek, Virginia Beach, VA
3. Place / Range of Redelivery: Joint Expeditionary Base Little Creek, Virginia Beach, VA.
4. Charter Period: 183-days with one 182-day Option Period
5. Laydays: Commencing: 18 February 2025 (0800 hours Local) Cancelling: 18 February 2025 (2000 hours Local)
6. TERMS/CONDITIONS/ATTACHMENTS ADDED, DELETED OR MODIFIED:
NMCARS ANNEX 16 – PERFORMANCE WORK STATEMENT LANGUAGE
IMPLEMENTING "THE DIB" MEMO
A. System Security Plan and Plans of Action and Milestones (SSP/POAM) Reviews
1. Within thirty (30) days of contract award, the Contractor shall make its System
Security Plan(s) (SSP(s)) for its covered contractor information system(s) available for review by the Government at the contractor’s facility. The SSP(s) shall implement the security requirements in Defense Federal Acquisition Regulation Supplement (DFARS) clause 252.204-7012, which is included in this contract. The Contractor shall fully cooperate in the Government’s review of the SSPs at the Contractor’s facility.
2. If the Government determines that the SSP(s) does not adequately implement the requirements of DFARS clause 252.204-7012 then the Government shall notify the Contractor of each identified deficiency. The Contractor shall correct any identified deficiencies within thirty (30) days of notification by the Government. The contracting officer may provide for a correction period longer than thirty (30) days and, in such a case, may require the Contractor to submit a plan of action and milestones (POAM) for the correction of the identified deficiencies. The Contractor shall immediately notify the contracting officer of any failure or anticipated failure to meet a milestone in such a
POAM.
3. Upon the conclusion of the correction period, the Government may conduct a follow-on review of the SSP(s) at the Contractor’s facilities. The Government may continue to conduct follow-on reviews until the Government determines that the Contractor has corrected all identified deficiencies in the SSP(s).
4. The Government may, in its sole discretion, conduct subsequent reviews at the Contractor’s site to verify the information in the SSP(s). The Government will conduct such reviews at least every three (3) years (measured from the date of contract award) and may conduct such reviews at any time upon thirty (30) days’ notice to the Contractor.
B. Compliance to NIST 800-171
1. The Contractor shall fully implement the CUI Security Requirements (Requirements) and associated Relevant Security Controls (Controls) in NIST Special Publication 800- 171 (Rev. 1) (NIST SP 800-171), or establish a SSP(s) and POA&Ms that varies from NIST 800-171 only in accordance with DFARS clause 252.204-7012(b)(2), for all covered contractor information systems affecting this contract.
2. Notwithstanding the allowance for such variation, the contractor shall identify in any SSP and POA&M their plans to implement the following, at a minimum:
(a) Implement Control 3.5.3 (Multi-factor authentication). This means that multi-factor authentication is required for all users, privileged and unprivileged accounts that log into a network. In other words, any system that is not standalone should be required to utilize acceptable multi-factor authentication.
For legacy systems and systems that cannot support this requirement, such as CNC equipment, etc., a combination of physical and logical protections acceptable to the Government may be substituted;
(b) Implement Control 3.1.5 (least privilege) and associated Controls, and identify practices that the contractor implements to restrict the unnecessary sharing with, or flow of, covered defense information to its subcontractors, suppliers, or vendors based on need-to-know principles;
(c) Implement Control 3.1.12 (monitoring and control remote access sessions) - Require monitoring and controlling of remote access sessions and include mechanisms to audit the sessions and methods.
(d) Audit user privileges on at least an annual basis;
(e) Implement:
i. Control 3.13.11 (FIPS 140-2 validated cryptology or implementation of NSA or NIST approved algorithms (i.e. FIPS 140-2 Annex A: AES or Triple DES) or compensating controls as documented in a SSP and POAM); and,
ii. NIST Cryptographic Algorithm Validation Program (CAVP) (see https://csrc.nist.gov/projects/cryptographic-algorithm-validation-program);
(f) Implement Control 3.13.16 (Protect the confidentiality of CUI at rest) or provide a POAM for implementation which shall be evaluated by the Navy for risk acceptance.
(g) Implement Control 3.1.19 (encrypt CUI on mobile devices) or provide a plan of action for implementation which can be evaluated by the Government Program Manager for risk to the program.
3. Cyber Incident Response:
(a) The Contractor shall, within fifteen (15) days of discovering the cyber incident (inclusive of the 72-hour reporting period), deliver all data used in performance of the contract that the Contractor determines is impacted by the incident and begin assessment of potential warfighter/program impact.
(b) Incident data shall be delivered in accordance with the Department of Defense Cyber Crimes Center (DC3) Instructions for Submitting Media available at http://www.acq.osd.mil/dpap/dars/pgi/docs/Instructions_for_Submitting_Media .docx. In delivery of the incident data, the Contractor shall, to the extent practical, remove contractor-owned information from Government covered defense information.
(c) If the Contractor subsequently identifies any such data not previously delivered to DC3, then the Contractor shall immediately notify the contracting officer in writing and shall deliver the incident data within ten (10) days of identification. In such a case, the Contractor may request a delivery date later than ten (10) days after identification. The contracting officer will approve or disapprove the request after coordination with DC3.
4. Naval Criminal Investigative Service (NCIS) Outreach
The Contractor shall engage with NCIS industry outreach efforts and consider recommendations for hardening of covered contractor information systems affecting DON programs and technologies.
5. NCIS/Industry Monitoring
(a) In the event of a cyber incident or at any time the Government has indication of a vulnerability or potential vulnerability, the Contractor shall cooperate with the Naval Criminal Investigative Service (NCIS), which may include cooperation related to: threat indicators; pre-determined incident information derived from the Contractor's infrastructure systems; and the continuous provision of all Contractor, subcontractor or vendor logs that show network activity, including any additional logs the contractor, subcontractor or vendor agrees to initiate as a result of the cyber incident or notice of actual or potential vulnerability.
(b) If the Government determines that the collection of all logs does not adequately protect its interests, the Contractor and NCIS will work together to implement additional measures, which may include allowing the installation of an appropriate network device that is owned and maintained by NCIS, on the Contractor's information systems or information technology assets. The specific details (e.g., type of device, type of data gathered, monitoring period) regarding the installation of an NCIS network device shall be the subject of a separate agreement negotiated between NCIS and the Contractor. In the alternative, the Contractor may install network sensor capabilities or a network monitoring service, either of which must be reviewed for acceptability by NCIS. Use of this alternative approach shall also be the subject of a separate agreement negotiated between NCIS and the Contractor.
(c) In all cases, the collection or provision of data and any activities associated with this statement of work shall be in accordance with federal, state, and non- US law.
PART III. SPECIAL TIME TERMS AND CONDITIONS (Addendum to FAR 52.212-4); add the following:
(o) Health and Safety. The ship-owner agrees that crew and other embarked personnel may be ordered by the charterer to stay aboard the vessel during port visits under this charter as deemed necessary by the charterer or local government authorities. Further, the ship-owner agrees that the charterer may limit access to the vessel by any shore-side personnel upon the vessel’s port calls during this charter.
REPLACE PART VI WITH THE FOLLOWING:
52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT
STATUTES OR EXECUTIVE ORDERS--COMMERCIAL PRODUCTS AND COMMERCIAL
SERVICES (NOV 2024)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:
(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities (Dec 2023) (Section 1634 of Pub. L. 115-91).
(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (Nov 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).
(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015).
(5) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (Mar 2023) ( 31 U.S.C. 3903 and 10 U.S.C. 3801).
(6) 52.233-3, Protest After Award (Aug 1996) (31 U.S.C. 3553).
(7) 52.233-4, Applicable Law for Breach of Contract Claim (Oct 2004) (Public Laws 108-77 and 108-78 ( 19 U.S.C. 3805 note)).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:
[Contracting Officer check as appropriate.]
XX (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Jun 2020), with Alternate I (Nov 2021) (41 U.S.C. 4704 and 10 U.S.C. 4655).
__ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Nov 2021) (41 U.S.C. 3509)).
__ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (Jun 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)
__ (4) 52.203-17, Contractor Employee Whistleblower Rights (Nov 2023) ( 41 U.S.C. 4712); this clause does not apply to contracts of DoD, NASA, the Coast Guard, or applicable elements of the intelligence community—see FAR 3.900(a).
XX (5) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Jun 2020) (Pub. L. 109-282) ( 31 U.S.C. 6101 note).
__ (6) [Reserved].
XX (7) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).
__ (8) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).
XX (9) 52.204-27, Prohibition on a ByteDance Covered Application (Jun 2023) (Section 102 of Division R of Pub. L. 117-328).
__ (10) 52.204-28, Federal Acquisition Supply Chain Security Act Orders—Federal Supply Schedules, Governmentwide Acquisition Contracts, and Multi-Agency Contracts. (Dec 2023) ( Pub. L. 115–390, title II).
__ (11) (i) 52.204-30, Federal Acquisition Supply Chain Security Act Orders—Prohibition. (Dec 2023) ( Pub. L. 115–390, title II).
__ (ii) Alternate I (Dec 2023) of 52.204-30.
XX (12) 52.209-6, Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (Nov 2021) ( 31 U.S.C. 6101 note).
XX (13) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (Oct 2018) ( 41 U.S.C. 2313).
__ (14) [Reserved].
__ (15) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (Oct 2022) ( 15 U.S.C. 657a).
XX (16) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (Oct 2022) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).
__ (17) [Reserved]
__ (18) (i) 52.219-6, Notice of Total Small Business Set-Aside (Nov 2020) (15 U.S.C. 644).
__ (ii) Alternate I (Mar 2020) of 52.219-6.
__ (19) (i) 52.219-7, Notice of Partial Small Business Set-Aside (Nov 2020) (15 U.S.C. 644).
__ (ii) Alternate I (Mar 2020) of 52.219-7.
XX (20) 52.219-8, Utilization of Small Business Concerns (Feb 2024) (15 U.S.C. 637(d)(2) and (3)).
XX (21) (i) 52.219-9, Small Business Subcontracting Plan (Sep 2023) (15 U.S.C. 637(d)(4)).
__ (ii) Alternate I (Nov 2016) of 52.219-9.
__ (iii) Alternate II (Nov 2016) of 52.219-9.
__ (iv) Alternate III (Jun 2020) of 52.219-9.
__ (v) Alternate IV (Sep 2023) of 52.219-9.
__ (22) (i) 52.219-13, Notice of Set-Aside of Orders (Mar 2020) (15 U.S.C. 644(r)).
__ (ii) Alternate I (Mar 2020) of 52.219-13.
__ (23) 52.219-14, Limitations on Subcontracting (Oct 2022) (15 U.S.C. 657s).
XX (24) 52.219-16, Liquidated Damages—Subcontracting Plan (Sep 2021) (15 U.S.C. 637(d)(4)(F)(i)).
__ (25) 52.219-27, Notice of Set-Aside for, or Sole-Source Award to, Service-Disabled Veteran- Owned Small Business (SDVOSB) Concerns Eligible Under the SDVOSB Program (Feb 2024) (15 U.S.C. 657f).
XX (26) (i) 52.219-28, Post Award Small Business Program Rerepresentation (Feb 2024) (15 U.S.C. 632(a)(2)).
__ (ii) Alternate I (Mar 2020) of 52.219-28.
__ (27) 52.219-29, Notice of Set-Aside for, or Sole-Source Award to, Economically Disadvantaged Women-Owned Small Business Concerns (Oct 2022) (15 U.S.C. 637(m)).
__ (28) 52.219-30, Notice of Set-Aside for, or Sole-Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (Oct 2022) (15 U.S.C. 637(m)).
__ (29) 52.219-32, Orders Issued Directly Under Small Business Reserves (Mar 2020) ( 15 U.S.C. 644(r)).
__ (30) 52.219-33, Nonmanufacturer Rule (Sep 2021) ( 15 U.S.C. 637(a)(17)).
XX (31) 52.222-3, Convict Labor (Jun 2003) (E.O.11755).
__ (32) 52.222-19, Child Labor-Cooperation with Authorities and Remedies (Feb 2024).
XX (33) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).
XX (34) (i) 52.222-26, Equal Opportunity (Sep 2016) (E.O.11246).
__ (ii) Alternate I (Feb 1999) of 52.222-26.
XX (35) (i) 52.222-35, Equal Opportunity for Veterans (Jun 2020) ( 38 U.S.C. 4212).
__ (ii) Alternate I (Jul 2014) of 52.222-35.
__ (36) (i) 52.222-36, Equal Opportunity for Workers with Disabilities (Jun 2020) ( 29 U.S.C. 793).
__ (ii) Alternate I (Jul 2014) of 52.222-36.
XX (37) 52.222-37, Employment Reports on Veterans (Jun 2020) ( 38 U.S.C. 4212).
XX (38) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496).
XX (39) (i) 52.222-50, Combating Trafficking in Persons (Nov 2021) (22 U.S.C. chapter 78 and E.O. 13627).
__ (ii) Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).
__ (40) 52.222-54, Employment Eligibility Verification (May 2022) (Executive Order 12989).
(Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial products or commercial services as prescribed in FAR 22.1803.)
__ (41) (i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated Items (May 2008) ( 42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
__ (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
__ (42) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (May 2024) ( 42 U.S.C. 7671, et seq.).
__ (43) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (May 2024) ( 42 U.S.C. 7671, et seq.).
__ (44) 52.223-20, Aerosols (May 2024) ( 42 U.S.C. 7671, et seq.).
__ (45) 52.223-21, Foams (May 2024) ( 42 U.S.C. 7671, et seq.).
__ (46) 52.223-23, Sustainable Products and Services (May 2024) ( E.O. 14057, 7 U.S.C. 8102, 42 U.S.C. 6962, 42 U.S.C. 8259b, and 42 U.S.C. 7671l).
__ (47) (i) 52.224-3 Privacy Training (Jan 2017) ( 5 U.S.C. 552 a).
__ (ii) Alternate I (Jan 2017) of 52.224-3.
__ (48) (i) 52.225-1, Buy American-Supplies (Oct 2022) (41 U.S.C. chapter 83).
__ (ii) Alternate I (Oct 2022) of 52.225-1.
__ (49) (i) 52.225-3, Buy American-Free Trade Agreements-Israeli Trade Act (NOV 2023) ( 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, 19 U.S.C.
chapter 29 (sections 4501-4732), Public Law 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.
__ (ii) Alternate I [Reserved].
__ (iii) Alternate II (Dec 2022) of 52.225-3.
__ (iv) Alternate III (Feb 2024) of 52.225-3.
__ (v) Alternate IV (Oct 2022) of 52.225-3.
__ (50) 52.225-5, Trade Agreements (NOV 2023) ( 19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).
XX (51) 52.225-13, Restrictions on Certain Foreign Purchases (Feb 2021) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).
__ (52) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. Subtitle A, Part V, Subpart G Note).
__ (53) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150).
__ (54) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007) (42 U.S.C. 5150).
XX (55) 52.226-8, Encouraging Contractor Policies to Ban Text Messaging While Driving (May 2024) ( E.O. 13513).
__ (56) 52.229-12, Tax on Certain Foreign Procurements (Feb 2021).
__ (57) 52.232-29, Terms for Financing of Purchases of Commercial Products and Commercial Services (Nov 2021) (41 U.S.C. 4505, 10 U.S.C. 3805).
__ (58) 52.232-30, Installment Payments for Commercial Products and Commercial Services (Nov 2021) (41 U.S.C. 4505, 10 U.S.C. 3805).
XX (59) 52.232-33, Payment by Electronic Funds Transfer-System for Award Management (Oct2018) ( 31 U.S.C. 3332).
__ (60) 52.232-34, Payment by Electronic Funds Transfer-Other than System for Award Management (Jul 2013) (31 U.S.C. 3332).
__ (61) 52.232-36, Payment by Third Party (May 2014) (31 U.S.C. 3332).
__ (62) 52.239-1, Privacy or Security Safeguards (Aug 1996) ( 5 U.S.C. 552a).
__ (63) 52.240-1, Prohibition on Unmanned Aircraft Systems Manufactured or Assembled by American Security Drone Act-Covered Foreign Entities (Nov 2024) (Sections 1821-1826, Pub. L.
118-31, 41 U.S.C. 3901 note prec.).
__ (64) 52.242-5, Payments to Small Business Subcontractors (Jan 2017) (15 U.S.C. 637(d)(13)).
XX (65) (i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Nov 2021) ( 46 U.S.C. 55305 and 10 U.S.C. 2631).
XX (ii) Alternate I (Apr 2003) of 52.247-64.
__ (iii) Alternate II (Nov 2021) of 52.247-64.
(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:
[Contracting Officer check as appropriate.]
XX (1) 52.222-41, Service Contract Labor Standards (Aug 2018) (41 U.S.C. chapter67).
XX (2) 52.222-42, Statement of Equivalent Rates for Federal Hires (May 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).
__ (3) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment (Multiple Year and Option Contracts) (Aug 2018) (29 U.S.C. 206 and 41 U.S.C. chapter 67).
XX (4) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment (May 2014) ( 29U.S.C.206 and 41 U.S.C. chapter 67).
__ (5) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment-Requirements (May 2014) (41 U.S.C. chapter 67).
__ (6) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services-Requirements (May 2014) (41 U.S.C. chapter 67).
XX (7) 52.222-55, Minimum Wages for Contractor Workers Under Executive Order 14026 (Jan 2022).
XX (8) 52.222-62, Paid Sick Leave Under Executive Order 13706 (Jan 2022) (E.O. 13706).
__ (9) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (Jun 2020) (42 U.S.C. 1792).
(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, as defined in FAR 2.101, on the date of award of this contract, and does not contain the clause at 52.215-2, Audit and Records-Negotiation.
(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor’s directly pertinent records involving transactions related to this contract.
(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.
(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.
(e)(1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c), and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in this paragraph (e)(1), in a subcontract for commercial products or commercial services. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause-
(i) 52.203-13, Contractor Code of Business Ethics and Conduct (Nov 2021) (41 U.S.C. 3509).
(ii) 52.203-17, Contractor Employee Whistleblower Rights (Nov 2023) ( 41 U.S.C. 4712).
(iii) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(iv) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities (Dec 2023) (Section 1634 of Pub. L. 115-91).
(v) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (Nov 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).
(vi) 52.204-27, Prohibition on a ByteDance Covered Application (Jun 2023) (Section 102 of Division R of Pub. L. 117-328).
(vii)(A) 52.204–30, Federal Acquisition Supply Chain Security Act Orders—Prohibition. (Dec 2023) ( Pub. L. 115–390, title II).
(B) Alternate I (Dec 2023) of 52.204–30.
(viii) 52.219-8, Utilization of Small Business Concerns (Feb 2024) ( 15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds the applicable threshold specified in FAR 19.702(a) on the date of subcontract award, the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.
(ix) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).
(x) 52.222-26, Equal Opportunity (Sep 2015) (E.O.11246).
(xi) 52.222-35, Equal Opportunity for Veterans (Jun 2020) (38 U.S.C. 4212).
(xii) 52.222-36, Equal Opportunity for Workers with Disabilities (Jun 2020) (29 U.S.C. 793).
(xiii) 52.222-37, Employment Reports on Veterans (Jun 2020) (38 U.S.C. 4212).
(xiv) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496). Flow down required in accordance with paragraph (f) of FAR clause 52.222- 40.
(xv) 52.222-41, Service Contract Labor Standards (Aug 2018) ( 41 U.S.C. chapter 67).
(xvi)(A) 52.222-50, Combating Trafficking in Persons (Nov 2021) (22 U.S.C. chapter 78 and E.O 13627).
(B) Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).
(xvii) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment-Requirements (May 2014) (41 U.S.C. chapter 67).
(xviii) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services-Requirements (May 2014) (41 U.S.C. chapter 67).
(xix) 52.222-54, Employment Eligibility Verification (May 2022) (E.O. 12989).
(xx) 52.222-55, Minimum Wages for Contractor Workers Under Executive Order 14026 (Jan 2022).
(xxi) 52.222-62, Paid Sick Leave Under Executive Order 13706 (Jan 2022) (E.O. 13706).
(xxii)(A) 52.224-3, Privacy Training (Jan 2017) ( 5 U.S.C. 552a).
(B) Alternate I (Jan 2017) of 52.224-3.
(xxiii) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. Subtitle A, Part V, Subpart G Note).
(xxiv) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (Jun 2020) (42 U.S.C. 1792). Flow down required in accordance with paragraph (e) of FAR clause 52.226-6.
(xxv) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (Mar 2023) ( 31 U.S.C. 3903 and 10 U.S.C. 3801). Flow down required in accordance with paragraph (c) of 52.232-40.
(xxvi) 52.240-1, Prohibition on Unmanned Aircraft Systems Manufactured or Assembled by American Security Drone Act-Covered Foreign Entities (Nov 2024) (Sections 1821-1826, Pub. L.
118-31, 41 U.S.C. 3901 note prec.).
(xxvii) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Nov 2021) ( 46 U.S.C. 55305 and 10 U.S.C. 2631). Flow down required in accordance with paragraph
(d) of FAR clause 52.247-64.
(1) While not required, the Contractor may include in its subcontracts for commercial products and commercial services a minimal number of additional clauses necessary to satisfy its contractual obligations.
(End of clause) https://www.acquisition.gov/far/52.212
PART VII. CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT
STATUTES OR EXECUTIVE ORDERS APPLICABLE TO DEFENSE ACQUISITIONS
OF COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
Amend (h)(xix)(E) to be CHECKED. That term reads as follows:
Use the provision at 252.247-7026, Evaluation Preference for Use of Domestic Shipyards – Applicable to Acquisition of Carriage by Vessel for DoD Cargo in the Coastwise or Noncontiguous Trade, as prescribed in 247.574(d), to comply with section 1017 of Pub. L. 109- 364.
PART VIII ADDITIONAL FAR AND DFARS CLAUSES; amend the following:
Amend (b)(2) FAR 52.204-4 Printed or Copied Double-Side on Postconsumer Fiber Content Paper, to read, “Reserved.”
Amend (b)(43) DFARS 252.232-7017 Accelerating Payments to Small Business Subcontractors Prohibition on Fees and Consideration, to read, “Reserved.”
Amend to read: (b)(27) DFARS 252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting (DEVIATION 2024-O0013) (MAY 2024)– CHECKED
Add: (b)(54) DFARS 252.225-7966 Prohibition Regarding Russian Fossil Fuel Business Operations—Representation (DEVIATION 2024-O0006, REVISION 1) (MAR 2024)
- CHECKED
Add: (b)(55) DFARS 252.225-7967 Prohibition Regarding Russian Fossil Fuel Business Operations—Representation (DEVIATION 2024-O0006, REVISION 1) (FEB 2024) -
CHECKED
Add: (b)(56) DFARS 252.225-7976 – Contractor Personnel Performing in Japan (DEVIATION
2018-O0019) (AUG 2018) - CHECKED
Add: (b)(57) DFARS 252.225-7987 Requirements for Contractor Personnel Performing in the U.S. Southern Command Area of Responsibility (DEVIATION 2021-O0004) (FEB 2021) -
CHECKED
Add: (b)(58) DFARS 252.225-7995 Contractor Personnel Performing in the United States Central Command Area of Responsibility (DEVIATION 2017-O0004) (SEP 2017) - CHECKED
Add: (b)(59) DFARS 252.225-7980 Contractor Personnel Performing in the United States Africa Command Area of Responsibility (DEVIATION 2016-O0008) (JUN 2016) - CHECKED
PART VIII(c)(6) DFARS 252.232-7006 Wide Area Work Flow Payment Instructions
VIII(c)(6) DFARS 252.232-7006 Wide Area Work Flow Payment Instructions
VIII(c)(6)(f)(1)(ii)(A) Not Applicable
VIII(c)(6)(f)(1)(ii)(B) Invoice 2-in-1
VIII(c)(6)(F)(3): Document routing: The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table:
Field Name in WAWF Data to be…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .