DTFACN-14-R-00197
PART 1 – SECTION C
SCOPE OF WORK
3.1-1 Clauses and Provisions Incorporated by reference (July 2011) This screening information request (SIR) or contract, as applicable, incorporates by reference the provisions or clauses listed below with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make the full text available, or offerors and contractors may obtain the full text via Internet at: http://conwrite.faa.gov.
(End of clause)
C.001 Scope of Work
The contractor shall furnish all labor, supplies and equipment necessary to perform snow and ice removal services at the Airport Traffic Control Tower (ATCT) located in Traverse City, Michigan. The contractor shall remove snow and ice from sidewalks, driveways, parking areas, and handicapped parking areas. Snow removal will be performed when the snow depth of the parking area and sidewalks reaches two (2) inches or as ordered by the Point of Contact (POC). Likewise, Calcium Chloride shall be applied when ice accumulation has developed on the parking area and sidewalks.
C.002 Location and Contact Information
Federal Aviation Administration (FAA)
Cherry Capital Airport Traverse City Airport 1275 Airport Access Road
Traverse City, MI 49686 C.003 Performance
Performance shall be of a high standard conforming to good trade practices. All services shall be rendered promptly and efficiently as follows:
(a) Service will be required between the hours of 6:30 a.m. and 9:00 p.m. However, it is recommended that total cleaning of the parking areas be accomplished between the hours of 12:00 a.m. and 5:30 a.m. when there is minimum staffing at the ATCT. Service may be ordered by telephone.
(b) The contractor shall furnish both the Contracting Officer (CO) and the POC a list of telephone numbers where either he/she or one of his/her authorized representatives may be contacted seven (7) days per week at any time of the day or night.
(c) The contractor shall move his/her equipment to the site(s) and begin work no more than two (2) hours after service is ordered.
C.004 Disposal of Snow
The snow must be removed from the premises when directed by the POC if the accumulation exceeds that which can be pushed off the roads and parking areas without blocking driveways, walkways, parking areas, islands, handicapped parking areas and loading dock.
C.005 Supervision The contractor shall provide proper supervision of all jobs. The POC will give directions for snow removal; however, detailed instructions for carrying out such directions will be the responsibility of the supervisor. The supervisor will be responsible for furnishing a list of all equipment, names of operators, and the time they arrive on-site, and the time each operator or piece of equipment leaves the work site to the POC.
C.006 Government Furnished Equipment
There will be no Government furnished equipment.
C.007 Contractor Furnished Equipment
The contractor shall furnish all equipment, materials and personnel consistent with good utilization depending on the amount of snow and ice involved. The contractor will keep necessary equipment and manpower at the site and continue with performance of the work until it is completed to the satisfaction of the POC.
(End of section)