Kenosha County Pre-Trial Facility HVAC Improvements - Bid Document Summary
This is a comprehensive set of construction drawings and specifications for HVAC improvements at the Kenosha County Pre-Trial Facility located at 927 54th Street, Kenosha, Wisconsin 53140, prepared by Clark Dietz engineering firm. The project encompasses selective demolition of existing heating, ventilation, and air conditioning systems across multiple floors (basement through third floor) and installation of new variable air volume (VAV) terminal units, air-cooled condensing units, heating and cooling coils, control systems, and related piping and ductwork. The scope includes replacement of approximately 27 VAV boxes with reheat capabilities, two air-cooled condensing units (80-ton and 60-ton capacity), new heating and cooling coils for existing air handling units, electric unit heaters, exhaust fans with CO/NO2 sensors, and comprehensive building automation system integration. The project is divided into multiple phased zones to maintain facility operations during construction, with specific requirements for temporary partitions in occupied areas and coordination with Kenosha County staff for after-hours work when access to occupied areas is necessary. The bid was issued for construction on November 26, 2025 (Revision 3), with an original 70% review submittal dated April 30, 2024 and a purchasing review dated July 3, 2025.
The electrical work includes installation of new feeder conductors, disconnect switches, and control wiring from existing panelboards (1HS, 1LS, and 3HN) to support new HVAC equipment. The drawings specify that contractors must provide complete system balancing, field verification of existing conditions, system draining and refilling during phasing, and all electrical and temperature control installations. The project requires coordination with existing boiler systems, hot water pumps, and fire alarm devices, with the contractor responsible for integrating new controls into the building management system. Pricing terms, bid amounts, and specific funding sources are not detailed in the design drawings provided; however, contractors must include costs for all coordination with county staff, temporary partitions, after-hours work, system commissioning, and integration with existing infrastructure in their bids. The detailed equipment schedules indicate manufacturer specifications (primarily Trane equipment for VAV boxes and air handling units), design airflow rates ranging from 100 to 1,800 CFM depending on space requirements, and comprehensive control sequences requiring building automation system interface with minimum data points for monitoring and alarming.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2522 Addendum 1.pdf | ||
| 2522 Specifications.pdf | ||
| 2522 Bid Documents.pdf | ||
| Background Check Form.docx | DOCX document | |
| Vendor Responsibility Form Construction.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT
LOCATION
PROJECT
LOCATION
PROJECT
LOCATION
P R
O J E
C T
T
IT
L E
D R
A W
IN
G
T
IT
L E
PROJECT No.
DRAWING No.
NOTE: DIMENSIONAL DATA IS NOT TO BE OBTAINED BY SCALING ANY PORTION OF THIS DRAWING th S tr e e t
K e n o sh a
W
I 5
C U s e rs
\J W ie d o ff \D o c u m e n ts
\K
K e n o s h a c o P
T F
H V
A C
I m p ro v e m e n ts
R J e ff .W ie d o ff S
D W
.r vt
/2 /2
:4
:2
A
M
G0.01
T
IT
L E
S H
E E
T K
E N
O S
H A
C O
U N
T Y
P R
E -T
R
IA
L F
A C
IL
IT
Y H
V A
C
IM
P R
O V
E M
E N
T S
K0450190
DESIGNED BY: JAW
DRAWN BY: JAW
CHECKED BY: NH
DATE CHECKED: 05/05/25
P H
O N
E
.6
.1 w w
.c la rk d ie tz
.c o m K e n o sh a W
I 5 th
S tr e e t, th F lo o r
SHEET LIST
NUMBER SHEET NAME
G0.01 TITLE SHEET
G1.01 BASEMENT PHASING PLAN
G1.02 FIRST FLOOR NORTH PHASING PLAN
G1.03 FIRST FLOOR SOUTH PHASING PLAN
G1.04 SECOND FLOOR NORTH PHASING PLAN
G1.05 SECOND FLOOR SOUTH PHASING PLAN
G1.06 THIRD FLOOR NORTH PHASING PLAN
G1.07 THIRD FLOOR SOUTH PHASING PLAN
M0.00 HVAC GENERAL NOTES, LEGEND, AND ABBREVIATIONS
M1.01 BASEMENT VENTILATION DEMOLITION PLAN
M1.02 BASEMENT HEATING DEMOLITION PLAN
M1.03 FIRST FLOOR NORTH VENTILATION DEMOLITION PLAN
M1.04 FIRST FLOOR NORTH HEATING DEMOLITION PLAN
M1.05 FIRST FLOOR SOUTH VENTILATION DEMOLITION PLAN
M1.06 FIRST FLOOR SOUTH HEATING DEMOLITION PLAN
M1.07 SECOND FLOOR NORTH VENTILATION DEMOLITION PLAN
M1.08 SECOND FLOOR NORTH HEATING DEMOLITION PLAN
M1.09 SECOND FLOOR SOUTH VENTILATION DEMOLITION PLAN
M1.10 SECOND FLOOR SOUTH HEATING DEMOLITION PLAN
M1.11 THIRD FLOOR NORTH VENTILATION DEMOLITION PLAN
M1.12 THIRD FLOOR NORTH HEATING DEMOLITION PLAN
M1.13 THIRD FLOOR SOUTH VENTILATION DEMOLITION PLAN
M1.14 THIRD FLOOR SOUTH HEATING DEMOLITION PLAN
M2.01 BASEMENT VENTILATION NEW WORK PLAN
M2.02 FIRST FLOOR NORTH VENTILATION NEW WORK PLAN
M2.03 FIRST FLOOR SOUTH VENTILATION NEW WORK PLAN
M2.04 SECOND FLOOR NORTH VENTILATION NEW WORK PLAN
M2.05 SECOND FLOOR SOUTH VENTILATION NEW WORK PLAN
M2.06 THIRD FLOOR NORTH VENTILATION NEW WORK PLAN
M2.07 THIRD FLOOR SOUTH VENTILATION NEW WORK PLAN
M3.01 BASEMENT HEATING NEW WORK PLAN
M3.02 FIRST FLOOR NORTH HEATING NEW WORK PLAN
M3.03 FIRST FLOOR SOUTH HEATING NEW WORK PLAN
M3.04 SECOND FLOOR NORTH HEATING NEW WORK PLAN
M3.05 SECOND FLOOR SOUTH HEATING NEW WORK PLAN
M3.06 THIRD FLOOR NORTH HEATING NEW WORK PLAN
M3.07 THIRD FLOOR SOUTH HEATING NEW WORK PLAN
M4.01 HVAC SCHEDULES
M4.02 HVAC SCHEDULES
M5.01 HVAC DETAILS
M5.02 HVAC CONTROL SCHEMATICS
M5.03 HVAC CONTROL SCHEMATICS
M5.04 HVAC CONTROL SCHEMATICS
M5.05 HVAC CONTROL SCHEMATICS
E0.00 ELECTRICAL GENERAL NOTES, LEGEND, AND ABBREVIATIONS
E1.01 FIRST FLOOR NORTH ELECTRICAL DEMOLITION PLAN
E1.02 FIRST FLOOR SOUTH ELECTRICAL DEMOLITION PLAN
E1.03 THIRD FLOOR NORTH ELECTRICAL DEMOLITION PLAN
E1.04 THIRD FLOOR SOUTH ELECTRICAL DEMOLITION PLAN
E2.01 FIRST FLOOR NORTH ELECTRICAL NEW WORK PLAN
E2.02 FIRST FLOOR SOUTH ELECTRICAL NEW WORK PLAN
E2.03 THIRD FLOOR NORTH ELECTRICAL NEW WORK PLAN
E2.04 THIRD FLOOR SOUTH ELECTRICAL NEW WORK PLAN
E4.01 ELECTRICAL SCHEDULES
NOT TO SCALE1
STATE MAP
NOT TO SCALE3
PROJECT LOCATION MAP
NOT TO SCALE2
PROJECT AREA MAP
COUNTY OF KENOSHA PRE-TRIAL
FACILITY HVAC IMPROVEMENTS
927 54TH ST, KENOSHA, WI 53140
NOVEMBER 26, 2025
ISSUED FOR BID
BID# 2522
NO. DATE REVISION
1 04/30/24 70% REVIEW
SUBMITTAL
2 07/03/25 PURCHASING
REVIEW
3 11/26/25 ISSUED FOR BID
HOLDING
HOLDING
HOLDING
HOLDING
GROUP HOLDING
JUVENILE HOLDING
JUVENILE HOLDING
SUMP ROOM
ELEV. EQUIP.
H.C. HOLDING
S.T.
S.P.
GROUP HOLDING
A/C
A/C
A/C
SALLY PORT
S.P.
ELEV S.P.
H.C. TLT.
T.
CONVEYANCE OFFICER
J.C.
0.S.
CORR.
VC01-7
VC01-6
VC01-5
VC01-4 VC01-3
VC01-2
VC01-1
ZONE 1
ZONE 2
P R
O J E
C T
T
IT
L E
D R
A W
IN
G
T
IT
L E
PROJECT No.
DRAWING No.
NOTE: DIMENSIONAL DATA IS NOT TO BE OBTAINED BY SCALING ANY PORTION OF THIS DRAWING th S tr e e t
K e n o sh a
W
I 5
C U s e rs
\J W ie d o ff \D o c u m e n ts
\K
K e n o s h a c o P
T F
H V
A C
I m p ro v e m e n ts
R J e ff .W ie d o ff S
D W
.r vt
/2 /2
:4
:3
A
M
G1.01
B A
S E
M E
N T
P H
A S
IN
G
P L A
N K
E N
O S
H A
C O
U N
T Y
P R
E -T
R
IA
L F
A C
IL
IT
Y H
V A
C
IM
P R
O V
E M
E N
T S
K0450190
DESIGNED BY: JAW
DRAWN BY: JAW
CHECKED BY: NH
DATE CHECKED: 05/05/25
P H
O N
E
.6
.1 w
.c la rk d ie tz
.c o m K e n o sh a W
I 5 th
S tr e e t, th F lo o r
8' 16'4'0
BASEMENT PHASING PLAN
KEYNOTES (THIS SHEET)
1. PROVIDE TEMPORARY FULL PARTITION FOR BOTH PHASES OF
WORK ON THIS FLOOR.
2. UNOCCUPIED AREA, WORK TO BE DONE ON REGULAR SHIFT HOURS.
GENERAL NOTES
1. WORK DOES NOT NECCESSARILY NEED TO BE COMPLETED IN
NUMERICAL ORDER OF THE ZONES. ZONES ARE NUMBERED
INDICATING THE SEPERATION OF WORK.
2. CONTRACTOR IS RESPONSIBLE FOR DRAINING AND REFILLING THE
SYSTEM AS REQUIRED TO COMPLETE EACH PHASE AND ENSURE THE
AREA IS OPERATIONAL ONCE THE WORK IN THAT AREA IS COMPLETE.
IF ACCESS TO COMPLETED AREA IS REQUIRED, THIS MUST BE
COORDINATED WITH KENOSHA COUNTY STAFF AND WORK MAY NEED
TO BE PERFORMED AFTER HOURS. CONTRACTOR MUST INCLUDE
THIS COORDINATION IN THEIR BID, NO ADDITIONAL COMPENSATION
WILL BE PROVIDED.
3. CONTRACTOR IS RESPONSIBLE FOR COMPLETING ALL ELECTRICAL
AND TEMPERATURE CONTROLS WORK INCLUDING CONDUIT AND
WIRING INSTALLATION IN EACH PHASE AND ENSURE THE AREA IS
OPERATIONAL ONCE THE WORK IN THAT AREA IS COMPLETE. IF
ACCESS TO COMPLETED AREA IS REQUIRED, THIS MUST BE
COORDINATED WITH KENOSHA COUNTY STAFF AND WORK MAY NEED
TO BE PERFORMED AFTER HOURS. CONTRACTOR MUST INCLUDE
THIS COORDINATION IN THEIR BID, NO ADDITIONAL COMPENSATION
WILL BE PROVIDED.
KEYPLAN_________
N.T.S.
NO. DATE REVISION
1 04/30/24 70% REVIEW
SUBMITTAL
2 07/03/25 PURCHASING
T S
TS
TS
INMATE PROPERTY
STORAGE
S.P.
SECUER STORAGE
ELEC. RM.
GROUP HOLDING
GROUP HOLDING
HOLDING
INMATE PROCESS
BOOKING
DRESS IN
H.C. HOLDING
GROUP HOLDING
GROUP HOLDING
S.P.
125A
S.P.
HOLD
123DECONT.
INTOX.
CORR.
INTOX.
METER RM.
HOLDING
HOLDING
CORR.
VIEWING
INTAKE COURT
CLO.
TRIAGE
HOLDING
HOLDING
DATA COM.
I.D.
COURT CLERK
164 CONFERENCE
COURT REPORTER
LOBBY
W.
M.
T.
Room
J.C.
DRESS OUT
T.
ISSUE
CLERK
VEST.
COURT COMM.
HOLD
Room
ELEVATOR SALLY
PORT
VEHICLE SALLY PORT
VC02-2
VC02-3
VC02-1
VC02-5VC02-4
VC02-7
VC02-8
VC02-9
VC02-10
VC02-11
VC02-12
VC02-13
VC02-14
VC02-15
VC02-27
VC02-6
(UH02-1)
(UH02-7)
(UH02-8)
(CUH02-2)
(CUH02-3)
(CUH02-4)
MATCHLINE
SEE M3.03
EUH02-1
(CEUH02-1)
ZONE 3
ZONE 6
ZONE 4
ZONE 5
ZONE 7
ZONE 8
ZONE 9
ZONE 10
P R
O J E
C T
T
IT
L E
D R
A W
IN
G
T
IT
L E
PROJECT No.
DRAWING No.
NOTE: DIMENSIONAL DATA IS NOT TO BE OBTAINED BY SCALING ANY PORTION OF THIS DRAWING th S tr e e t
K e n o sh a
W
I 5
C U s e rs
\J W ie d o ff \D o c u m e n ts
\K
K e n o s h a c o P
T F
H V
A C
I m p ro v e m e n ts
R J e ff .W ie d o ff S
D W
.r vt
/2 /2
:4
:3
A
M
G1.02
F
IR
S T
F L
O O
R N
O R
T H
P H
A S
IN
G
P L A
N
K E
N O
S H
A C
O U
N T
Y P
R E
-T R
IA
L
F A
C
IL
IT
Y
H V
A C
IM
P
R O
V E
M E
N T
S
K0450190
DESIGNED BY: JAW
DRAWN BY: JAW
CHECKED BY: NH
DATE CHECKED: 05/05/25
P H
O N
E
.6
.1 w
.c la rk d ie tz
.c o m K e n o sh a W
I 5 th
S tr e e t, th F lo o r
8' 16'4'0
FIRST FLOOR NORTH HEATING NEW WORK PLAN
KEYNOTES (THIS SHEET)
1. PROVIDE TEMPORARY FULL PARTITION FOR WORK DONE IN ZONES
3 AND 6.
2. PROVIDE TEMPORARY FULL PARTITION FOR WORK DONE IN ZONE 4.
3. PROVIDE TEMPORARY FULL PARTITION FOR WORK DONE IN ZONES
6 AND 8.
4. UNOCCUPIED AREA, WORK TO BE DONE ON REGULAR SHIFT HOURS.
5. OCCUPIED AREA, WORK TO BE DONE ON WEEKEND/EVENING
HOURS.
KEYPLAN_________
N.T.S.
NO. DATE REVISION
1 04/30/24 70% REVIEW
SUBMITTAL
2 07/03/25 PURCHASING
REVIEW
3 11/26/25 ISSUED FOR BID
GENERAL NOTES
1. WORK DOES NOT NECCESSARILY NEED TO BE COMPLETED IN
NUMERICAL ORDER OF THE ZONES. ZONES ARE NUMBERED
INDICATING THE SEPERATION OF WORK.
2. CONTRACTOR IS RESPONSIBLE FOR DRAINING AND REFILLING THE
SYSTEM AS REQUIRED TO COMPLETE EACH PHASE AND ENSURE THE
AREA IS OPERATIONAL ONCE THE WORK IN THAT AREA IS COMPLETE.
IF ACCESS TO COMPLETED AREA IS REQUIRED, THIS MUST BE
COORDINATED WITH KENOSHA COUNTY STAFF AND WORK MAY NEED
TO BE PERFORMED AFTER HOURS. CONTRACTOR MUST INCLUDE
THIS COORDINATION IN THEIR BID, NO ADDITIONAL COMPENSATION
WILL BE PROVIDED.
3. CONTRACTOR IS RESPONSIBLE FOR COMPLETING ALL ELECTRICAL
AND TEMPERATURE CONTROLS WORK INCLUDING CONDUIT AND
WIRING INSTALLATION IN EACH PHASE AND ENSURE THE AREA IS
OPERATIONAL ONCE THE WORK IN THAT AREA IS COMPLETE. IF
ACCESS TO COMPLETED AREA IS REQUIRED, THIS MUST BE
COORDINATED WITH KENOSHA COUNTY STAFF AND WORK MAY NEED
TO BE PERFORMED AFTER HOURS. CONTRACTOR MUST INCLUDE
THIS COORDINATION IN THEIR BID, NO ADDITIONAL COMPENSATION
WILL BE PROVIDED.
ELEV. S.P.
FACILITY ADMIN
CONF.
CL.
115A
STORAGE
CONFERENCE
OFFICE
OFFICE
OFFICE
OFFICE
LOBBY
T.
J.C.
CLERICAL
CL.
104A
CORR.
RECORDS STORAGE
ELEC. RM.
116A
W.
M.
CORR.
VC03-1
VC03-2
VC03-3
VC03-4
VC03-5
VC03-6
VC03-7
VC03-8
VC03-9
VC03-10
VC03-11
MATCHLINE
SEE M3.02
(CUH03-5)
(CUH03-6)
ZONE 11
ZONE 12
ZONE 14
ZONE 13
ZONE 15
P R
O J E
C T
T
IT
L E
D R
A W
IN
G
T
IT
L E
PROJECT No.
DRAWING No.
NOTE: DIMENSIONAL DATA IS NOT TO BE OBTAINED BY SCALING ANY PORTION OF THIS DRAWING th S tr e e t
K e n o sh a
W
I 5
C U s e rs
\J W ie d o ff \D o c u m e n ts
\K
K e n o s h a c o P
T F
H V
A C
I m p ro v e m e n ts
R J e ff .W ie d o ff S
D W
.r vt
/2 /2
:4
:3
A
M
G1.03
F
IR
S T
F L
O O
R S
O U
T H
P H
A S
IN
G
P L A
N
K E
N O
S H
A C
O U
N T
Y P
R E
-T R
IA
L
F A
C
IL
IT
Y
H V
A C
IM
P
R O
V E
M E
N T
S
K0450190
DESIGNED BY: JAW
DRAWN BY: JAW
CHECKED BY: NH
DATE CHECKED: 05/05/25
P H
O N
E
.6
.1 w
.c la rk d ie tz
.c o m K e n o sh a W
I 5 th
S tr e e t, th F lo o r
8' 16'4'0
FIRST FLOOR SOUTH HEATING NEW WORK PLAN
KEYNOTES (THIS SHEET)
1. UNOCCUPIED AREA, WORK TO BE DONE ON REGULAR SHIFT HOURS.
2. PROVIDE TEMPORARY FULL PARTITION FOR WORK DONE IN ZONE
11.
3. PROVIDE TEMPORARY FULL PARTITION FOR WORK DONE IN ZONES
13 AND 15.
4. PROVIDE TEMPORARY FULL PARTITION FOR WORK DONE IN ZONES
13 AND 14.
KEYPLAN_________
N.T.S.
NO. DATE REVISION
1 04/30/24 70% REVIEW
SUBMITTAL
2 07/03/25 PURCHASING
REVIEW
3 11/26/25 ISSUED FOR BID
GENERAL NOTES
1. WORK DOES NOT NECCESSARILY NEED TO BE COMPLETED IN
NUMERICAL ORDER OF THE ZONES. ZONES ARE NUMBERED
INDICATING THE SEPERATION OF WORK.
2. CONTRACTOR IS RESPONSIBLE FOR DRAINING AND REFILLING THE
SYSTEM AS REQUIRED TO COMPLETE EACH PHASE AND ENSURE THE
AREA IS OPERATIONAL ONCE THE WORK IN THAT AREA IS COMPLETE.
IF ACCESS TO COMPLETED AREA IS REQUIRED, THIS MUST BE
COORDINATED WITH KENOSHA COUNTY STAFF AND WORK MAY NEED
TO BE PERFORMED AFTER HOURS. CONTRACTOR MUST INCLUDE
THIS COORDINATION IN THEIR BID, NO ADDITIONAL COMPENSATION
WILL BE PROVIDED.
3. CONTRACTOR IS RESPONSIBLE FOR COMPLETING ALL ELECTRICAL
AND TEMPERATURE CONTROLS WORK INCLUDING CONDUIT AND
WIRING INSTALLATION IN EACH PHASE AND ENSURE THE AREA IS
OPERATIONAL ONCE THE WORK IN THAT AREA IS COMPLETE. IF
ACCESS TO COMPLETED AREA IS REQUIRED, THIS MUST BE
COORDINATED WITH KENOSHA COUNTY STAFF AND WORK MAY NEED
TO BE PERFORMED AFTER HOURS. CONTRACTOR MUST INCLUDE
TREATMENT
EXAM
STOR.
T.
T.
PHARMACY
LAB
OFFICE
STOR.
STAFF
T.
J.C.
WARD
ISO.
ISO.
WARD
STOR.
CORR.
CORR.
ELEVATOR SALLY
PORT
CORR.
TOILET/SHWR
TLT.
STOR.
CORR.
Z ROOM
SOIL. LIN.
BATH
Room
NURSE
DATA COM.
DENTAL
J.C.
TLT.
RECORDS
WAITING
REC.
CORR.
Room
VC04-5
VC04-2
VC04-3 VC04-4
VC04-1
VC04-6
VC04-7
VC04-8
VC04-9
VC04-10
MATCHLINE
SEE M3.05
ZONE 16
ZONE 17
ZONE 18
ZONE 19
ZONE 20
ZONE 21
ZONE 22
ZONE 23
P R
O J E
C T
T
IT
L E
D R
A W
IN
G
T
IT
L E
PROJECT No.
DRAWING No.
NOTE: DIMENSIONAL DATA IS NOT TO BE OBTAINED BY SCALING ANY PORTION OF THIS DRAWING th S tr e e t
K e n o sh a
W
I 5
C U s e rs
\J W ie d o ff \D o c u m e n ts
\K
K e n o s h a c o P
T F
H V
A C
I m p ro v e m e n ts
R J e ff .W ie d o ff S
D W
.r vt
/2 /2
:4
:4
A
M
G1.04
S E
C O
N D
F L
O O
R N
O R
T H
P H
A S
IN
G
P L A
N
K E
N O
S H
A C
O U
N T
Y P
R E
-T R
IA
L
F A
C
IL
IT
Y
H V
A C
IM
P
R O
V E
M E
N T
S
K0450190
DESIGNED BY: JAW
DRAWN BY: JAW
CHECKED BY: NH
DATE CHECKED: 05/05/25
P H
O N
E
.6
.1 w
.c la rk d ie tz
.c o m K e n o sh a W
I 5 th
S tr e e t, th F lo o r
8' 16'4'0
SECOND FLOOR NORTH HEATING NEW WORK PLAN
KEYNOTES (THIS SHEET)
1. PROVIDE TEMPORARY FULL PARTITION FOR WORK DONE IN ZONES
17 AND 18.
2. PROVIDE TEMPORARY FULL PARTITION FOR WORK DONE IN ZONES
19, 20, AND 21.
3. UNOCCUPIED AREA, WORK TO BE DONE ON REGULAR SHIFT HOURS.
4. OCCUPIED AREA, WORK TO BE DONE ON WEEKEND/EVENING
HOURS.
KEYPLAN_________
N.T.S.
NO. DATE REVISION
1 04/30/24 70% REVIEW
SUBMITTAL
2 07/03/25 PURCHASING
REVIEW
3 11/26/25 ISSUED FOR BID
GENERAL NOTES
1. WORK DOES NOT NECCESSARILY NEED TO BE COMPLETED IN
NUMERICAL ORDER OF THE ZONES. ZONES ARE NUMBERED
INDICATING THE SEPERATION OF WORK.
2. CONTRACTOR IS RESPONSIBLE FOR DRAINING AND REFILLING THE
SYSTEM AS REQUIRED TO COMPLETE EACH PHASE AND ENSURE THE
AREA IS OPERATIONAL ONCE THE WORK IN THAT AREA IS COMPLETE.
IF ACCESS TO COMPLETED AREA IS REQUIRED, THIS MUST BE
COORDINATED WITH KENOSHA COUNTY STAFF AND WORK MAY NEED
TO BE PERFORMED AFTER HOURS. CONTRACTOR MUST INCLUDE
THIS COORDINATION IN THEIR BID, NO ADDITIONAL COMPENSATION
WILL BE PROVIDED.
3. CONTRACTOR IS RESPONSIBLE FOR COMPLETING ALL ELECTRICAL
AND TEMPERATURE CONTROLS WORK INCLUDING CONDUIT AND
WIRING INSTALLATION IN EACH PHASE AND ENSURE THE AREA IS
OPERATIONAL ONCE THE WORK IN THAT AREA IS COMPLETE. IF
ACCESS TO COMPLETED AREA IS REQUIRED, THIS MUST BE
COORDINATED WITH KENOSHA COUNTY STAFF AND WORK MAY NEED
TO BE PERFORMED AFTER HOURS. CONTRACTOR MUST INCLUDE
WOMEN'S LOCKER
ROOM
TLT.
ELEV. S.P.
STORAGE
204B
OFFICE
OFFICE
OFFICE
CUSTODY STAFF
ASSEMBLY
CORR.
J.C.
STOR.
204A
VEST.
TLT.
MEN'S LOCKER ROOM
VC05-1
VC05-2
VC05-3
VC05-4
VC05-5 VC05-6
VC05-7
MATCHLINE
SEE M3.04
ZONE 24
ZONE 26
ZONE 25
ZONE 27
P R
O J E
C T
T
IT
L E
D R
A W
IN
G
T
IT
L E
PROJECT No.
DRAWING No.
NOTE: DIMENSIONAL DATA IS NOT TO BE OBTAINED BY SCALING ANY PORTION OF THIS DRAWING th S tr e e t
K e n o sh a
W
I 5
C U s e rs
\J W ie d o ff \D o c u m e n ts
\K
K e n o s h a c o P
T F
H V
A C
I m p ro v e m e n ts
R J e ff .W ie d o ff S
D W
.r vt
/2 /2
:4
:4
A
M
G1.05
S E
C O
N D
F L
O O
R S
O U
T H
P H
A S
IN
G
P L
A N
K E
N O
S H
A C
O U
N T
Y P
R E
-T R
IA
L
F A
C
IL
IT
Y
H V
A C
IM
P
R O
V E
M E
N T
S
K0450190
DESIGNED BY: JAW
DRAWN BY: JAW
CHECKED BY: NH
DATE CHECKED: 05/05/25
P H
O N
E
.6
.1 w
.c la rk d ie tz
.c o m K e n o sh a W
I 5 th
S tr e e t, th F lo o r
8' 16'4'0
SECOND FLOOR SOUTH HEATING NEW WORK PLAN
KEYNOTES (THIS SHEET)
1. UNOCCUPIED AREA, WORK TO BE DONE ON REGULAR SHIFT HOURS.
2. OCCUPIED AREA, WORK TO BE DONE ON WEEKEND/EVENING
HOURS.
KEYPLAN_________
N.T.S.
NO. DATE REVISION
1 04/30/24 70% REVIEW
SUBMITTAL
2 07/03/25 PURCHASING
REVIEW
3 11/26/25 ISSUED FOR BID
GENERAL NOTES
1. WORK DOES NOT NECCESSARILY NEED TO BE COMPLETED IN
NUMERICAL ORDER OF THE ZONES. ZONES ARE NUMBERED
INDICATING THE SEPERATION OF WORK.
2. CONTRACTOR IS RESPONSIBLE FOR DRAINING AND REFILLING THE
SYSTEM AS REQUIRED TO COMPLETE EACH PHASE AND ENSURE THE
AREA IS OPERATIONAL ONCE THE WORK IN THAT AREA IS COMPLETE.
IF ACCESS TO COMPLETED AREA IS REQUIRED, THIS MUST BE
COORDINATED WITH KENOSHA COUNTY STAFF AND WORK MAY NEED
TO BE PERFORMED AFTER HOURS. CONTRACTOR MUST INCLUDE
THIS COORDINATION IN THEIR BID, NO ADDITIONAL COMPENSATION
WILL BE PROVIDED.
3. CONTRACTOR IS RESPONSIBLE FOR COMPLETING ALL ELECTRICAL
AND TEMPERATURE CONTROLS WORK INCLUDING CONDUIT AND
WIRING INSTALLATION IN EACH PHASE AND ENSURE THE AREA IS
OPERATIONAL ONCE THE WORK IN THAT AREA IS COMPLETE. IF
ACCESS TO COMPLETED AREA IS REQUIRED, THIS MUST BE
COORDINATED WITH KENOSHA COUNTY STAFF AND WORK MAY NEED
TO BE PERFORMED AFTER HOURS. CONTRACTOR MUST INCLUDE
TS
S
TS
NORTH MECH.
PENTHOUSE
NORTH STORAGE
ELEV. EQUIP.
VC06-1
MATCHLINE
SEE M3.07
(UH06-3)
(UH06-2)
(UH06-5)
CU-1
(B-1)(B-2)
(HWP-1)
(HWP-2)
(AHU-1)
ZONE 28
ZONE 29
P R
O J E
C T
T
IT
L E
D R
A W
IN
G
T
IT
L E
PROJECT No.
DRAWING No.
NOTE: DIMENSIONAL DATA IS NOT TO BE OBTAINED BY SCALING ANY PORTION OF THIS DRAWING th S tr e e t
K e n o sh a
W
I 5
C U s e rs
\J W ie d o ff \D o c u m e n ts
\K
K e n o s h a c o P
T F
H V
A C
I m p ro v e m e n ts
R J e ff .W ie d o ff S
D W
.r vt
/2 /2
:4
:4
A
M
G1.06
T H
IR
D
F L O
O R
N O
R T
H P
H A
S
IN
G P
L A
N
K E
N O
S H
A C
O U
N T
Y P
R E
-T R
IA
L
F A
C
IL
IT
Y
H V
A C
IM
P
R O
V E
M E
N T
S
K0450190
DESIGNED BY: JAW
DRAWN BY: JAW
CHECKED BY: NH
DATE CHECKED: 05/05/25
P H
O N
E
.6
.1 w
.c la rk d ie tz
.c o m K e n o sh a W
I 5 th
S tr e e t, th F lo o r
8' 16'4'0
THIRD FLOOR NORTH HEATING NEW WORK PLAN
KEYNOTES (THIS SHEET)
1. UNOCCUPIED AREA, WORK TO BE DONE ON REGULAR SHIFT HOURS.
2. WORK ON AHU TO BE DONE ON EXTENDED WEEKENDS.
KEYPLAN_________
N.T.S.
NO. DATE REVISION
1 04/30/24 70% REVIEW
SUBMITTAL
2 07/03/25 PURCHASING
REVIEW
3 11/26/25 ISSUED FOR BID
GENERAL NOTES
1. WORK DOES NOT NECCESSARILY NEED TO BE COMPLETED IN
NUMERICAL ORDER OF THE ZONES. ZONES ARE NUMBERED
INDICATING THE SEPERATION OF WORK.
2. CONTRACTOR IS RESPONSIBLE FOR DRAINING AND REFILLING THE
SYSTEM AS REQUIRED TO COMPLETE EACH PHASE AND ENSURE THE
AREA IS OPERATIONAL ONCE THE WORK IN THAT AREA IS COMPLETE.
IF ACCESS TO COMPLETED AREA IS REQUIRED, THIS MUST BE
COORDINATED WITH KENOSHA COUNTY STAFF AND WORK MAY NEED
TO BE PERFORMED AFTER HOURS. CONTRACTOR MUST INCLUDE
THIS COORDINATION IN THEIR BID, NO ADDITIONAL COMPENSATION
WILL BE PROVIDED.
3. CONTRACTOR IS RESPONSIBLE FOR COMPLETING ALL ELECTRICAL
AND TEMPERATURE CONTROLS WORK INCLUDING CONDUIT AND
WIRING INSTALLATION IN EACH PHASE AND ENSURE THE AREA IS
OPERATIONAL ONCE THE WORK IN THAT AREA IS COMPLETE. IF
ACCESS TO COMPLETED AREA IS REQUIRED, THIS MUST BE
COORDINATED WITH KENOSHA COUNTY STAFF AND WORK MAY NEED
TO BE PERFORMED AFTER HOURS. CONTRACTOR MUST INCLUDE
TS
SOUTH MECH.
PENTHOUSE
SOUTH STORAGE
MATCHLINE
SEE M3.06
(UH07-4)
(UH07-6)
CU-2
(AHU-2)
ZONE 30
ZONE 31
P R
O J E
C T
T
IT
L E
D R
A W
IN
G
T
IT
L E
PROJECT No.
DRAWING No.
NOTE: DIMENSIONAL DATA IS NOT TO BE OBTAINED BY SCALING ANY PORTION OF THIS DRAWING th S tr e e t
K e n o sh a
W
I 5
C U s e rs
\J W ie d o ff \D o c u m e n ts
\K
K e n o s h a c o P
T F
H V
A C
I m p ro v e m e n ts
R J e ff .W ie d o ff S
D W
.r vt
/2 /2
:4
:5
A
M
G1.07
T H
IR
D
F L O
O R
S O
U T
H P
H A
S
IN
G P
L A
N
K E
N O
S H
A C
O U
N T
Y P
R E
-T R
IA
L
F A
C
IL
IT
Y
H V
A C
IM
P
R O
V E
M E
N T
S
K0450190
DESIGNED BY: JAW
DRAWN BY: JAW
CHECKED BY: NH
DATE CHECKED: 05/05/25
P H
O N
E
.6
.1 w
.c la rk d ie tz
.c o m K e n o sh a W
I 5 th
S tr e e t, th F lo o r
8' 16'4'0
THIRD FLOOR SOUTH HEATING NEW WORK PLAN
KEYNOTES (THIS SHEET)
1. UNOCCUPIED AREA, WORK TO BE DONE ON REGULAR SHIFT HOURS.
2. WORK ON AHU TO BE DONE ON EXTENDED WEEKENDS.
KEYPLAN_________
N.T.S.
NO. DATE REVISION
1 04/30/24 70% REVIEW
SUBMITTAL
2 07/03/25 PURCHASING
REVIEW
3 11/26/25 ISSUED FOR BID
GENERAL NOTES
1. WORK DOES NOT NECCESSARILY NEED TO BE COMPLETED IN
NUMERICAL ORDER OF THE ZONES. ZONES ARE NUMBERED
INDICATING THE SEPERATION OF WORK.
2. CONTRACTOR IS RESPONSIBLE FOR DRAINING AND REFILLING THE
SYSTEM AS REQUIRED TO COMPLETE EACH PHASE AND ENSURE THE
AREA IS OPERATIONAL ONCE THE WORK IN THAT AREA IS COMPLETE.
IF ACCESS TO COMPLETED AREA IS REQUIRED, THIS MUST BE
COORDINATED WITH KENOSHA COUNTY STAFF AND WORK MAY NEED
TO BE PERFORMED AFTER HOURS. CONTRACTOR MUST INCLUDE
THIS COORDINATION IN THEIR BID, NO ADDITIONAL COMPENSATION
WILL BE PROVIDED.
3. CONTRACTOR IS RESPONSIBLE FOR COMPLETING ALL ELECTRICAL
AND TEMPERATURE CONTROLS WORK INCLUDING CONDUIT AND
WIRING INSTALLATION IN EACH PHASE AND ENSURE THE AREA IS
OPERATIONAL ONCE THE WORK IN THAT AREA IS COMPLETE. IF
ACCESS TO COMPLETED AREA IS REQUIRED, THIS MUST BE
COORDINATED WITH KENOSHA COUNTY STAFF AND WORK MAY NEED
TO BE PERFORMED AFTER HOURS. CONTRACTOR MUST INCLUDE
M
M
M D
Ƨ Ƨ
C3H3
CH4
CO2
CO
H2
H2S
HZG
NO2
HS
TS
TH
TS
T
H
O2
TS
TS
CD
HWR
HWS
CONDENSATE DRAINAGE
HEATING WATER RETURN
HEATING WATER SUPPLY
REF-L
REF-S
REFRIGERANT-LIQUID
REFRIGERANT-SUCTION
REF-HG REFRIGERANT-HOT GAS
HEATING SYMBOLS
KEYNOTE
CONTINUATION SYMBOL
NUMBER OF SHEET WHERE DETAIL APPEARS
NUMBER OF DETAIL ON SHEET
REVISION NUMBER - SHOWN ON PLANS
GENERAL PLAN SYMBOLS
ROOM NAME AND NUMBER
NEW CONNECTION TO EXISTING
ITEM TO BE DEMOLISHED
AREA NOT IN CONTRACT
* NOTE *
ALL OF GENERAL NOTES ON THIS SHEET ARE TO BE APPLIED TO ALL
OTHER DRAWINGS IN THIS SET.THE SYMBOLS AND ABBREVIATIONS SHOWN
ON THIS SHEET MAY OR MAY NOT BE USED IN THIS SET OF DRAWINGS.
Room
18"/12"
18"/12"ø
(18"ø
18"ø
EXHAUST AIR
OUTSIDE AIR
RETURN AIR
SUPPLY AIR
TRANSFER AIR
EXISTING DUCT
OVAL DUCT (WIDTH / HEIGHT)
RECTANGULAR DUCT (WIDTH x HEIGHT)
ROUND DUCT (DIAMETER)
DUCT TO BE REMOVED
Ø ROUND
ABV ABOVE
AC AIR CONDITIONING
ADD ADDENDUM
AFF ABOVE FINISHED FLOOR
ALT ALTERNATE
AP ACCESS PANEL
ARCH ARCHITECT/ARCHITECTURAL
BFF BELOW FINISHED FLOOR
BLW BELOW
BTU BRITISH THERMAL UNITS
BTUH BRITISH THERMAL UNITS PER HOUR
CAP CAPACITY
CB CATCH BASIN
CFM CUBIC FEET PER MINUTE
CLG CEILING
CW COLD WATER
D DEGREE
DB DRY BULB
DIA DIAMETER
DN DOWN
EA EACH
EAT ENTERING AIR TEMPERATURE
ELEC ELECTRICAL
EQUIP EQUIPMENT
EWT ENTERING WATER TEMPERATURE
E/A EXHAUST AIR
EXIST EXISTING
F DEGREES FAHRENHEIT
FD FLOOR DRAIN
FL FLOOR
FPM FEET PER MINUTE
FT FOOT/FEET
FTR FIN TUBE RADIATION
GAL GALLON
GC GENERAL CONTRACTOR
GPM GALLONS PER MINUTE
HP HORSE POWER
HTG HEATING
HTR HEATER
HW HOT WATER
HYD HYDRANT
ID INDIRECT
IN INCH
INV INVERT
LB POUND
LB/HR POUNDS PER HOUR
LAT LEAVING AIR TEMPERATURE
LP LOW PRESSURE
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
M/A MIXED AIR
MAX MAXIMUM
MBH ONE THOUSAND BTU PER HOUR
MCF ONE THOUSAND CUBIC FEET
MD MOTORIZED DAMPER
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MTR MOTOR
MU/A MAKE-UP/AIR
NC NOISE CRITERIA
NC NORMALLY CLOSED
NIC NOT IN CONTRACT
NO NUMBER
NTS NOT TO SCALE
O/A OUTSIDE AIR
ORD OVERFLOW ROOF DRAIN
PD PRESSURE DROP
PRESS PRESSURE
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PSIG POUNDS PER SQUARE INCH GAUGE
PWR POWER
R/A RETURN AIR
RD ROOF DRAIN
REC RECESSED
RED REDUCER
RM ROOM
RPM REVOLUTIONS PER MINUTE
SF SQUARE FOOT
S/A SUPPLY AIR
SAN SANITARY
SF SQUARE FOOT
SD SMOKE DAMPER
SP STATIC PRESSURE
STM STEAM
T THERMOSTAT
TD TEMPERATURE DROP
TDR TRENCH DRAIN
TEMP TEMPERATURE
TYP TYPICAL
UG UNDERGROUND
VAC VACUUM
V VENT
VAV VARIABLE AIR VOLUME
VENT VENTILATION
WB WET BULB
AC AIR CONDITIONING UNIT
ACCU AIR COOLING CONDENSING UNIT
AHU AIR HANDLING UNIT
AS AIR SEPARATOR
B BOILER
CUH CABINET UNIT HEATER
DC DUCT MOUNTED COIL
EF EXHAUST FAN
EDC ELECTRIC DUCT COIL
ET EXPANSION TANK
FCU FAN COIL UNIT
GRV GRAVITY ROOF VENTILATOR
HWP HEATING WATER PUMP
RE RETURN/EXHAUST FAN
UH UNIT HEATER
EQUIPMENT ABBREVIATIONS
18"/18" SA
18"/18" OA
18"/18" RA
18"/18" TA
18"/18" EA
PIPING ACCESSORY SYMBOLS
BALANCING VALVE
CIRCUIT SETTER
GATE VALVE
STRAINER
ELEC. CONTROL
BALL VALVE
SOLENOID VALVE
CHECK VALVE
PRESS REGULATORBUTTERFLY VALVE
3-WAY ELEC. CONTROL
HVAC ABBREVIATIONS
CPD CONDENSATE PUMP DISCHARGE
VENTILATION SYMBOLS
HVAC LEGEND
SUPPLY DUCT UP OR TOWARD
SUPPLY DUCT DOWN OR AWAY
RETURN DUCT UP OR TOWARD
EXHAUST DUCT UP OR TOWARD
RETURN DUCT DOWN OR AWAY
EXHAUST DUCT DOWN OR AWAY
FLEXIBLE DUCT
SUPPLY DIFFUSER (WITH HARD DUCT)
SUPPLY DIFFUSER (WITH FLEX DUCT)
RETURN GRILLE OR REGISTER (WITH HARD DUCT)
RETURN GRILLE OR REGISTER (WITH FLEX DUCT)
EXHAUST GRILLE OR REGISTER (WITH HARD DUCT)
EXHAUST GRILLE OR REGISTER (WITH FLEX DUCT)
LAY-IN GRILLE / REGISTER / DIFFUSER
DUCT MOUNTED SUPPLY GRILLES
DUCT MOUNTED RETURN/EXHAUST GRILLES
DUCTWORK (DIRECTION OF AIRFLOW)
90° ELBOW RADIUS AND MITERED W/ TURNING VANES
BRANCH DUCT TAP
BEVELED (RECTANGULAR BRANCH)
CONICAL (ROUND BRANCH)
CONICAL W/ VOLUME DAMPER (ROUND BRANCH)
SIZE TRANSITION
A1 125
AIRFLOW (CFM)
TYPE MARK
LINEAR SLOT DIFFUSERS
ELBOW DOWN OR AWAY
ELBOW UP OR TOWARD
TEE DOWN OR AWAY
TEE UP OR TOWARD
RISE OR DROP
90° ELBOW
PIPE TEE
PIPE TAKEOFF (FROM BOTTOM OF MAIN)
PIPE TAKEOFF (FROM TOP OF MAIN)
45° ELBOW
45° BRANCH
CAP
DIRECTION OF FLOW
DUCT ACCESSORY SYMBOLS
MOTORIZED DAMPER
BACKDRAFT DAMPER
MANUAL BALANCING DAMPERCOMB. FIRE/SMOKE DAMPER
FIRE DAMPER
SMOKE DAMPER
HVAC CONTROL PANEL
C3H3 DETECTOR
CH4 DETECTOR
CO2 DETECTOR
CO DETECTOR
H2 DETECTOR
H2S DETECTOR
HAZARDOUS GAS DETECTOR
NO2 DETECTOR
HUMIDITY SENSOR
TEMPERATURE SENSOR
TEMPERATURE & HUMIDITY SENSOR
TEMPERATURE SENSOR
THERMOSTAT
HUMIDISTAT
O2 DETECTOR
HVAC CONTROL SYMBOLS
CONTROL WIRING
HVAC EQUIPMENT SYMBOLS
VAV-XX
(VAV-XX)
NEW EQUIPMENT
EXISTING EQUIPMENT TO REMAIN
EQUIPMENT TO BE REMOVED
EQUIPMENT BY OTHER DISCIPLINES
ROOM ABBREVIATIONS
CL CLOSET
COM COMMUNICATIONS
CORR CORRIDOR
JC JANITOR'S CLOSET
M. MEN'S RESTROOM
SP SALLY PORT
TLT TOILET
W. WOMEN'S RESTROOM
S EXISTING SUPPLY DIFFUSER
R EXISTING RETURN REGISTER
E EXISTING EXHAUST REGISTER
P R
O J E
C T
T
IT
L E
D R
A W
IN
G
T
IT
L E
PROJECT No.
DRAWING No.
NOTE: DIMENSIONAL DATA IS NOT TO BE OBTAINED BY SCALING ANY PORTION OF THIS DRAWING th S tr e e t
K e n o sh a
W
I 5
C U s e rs
\J W ie d o ff \D o c u m e n ts
\K
K e n o s h a c o P
T F
H V
A C
I m p ro v e m e n ts
R J e ff .W ie d o ff S
D W
.r vt
/2 /2
:4
:5
A
M
M0.00
H V
A C
G E
N E
R A
L N
O T
E S
L
E G
E N
D
A N
D A
B B
R E
V
IA
T
IO
N S
K E
N O
S H
A C
O U
N T
Y P
R E
-T R
IA
L
F A
C
IL
IT
Y
H V
A C
IM
P
R O
V E
M E
N T
S
K0450190
DESIGNED BY: JAW
DRAWN BY: JAW
CHECKED BY: NH
DATE CHECKED: 05/05/25
P H
O N
E
.6
.1 w
.c la rk d ie tz
.c o m K e n o sh a W
I 5 th
S tr e e t, th F lo o r
HEATING GENERAL NOTES
1. PIPING IS SHOWN IN SCHEMATIC FORM ONLY, CHANGES IN ELEVATION ARE NOT NECESSARILY SHOWN.
ROUTE PIPING IN AN ORDERLY MANNER AS REQUIRED FOR CLEARANCE WITH STRUCTURAL CONDITIONS.
COORDINATE LOCATION OF PIPING WITH OTHER TRADES PRIOR TO INSTALLATION. WHERE POSSIBLE, RACK
PIPING HORIZONTALLY OR VERTICALLY.
2. COORDINATE LOCATIONS AND SIZES OF PIPING CONNECTIONS TO EQUIPMENT BEING PROVIDED BY OTHERS.
3. PROVIDE AND INSTALL ISOLATION VALVES IN ALL BRANCH PIPING.
4. CONNECTIONS TO EQUIPMENT SHALL BE PROVIDED WITH ISOLATION VALVES AND UNIONS TO FACILITATE
EQUIPMENT REMOVAL.
5. LOCATE ALL ISOLATION VALVES IN AN ACCESSIBLE LOCATION. WHERE VALVES ARE NOT ACCESSIBLE
PROVIDE 12X12 ACCESS DOOR.
6. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ADEQUATE SUPPORTING SYSTEMS AND DEVICES FOR
ALL HEATING PIPING, EQUIPMENT, AND ACCESSORIES.
7. SEE HEATING DETAILS FOR EXACT PIPING CONNECTIONS TO EQUIPMENT, INCLUDING VALVES, TRAPS, AND
SYSTEM ACCESSORIES.
8. BALANCING VALVES SHALL BE, AT A MINIMUM, ONE PIPE SIZE SMALLER THAN THE PIPING IN WHICH THEY ARE INSTALLED. CONTRACTOR SHALL VERIFY THAT VALVE CAN BE ADJUSTED TO MEET FLOW REQUIREMENTS
WITHOUT THE PRODUCTION OF UNACCEPTABLE NOISE.
9. LOCATE AND INSTALL ALL HEATING EQUIPMENT TO PROVIDE MANUFACTURER'S MINIMUM SERVICE
CLEARANCES.
11. THE LOCATIONS AND SIZES OF EXISTING PIPING AND EQUIPMENT HAS BEEN TAKEN FROM "AS-BUILT" DRAWINGS AND INFORMATION PROVIDED BY THE OWNER. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
CONDITIONS PRIOR TO START OF WORK.
12. ALL CONNECTIONS TO, OR SHUTDOWNS OF, EXISTING SYSTEMS SHALL BE COORDINATED WITH THE OWNER TO PROVIDE MINIMUM INTERFERENCE WITH THEIR OPERATION AND DOWNTIME OF THE SYSTEM. PROVIDE PROPOSED PHASING PLAN FOR CONNECTIONS TO EXISTING SERVICES TO OWNER FOR APPROVAL PRIOR TO
STARTING OF WORK.
13. SUPPLY AND RETURN PIPING TO COILS ARE THE SAME SIZE.
16. CONDENSATE DRAINS SHALL BE SUPPLIED FOR ALL COOLING EQUIPMENT. CONTRACTOR SHALL ENSURE PROPER INSTALLATION AND DRAINAGE AS REQUIRED BY FEDERAL, STATE, AND LOCAL CODES. CONDENSATE
PIPING SHALL BE TYPE "L" COPPER.
18. COORDINATE THE EXACT LOCATION OF ALL CEILING DIFFUSERS, REGISTERS, AND GRILLES WITH NEW AND
EXISTING LIGHTING.
19. PROVIDE DIFFUSERS AND REGISTERS WITH 4-WAY BLOW PATTERN UNLESS OTHERWISE NOTED.
20. PROVIDE A 4" HOUSEKEEPING PAD FOR EACH PIECE OF MECHANICAL EQUIPMENT. COORDINATE SIZES WITH
MECHANICAL EQUIPMENT SELECTED.
HEATING DEMOLITION GENERAL NOTES
1. VERIFY EXACT SIZE AND LOCATION OF EXISTING UTILITIES PRIOR TO START OF DEMOLITION.
2. DISCONNECT ALL HEATING PIPING CONNECTIONS TO EQUIPMENT BEING REMOVED.
3. UNLESS OTHERWISE NOTED, REMOVAL OF PIPING AND/OR EQUIPMENT SHALL INCLUDE ALL INSULATION, VALVES, HANGERS, SUPPORTS, EQUIPMENT PADS, FLASHING, CONTROLS, AND ASSOCIATED ACCESSORIES.
4. UNLESS OTHERWISE NOTED, REMOVAL OF PIPING SHALL BE BACK TO THE MAIN OR LAST ACTIVE SERVICE.
5. ALL OPENINGS OR HOLES LEFT IN EXISTING WALLS, FLOORS, AND CEILINGS TO REMAIN, INCLUDING CHASES, SHALL BE PATCHED TO MATCH EXISTING CONDITIONS BY THE CONTRACTOR WHOSE WORK HAS CREATED THE OPENING OR HOLE. PATCHING SHALL BE IN ACCORDANCE WITH THE APPROPRIATE DIVISION OF THE
SPECIFICATIONS.
VENTILATION GENERAL NOTES
1. DUCTWORK IS SHOWN IN SCHEMATIC FORM ONLY, OFFSETS AND CHANGES IN ELEVATIONS ARE NOT
NECESSARILY SHOWN. ROUTE DUCTWORK IN AN ORDERLY MANNER AS REQUIRED FOR CLEARANCE WITH
STRUCTURAL CONDITIONS. COORDINATE LOCATION OF DUCTWORK PRIOR TO INSTALLATION.
2. COORDINATE LOCATIONS AND SIZES OF CONNECTIONS TO EQUIPMENT BEING PROVIDED BY OTHERS.
3. PROVIDE AND INSTALL MANUAL BALANCING DAMPERS IN ALL BRANCH DUCTWORK AND AT EACH AIR INLET
AND OUTLET.
4. LOCATE ALL MANUAL BALANCING DAMPERS IN AN ACCESSIBLE LOCATION. WHERE DAMPERS ARE NOT ACCESSIBLE PROVIDE MINIMUM 18x18 ACCESS DOOR.
5. UNLESS OTHERWISE NOTED, CONCEAL ALL DUCTWORK ABOVE CEILINGS, IN WALLS, OR INSIDE CHASES.
6. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ADEQUATE SUPPORTING SYSTEMS AND DEVICES FOR
ALL DUCTWORK, VENTILATION EQUIPMENT, AND ACCESSORIES.
7. PROVIDE AND INSTALL SLEEVES FOR ALL DUCTWORK PASSING THROUGH WALLS AND FLOORS.
8. PROVIDE FIRE AND/OR SMOKE DAMPERS AT ALL PENETRATIONS OF FIRE AND/OR SMOKE RATED WALLS, CEILINGS, AND FLOORS. SEE ARCHITECTURAL PLANS FOR LOCATIONS OF FIRE AND/OR SMOKE RATED WALLS, CEILINGS, AND FLOORS. PROVIDE ACCESS DOOR(S) TO FACILITATE RESETTING OF DAMPERS.
9. PROVIDE RIGID METAL DUCT, WITH NO EXCEPTION, WHERE FIRE AND/OR SMOKE RATED WALLS, CEILINGS, AND FLOORS ARE PENETRATED.
10. FOR DUCT CONNECTIONS TO TERMINAL DEVICES, FANS, AND OTHER EQUIPMENT SEE VENTILATION DETAILS.
11. COORDINATE LOCATIONS OF ALL DIFFUSERS, GRILLES, AND REGISTERS WITH ARCHITECTURAL REFLECTED
CEILING PLANS.
12. LOCATE AND INSTALL ALL VENTILATION EQUIPMENT TO PROVIDE MANUFACTURER'S MINIMUM SERVICE
CLEARANCES.
13. THE LOCATIONS AND SIZES OF EXISTING DUCTWORK AND EQUIPMENT HAS BEEN TAKEN FROM "AS-BUILT" DRAWINGS AND INFORMATION PROVIDED BY THE OWNER. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
CONDITIONS PRIOR TO START OF WORK.
14. ALL CONNECTIONS TO, OR SHUTDOWNS OF, EXISTING SYSTEMS SHALL BE COORDINATED WITH THE OWNER TO PROVIDE MINIMUM INTERFERENCE WITH THEIR OPERATION AND DOWNTIME OF THE SYSTEM. PROVIDE PROPOSED PHASING PLAN FOR CONNECTIONS TO EXISTING SERVICES TO OWNER FOR APPROVAL PRIOR TO
STARTING WORK.
VENTILATION DEMOLITION GENERAL NOTES
1. VERIFY EXACT SIZE AND LOCATION OF EXISTING UTILITIES PRIOR TO START OF DEMOLITION.
2. DISCONNECT ALL DUCTWORK CONNECTIONS TO EQUIPMENT BEING REMOVED.
3. ALL OPENINGS OR HOLES LEFT IN EXISTING WALLS, FLOORS, AND CEILINGS TO REMAIN, INCLUDING CHASES, SHALL BE PATCHED TO MATCH EXISTING CONDITIONS BY THE CONTRACTOR WHOSE WORK HAS CREATED THE OPENING OR HOLE. PATCHING SHALL BE IN ACCORDANCE WITH THE APPROPRIATE DIVISION OF THE
SPECIFICATIONS.
TEMPERATURE CONTROL GENERAL NOTES
1 COORDINATE EXACT LOCATIONS OF EQUIPMENT.
2 WALL THERMOSTATS AND/OR TEMPERATURE SENSORS SHALL BE INSTALLED AT 48" TO 54" ABOVE FLOOR ADJACENT TO OR ABOVE LIGHT CONTROL DEVICE. DO NOT INSTALL THERMOSTATS AND/OR TEMPERATURE
SENSORS ON EXTERIOR WALLS.
3 UNLESS OTHERWISE NOTED, TEMPERATURE CONTROL WIRING/PIPING SHALL BE CONCEALED ABOVE
CEILINGS, IN WALLS, OR INSIDE CHASES.
4 CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ADEQUATE SUPPORTING SYSTEMS FOR
TEMPERATURE CONTROL WIRING/PIPING, EQUIPMENT, AND ACCESSORIES.
5 SEE SPECIFICATION FOR CONTROLS & INSTRUMENTATION REQUIREMENTS AND THE SEQUENCE OF
OPERATION FOR EQUIPMENT.
6 TEMPERATURE CONTROLS CABLING SHALL BE PLENUM RATED.
NO. DATE REVISION
1 04/30/24 70% REVIEW
SUBMITTAL
2 07/03/25 PURCHASING
TS
TS
T S
TS
TS
T S
HOLDING
HOLDING
GROUP HOLDING
JUVENILE HOLDING
JUVENILE HOLDING
SUMP ROOM
ELEV. EQUIP.
H.C. HOLDING
S.T.
S.P.
GROUP HOLDING
A/C
A/C
A/C
SALLY PORT
S.P.
ELEV S.P.
H.C. TLT.
T.
CONVEYANCE OFFICER
J.C.
0.S.
CORR.
(S A
(S A
(S A
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(RA)
(EA)
(TYP.)
(TYP.)
P R
O J E
C T
T
IT
L E
D R
A W
IN
G
T
IT
L E
PROJECT No.
DRAWING No.
NOTE: DIMENSIONAL DATA IS NOT TO BE OBTAINED BY SCALING ANY PORTION OF THIS DRAWING th S tr e e t
K e n o sh a
W
I 5
C U s e rs
\J W ie d o ff \D o c u m e n ts
\K
K e n o s h a c o P
T F
H V
A C
I m p ro v e m e n ts
R J e ff .W ie d o ff S
D W
.r vt
/2 /2
:4
:0
A
M
M1.01
B A
S E
M E
N T
V E
N T
IL
A
T
IO
N D
E M
O L
IT
IO
N
P L
A N
K E
N O
S H
A C
O U
N T
Y P
R E
-T R
IA
L
F A
C
IL
IT
Y
H V
A C
IM
P
R O
V E
M E
N T
S
K0450190
DESIGNED BY: JAW
DRAWN BY: JAW
CHECKED BY: NH
DATE CHECKED: 05/05/25
P H
O N
E
.6
.1 w
.c la rk d ie tz
.c o m K e n o sh a W
I 5 th
S tr e e t, th F lo o r
8' 16'4'0
BASEMENT VENTILATION DEMOLITION PLAN
DEMOLITION KEYNOTES
1. REMOVE EXISTING VAV BOX WITH HW REHEAT AND ASSOCIATED
CONTROLS. DISCONNECT TRANSITION FITTINGS ON BOTH SIDES OF
BOX. REMOVE EXISTING GYPSUM BOARD CEILING.
2. REMOVE EXISTING VAV BOX WITH HW REHEAT AND ASSOCIATED
CONTROLS. DISCONNECT TRANSITION FITTINGS ON BOTH SIDES OF
BOX.
3. REMOVE TEMPERTAURE SENSOR AND ASSOCIATED WIRING.
REPLACE WITH NEW.
KEYPLAN________
N.T.S.
GENERAL NOTES
1. CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING AND
REPLACING ALL CEILING TILES REQUIRED FOR DEMOLITION AND TO
INSTALL THEIR WORK.
2. PROVIDE NEW CEILING TILES WHERE EXISTING CEILING TILES ARE
DAMAGED DURING WORK.
3. PROVIDE NEW CEILING GRID WHERE REQUIRED TO ALLOW
DEMOLITION OF EXISTING DUCTWORK AND INSTALLATION OF
DUCTWORK.
4. CONTRACTORS SHALL BE RESPONBILE FOR TEMPORARILY
REMOVING LIGHT FIXTURES TO FACILITATE WORK AND REPLACING
LIGHT FIXTURES WHEN WORK IS COMPLETE.
5. EXISTING TRANSFER OPENINGS THROUGHOUT TO REMAIN.
KEYNOTES (THIS SHEET)
1. EXISTING EXHAUST GRILLE AND ASSOCIATED DUCTWORK TO
REMAIN.
2. EXISTING RETURN GRILLE AND ASSOCIATED DUCTWORK TO
REMAIN.
3. EXISTING SUPPLY DIFFUSER AND ASSOCIATED DUCTWORK TO
REMAIN.
4. EXISTING EXHAUST DUCT UP TO FLOOR ABOVE TO REMAIN.
5. EXISTING RETURN DUCT UP TO FLOOR ABOVE TO REMAIN.
6. EXISTING SUPPLY DUCT UP TO FLOOR ABOVE TO REMAIN.
7. UNEXCAVATED SITE. NO WORK.
10. EXISTING SUPPLY DIFFUSER AND ASSOCIATED DUCTWORK TO
REMAIN.
NO. DATE REVISION
1 04/30/24 70% REVIEW
SUBMITTAL
2 07/03/25 PURCHASING
HOLDING
HOLDING
GROUP HOLDING
JUVENILE HOLDING
JUVENILE HOLDING
SUMP ROOM
ELEV. EQUIP.
H.C. HOLDING
S.T.
S.P.
GROUP HOLDING
A/C
A/C
A/C
SALLY PORT
S.P.
ELEV S.P.
H.C. TLT.
T.
CONVEYANCE OFFICER
J.C.
0.S.
CORR.
3/4"
3/4"
1"
(H W
R
(H W
S
(H W
R
(H W
S
1 1/4"
P R
O J E
C T
T
IT
L E
D R
A W
IN
G
T
IT
L E
PROJECT No.
DRAWING No.
NOTE: DIMENSIONAL DATA IS NOT TO BE OBTAINED BY SCALING ANY PORTION OF THIS DRAWING th S tr e e t
K e n o sh a
W
I 5
C U s e rs
\J W ie d o ff \D o c u m e n ts
\K
K e n o s h a c o P
T F
H V
A C
I m p ro v e m e n ts
R J e ff .W ie d o ff S
D W
.r vt
/2 /2
:4
:0
A
M
M1.02
B A
S E
M E
N T
H E
A T
IN
G
D E
M O
L
IT
IO
N
P L A
N
K E
N O
S H
A C
O U
N T
Y P
R E
-T R
IA
L
F A
C
IL
IT
Y
H V
A C
IM
P
R O
V E
M E
N T
S
K0450190
DESIGNED BY: JAW
DRAWN BY: JAW
CHECKED BY: NH
DATE CHECKED: 05/05/25
P H
O N
E
.6
.1 w
.c la rk d ie tz
.c o m K e n o sh a W
I 5 th
S tr e e t, th F lo o r
8' 16'4'0
BASEMENT HEATING DEMOLITION PLAN
DEMOLITION KEYNOTES
1. DISCONNECT PIPING AND REMOVE EXISTING VAV BOX AND COIL.
REMOVE EXISTING GYPSUM BOARD CEILING.
2. DISCONNECT PIPING AND REMOVE EXISTING VAV BOX AND COIL.
3. REMOVE EXISTING HWS/R PIPING. REMOVE GYPSUM BOARD
CEILING.
4. DISCONNECT HWS/R PIPING FOR NEW VALVES. SEE M3.01. REMOVE
GYPSUM BOARD CEILING.
5. REMOVE EXISTING PIPING FROM VAV BACK TO VALVES.
KEYPLAN_________
N.T.S.
GENERAL NOTES
1. CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING AND
REPLACING ALL CEILING TILES REQUIRED FOR DEMOLITION AND TO
INSTALL THEIR WORK.
2. PROVIDE NEW CEILING TILES WHERE EXISTING CEILING TILES ARE
DAMAGED DURING WORK.
3. PROVIDE NEW CEILING GRID WHERE REQUIRED TO ALLOW
DEMOLITION OF EXISTING PIPING AND INSTALLATION OF
PIPING.
4. CONTRACTORS SHALL BE RESPONBILE FOR TEMPORARILY
REMOVING LIGHT FIXTURES TO FACILITATE WORK AND REPLACING
LIGHT FIXTURES WHEN WORK IS COMPLETE.
KEYNOTES (THIS SHEET)
1. HWS/R PIPING ABOVE CEILING TO REMAIN.
2. HWS/R PIPING UP TO FLOOR ABOVE TO REMAIN.
3. UNEXCAVATED SITE. NO WORK.
NO. DATE REVISION
1 04/30/24 70% REVIEW
SUBMITTAL
2 07/03/25 PURCHASING
T S
TS
T S
T S
TS
T S
TS
TS
TS
TS
TS
T S
TS
T S
TS
TS
TS
T S
TS
TS
TS
T S
TS
T S
T S
TS
TS
TS
TS TS
TS
T S
TS
TS
INMATE PROPERTY
STORAGE
S.P.
SECUER STORAGE
ELEC. RM.
GROUP HOLDING
GROUP HOLDING
HOLDING
INMATE PROCESS
BOOKING
DRESS IN
H.C. HOLDING
GROUP HOLDING
GROUP HOLDING
S.P.
125AS.P.
HOLD
123DECONT.
INTOX.
CORR.
INTOX.
METER RM.
HOLDING
HOLDING
Room
VIEWING
INTAKE COURT
CLO.
Room
HOLDING
HOLDING
DATA COM.
I.D.
COURT CLERK
CONFERENCE
COURT REPORTER
LOBBY
W.
M.
T.
Room
J.C.
DRESS OUT
Room
ISSUE
CLERK
VEST.
COURT COMM.
HOLD
Room
VEHICLE SALLY PORT
3 3
7 7
(S A
(SA)
(S A
(S A
MATCHLINE
SEE M1.05
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(R A
(RA)
(RA)
(EA)
(EA)
(EA)
(TYP.)
(TYP.)
P R
O J E
C T
T
IT
L E
D R
A W
IN
G
T
IT
L E
PROJECT No.
DRAWING No.
NOTE: DIMENSIONAL DATA IS NOT TO BE OBTAINED BY SCALING ANY PORTION OF THIS DRAWING th S tr e e t
K e n o sh a
W
I 5
C U s e rs
\J W ie d o ff \D o c u m e n ts
\K
K e n o s h a c o P
T F
H V
A C
I m p ro v e m e n ts
R J e ff .W ie d o ff S
D W
.r vt
/2 /2
:4
:0
A
M
M1.03
F
IR
S T
F L O
O R
N O
R T
H V
E N
T
IL
A T
IO
N
D E
M O
L
IT
IO
N
P L A
N
K E
N O
S H
A C
O U
N T
Y P
R E
-T R
IA
L
F A
C
IL
IT
Y
H V
A C
IM
P
R O
V E
M E
N T
S
K0450190
DESIGNED BY: JAW
DRAWN BY: JAW
CHECKED BY: NH
DATE CHECKED: 05/05/25
P H
O N
E
.6
.1 w
.c la rk d ie tz
.c o m K e n o sh a W
I 5 th
S tr e e t, th F lo o r
8' 16'4'0
FIRST FLOOR NORTH VENTILATION DEMOLITION PLAN
DEMOLITION KEYNOTES
1. REMOVE EXISTING VAV BOX WITH HW REHEAT AND ASSOCIATED
CONTROLS. DISCONNECT TRANSITION FITTINGS ON BOTH SIDES OF
BOX. REMOVE EXISTING GYPSUM BOARD CEILING.
2. REMOVE EXISTING VAV TERMINAL BOX. DISCONNECT TRANSITION
FITTINGS ON BOTH SIDES OF THE BOX. REMOVE EXISTING GYPSUM
BOARD CEILING.
3. REMOVE EXISTING VAV BOX WITH HW REHEAT AND ASSOCIATED
CONTROLS. DISCONNECT TRANSITION FITTINGS ON BOTH SIDES OF
BOX.
4. REMOVE EXISTING VAV TERMINAL BOX. DISCONNECT TRANSITION
FITTINGS ON BOTH SIDES OF THE BOX.
5. REMOVE EXISTING FINTUBE STYLE HEATER AND ASSOCIATED
PIPING. SEE M1.04 FOR PIPING.
6. REMOVE TEMPERTAURE SENSOR AND ASSOCIATED WIRING.
REPLACE WITH NEW.
7. REMOVE EXISTING TEMPERATURE CONTROLS SERVING ELECTRIC
UNIT HEATER. EXISTING UNIT HEATER TO REMAIN.
8. REMOVE EXISTING TEMPERATURE CONTROLS SERVING HOT WATER
CABINET UNIT HEATER. EXISTING UNIT HEATER TO REMAIN.
9. REMOVE EXISTING HOT WATER UNIT HEATER AND ASSOCIATED
PIPING AND ACCESSORIES.
10. REMOVE EXISTING ELECTRIC UNIT HEATER.
11. REMOVE IN-UNIT THERMOSTAT
KEYPLAN_________
N.T.S.
GENERAL NOTES
1. CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING AND
REPLACING ALL CEILING TILES REQUIRED FOR DEMOLITION AND TO
INSTALL THEIR WORK.
2. PROVIDE NEW CEILING TILES WHERE EXISTING CEILING TILES ARE
DAMAGED DURING WORK.
3. PROVIDE NEW CEILING GRID WHERE REQUIRED TO ALLOW
DEMOLITION OF EXISTING DUCTWORK AND INSTALLATION OF
DUCTWORK.
4. CONTRACTORS SHALL BE RESPONBILE FOR TEMPORARILY
REMOVING LIGHT FIXTURES TO FACILITATE WORK AND REPLACING
LIGHT FIXTURES WHEN WORK IS COMPLETE.
5. EXISTING TRANSFER OPENINGS THROUGHOUT TO REMAIN.
KEYNOTES (THIS SHEET)
1. EXISTING EXHAUST GRILLE AND ASSOCIATED DUCTWORK TO
REMAIN.
2. EXISTING RETURN GRILLE AND ASSOCIATED DUCTWORK TO
REMAIN.
3. EXISTING ELECTRIC CABINET UNIT HEATER TO REMAIN.
4. EXISTING SUPPLY DIFFUSER AND ASSOCIATED DUCTWORK TO
REMAIN.
5. EXISTING EXHAUST DUCT UP TO FLOOR ABOVE TO REMAIN.
6. EXISTING RETURN DUCT UP TO FLOOR ABOVE TO REMAIN.
7. EXISTING SUPPLY DUCT UP TO FLOOR ABOVE TO REMAIN.
NO. DATE REVISION
1 04/30/24 70% REVIEW
SUBMITTAL
2 07/03/25 PURCHASING
TS
TS
INMATE PROPERTY
STORAGE
S.P.
SECUER STORAGE
ELEC. RM.
GROUP HOLDING
GROUP HOLDING
HOLDING
INMATE PROCESS
BOOKING
DRESS IN
H.C. HOLDING
GROUP HOLDING
GROUP HOLDING
S.P.
125A
S.P.
HOLD
123DECONT.
INTOX.
CORR.
INTOX.
METER RM.
HOLDING
HOLDING
CORR.
VIEWING
INTAKE COURT
CLO.
TRIAGE
HOLDING
HOLDING
DATA COM.
I.D.
COURT CLERK
164 CONFERENCE
COURT REPORTER
LOBBY
W.
M.
T.
Room
J.C.
DRESS OUT
T.
ISSUE
CLERK
VEST.
COURT COMM.
HOLD
Room
ELEVATOR SALLY
PORT
VEHICLE SALLY PORT
(HWS)
(HWR)
(H W
S
(H W
R
(HWS)
(HWR)
(H W
S
(H W
R
3/4"
MATCHLINE
SEE M1.06
3/4"
3/4"
1"
1/2"
2"
1 1/4"
1 1/4"
P R
O J E
C T
T
IT
L E
D R
A W
IN
G
T
IT
L E
PROJECT No.
DRAWING No.
NOTE: DIMENSIONAL DATA IS NOT TO BE OBTAINED BY SCALING ANY PORTION OF THIS DRAWING th S tr e e t
K e n o sh a
W
I 5
C U s e rs
\J W ie d o ff \D o c u m e n ts
\K
K e n o s h a c o P
T F
H V
A C
I m p ro v e m e n ts
R J e ff .W ie d o ff S
D W
.r vt
/2 /2
:4
:1
A
M
M1.04
F
IR
S T
F L
O O
R N
O R
T H
H E
A T
IN
G
D E
M O
L
IT
IO
N
P L
A N
K E
N O
S H
A C
O U
N T
Y P
R E
-T R
IA
L
F A
C
IL
IT
Y
H V
A C
IM
P
R O
V E
M E
N T
S
K0450190
DESIGNED BY: JAW
DRAWN BY: JAW
CHECKED BY: NH
DATE CHECKED: 05/05/25
P H
O N
E
.6
.1 w
.c la rk d ie tz
.c o m K e n o sh a W
I 5 th
S tr e e t, th F lo o r
8' 16'4'0
FIRST FLOOR NORTH HEATING DEMOLITION PLAN
DEMOLITION KEYNOTES
1. DISCONNECT PIPING AND REMOVE EXISTING VAV BOX AND COIL.
REMOVE EXISTING GYPSUM BOARD CEILING.
2. DISCONNECT PIPING AND REMOVE EXISTING VAV BOX AND COIL.
3. REMOVE EXISTING HWS/R PIPING.
4. REMOVE EXISTING FINTUBE STYLE HEATER AND ASSOCIATED
PIPING.
5. REMOVE EXISTING HOT WATER UNIT HEATER AND ASSOCIATED
PIPING AND ACCESSORIES.
6. REMOVE EXISTING ELECTRIC UNIT HEATER.
7. DISCONNECT HWS/R PIPING FOR NEW VALVES. SEE M3.02. REMOVE
GYPSUM BOARD CEILING.
8. REMOVE EXISTING HWS/R PIPING. REMOVE GYPSUM BOARD
CEILING.
9. REMOVE EXISTING HWS/R PIPING EXPOSED AT CEILING.
10. REMOVE EXISTING PIPING FROM CABINET UNIT HEATER BACK TO
VALVES.
11. REMOVE EXISTING PIPING FROM UNIT HEATER BACK TO VALVES.
12. REMOVE EXISTING PIPING FROM VAV BACK TO VALVES.
KEYPLAN_________
N.T.S.
GENERAL NOTES
KEYNOTES (THIS SHEET)
1. EXISTING HOT WATER UNIT HEATER TO REMAIN.
2. EXISTING HOT WATER CABINET HEATER TO REMAIN.
3. EXISTING ELECTRIC UNIT HEATER TO REMAIN.
4. EXISTING ELECTRIC CABINET UNIT HEATER TO REMAIN.
5. HWS/R PIPING ABOVE CEILING TO REMAIN.
6. HWS/R PIPING UP TO FLOOR ABOVE TO REMAIN.
1. CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING AND
REPLACING ALL CEILING TILES REQUIRED FOR DEMOLITION AND TO
INSTALL THEIR WORK.
2. PROVIDE NEW CEILING TILES WHERE EXISTING CEILING TILES ARE
DAMAGED DURING WORK.
3. PROVIDE NEW CEILING GRID WHERE REQUIRED TO ALLOW
DEMOLITION OF EXISTING PIPING AND INSTALLATION OF
PIPING.
4. CONTRACTORS SHALL BE RESPONBILE FOR TEMPORARILY
REMOVING LIGHT FIXTURES TO FACILITATE WORK AND REPLACING
LIGHT FIXTURES WHEN WORK IS COMPLETE.
NO. DATE REVISION
1 04/30/24 70% REVIEW
SUBMITTAL
2 07/03/25 PURCHASING
TS
T S
T S
TS
T S
T S
TS
TS
T S
ELEV. S.P.
FACILITY ADMIN
CONF.
CL.
115A
STORAGE
CONFERENCE
OFFICE
OFFICE
OFFICE
OFFICE
LOBBY
T.
J.C.
CLERICAL
CL.
104A
CORR.
RECORDS STORAGE
ELEC. RM.
116A
W.
M.
CORR.
(SA)
(SA)
(S A
(S
A
MATCHLINE
SEE M1.03
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(RA)
(E A
(TYP.)
4 5 6
(TYP.)
P R
O J E
C T
T
IT
L E
D R
A W
IN
G
T
IT
L E
PROJECT No.
DRAWING No.
NOTE: DIMENSIONAL DATA IS NOT TO BE OBTAINED BY SCALING ANY PORTION OF THIS DRAWING th S tr e e t
K e n o sh a
W
I 5
C U s e rs
\J W ie d o ff \D o c u m e n ts
\K
K e n o s h a c o P
T F
H V
A C
I m p ro v e m e n ts
R J e ff .W ie d o ff S
D W
.r vt
/2 /2
:4
:1
A
M
M1.05
F
IR
S T
F L
O O
R S
O U
T H
V E
N T
IL
A
T
IO
N D
E M
O L
IT
IO
N P
L A
N
K E
N O
S H
A C
O U
N T
Y P
R E
-T R
IA
L
F A
C
IL
IT
Y
H V
A C
IM
P
R O
V E
M E
N T
S
K0450190
DESIGNED BY: JAW
DRAWN BY: JAW
CHECKED BY: NH
DATE CHECKED: 05/05/25
P H
O N
E
.6
.1 w
.c la rk d ie tz
.c o m K e n o sh a W
I 5 th
S tr e e t, th F lo o r
8' 16'4'0
FIRST FLOOR SOUTH VENTILATION DEMOLITION PLAN
DEMOLITION KEYNOTES
1. REMOVE EXISTING VAV BOX WITH HW REHEAT AND ASSOCIATED
CONTROLS. DISCONNECT TRANSITION FITTINGS ON BOTH SIDES OF
BOX.
2. REMOVE EXISTING SA DUCT. ASSOCIATED SA DIFFUSERS TO
REMAIN. SEE M1.6 FOR NEW WORK.
3. REMOVE EXISTING VAV BOX WITH HW REHEAT AND ASSOCIATED
CONTROLS. DISCONNECT TRANSITION FITTINGS ON BOTH SIDES OF
BOX. REMOVE EXISTING GYPSUM BOARD CEILING.
4. REMOVE TEMPERTAURE SENSOR AND ASSOCIATED WIRING.
REPLACE WITH NEW.
5. REMOVE EXISTING TEMPERATURE CONTROLS SERVING HOT WATER
CABINET HEATER. EXISTING CABINET HEATER TO REMAIN. REMOVE
EXISTING TEMPERATURE SENSOR.
KEYPLAN_________
N.T.S.
GENERAL NOTES
1. CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING AND
REPLACING ALL CEILING TILES REQUIRED FOR DEMOLITION AND TO
INSTALL THEIR WORK.
2. PROVIDE NEW CEILING TILES WHERE EXISTING CEILING TILES ARE
DAMAGED DURING WORK.
3. PROVIDE NEW CEILING GRID WHERE REQUIRED TO ALLOW
DEMOLITION OF EXISTING DUCTWORK AND INSTALLATION OF
DUCTWORK.
4. CONTRACTORS SHALL BE RESPONBILE FOR TEMPORARILY
REMOVING LIGHT FIXTURES TO FACILITATE WORK AND REPLACING
LIGHT FIXTURES WHEN WORK IS COMPLETE.
5. EXISTING TRANSFER OPENINGS THROUGHOUT TO REMAIN.
KEYNOTES (THIS SHEET)
1. EXISTING EXHAUST GRILLE AND ASSOCIATED DUCTWORK TO
REMAIN.
2. EXISTING RETURN GRILLE AND ASSOCIATED DUCTWORK TO
REMAIN.
3. EXISTING SUPPLY DIFFUSER AND ASSOCIATED DUCTWORK TO
REMAIN.
4. EXISTING EXHAUST DUCT UP TO FLOOR ABOVE TO REMAIN.
5. EXISTING RETURN DUCT UP TO FLOOR ABOVE TO REMAIN.
6. EXISTING SUPPLY DUCT UP TO FLOOR ABOVE TO REMAIN.
NO. DATE REVISION
1 04/30/24 70% REVIEW
SUBMITTAL
2 07/03/25 PURCHASING
ELEV. S.P.
FACILITY ADMIN
CONF.
CL.
115A
STORAGE
CONFERENCE
OFFICE
OFFICE
OFFICE
OFFICE
LOBBY
T.
J.C.
CLERICAL
CL.
104A
CORR.
RECORDS STORAGE
ELEC. RM.
116A
W.
M.
110CORR.
(HWS)
(HWR)
(H W
S
(H W
R
(H W
S
(H W
R
MATCHLINE
SEE M1.04
1 1/2"
P R
O J E
C T
T
IT
L E
D R
A W
IN
G
T
IT
L E
PROJECT No.
DRAWING No.
NOTE: DIMENSIONAL DATA IS NOT TO BE OBTAINED BY SCALING ANY PORTION OF THIS DRAWING th S tr e e t
K e n o sh a
W
I 5
C U s e rs
\J W ie d o ff \D o c u m e n ts
\K
K e n o s h a c o P
T F
H V
A C
I m p ro v e m e n ts
R J e ff .W ie d o ff S
D W
.r vt
/2 /2
:4
:2
A
M
M1.06
F
IR
S T
F L O
O R
S O
U T
H H
E A
T
IN
G D
E M
O L
IT
IO
N
P L
A N
K E
N O
S H
A C
O U
N T
Y P
R E
-T R
IA
L
F A
C
IL
IT
Y
H V
A C
IM
P
R O
V E
M E
N T
S
K0450190
DESIGNED BY: JAW
DRAWN BY: JAW
CHECKED BY: NH
DATE CHECKED: 05/05/25
P H
O N
E
.6
.1 w
.c la rk d ie tz
.c o m K e n o sh a W
I 5 th
S tr e e t, th F lo o r
8' 16'4'0
FIRST FLOOR SOUTH HEATING DEMOLITION PLAN
DEMOLITION KEYNOTES
1. DISCONNECT PIPING AND REMOVE EXISTING VAV BOX AND COIL.
2. DISCONNECT PIPING AND REMOVE EXISTING VAV BOX AND COIL.
REMOVE EXISTING GYPSUM BOARD CEILING.
3. REMOVE HWS/R PIPING FOR NEW VALVES. SEE M3.03.
4. REMOVE EXISTING HWS/R PIPING. REMOVE GYPSUM BOARD
CEILING.
5. REMOVE EXISTING PIPING FROM VAV BACK TO VALVES.
6. REMOVE EXISTING PIPING FROM CABINET UNIT HEATER BACK TO
VALVES.
KEYPLAN_________
N.T.S.
GENERAL NOTES
KEYNOTES (THIS SHEET)
1. EXISTING HOT WATER CABINET HEATER TO REMAIN.
2. HWS/R PIPING ABOVE CEILING TO REMAIN.
3. HWS/R PIPING UP TO FLOOR ABOVE TO REMAIN.
1. CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING AND
REPLACING ALL CEILING TILES REQUIRED FOR DEMOLITION AND TO
INSTALL THEIR WORK.
2. PROVIDE NEW CEILING TILES WHERE EXISTING CEILING TILES ARE
DAMAGED DURING WORK.
3. PROVIDE NEW CEILING GRID WHERE REQUIRED TO ALLOW
DEMOLITION OF EXISTING PIPING AND INSTALLATION OF
PIPING.
4. CONTRACTORS SHALL BE RESPONBILE FOR TEMPORARILY
REMOVING LIGHT FIXTURES TO FACILITATE WORK AND REPLACING
LIGHT FIXTURES WHEN WORK IS COMPLETE.
NO. DATE REVISION
1 04/30/24 70% REVIEW
SUBMITTAL
2 07/03/25 PURCHASING
T S
TS
T S
TS TS
TS
TS
TS
TS
TS
TS
T S
TS
TS
T S
T S
TREATMENT
EXAM
STOR.
T.
T.
PHARMACY
LAB
OFFICE
STOR.
STAFF
T.
J.C.
WARD
ISO.
ISO.
WARD
STOR.
CORR.
CORR.
ELEVATOR SALLY
PORT
CORR.
TOILET/SHWR
TLT.
STOR.
CORR.
Z ROOM
SOIL. LIN.
BATH
Room
NURSE
DATA COM.
DENTAL
J.C.
TLT.
RECORDS
WAITING
REC.
CORR.
Room
(S A
(SA)(SA) (SA)
MATCHLINE
SEE M1.09
(TYP.)
(TYP.)
(TYP.)
2(TYP.)
(TYP.)
(TYP.)
(R A
) (EA)
(E A
(TYP.)
(TYP.)
P R
O J E
C T
T
IT
L E
D R
A W
IN
G
T
IT
L E
PROJECT No.
DRAWING No.
NOTE: DIMENSIONAL DATA IS NOT TO BE OBTAINED BY SCALING ANY PORTION OF THIS DRAWING th S tr e e t
K e n o sh a
W
I 5
C U s e rs
\J W ie d o ff \D o c u m e n ts
\K
K e n o s h a c o P
T F
H V
A C
I m p ro v e m e n ts
R J e ff .W ie d o ff S
D W
.r vt
/2 /2
:4
:2
A
M
M1.07
S E
C O
N D
F L
O O
R N
O R
T H
V E
N T
IL
A
T
IO
N D
E M
O L
IT
IO
N P
L A
N
K E
N O
S H
A C
O U
N T
Y P
R E
-T R
IA
L
F A
C
IL
IT
Y
H V
A C
IM
P
R O
V E
M E
N T
S
K0450190
DESIGNED BY: JAW
DRAWN BY: JAW
CHECKED BY: NH
DATE CHECKED: 05/05/25
P H
O N
E
.6
.1 w
.c la rk d ie tz
.c o m K e n o sh a W
I 5 th
S tr e e t, th F lo o r
8' 16'4'0
SECOND FLOOR NORTH VENTILATION DEMOLITION PLAN
DEMOLITION KEYNOTES
1. REMOVE EXISTING VAV BOX WITH HW REHEAT AND ASSOCIATED
CONTROLS. DISCONNECT TRANSITION FITTINGS ON BOTH SIDES OF
BOX.
2. REMOVE EXISTING VAV TERMINAL BOX. DISCONNECT TRANSITION
FITTINGS ON BOTH SIDES OF THE BOX.
3. REMOVE EXISTING VAV BOX WITH HW REHEAT AND ASSOCIATED
CONTROLS. DISCONNECT TRANSITION FITTINGS ON BOTH SIDES OF
BOX. REMOVE EXISTING GYPSUM BOARD CEILING.
4. REMOVE EXISTING VAV TERMINAL BOX. DISCONNECT TRANSITION
FITTINGS ON BOTH SIDES OF THE BOX. REMOVE EXISTING GYPSUM
BOARD CEILING.
5. REMOVE TEMPERTAURE SENSOR AND ASSOCIATED WIRING.
REPLACE WITH NEW.
KEYPLAN_________
N.T.S.
GENERAL NOTES
1. CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING AND
REPLACING ALL CEILING TILES REQUIRED FOR DEMOLITION AND TO
INSTALL THEIR WORK.
2. PROVIDE NEW CEILING TILES WHERE EXISTING CEILING TILES ARE
DAMAGED DURING WORK.
3. PROVIDE NEW CEILING GRID WHERE REQUIRED TO ALLOW
DEMOLITION OF EXISTING DUCTWORK AND INSTALLATION OF
DUCTWORK.
4. CONTRACTORS SHALL BE RESPONBILE FOR TEMPORARILY
REMOVING LIGHT FIXTURES TO FACILITATE WORK AND REPLACING
LIGHT FIXTURES WHEN WORK IS COMPLETE.
5. EXISTING TRANSFER OPENINGS THROUGHOUT TO REMAIN.
KEYNOTES (THIS SHEET)
1. EXISTING EXHAUST GRILLE AND ASSOCIATED DUCTWORK TO
REMAIN.
2. EXISTING RETURN GRILLE AND ASSOCIATED DUCTWORK TO
REMAIN.
3. EXISTING SUPPLY DIFFUSER AND ASSOCIATED DUCTWORK TO
REMAIN.
4. EXISTING EXHAUST DUCT UP TO FLOOR ABOVE TO REMAIN.
5. EXISTING RETURN DUCT UP TO FLOOR ABOVE TO REMAIN.
6. EXISTING SUPPLY DUCT UP TO FLOOR ABOVE TO REMAIN.
NO. DATE REVISION
1 04/30/24 70% REVIEW
SUBMITTAL
2 07/03/25 PURCHASING
TREATMENT
EXAM
STOR.
T.
T.
PHARMACY
LAB
OFFICE
STOR.
STAFF
T.
J.C.
WARD
ISO.
ISO.
WARD
STOR.
CORR.
CORR.
ELEVATOR SALLY
PORT
CORR.
TOILET/SHWR
TLT.
STOR.
CORR.
Z ROOM
SOIL. LIN.
BATH
Room
NURSE
DATA COM.
DENTAL
J.C.
TLT.
RECORDS
WAITING
REC.
CORR.
Room
(HWS)
(HWR)
(HWR)
(HWS)
(H W
S
(H W
R
3 3
1 1/4"
3/4"
MATCHLINE
SEE M1.10
31"
1" 1"
1"
P R
O J E
C T
T
IT
L E
D R
A W
IN
G
T
IT
L E
PROJECT No.
DRAWING No.
NOTE: DIMENSIONAL DATA IS NOT TO BE OBTAINED BY SCALING ANY PORTION OF THIS DRAWING th S tr e e t
K e n o sh a
W
I 5
C U s e rs
\J W ie d o ff \D o c u m e n ts
\K
K e n o s h a c o P
T F
H V
A C
I m p ro v e m e n ts
R J e ff .W ie d o ff S
D W
.r vt
/2 /2
:4
:3
A
M
M1.08
S E
C O
N D
F L
O O
R N
O R
T H
H E
A T
IN
G
D E
M O
L
IT
IO
N
P L A
N
K E
N O
S H
A C
O U
N T
Y P
R E
-T R
IA
L
F A
C
IL
IT
Y
H V
A C
IM
P
R O
V E
M E
N T
S
K0450190
DESIGNED BY: JAW
DRAWN BY: JAW
CHECKED BY: NH
DATE CHECKED: 05/05/25
P H
O N
E
.6
.1 w
.c la rk d ie tz
.c o m K e n o sh a W
I 5 th
S tr e e t, th F lo o r
8' 16'4'0
SECOND FLOOR NORTH HEATING DEMOLITION PLAN
DEMOLITION KEYNOTES
1. DISCONNECT PIPING AND REMOVE EXISTING VAV BOX AND COIL.
2. DISCONNECT PIPING AND REMOVE EXISTING VAV BOX AND COIL.
REMOVE EXISTING GYPSUM BOARD CEILING.
3. REMOVE EXISTING HWS/R PIPING.
4. REMOVE EXISTING HWS/R PIPING. REMOVE EXISTING GYPSUM
BOARD CEILING.
5. REMOVE EXISTING PIPING FROM VAV BACK TO VALVES.
KEYPLAN_________
N.T.S.
GENERAL NOTES
1. CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING AND
REPLACING ALL CEILING TILES REQUIRED FOR DEMOLITION AND TO
INSTALL THEIR WORK.
2. PROVIDE NEW CEILING TILES WHERE EXISTING CEILING TILES ARE
DAMAGED DURING WORK.
3. PROVIDE NEW CEILING GRID WHERE REQUIRED TO ALLOW
DEMOLITION OF EXISTING PIPING AND INSTALLATION OF
PIPING.
4. CONTRACTORS SHALL BE RESPONBILE FOR TEMPORARILY
REMOVING LIGHT FIXTURES TO FACILITATE WORK AND REPLACING
LIGHT FIXTURES WHEN WORK IS COMPLETE.
KEYNOTES (THIS SHEET)
1. HWS/R PIPING ABOVE CEILING TO REMAIN.
2. HWS/R PIPING UP TO FLOOR ABOVE TO REMAIN.
NO. DATE REVISION
1 04/30/24 70% REVIEW
SUBMITTAL
2 07/03/25 PURCHASING
S
T S
T S
T S
TS
T S
TS
WOMEN'S LOCKER
ROOM
TLT.
ELEV. S.P.
STORAGE
204B
OFFICE
OFFICE
OFFICE
CUSTODY STAFF
ASSEMBLY
CORR.
J.C.
STOR.
204AVEST.
TLT.
MEN'S LOCKER ROOM
(SA)
(S A
(SA)
MATCHLINE
SEE M1.07
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(E A
(RA)
(TYP.)
4 5 6
(TYP.)
P R
O J E
C T
T
IT
L E
D R
A W
IN
G
T
IT
L E
PROJECT No.
DRAWING No.
NOTE: DIMENSIONAL DATA IS NOT TO BE OBTAINED BY SCALING ANY PORTION OF THIS DRAWING th S tr e e t
K e n o sh a
W
I 5
C U s e rs
\J W ie d o ff \D o c u m e n ts
\K
K e n o s h a c o P
T F
H V
A C
I m p ro v e m e n ts
R J e ff .W ie d o ff S
D W
.r vt
/2 /2
:4
:3
A
M
M1.09
S E
C O
N D
F L
O O
R S
O U
T H
V E
N T
IL
A
T
IO
N D
E M
O L
IT
IO
N P
L A
N
K E
N O
S H
A C
O U
N T
Y P
R E
-T R
IA
L
F A
C
IL
IT
Y
H V
A C
IM
P
R O
V E
M E
N T
S
K0450190
DESIGNED BY: JAW
DRAWN BY: JAW
CHECKED BY: NH
DATE CHECKED: 05/05/25
P H
O N
E
.6
.1 w
.c la rk d ie tz
.c o m K e n o sh a W
I 5 th
S tr e e t, th F lo o r
8' 16'4'0
SECOND FLOOR SOUTH VENTILATION DEMOLITION PLAN
DEMOLITION KEYNOTES
1. REMOVE EXISTING VAV BOX AND COIL. DISCONNECT TRANSITION
FI…