This pre-solicitation notice describes the Bureau of Land Management's (BLM) construction project for Melstone Dam Reconstruction in Musselshell County, Montana. The project involves comprehensive dam repair and reconstruction, including dewatering the reservoir, excavating the existing dam embankment, constructing new outlet works, reconstructing the dam embankment with compacted fill and riprap, installing a toe drain system, and reclaiming disturbed areas. The estimated construction magnitude is between $1M-$5M, with a 445-calendar day performance period from September 2025 through November 2026, and annual onsite work restrictions from March 15 to July 15.

The solicitation is set aside for total small business participation, with a NAICS code of 237990 and a small business size standard of $45M. BLM anticipates issuing the Request for Proposals (RFP) by end of May 2025, with proposals due approximately 30 days after the solicitation date. Potential offerors must have a UEI number and be registered in the System for Award Management (SAM). The award will be based on best value to the government in accordance with Federal Acquisition Regulations, and interested parties should monitor www.sam.gov for all communication and solicitation package details.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of the Interior

BUREAU OF LAND MANAGEMENT

National Operations Center Denver Federal Center, Building 85

P.O. Box 25047 Denver, Colorado 80225-0047 http://www.blm.gov

GAOA MELSTONE DAM RECONSTRUCTION

140L0625R0012 | Pre-Solicitation Notice

Project Location: Musselshell County, approximately 1.5 miles west of Melstone, MT.

Project Description: The Bureau of Land Management (BLM) has a construction requirement for all labor, materials, equipment, and supervision to repair Melstone Dam. Major items of work include:

1) Unwater the reservoir and dewater the construction area.

2) Excavate the existing dam embankment and foundation to remove the existing outlet works structures and construct the new outlet works.

3) Reconstruct the dam embankment, including:

a) Placement of compacted fill from onsite borrow sources.

b) Placement of compacted lime amended fill.

c) Replacement of salvaged riprap in designated areas of the upstream slope along with the placement of imported riprap

d) Placement and compaction of imported sand and gravel for internal filter and drain features.

4) Construct a toe drain system consisting of drain pipes, precast concrete manholes, flow measurement flumes, and imported sand and gravel.

5) Construct new outlet works, including:

a) A precast concrete outlet works tower.

b) Concrete-encased, precast reinforced concrete pipe outlet conduit.

c) Concrete gated low-level inlet, stem encasement, HDPE conduit, and gate pedestal structures.

d) Grouted riprap stilling basin.

6) Excavation and grading in the spillway.

7) Place imported road gravel surfacing along the crest of the dam.

8) Reclaim all disturbed areas, including construction staging areas and temporary roads. Reclamation consists of the preparation of soil and seeding.

Estimated Period of Performance (PoP): 445 calendar days after issuance of the notice to proceed. Assumes PoP Sep 2025 through Nov 2026. (Onsite work restrictions annually Mar 15 - Jul 15).

Magnitude of Construction: Between $1M – $5M

Solicitation Set-Aside: Total Small Business

NAICS Code: 237990 / Other Heavy and Civil Engineering Construction

Produce Service Code: Y1AZ – Construction of Other Administrative Facilities and Service Buildings

Small Business Size Standard: $45M

Site Visit: Date, time and meeting location, will be provided in the solicitation. Offerors are highly encouraged to attend the scheduled site visit to ensure they fully understand the requirement and conditions that may affect the specifications, cost, and performance of the project.

Solicitation Issuance Date: The BLM anticipates issuing a request for proposals (RFP) end of May 2025. The proposals will be due approximately 30 days after the solicitation issue date. Potential offerors are responsible for monitoring www.sam.gov Contract Opportunities for all communication regarding this requirement, including downloading the complete solicitation package and all solicitation amendments. No paper copies or email copies will be provided.

Registration: Offerors must have a UEI number and be registered and active in the System for Award Management (SAM) www.sam.gov in order to be eligible for award.

Award will be based on best value to the government in accordance with the Federal Acquisition Regulations (FAR). This notice does not obligate the government to award a contract, nor does it obligate the government to pay for any proposal preparation costs.

Point of contact: Contracting Officer, Lisa McKeon at lmckeon@blm.gov http://www.sam.gov/ http://www.sam.gov/ mailto:lmckeon@blm.gov

BUREAU OF LAND MANAGEMENT
National Operations Center
Denver Federal Center, Building 85
P.O. Box 25047
Denver, Colorado 80225-0047
http://www.blm.gov

File details come from the government source that posted it. Updated .