This is a cost sheet for RFP 25NC0488, issued by the California Public Utilities Commission (CPUC), for research services covering two primary areas: Potential and Goals studies and Industry and Market Studies. The contract encompasses 17 distinct tasks spanning a four-year period, requiring deliverables such as research sector work plans, monthly and scheduled progress reports, coordination meetings, stakeholder workshops, data collection and analysis, simulation modeling tools, technical assessments, scenario analyses, and building electrification potential studies. Key deliverables include two final research sector work plans, 48 monthly progress reports, approximately 80 scheduled reports, 348 coordination meetings with CPUC staff, 80 stakeholder engagement events of varying durations, and multiple draft and final reports across various research areas including the Potential and Goals Study, SB 350 IOU Territory Targets Update, and End-Use Specific Market Characterization studies.
The cost sheet establishes line-item pricing for each task and deliverable, with units of measure ranging from individual reports and meetings to data collection periods and training sessions. Task 17 allocates $250,000 for unanticipated tasks, providing flexibility for emerging research needs throughout the contract term. The cost sheet requires proposers to identify key staff members and their hourly rates, indicating that pricing will be based on a combination of fixed unit costs and labor rates. The contract duration covers Years 1 through 4, with no renewal options noted in the available documentation. No specific contract award date, response deadline, or funding source information is provided in this cost sheet document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 25NC0488_RFP_Potential_and_Goals_Study_-_Group_E.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Cost Sheet RFP 25NC0488 | |
| Proposer Name: | |
| Key Staff Members Name and Title | Hourly Rate |
| Task 1: Research Sector Work Plans and Updates | Unit of Measure | Cost Per Unit | Amount Required | Total Cost Years 1-4 |
| 1) Final Draft Research Sector Work Plan for the “Potential and Goals Study” research area | Per Plan | 1 | ||
| 2) Final Draft Research Sector Work Plan for the “Industry and Market Studies” research area | Per Plan | 1 | ||
| 3) Annual updates to both Research Sector Work Plans | Per Plan | 6 | ||
| Total Cost |
| Task 2a: Progress Reports and Updates | Unit of Measure | Cost Per Unit | Amount Required | Total Cost Years 1-4 |
| 2) Monthly Progress Reports | Per Report | 48 | ||
| 4) Closeout Report | Per Report | 1 | ||
| Total Cost |
| Task 2b: Scheduled Reports and Ad Hoc Reports | Unit of Measure | Cost Per Unit | Amount Required | Total Cost Years 1-4 |
| 1) Scheduled Reports | Per Report | 80 | ||
| 2) Ad Hoc Reports | Per Report | 80 | ||
| Total Cost |
| Task 3: Kickoff Meeting | Unit of Measure | Cost Per Unit | Amount Required | Total Cost Years 1-4 |
| 1) Kick Off Meeting | Each | 1 | ||
| Total Cost |
| Task 4: Coordination Meetings With CPUC Staff | Unit of Measure | Cost Per Unit | Amount Required | Total Cost Years 1-4 |
| 1) Coordination meetings | Each | 348 | ||
| Total Cost |
| Task 5: Stakeholder Workshops & Webinars | Unit of Measure | Cost Per Unit | Amount Required | Total Cost Years 1-4 |
| 1) Provide SME and/or hosting services at up to each engagement (for engagements up to 2 hours) | Each | 80 | ||
| 1) Provide SME and/or hosting services at up to each engagement (for engagements 2 to 4 hours) | Each | 10 | ||
| 2) Provide SME and/or hosting services at up to each engagement (for engagements from 4 hours to full day) | Each | 10 | ||
| 3) Produce and share agenda for up to each engagement | Each | 100 | ||
| 4) PowerPoint presentations and other presentation materials for up to each engagement | Each | 100 | ||
| 5) | Meeting notes for up to each engagement | Each | 100 | |
| 6) Record, organize, and responds to stakeholder feedback for up to each engagement | Each | 100 | ||
| Total Cost |
| Task 6: Gaps and Emerging Issues Report | Unit of Measure | Cost Per Unit | Amount Required | Total Cost Years 1-4 |
| 1) Gaps and Emerging Issues Draft Reports | Per report | 2 | ||
| 2) Gaps and Emerging Issues Final Reports | Per report | 2 | ||
| 3) Industry and Market Study Draft Reports | Per report | 10 | ||
| 4) Industry and Market Study Final Reports | Per report | 10 | ||
| Total Cost |
| Task 7: Data Collection, Transmission, and Storage Plan | Unit of Measure | Cost Per Unit | Amount Required | Total Cost Years 1-4 |
| 1) Draft data collection, storage, and transmission plan | Per plan | 1 | ||
| 2) Final data collection, storage, and transmission plan | Per plan | 1 | ||
| 3) Descriptive statistics for each collection period | Per data collection | 1 | ||
| 4) Data requests | Per data collection | 1 | ||
| 5) Data collection forms and surveys | Per data collection | 1 | ||
| 6) Quality check methodology and results | Per data collection | 1 | ||
| 7) Training materials | Per data collection | 1 | ||
| 8) Documentation of all data sets and calculations | Per data collection | 1 | ||
| 9) All primary and secondary data collected | Per data collection | 1 | ||
| 10) All primary and secondary data analysis and tools | Per data collection | 1 | ||
| Total Cost |
| Task 8a: Potential and Goals Energy Efficiency Adoption Simulation Model | Unit of Measure | Cost Per Unit | Amount Required | Total Cost Years 1-4 |
| 1) Simulation modeling tool | Per tool | 2 | ||
| 2) User manual | Per manual | 2 | ||
| 3) Train CPUC staff and public audience on how to use the tool | Per training | 2 | ||
| Total Cost | ||||
| Task 8b: Potential and Goals Study | Unit of Measure | Cost Per Unit | Amount Required | Total Cost Years 1-4 |
| 1) Technical potential assessment | Per report | 2 | ||
| 2) Economic potential assessment | Per report | 2 | ||
| 3) Market achievable potential assessment | Per report | 2 | ||
| 4) Draft Potential and Goals Study Report | Per report | 2 | ||
| 5) Final Potential and Goals Study Report | Per report | 2 | ||
| Total Cost | ||||
| Task 9: Additional Achievable Energy Efficiency Scenarios | Unit of Measure | Cost Per Unit | Amount Required | Total Cost Years 1-4 |
| 1) Preliminary scenario data | Per Report | 2 | ||
| 2) Completed scenarios and data | Per Report | 2 | ||
| 3) Draft report for public discussion of the six (6) energy efficiency scenarios | Per Report | 2 | ||
| 4) Final report for public discussion of the six (6) energy efficiency scenarios | Per Report | 2 | ||
| 5) Draft report detailing Contractor’s data sources, methods, analysis, findings, and recommendations | Per Report | 2 | ||
| 6) Final report detailing Contractor’s data sources, methods, analysis, findings, and recommendations | Per Report | 2 | ||
| Total Cost | ||||
| Task 10: SB 350 IOU Territory Targets Update | Unit of Measure | Cost Per Unit | Amount Required | Total Cost Years 1-4 |
| 1) Presentations for public meetings | Each | 6 | ||
| 2a) Meeting notes (for remote meetings) | Per meeting | 6 | ||
| 2b) Meeting notes (for in person meetings) | Per meeting | 6 | ||
| 3) Written responses to stakeholder comments | Per meeting | 6 | ||
| 4) SB 350 IOU Territory Targets Update Draft Report | Per Report | 2 | ||
| 5) SB 350 IOU Territory Targets Update Final Report | Per Report | 2 | ||
| Total Cost | ||||
| Task 11: Assessment of Achievable Building Electrification Potential | Unit of Measure | Cost Per Unit | Amount Required | Total Cost Years 1-4 |
| 1) | Draft Scenarios | Per scenario set | 2 | |
| 2) | Final Scenarios | Per scenario set | 2 | |
| 3) Draft Report | Per report | 2 | ||
| 4) Final Report | Per report | 2 | ||
| Total Cost | ||||
| Task 12: End-Use Specific Market Characterization | Unit of Measure | Cost Per Unit | Amount Required | Total Cost Years 1-4 |
| 1) Draft Reports | Per report | 2 | ||
| 2) Final Reports | Per report | 2 | ||
| Total Cost |
| Task 13: Baseline Characterization | Unit of Measure | Cost Per Unit | Amount Required | Total Cost Years 1-4 |
| 1) Draft Reports | Per report | 2 | ||
| 2) Final Reports | Per report | 2 | ||
| Total Cost | ||||
| Task 14: Market Effects Studies | Unit of Measure | Cost Per Unit | Amount Required | Total Cost Years 1-4 |
| 1) Draft Reports | Per report | 2 | ||
| 2) Final Reports | Per report | 2 | ||
| Total Cost | ||||
| Task 15: Quantifying Equity and Market Support Goals | Unit of Measure | Cost Per Unit | Amount Required | Total Cost Years 1-4 |
| Draft Report | Per report | 2 | ||
| Final Report | Per report | 2 | ||
| Total Cost |
| Task 16: Data Tool Maintenance | Unit of Measure | Cost Per Unit | Amount Required | Total Cost Years 1-4 |
| Update Documentation | Per report | 2 | ||
| User Guide | Per report | 2 | ||
| Total Cost |
| Task 17: Unanticipated Tasks | ||
| $250,000 | ||
| Total Proposal Cost |