25NC0488_-_Cost_Sheet_FINAL.xlsx

XLSX spreadsheet 22 KB Posted

Attached to
RFP Secondary 25NC0488 Potential and Goals Study - Group E
Solicitation number
0000038224
Issued by
California

About this file

This is a cost sheet for RFP 25NC0488, issued by the California Public Utilities Commission (CPUC), for research services covering two primary areas: Potential and Goals studies and Industry and Market Studies. The contract encompasses 17 distinct tasks spanning a four-year period, requiring deliverables such as research sector work plans, monthly and scheduled progress reports, coordination meetings, stakeholder workshops, data collection and analysis, simulation modeling tools, technical assessments, scenario analyses, and building electrification potential studies. Key deliverables include two final research sector work plans, 48 monthly progress reports, approximately 80 scheduled reports, 348 coordination meetings with CPUC staff, 80 stakeholder engagement events of varying durations, and multiple draft and final reports across various research areas including the Potential and Goals Study, SB 350 IOU Territory Targets Update, and End-Use Specific Market Characterization studies.

The cost sheet establishes line-item pricing for each task and deliverable, with units of measure ranging from individual reports and meetings to data collection periods and training sessions. Task 17 allocates $250,000 for unanticipated tasks, providing flexibility for emerging research needs throughout the contract term. The cost sheet requires proposers to identify key staff members and their hourly rates, indicating that pricing will be based on a combination of fixed unit costs and labor rates. The contract duration covers Years 1 through 4, with no renewal options noted in the available documentation. No specific contract award date, response deadline, or funding source information is provided in this cost sheet document.

View the file

Other files

File Type Posted
25NC0488_RFP_Potential_and_Goals_Study_-_Group_E.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Cost Sheet RFP 25NC0488
Proposer Name:
Key Staff Members Name and TitleHourly Rate
Task 1: Research Sector Work Plans and UpdatesUnit of MeasureCost Per UnitAmount RequiredTotal Cost Years 1-4
1) Final Draft Research Sector Work Plan for the “Potential and Goals Study” research areaPer Plan1
2) Final Draft Research Sector Work Plan for the “Industry and Market Studies” research areaPer Plan1
3) Annual updates to both Research Sector Work PlansPer Plan6
Total Cost
Task 2a: Progress Reports and UpdatesUnit of MeasureCost Per UnitAmount RequiredTotal Cost Years 1-4
2) Monthly Progress ReportsPer Report48
4) Closeout ReportPer Report1
Total Cost
Task 2b: Scheduled Reports and Ad Hoc ReportsUnit of MeasureCost Per UnitAmount RequiredTotal Cost Years 1-4
1) Scheduled ReportsPer Report80
2) Ad Hoc ReportsPer Report80
Total Cost
Task 3: Kickoff MeetingUnit of MeasureCost Per UnitAmount RequiredTotal Cost Years 1-4
1) Kick Off MeetingEach1
Total Cost
Task 4: Coordination Meetings With CPUC StaffUnit of MeasureCost Per UnitAmount RequiredTotal Cost Years 1-4
1) Coordination meetingsEach348
Total Cost
Task 5: Stakeholder Workshops & WebinarsUnit of MeasureCost Per UnitAmount RequiredTotal Cost Years 1-4
1) Provide SME and/or hosting services at up to each engagement (for engagements up to 2 hours)Each80
1) Provide SME and/or hosting services at up to each engagement (for engagements 2 to 4 hours)Each10
2) Provide SME and/or hosting services at up to each engagement (for engagements from 4 hours to full day)Each10
3) Produce and share agenda for up to each engagementEach100
4) PowerPoint presentations and other presentation materials for up to each engagementEach100
5)Meeting notes for up to each engagementEach100
6) Record, organize, and responds to stakeholder feedback for up to each engagementEach100
Total Cost
Task 6: Gaps and Emerging Issues ReportUnit of MeasureCost Per UnitAmount RequiredTotal Cost Years 1-4
1) Gaps and Emerging Issues Draft ReportsPer report2
2) Gaps and Emerging Issues Final ReportsPer report2
3) Industry and Market Study Draft ReportsPer report10
4) Industry and Market Study Final ReportsPer report10
Total Cost
Task 7: Data Collection, Transmission, and Storage PlanUnit of MeasureCost Per UnitAmount RequiredTotal Cost Years 1-4
1) Draft data collection, storage, and transmission planPer plan1
2) Final data collection, storage, and transmission planPer plan1
3) Descriptive statistics for each collection periodPer data collection1
4) Data requestsPer data collection1
5) Data collection forms and surveysPer data collection1
6) Quality check methodology and resultsPer data collection1
7) Training materialsPer data collection1
8) Documentation of all data sets and calculationsPer data collection1
9) All primary and secondary data collectedPer data collection1
10) All primary and secondary data analysis and toolsPer data collection1
Total Cost
Task 8a: Potential and Goals Energy Efficiency Adoption Simulation ModelUnit of MeasureCost Per UnitAmount RequiredTotal Cost Years 1-4
1) Simulation modeling toolPer tool2
2) User manualPer manual2
3) Train CPUC staff and public audience on how to use the toolPer training2
Total Cost
Task 8b: Potential and Goals StudyUnit of MeasureCost Per UnitAmount RequiredTotal Cost Years 1-4
1) Technical potential assessmentPer report2
2) Economic potential assessmentPer report2
3) Market achievable potential assessmentPer report2
4) Draft Potential and Goals Study ReportPer report2
5) Final Potential and Goals Study ReportPer report2
Total Cost
Task 9: Additional Achievable Energy Efficiency ScenariosUnit of MeasureCost Per UnitAmount RequiredTotal Cost Years 1-4
1) Preliminary scenario dataPer Report2
2) Completed scenarios and dataPer Report2
3) Draft report for public discussion of the six (6) energy efficiency scenariosPer Report2
4) Final report for public discussion of the six (6) energy efficiency scenariosPer Report2
5) Draft report detailing Contractor’s data sources, methods, analysis, findings, and recommendationsPer Report2
6) Final report detailing Contractor’s data sources, methods, analysis, findings, and recommendationsPer Report2
Total Cost
Task 10: SB 350 IOU Territory Targets UpdateUnit of MeasureCost Per UnitAmount RequiredTotal Cost Years 1-4
1) Presentations for public meetingsEach6
2a) Meeting notes (for remote meetings)Per meeting6
2b) Meeting notes (for in person meetings)Per meeting6
3) Written responses to stakeholder commentsPer meeting6
4) SB 350 IOU Territory Targets Update Draft ReportPer Report2
5) SB 350 IOU Territory Targets Update Final ReportPer Report2
Total Cost
Task 11: Assessment of Achievable Building Electrification PotentialUnit of MeasureCost Per UnitAmount RequiredTotal Cost Years 1-4
1)Draft ScenariosPer scenario set2
2)Final ScenariosPer scenario set2
3) Draft ReportPer report2
4) Final ReportPer report2
Total Cost
Task 12: End-Use Specific Market CharacterizationUnit of MeasureCost Per UnitAmount RequiredTotal Cost Years 1-4
1) Draft ReportsPer report2
2) Final ReportsPer report2
Total Cost
Task 13: Baseline CharacterizationUnit of MeasureCost Per UnitAmount RequiredTotal Cost Years 1-4
1) Draft ReportsPer report2
2) Final ReportsPer report2
Total Cost
Task 14: Market Effects StudiesUnit of MeasureCost Per UnitAmount RequiredTotal Cost Years 1-4
1) Draft ReportsPer report2
2) Final ReportsPer report2
Total Cost
Task 15: Quantifying Equity and Market Support GoalsUnit of MeasureCost Per UnitAmount RequiredTotal Cost Years 1-4
Draft ReportPer report2
Final ReportPer report2
Total Cost
Task 16: Data Tool MaintenanceUnit of MeasureCost Per UnitAmount RequiredTotal Cost Years 1-4
Update DocumentationPer report2
User GuidePer report2
Total Cost
Task 17: Unanticipated Tasks
$250,000
Total Proposal Cost