This is a Justification for Other Than Full and Open Competition (JOFOC) memorandum for a simplified acquisition to procure TDM circuits for telecommunication support from Cox Communications LLC. The period of performance is March 1, 2025 to February 28, 2025.
The justification cites Cox Communications as the only responsible source due to their proprietary rights and critical equipment considerations. Cox owns the proprietary rights to the system and all affected supported equipment, with other carriers having no rights or accessibility to the connections or equipment. The document emphasizes that attempting to change providers would require restructuring of lines and equipment, resulting in unacceptable service interruptions and costs that would exceed the value of maintaining current systems. The circuits are deemed vital to maintain mission and operational functions for affected agencies. The procurement falls under the simplified acquisition threshold, though the specific anticipated dollar value is redacted in the document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 25Q0008 ANNEX B EVAL FACTORS.docx | DOCX document | |
| 25Q0008 ANNEX C PRICING.xlsx | XLSX spreadsheet | |
| SF 1449 - N7027225Q0008.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 Ver 2.0 (01 June 2018)
Date: 01/19/2025
MEMORANDUM
Subj: USE OF OTHER THAN FULL AND OPEN COMPETITION FOR AN ACQUISITION UNDER
THE SIMPLIFIED ACQUISITION THRESHOLD
Ref: (a) PR Number(s): __N7027225PRCOX23______________________________
I. BACKGROUND:
1. In considering the references, FAR 13.106-1(b)(1)(i) states for purchases not exceeding the simplified acquisition threshold, Contacting Officers may solicit from one source if the Contracting Officer determines that, under the circumstances of the contract action, only one source is reasonably available (e.g., urgency, exclusive licensing, brand-name, or industrial mobilization).
2. As required by FAR 13.106-3(b)(3)(i), this memorandum explains the absence of competition for this acquisition because only one source will be solicited for this requirement (or for a portion of the requirement) and the requirement is not expected to exceed the simplified acquisition threshold.
II. DESCRIPTION OF ITEM OR SERVICE:
1. Provide a description of the item or service required, to include
a) the name of the required source or brand name
COX COMMUNICATIONS LLC.
b) the required delivery date/period of performance and
MARCH 01, 2025 TO FEBRUARY 28, 2025
c) its intended use.
TDM CIRCUITS FOR TELECOMMUNICATION SUPPORT
2. List the source(s) or known vendor(s) who are able to provide the above described item or service.
COX COMMUNICATIONS LLC.
III. THE DETERMINATION FOR USE OF OTHER THAN FULL AND OPEN COMPETITION IS BASED
ON THE FOLLOWING (select all that apply):
A. _XX_ Only one responsible source (select all that apply):
1. _XX_ RESTRICTIVE RIGHTS: the source has established proprietary rights, limited rights in data, patent rights, copyrights, or secret processes in the item or service.
a. Explain what is subject to the restrictive rights.
TIME DIVISION MULTIPLEXING (TDM) CIRCUITS SPECIFIC TO TELECOM SUPPORT
SERVICES APPLICABLE FOR INTERNET AND PHONE LINES PROVIDED BY COX
COMMUNICATIONS.
b. If drawings are included, who is identified as “owning” the drawings.
2 Ver 2.0 (01 June 2018)
COX COMMUNICATIONS OWNS THE PROPRIETARY RIGHTS TO SYSTEM AS ALL
AFFECTED SUPPORTED EQUIPMENT IS PROVIDED BY THE PROPRIETARY OWNER,
OTHER CARRIERS DO NOT HAVE RIGHTS OR ACCESSIBILITY TO CONNECTIONS OR
EQUIPMENT PROVIDED BY COX COMMUNICATIONS
2. ____ EXCLUSIVE LICENSING AGREEMENTS: The item or service is only available from the Original Equipment Manufacturer (OEM), or there is ONLY ONE authorized distributor or technical representative for the OEM.
a. Identify the OEM and explain the circumstances surrounding why the item or service is only available from the OEM.
b. Identify the distributors / authorized technical representatives for the item or service.
Provide evidence of the licensing or OEM certification agreement as an attachment to this document.
3. _XX_ OTHER REASON:
a. _XX__ CRITICAL EQUIPMENT: The required item is critical equipment, the failure of which poses a hazard to the operational system, the crew, or the environment.
i. Explanation on how requirement and intended purpose is critical:
CURRENT SYSTEMS ARE DIRECTLY CONNECTED TO EXISTING
CIRCUITS APPLICABLE TO LOCATIONS. CONNECTIVITY IS VITAL TO
MAINTAIN MISSION AND OPERATIONAL FUNCTIONS APPLICABLE
TO ALL AFFECTED AGENCIES. ANY ATTEMPT TO OPEN
COMPETITION IF THE INCUMBENT IS NOT PROVIDED AWARD
WOULD REQUIRE RESTRUCTURE OF LINES AND EQUIPMENT
RESULTING IN AN UNACCEPTABLE PERIOD OF NO CONNECTIVITY
ADVERSLY AFFECTING MISSION AND OPERATIONS, AS WELL THE
COST TO THE GOVERNMENT TO REALIGN WITH A NEW SYSTEM
WOULD DRASTICALLY EXCEED THE VALUE OF MAINTAINING
CURRENT SYSTEMS IN PLACE.
b. _____ STANDARDIZATION / BRAND NAME: only the specified make/model of the equipment/parts will satisfy the Government’s needs for additional units or replacement items.
i. Identify Make / Model Number(s): ___________________
ii. Identify other systems with this Make / Model:
c. ___ FORM, FIT, AND FUNCTION: Item is direct replacement parts / components for existing equipment and must be compatible in terms of form, fit, and function with existing equipment / configurations.
i. Identify Make / Model of existing equipment:
3 Ver 2.0 (01 June 2018)
ii. Describe how the equipment must be compatible with the existing configuration.
d. _____ OTHER:
4. _____ UNUSUAL AND COMPELLING URGENCY: The supplies or services are of such unusual and compelling urgency that the Government would be seriously injured unless the agency is permitted to limit the number of sources from which it solicits. Urgent requirements are supplies or services that will result in work stoppage, or are mission critical and the routine processing time would injure the Government. The determination that the procurement for the above is an urgent and compelling requirement is based on the following:
a. Date on which the requirement was identified: ______________________________
b. Required delivery date / Period of Performance: _____________________________
c. If the difference between a. and b. is more than one week, explain the delay in submitting the requirement.
d. Estimated production lead time: ______________________________
e. Explanation of why delivery / commencement of services by the date required is needed: (explain the impact to the mission, any special circumstances or conditions, etc.)
f. CASREP Number: _________________________________________
IV. ANTICIPATED DOLLAR VALUE OF PROCURMENT: .
4 Ver 2.0 (01 June 2018)
V. CERTIFICATIONS AND APPROVALS:
Technical / Requirement Certification: I certify that the facts and representation under my cognizance which are included in this justification are complete and accurate to the best of my knowledge and belief.
File details come from the government source that posted it. Updated .