This is Addendum #1 to a construction contract issued by Kenosha County for miscellaneous security upgrades (#2519) at the Kenosha County Detention Center. The addendum modifies the original drawings and specifications and becomes part of the contract documents. Bids are due Wednesday, November 5, 2025 at 1:00 p.m. local time at the County of Kenosha Purchasing Division located at 1010 56th Street, Second Floor, Kenosha, WI 53140, where bids will be opened publicly. The project encompasses security enhancements including bullet-resistant fiberglass paneling, padded cell room construction, sally port door replacement, reception area renovation with solid surface capping and hollow metal windows, fire protection relocation, and access control system coordination. The addendum clarifies specification requirements, addresses framing standards (20-gauge metal studs for non-load-bearing applications), and confirms that the "H" dorm will be emptied during construction to eliminate the need for temporary enclosures. Key construction considerations include temporary sally port door opening security measures, intercom box adjustment to align with new padding systems, and window infill specifications using 8-inch CMU with painting per section 09 91 00.
The general contractor is responsible for obtaining and paying all permits related to on-site construction and for organizing subcontractor bid packages, including the supply of bullet-resistant fiberglass paneling per specifications section 09 29 00. The contractor must coordinate with County IT regarding the existing SGTS access control system and verify that north and south sally port door access controls are removed and reinstalled in-kind without requiring new card readers at the South Sallyport door. Material storage may utilize the H Dorm and Boiler room, while debris removal occurs through the Southwest Sallyport door and West loading dock, with dumpster placement in the East lot behind the building or in front for lobby construction work. All cell furniture, plumbing fixtures, accessories, and cell doors must be delivered to the County for reuse, with coordination required prior to demolition. The County does not anticipate asbestos presence based on facility construction, but contractors must notify the County immediately if unforeseen hazardous materials are encountered, with the County handling remediation under a separate contract. The County Electrician will provide additional power and data to the temporary reception location as needed.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2519 Specifications.pdf | ||
| 2419 Bid Documents.pdf | ||
| Vendor Responsibility Form Construction.pdf | ||
| 2519 Drawings.pdf | ||
| Background Check Form.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Kenosha County Detention Center Misc. Security Upgrades #2519
ADDENDUM # 1
October 29, 2025
BIDS DUE: Wednesday, November 5, 2025 at 1:00 Local Time. At that time Bids will be opened publicly for consideration by the Owner at the County of Kenosha Purchasing Division located at 1010 56th Street, Second Floor Kenosha, WI 53140.
To all Contract Bidders of record.
This Addendum is issued to modify, explain or correct the original Drawings and Specifications as noted below, and is hereby made a part of the Contract documents.
Please attach this Addendum to the Specifications in your possession. Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may subject Bidder to disqualification.
This Addendum consists of (3) written pages, (3) Attachments and (1) Sign in sheet.
QUESTIONS AND ANSWERS
1. For the bullet resistant fiberglass panels, are these being supplied by a vendor for us to install? Or are we responsible for furnishing and installing of the panels behind our drywall?
a. The general contractor will be responsible for organizing their subcontractor bid packages. The fiberglass bullet proof paneling is required to be supplied per specifications section 09 29 00.
2. Some of the framing notes are referencing 05 41 00 (cold-formed metal framing, which isn’t provided in the spec manual) or “structural stud”. I’m assuming that this is all intended to be 20ga (30mil) framing since none of it is load bearing?
a. Specification section 05 41 00 is not required for the project. However, the stud framing for the lobby construction is required to be 20ga per the sections and details.
3. What are the existing Access Control systems?
a. The existing access control system in the facility is SGTS. The division 27 contractor will be responsible to coordinate with County IT and all existing access control systems as required.
4. Sheet A/200 Demo note #19 Intercom to remain, provide new box to flush with new padding. What exactly is required for this?
a. It will be required to move the box for the intercom in the cell for communication with detention staff. The padding system changes the thickness of the wall system, and the intercom system box needs to be flush with the new padding system and tamper resistant.
5. Are we going to be required to build temporary walls at Cells during construction and if so, what is required?
-2-
a. This will not be required. The “H” dorm will be emptied during construction.
Temporary enclosure will not be required.
6. Removal of Sally Port Doors, it’s going to take one day to remove existing and another day to install new, maybe even more time. What do we need to do to secure these openings during this time?
a. The opening should be temporary secured during the work as to restrict any entry. The Sallyport vestibule is securable, but the temporary opening should not allow any access to this area. G.C. is responsible for the means and methods of constructing this barrier. All temporary barriers are to be coordinated with the County detention staff.
7. Reception Area. Are the countertops on the cabinets and the front desk solid surface or plastic laminate?
a. The countertop over the cabinet area is plastic laminate. Refer to section 3/A402.
8. The existing half wall in the lobby area, are we to remove the wood cap and replace with a solid surface cap?
a. That is correct. See the attached sheet with updated solid surface capping keynotes.
9. Detail 2&3/A402. Window sills what are we to use for this? Would this be drywall or Solid Surface?
a. The window sills are sections 02,04/A402 are to be notes as drywall sills.
10. Will the segregation cell block and day room be emptied of prisoners for the duration of the padded room project or will the contractor be required to construct a permanent temporary wall with access door at the entry of these cells?
a. An access door and enclosure will not be required. The “H” dorm will be emptied during construction.
11. Will the fire protection heads in the proposed padded cell rooms need to be extended?
a. Yes, the fire protection will be required to be relocated to the new surface finish.
12. The north and south sally port doors have different access controls. Please verify that these access controls are to removed and reinstalled in the new detention framing system? See attached photos.
a. The division contractor will be required to remove and re-install the existing conditions in kind. No new card reader is required at the South Sallyport door.
13. The intent of the temporary reception location is that the contractor can have the proposed reception area to complete without additional phasing?
a. That is correct, no phasing is required as part of the project. However, if an area of work is started it needs to remain under construction until complete. A path to the lockers is to be maintained as part of the construction barrier.
14. Will any additional temporary electrical and low voltage be required by the contractor for the temporary reception location?
a. There is power and data in the existing temporary location indicated on A201.
The County Electrician will provide additional power and data if needed.
-3-
15. On Sheet A20, Note #16 stats to infill the window with 8” CMU. Are we to just infill the existing window lite in the existing window frame?
a. The entire window system should be demolished and a new HM window provided per the updated plans attached. The remaining opening should be infilled with CMU to match and painted per 09 91 00.
16. Are contractors required to obtain and pay for permits?
a. The general contractor is required to obtain and pay for all permits related to the on-site construction.
17. Where will the check in desk be relocated during construction?
a. That is correct. Refer to sheet A201 and see questions above addressing power and data.
18. Is there any asbestos in the work areas?
a. Based on the construction of the facility, the County does not anticipate any Asbestos to be present. If the contractor encounters unforeseen hazardous material, they are to notify the County. The County will handle remediation under a separate contract.
19. Clarifying if the County is keeping the cell doors and fixtures.?
a. That is correct. The contractor is responsible to give all of the cell furniture, plumbing fixtures, accessories, and the cell doors to the County for re-use. G.C.
to coordinate with the County prior to demo to confirm that all items desired are saved.
20. Clarify how they will get materials in and construction debris out, and where can tools be stored during construction?
a. H Dorm and the Boiler room toured at the pre-bid can be utilized for the tool storage. The Southwest Sallyport door and the West loading dock toured at the pre-bid can be utilized for debris removal. Coordinate with the County for all debris removal. The dumpster can be stored in the East lot behind the building adjacent to the current dumpsters. If a dumpster is desired for the Lobby construction, a dumpster can be placed in front of the building. However, when the dorm work is being completed, the lobby cannot be utilized for debris removal.
REVISIONS TO THE DRAWINGS
1. A201 – Floor Plan – Existing and Demo – Area J’
a. Demo of hollow metal windows clarified at the new reception area.
2. A203 – Floor Plan – Proposed – Area J’
a. New hollow metal window clarified at the reception area.
b. Solid surface wall capping clarified at the lobby half wall.
3. A700 – Floor Plan – Proposed – Area J’
a. Detail 7/A700 adjusted. New hollow metal window clarified at the reception area.
23'�8"
8"
4'�0" 8"
48'�0"
11'�4" existing restroom existing restroom
NO WORK IN THIS
AREA
NO WORK IN THIS
AREA
TE�P DES� AREA
17�5
17�5
��5��5
��5��5
��5��5
��4��4
��9��9
11'�4" 8" 11'�4" 8" 11'�6" 11'�9 13�16"
6'�0"
11'�4" 8" existing waiting existing lockers and waiting existing visiting existing visiting
24'�0" 24'�0"
48'�0" existing visiting existing conference existing visiting
��3��3
4"
17�8
17�8
2'�0" 4'�0"
��8��8
NO WORK IN THIS
AREA
5 5
NO WORK IN THIS
AREA
A400
17�5
17�5
��5��5
��5��5
��5��5
��9��9
��3��3
17�8
17�8
��8��8
48'�0"
24'�0" 12'�6" 11'�6"
EXISTING SKYLIGHT
TO REMAIN
VERIFY I FIE�D
12'�10 7�8"
EXISTI G S#FFIT
T# RE�AI
EXISTI G S#FFIT
T# RE�AI
1 DEMO EXISTING FURNITURE SYSTEM; DEMO TO INCLUDE ALL
COUNTER SECTIONS, PARITIONS WALL, AND SUPPORTS AS
REQUIRED. DEMO COMPLETE SYSTEM
2 DEMO EXISTING WALL; DEMO TO CONTAIN COMPLETE WALL
CONSTRUCTION - G.C. TO FIELD VERIFY CONDITION AND COORDINATE
WITH PROPOSED WORK
3 DEMO EXISTING FLOORING; CLEAN LINE OF REMOVAL TO SECTOIN
THAT IS TO REMAIN; FIELD VERIFY BEST LOCATION TO DEMO CLOSEST
TO AREA INDICATED
4 RELOCATE EXISTING METAL DETECTOR AND ASSOCIATED POWER;
G.C. TO CUT FLOOR AND REPLACE SLAB TO RELOCATE POWER TO
NEW LOCATION
5 DEMO EXISTING LIGHT; RE-USE CIRCUIT FOR NEW LIGHTING AS
REQUIRED
6 RELOCATE EXISTING SUPPLY REGISTER; SEE PLAN FOR LOCATION
7 DEMO EXISTING CEILING; DEMO INCLUDES COMPLETE SYSTEM AND
AND ALL COMPONENTS NECESSARY FOR NEW CONSTRUCTION;
PATCH AND FRAME AREAS NECESSARY FOR NEW CEILING AND WALL
CONSTRUCTION
8 DEMO EXISTING WALL MOUNT TOILETS; SEE MEP FOR NEW PLUMBING
SCOPE; PATCH MASONRY WALL AS REQUIRED
9 DEMO EXISTING WALL MOUNT STEEL BED; PATCH AMCHOR HOLES -
CONCRETE PATCHING COMPOUND OR MORTAR MIX PATCH
10 DEMO EXISTING FLOOR MOUNT STEEL BENCH AND TABLE
11 DEMO EXISTING LIGHT FIXTURE; SEE MEP PLANS FOR NEW LIGHT
FIXTURE - RE-USE EXISTING CIRCUITING IF APPLICABLE
12 DEMO EXISTING WALL MOUNT MIRROR
13 DEMO SECTION OF CONCRETE SLAB FOR NEW FLOOR DRAIN INSTALL;
FIELD VERIFY ROUTING NECESSARY AND PROVIDE SAW CUT /
CONCRETE FLOOR POUR INFILL
14 DEMO EXISTING SLIDING CELL DOOR - VERIFY WITH COUNTY FOR
DISPOSAL OR RE-USE
15 REMOVE EXISTING SECTIONS OF OVERHEAD SLIDING TRACK; TRACK
AT ADJACENT CELLS TO REMAIN; G.C. RESPONSIBLE TO INVESTIGATE
CURRENT TRACK SYSTEM AND REMOVE AS NECESSARY FOR THE
NEW DOOR INSTALL
16 DEMO EXISTING WINDOW; INFILL WITH 8" CMU TO MATCH EXISTING
WALL - PAINT PER 09 91 00
17 DEMO EXISTING HOLLOW METAL SECURITY EXTERIOR DOOR; REMOVE
SILL, AND PREP JAMBS AND HEAD FOR NEW DOOR INSTALL
18 DEMO EXISTING LOCKING COLUMN TABS; BENT STEEL PLATE AT HEAD
AND JAMBS TO REMAIN
19 EXISTING INTERCOM TO REMAIN; PROVIDE NEW BOX TO FLUSH WITH
NEW PADDED CELL SURFACE
20 DEMO EXISTING FLOORING IN REMAINING AREA OF ROOM UNDER
ALTERNATE #2
1. DEMOLITION NOTES AND PLANS ARE PROVIDED AS A
REFERENCE. CONTRACTOR TO VERIFY EXISTING
CONDITIONS AND EXAMINE DRAWINGS AND DETAILS TO
DETERMINE EXTENT AND LIMITS OF DEMOLITION REQUIRED
TO ACCOMMODATE NEW CONSTRUCTION.
2. REFER TO CONSULTANT DRAWINGS FOR ADDITIONAL
DEMOLITION OF OTHER DISCIPLINES.
3. PROVIDE AND COORDINATE ALL DEMOLITION AND NEW
CONSTRUCTION WITH PROPOSED PLAN DIMENSIONS AND
INSTALLATION OF NEW MATERIALS AND FINISHES.
DEMOLITION TO BE IN ACCORDANCE WITH NEW FINAL
PRODUCT.
4. PROVIDE SMOOTH AND CLEAN SURFACE TO ALL AREAS
RECEIVING NEW FINISHES. COORDINATE WORK WITH PLANS
AND THE ROOM FINISH SCHEDULE TO COMPLY WITH NEW
PROPOSED MATERIAL.
5. ALL RELATED WOOD BLOCKING, HARDWARE CONNECTION
DEVICES, ADHESIVES, AND/OR MASTIC SHALL BE REMOVED
FROM SURFACES AT ITEMS NOTED FOR DEMO. PROVIDE
SURFACES ACCEPTABLE FOR PATCHING AND/OR NEW
CONSTRUCTION.
6. IDENTIFICATION AND/OR ABATEMENT OF HAZARDOUS
MATERIALS IS NOT PART OF THIS SCOPE OF WORK. IF
ASBESTOS OR OTHER HAZARDOUS MATERIALS ARE
ENCOUNTERED, THE CONTRACTOR SHALL NOTIFY THE
OWNER IMMEDIATELY.
7. REMOVE LOOSE PAINT AND MISCELLANEOUS HANGING
OBJECTS FROM WALLS AND CEILINGS AT ALL AREAS TO
RECEIVE NEW FINISHES.
8. OPENING IN THE EXISTING STRUCTURE SMALLER THAN 12"
IN ANY DIRECTION ARE NOT IDENTIFIED ON THESE
DRAWINGS. SUB-CONTRACTORS SHALL BE RESPONSIBLE
FOR PROVIDING OPENINGS SMALLER THAN 12" AS
REQUIRED FOR INSTALLATION OF THEIR WORK.
9. OPENINGS IN THE EXISTING STRUCTURE SHALL NOT BE MADE
WITHOUT PRIOR APPROVAL OF THE STRUCTURAL ENGINEER.
10. PATCH AND REPAIR ALL EXISTING FLOOR SLABS AND WALL
SURFACES DAMAGED FROM DEMOLITION OR PRIOR USE.
11. PATCH ALL AREAS OF ELECTRICAL AND MECHANICAL
DEMOLITION THAT WILL NOT BE REUSED.
12. DO NOT REMOVE ANY ITEMS WHICH JEOPARDIZE THE
STRUCTURAL INTEGRITY OF THE BUILDING. IF HIDDEN
ELEMENTS OR DETERIORATED ELEMENTS ARE
ENCOUNTERED, NOTIFY THE ARCHITECT IMMEDIATELY.
13. PROTECT ALL ADJACENT AREAS AND ITEMS "TO REMAIN"
DURING DEMOLITION/CONSTRUCTION. REPAIR/REPLACE ALL
ITEMS DAMAGED DURING CONSTRUCTION.
14. EXISTING BUILDING CONDITIONS SHOWN ON THESE
DRAWINGS ARE DERIVED FROM DRAWINGS OF THE ORIGINAL
BUILDING AND FROM LIMITED FIELD OBSERVATION.
15. INDICATED EXISTING BUILDING CONDITIONS ARE ASSUMED TO
BE REPRESENTATIVE OF THE ACTUAL CONSTRUCTION OF
THE BUILDING.
FIELD CONDITIONS MAY VARY.
16. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN
ADDITIONAL MEANS OF EGRESS AS NEEDED AS A RESULT OF
CONSTRUCTION SEQUENCING AND/OR REGULATORY
REQUIREMENTS
17. G.C. IS RESPONSIBLE FOR ALL DEMO WORK REQUIRED FOR
THE COMPLETION OF THE PROPOSED SCOPE OF WORK;
REFER TO ALL BASE BID AND ALTERNATE PLANS. ALL
CUTTING AND PARCHING REQUIRED IS THE RESPONSIBILITY
OF THE G.C.
"A�� AREAS SH#W AS DIAG# A� HATCH T# RE�AI
EXISTI G U� �#�
I DICATED GE ERA� (BUT #T �I�ITED T#) AREA OF
WORK
17�5
17�5
E�5E�5
F�5F�5
17�8
17�8 sally port
J009
24'�0" 24'�0" 12'�6" 11'�6"
48'�0"
8'�0"
171'�4"
7'�8"
17�5
17�5
PP
RR
17�8
17�8
24'�0" 24'�0" 12'�6" 11'�6"
48'�0" sallyport
K009
8'�0"
1'�4" 7'�8"
OWNER:
PROJECT:
PROJECT
PROJECT ISSUE DATE:
©2025 Kueny Architects L.L.C. - All Rights Reserved
10505 Corporate Drive, Pleasant Prairie, WI 53158 phone: 262.857.8101 web: www.kuenyarch.com
A
1 2 3 4
1 2 3 4
X
B
C
D
X X
X
A
B
C
D
CONSULTANTS
REV # DESCRIPTION DATE
REVISIONS
KEY PLAN
PLAN NORTH
SHEET
SHEET TITLE:
ARCHITECT
Kueny Architects Phone: 262.857.8101 Address: 10505 Corporate Drive, Suite 100 Pleasant Prairie, Wisconsin 53158
Architect of Record - Jon P. Wallenkamp P:414.690.3197
Project Manager - Lee Anderson P:262.945.7709
MEP
Root Engineering Services, P.C.
Phone: 847.249.8398 Address: 10411 Corporate Drive, Suite 108 Pleasant Prairie, Wisconsin 53158
Engineer of Record - Eric Tien
KEYNOTE LEGEND
/2 /2
:2
:0
A M
SCALE: As indicated
A201
Kenosha County
4777 88th Ave, Kenosha, WI 53144
Detention Center - Misc.
Security Upgrades
Floor Plan - Existing and Demo - Area J
September 30, 2025
3/16" = 1'-0"1 Existing and Demo - Area J 3/16" = 1'-0"2 Existing and Demo - Ceiling Plan - Area J
DEMO GENERAL NOTES
1 Addendum #1 10/29/2025
1/16" = 1'-0"3 Area H Sally Port South Door - Demo Plan 1/16" = 1'-0"4 Area H Sally Port North Door - Demo Plan
23'�8"
8"
4'�0"
8"
48'�0"
�4
�1
4'�6 1�2"
1'�0"
�4 reception
J003 lobby
J002
A700
A700
A400
17�5
17�5
��5��5
��5��5
��5��5
��9
��9
��3��3
17�8
17�8
��8��8
�3�3a vestibule
J001
48'�0"
24'�0" 12'�6" 11'�6"
06 61 00.09
06 61 00.09
8" 4'�0" 8"
1'�6"
1'�0" A2 5'
�2 reception
J003
A400
A400
A401
A401
A401
A402
A402
A402
A402
A700
5'�5"
A400
17�5
17�5
��5��5
B1 c
EQ EQ
��3��3
BR
s
BR
s
B3 s
B3 s
BR
s
BR
s
17�8
17�8
12'�6"
2'�0"
9'�2 7�16"
�3
2'�0" 2'�10" 1'�7 1�8" 2'�10"
6"
��8��8
6" 2'�0"
2'�0"
5'�2 1�8"
B3 c
B2 c
BR
s
B1 c
B1 c
BR
s
BR
s
BR
s
�8
3'�6" 6'�0" 2'�8"
12'�6"
C E
T
E R
I
E
F
E T
A D
E T
E C
T
R
�8
08 11 00.A3
08 80 00.10
4"
17�5
17�5
24'�0"
24'�0"
48'�0"
��5��5
��5��5
��5��5
��4��4
��9��9
W21X44 W21X44
26�10
26�10
26�10
26�10
26�10
26�10
13' � 4"
W
X
W18X35
18�4
W18X35
18�4
18�4
26�10
W12X16
16�7
16�7
16�7
16�7
16�7
16�7
16�7
16�7
W12X16
16�7
16�7
16�7
W12X16
16�7
16�7
16�7
16�7
16�7
16�7
16�7
26�10
26�10
26�10
26�10
26�10
26�10
1'�4"
��3��3
17�8
17�8
��8��8
EW SECURE
RECEPTI# AREA
(SEE A203)
PAINT SCHEDULE
ROOM
FLOOR
WALLS
CEILING METAL WOOD REMARKSNUM NAME NORTH SOUTH EAST WEST
�001 vestibu5e 6�a PT�1 PT�1 PT�1 PT�1 PT�1 6�a VAR ISH RE�PAI T R##� U DER A�TER ATE #18 I C�UDES A�� WA��S8 CEI�I G8 A D H� FRA�ES
�002 59bby 6�a PT�1 PT�1 PT�1 PT�1 PT�1 6�a VAR ISH RE�PAI T R##� U DER A�TER ATE #18 I C�UDES A�� WA��S8 CEI�I G8 A D H� FRA�ES
�003 recepti96 6�a PT�1 PT�1 PT�1 PT�1 PT�1 6�a VAR ISH
OWNER:
PROJECT:
PROJECT
PROJECT ISSUE DATE:
©2025 Kueny Architects L.L.C. - All Rights Reserved
10505 Corporate Drive, Pleasant Prairie, WI 53158 phone: 262.857.8101 web: www.kuenyarch.com
A
1 2 3 4
1 2 3 4
X
B
C
D
X X
X
A
B
C
D
CONSULTANTS
REV # DESCRIPTION DATE
REVISIONS
KEY PLAN
PLAN NORTH
SHEET
SHEET TITLE:
ARCHITECT
Kueny Architects Phone: 262.857.8101 Address: 10505 Corporate Drive, Suite 100 Pleasant Prairie, Wisconsin 53158
Architect of Record - Jon P. Wallenkamp P:414.690.3197
Project Manager - Lee Anderson P:262.945.7709
MEP
Root Engineering Services, P.C.
Phone: 847.249.8398 Address: 10411 Corporate Drive, Suite 108 Pleasant Prairie, Wisconsin 53158
Engineer of Record - Eric Tien
KEYNOTE LEGEND
/2 /2
:2
:0
A M
SCALE: As indicated
A203
Kenosha County
4777 88th Ave, Kenosha, WI 53144
Detention Center - Misc.
Security Upgrades
Floor Plan - Proposed - Area J
September 30, 2025
ROOM SCHEDULE
NUMBER NAME FLOOR TYPE BASE
WALL FINISH CEILING
REMARKSNORTH SOUTH EAST WEST TYPE
�001 vestibu5e W��1 VB�1 EXISTI G C�U EXISTI G C�U EXISTI G C�U EXISTI G C�U EXISTI G GYP�1
�002 59bby �VT�1 VB�1 EXISTI G C�U � GYP�1 EXISTI G GYP�1 EXISTI G GYP�1 EXISTI G C�U � GYP�1 EXISTI G GYP�1 � ACT�1 � S�Y�IGHT
�003 recepti96 �VT�1 VB�1 � VB�2 GYP�1 � G��3 GYP�1 � G��3 GYP�1 � G��3 GYP�1 � G��3 GYP�1 � ACT�1
3/16" = 1'-0"1 Level 01 - Proposed - Area J
1/2" = 1'-0"2 Area J - Enlarged Reception Plan
06 61 00.09 SOLID SURFACE WALL CAP
08 11 00.A3 HOLLOW METAL WINDOW FRAME
08 80 00.10 1" INTERIOR ATTACK RESISTANT GLAZING
1/8" = 1'-0"3 Framing Plan - Area "J" - Reference Plan
1 Addendum #1 10/29/2025
LEVEL 1
0'-0"
09 68 00.A1
17�5 1717�8
09 68 00.A1
09 91 00.01
=�� 4'�6"
13'�7 1�4"
10 14 00.A1
08 34 14.A1
06 61 00.09
24'�0"12'�6"11'�6"
48'�0"
06 61 00.09
09 91 00.01
01 00 00.A1
06 61 00.01
09 68 00.A1
06 40 00.08
08 34 14.A2 09 29 00.A7
LEVEL 1
0'-0"
��5� ��3
12'�0"
3'�8" 8'�4"
09 68 00.A1
09 29 00.A7
08 14 29.A1
�3
08 11 00.A1
08 34 14.A1
06 61 00.01
2'�0" 8" 3'�4"1'�8"
01 00 00.A1
10 14 00.A1
06 40 00.08
LEVEL 1
0'-0"
���5��5 ���3
8'�4" 3'�8" 12'�0" 12'�0"
36'�0"
09 68 00.A1
09 29 00.A7
10 14 00.A1
06 61 00.01
01 00 00.A1
09 68 00.A1
06 40 00.08
08 34 14.A1
09 29 00.B6
08 34 14.A3
7'�10 3�8"
EQ EQ EQ1'�6"
EQ EQ EQ
09 91 00.02
09 29 00.A7
09 91 00.03
09 91 00.02
LEVEL 1
0'-0"
1817�5 17�8
12'�6" 11'�6"
24'�0"
A401
Si>
09 91 00.02
09 29 00.A7
08 34 14.A1
06 61 00.01
09 68 00.A1
06 61 00.01 06 61 00.01
09 29 00.A7
09 68 00.A1
09 91 00.01
LEVEL 1
0'-0"
17�517�8
12'�6"
3'�10"6'�0"
A402
Si>
08 34 14.A1
06 61 00.018
09 51 00.A1
09 91 00.01
06 40 00.02
09 51 00.A1
08 34 14.A1
09 29 00.B6
09 29 00.A1
08 80 00.07
3'�0"2'�6"1'�7"1'�7"3'�0"
A500
Si>
A500
Si>
LEVEL 1
0'-0"
� ��5 ��5� ���3 ��8
4'�6" 1'�2 7�8"
12'�0" 12'�0" 3'�8" 8'�4" 7'�4" 10'�8"
48'�0"
09 51 00.A1
08 34 14.A1
06 40 00.02
06 40 00.01
09 68 00.A1
08 80 00.07
08 34 14.A1
10 14 00.A1
06 61 00.01
09 29 00.B6
09 91 00.02
09 91 00.02
09 68 00.A1
LEVEL 1
0'-0"
��5 ��3��8
15'�8"
7'�4" 8'�4"
�3
06 40 00.02
06 61 00.01
08 34 14.A1
09 29 00.B6
09 68 00.A108 14 29.A1
08 34 14.A1
06 40 00.01
09 29 00.B6
09 51 00.A1
09 91 00.01
09 91 00.01
OWNER:
PROJECT:
PROJECT
PROJECT ISSUE DATE:
©2025 Kueny Architects L.L.C. - All Rights Reserved
10505 Corporate Drive, Pleasant Prairie, WI 53158 phone: 262.857.8101 web: www.kuenyarch.com
A
1 2 3 4
1 2 3 4
X
B
C
D
X X
X
A
B
C
D
CONSULTANTS
REV # DESCRIPTION DATE
REVISIONS
KEY PLAN
SHEET
SHEET TITLE:
ARCHITECT
Kueny Architects Phone: 262.857.8101 Address: 10505 Corporate Drive, Suite 100 Pleasant Prairie, Wisconsin 53158
Architect of Record - Jon P. Wallenkamp P:414.690.3197
Project Manager - Lee Anderson P:262.945.7709
MEP
Root Engineering Services, P.C.
Phone: 847.249.8398 Address: 10411 Corporate Drive, Suite 108 Pleasant Prairie, Wisconsin 53158
Engineer of Record - Eric Tien
KEYNOTE LEGEND
/2 /2
:2
:0
A M
SCALE: 1/4" = 1'-0"
A700
Kenosha County
4777 88th Ave, Kenosha, WI 53144
Detention Center - Misc.
Security Upgrades
Elevations and Details
September 30, 2025
1/4" = 1'-0"1 Lobby J001 - North
01 00 00.A1 EXISTING METAL DETECTOR; G.C. TO RELOCATE TO NEW
LOCATIONS INDICATED ON PLANS
06 40 00.01 PLASTIC LAMINATE COUNTER TOP & BACKSPLASH;
CONCEALED SUPPORTS AT LOCATIONS WITH NO BASE
CABINETS
06 40 00.02 BASE CABINET; PLASTIC LAMINATE FACES AND EXPOSED
SURFACES; ADJUSTABLE SHELVING; PVC EDGING - TYP.
06 40 00.08 PLASTIC LAMINATE PROTECTIVE PANELING
06 61 00.01 SOLID SURFACE COUNTER TOP
06 61 00.09 SOLID SURFACE WALL CAP
08 11 00.A1 HOLLOW METAL DOOR FRAME; SEE SCHEDULES
08 14 29.A1 SOLID CORE WOOD DOOR; PRE-FINISHED
08 34 14.A1 BULLET RESISTANT VERTICAL BAFFLE SYSTEM; LEVEL III
PROTECTION
08 34 14.A2 EXTRUDED ALUMINUM CHANNEL. SIZE TO MATCH LEVEL OF
LAMINATED POLYCARBONATE PROTECTION; ARCHITECTURAL
BRUSHED ALUMINUM FINISH
08 34 14.A3 BULLET RESISTANT BRIEFCASE PASS THRU; LEVEL III
PROTECTION - FINAL DESIGN BY BULLET RESISTANT
CONTRACTOR
08 80 00.07 1-1/4" LAMINATED POLYCARBONATE; UL LEVEL III
PROTECTION; SEE SPECIFICATIONS
09 29 00.A1 5/8" TYPE "X" GYPSUM WALLBOARD; PAINT PER SPECS
09 29 00.A7 CEILING - 5/8" GYPSUM BOARD OVER 3-5/8" MTL. STUDS @ 16"
O.C. - PAINTED FINISH
09 29 00.B6 3-5/8" 20 GAUGE STRUCTURAL METAL STUD FRAMING AT 16"
O.C.; FINAL FRAMING LAYOUT BY METAL STUD CONT.
09 51 00.A1 ACOUSTICAL CEILING TILE SYSTEM; 24" X 24" (ACT-1)
09 68 00.A1 WALL BASE PER ROOM FINISH SCHEDULES
09 91 00.01 PAINT PER SPECIFICATIONS
09 91 00.02 PAINT PER SPECIFICATION; LOCATIONS OUTSIDE OF WORK
AREA UNDER ALTERNATE #1
09 91 00.03 PAINT EXISTING HOLLOW METAL WINDOW FRAMES; WORK
UNDER ALTERNATE #1
10 14 00.A1 ALUMINUM FLAT CUT LETTERING; LETTERING HEIGHT PER
ELEVATIONS
1/4" = 1'-0"2 Lobby J001 - West
1/4" = 1'-0"3 Lobby J001 - East
1/4" = 1'-0"4 Reception J003a - South 1/4" = 1'-0"5 Reception J003a - North
1/4" = 1'-0"6 Reception J003a - West 1/4" = 1'-0"7 Reception J003a - East
1 Addendum #1 10/29/2025
File details come from the government source that posted it. Updated .