2510200.Final Asbestos Bid Document Package - Central Elementary School.pdf

PDF 2 MB Posted

Attached to
Asbestos Abatement - Central Elementary School
Solicitation number
RFP-LIND-250000001399-1
Issued by
Genesee County, Michigan

About this file

This is a Request for Asbestos Abatement Proposal from Linden Community Schools in Linden, Michigan, involving multiple state and local regulatory agencies including EPA, OSHA, Michigan Department of Labor and Economic Opportunity, and Michigan Department of Environment, Great Lakes and Energy. The project involves asbestos abatement at Central Elementary School located at 7199 Silver Lake Road, with a bid release on February 7, 2025, a mandatory pre-bid meeting on February 17, 2025 at 11:00 AM, and bids due on March 11, 2025 at 2:00 PM. The scope includes removing approximately 11,900 square feet of carpet over yellow carpet glue and black mastic, and multiple areas of 12" x 12" floor tiles with yellow and black mastic, totaling around 4,520 square feet. The abatement will be conducted in phases, with initial work beginning during spring break (March 29 - April 6, 2025) and the remainder starting on June 10, 2025 after the school year ends.

The project requires bidders to submit comprehensive documentation including a 5% bid bond, proof of current Michigan Asbestos Abatement License, and extensive insurance coverage with minimum limits including $1,000,000 general liability, $500,000 workers' compensation, and $5,000,000 excess liability. Bidders must also provide a detailed abatement work plan, project schedule, respiratory protection program, and comply with all federal and state asbestos abatement regulations. The project is not tax-exempt and will not require prevailing wages. Bidders must submit a complete proposal packet including qualifications, certifications, familial relationship disclosures, and Iran Economic Sanctions Act compliance statements. The project is structured to ensure comprehensive safety and regulatory compliance throughout the asbestos removal process.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

28004 Center Oaks Court, Suite 201 Wixom, Michigan 48393 Voice: 248.926.3800 Fax: 248.926.3838 105 Bradford Road, Suite 320 Wexford, PA 15090 Voice: 412.463.6576

Request for Asbestos Abatement Proposal

Linden Community Schools 7205 W. Silver Lake Road

Linden, Michigan

Linden Community Schools (LCS) will accept sealed bids for the following building:

CENTRAL ELEMENTARY SCHOOL

7199 SILVER LAKE ROAD

LINDEN, MICHIGAN 48451

Issue Date: February 7, 2025 Pre-Bid: 11:00 AM, Monday, February 17, 2025 Bids Due: 2:00 PM, Tuesday, March 11, 2025 Performance Project #: 2510200

AHERA PROJECT DESIGNER ASBESTOS CONSULTANT

Name: Jeffrey Gross Performance Environmental Services, Inc.

State of Accreditation: Michigan 28004 Center Oaks Court, Suite 201 Accreditation Number: A11261 Wixom, Michigan 48093 State Expiration Date: July 16, 2025 Phone: (248) 926-3800 Training Expiration Date: September 18, 2025 Fax: (248) 926-3838

TABLE OF CONTENTS

SECTION I – BID INFORMATION

BID ADVERTISEMENT

PROJECT DETAILS

REQUEST FOR PROPOSAL PACKET

BIDDER’S AGREEMENT AND CERTIFICATION

BID NO. 20.01 – CENTRAL ELEMENTARY SCHOOL (BASE BID)

BID NO. 20.02 – UNIT PRICE SCHEDULE

FAMILIAL RELATIONSHIP DISCLOSURE STATEMENT

AFFIDAVIT OF COMPLIANCE - IRAN ECONOMIC SANCTIONS ACT

BIDDER’S STATEMENT OF QUALIFICATIONS and STATEMENT OF BID PREPARATION

SECTION II – GENERAL INFORMATION AND REQUIREMENTS

ABATEMENT WORK PLAN

PROJECT SCHEDULE

GENERAL REQUIREMENTS FOR ALL PROJECTS

ASBESTOS PROJECT NOTIFICATIONS

SECTION III – SPECIFICATIONS FOR ASBESTOS ABATEMENT

APPENDIX 1 ................................................................................ASBESTOS PLM TESTING REPORTS

APPENDIX 2 ...........................................LINDEN COMMUNITY SCHOOLS CALENDAR AND SITE MAP

SECTION I – BID INFORMATION

BID ADVERTISEMENT

The Linden Community Schools (“Owner” or “School District” or “LCS”) will receive sealed Bid Proposals for:

ASBESTOS ABATEMENT – CENTRAL ELEMENTARY SCHOOL

7199 SILVER LAKE ROAD, LINDEN, MICHIGAN 48451

Bid Proposals will be received by Mr. Greg Vadasz with Linden Community Schools in the Administration Building located at Linden Community Schools 7205 W. Silver Lake Road, Linden, Michigan, on or before 2:00 PM. (local time) on Tuesday, March 11, 2025 (“Due Date”) or can mailed to 7205 W. Silver Lake Road, Linden, MI 48451. LCS will not consider or accept a Bid Proposal received after the Due Date, which is the date and time specified for Bid Proposal submission. Bid Proposals will be publicly opened and read aloud immediately following the Due Date at the same location.

A mandatory pre-Bid Proposal meeting will be held on Monday, February 17, 2025 at 11:00 AM. All bidders must meet at the main door entrance for Central Elementary School located at 7199 Silver Lake Road, Linden, Michigan and the walkthrough will progress from there. Please be aware that there are areas in the facility with asbestos-containing materials; therefore, you should protect yourself according to what you feel is sufficient.

In accordance with MCL 380.1267, each Bid Proposal must be accompanied by a sworn and notarized statement disclosing any familial relationship that exists between the owner or any employee of the bidder and any member of the Board of Education or the Superintendent of the Linden Community Schools. The Board of Education will not accept a Bid Proposal that does not include this sworn and notarized disclosure statement.

Each Bid Proposal must be accompanied by a sworn and notarized statement certifying that the Contractor is not an Iran Linked Business. The Board of Education will not accept a Bid Proposal that does not include this sworn and notarized statement.

Each Bid Proposal must be accompanied by a bid bond in the amount no less than five percent (5%) of the total bid amount(s).

The Linden Community Schools Board of Education reserves the right to accept or reject any and all Bid Proposals, either in whole or in part, to waive any informalities or irregularities therein, or to award the contract to other than the contractor submitting the best financial Bid Proposal (low bidder), in its sole and absolute discretion.

If you have any questions, please do not hesitate to contact Mr. Dennis Wood at (248) 467-0769 or email at dennis.wood@perform-env.com of Performance Environmental Services, Inc. (Performance). At the time of the pre-Bid Proposal meeting, Performance will provide a brief tour of the building and host a Q&A session for interested bidders.

Questions Regarding Project Details:

Official questions and any need for clarification regarding project details including scheduling, bonding, contract language and legal questions should be addressed to:

Mr. Greg Vadasz

Office: (810) 591-0284 Email: gvadasz@lindenschools.org

Scheduling, non-legal questions and clarifications regarding the Asbestos Specifications should be addressed to:

Mr. Dennis Wood Office: (248) 926-3800 Mobile: (248) 467-0769 Email: dennis.wood@perform-env.com

All official changes/interpretations to the project details and/or the Asbestos Specifications will be made via addenda only.

mailto:dennis.wood@perform-env.com mailto:gvadasz@lindenschools.org mailto:dennis.wood@perform-env.com

Bonding Requirements:

LCS requires that all bidders submit a Bid Bond in accordance with the requirements summarized below and that all selected Contractors submit Performance Bonds and Labor & Materials Payment Bonds in accordance with the requirements summarized below:

Bid Bond Amount: 5% Requirements: The Bidder shall submit the required Bid Security in the form of a Bid Bond by a Treasury approved surety licensed to do business in the State of Michigan, a Cashier's Check, or a Certified Check in the amount of 5% of the bid price made payable to Linden Community Schools. The Bid Security shall be submitted with the understanding that if the bid is accepted, the Bidder will enter into a formal contract with the Owner and that the required Performance Bond and Labor & Material Payment Bond (as listed below and fully detailed in the General Conditions section) will be provided by the Contractor. The Bid Security oblige is LCS. Bidders shall agree not to withdraw proposals for a period of thirty (30) days after the bid due date. Failure to furnish the Bid Bond by the time of bid opening may be cause for rejection of the bid. Bid bonds will be returned to unsuccessful bidders after bid opening. LCS reserves the right to retain security of the three lowest bidders until entered into contract with one of the bidders; or until thirty (30) days after bid opening date. If any bidder refuses to enter into a contract, LCS will retain the bid bond as liquidated damage.

Performance Bond and Labor & Material Payment Bond Amount: 100% Requirements: The accepted Contractor will be required to furnish, at his request, prior to execution of the contract in the amount of 100% of the total Contract Price, satisfactory Performance Bond and Labor & Material Payment Bond by a Treasury approved surety, as listed on the U.S. Department of Treasury Circular 570, licensed to do business in the State of Michigan. The U.S. Department of Treasury Circular 570 can be viewed at https://www.fiscal.treasury.gov/surety-bonds/list-certified-companies.html. The accepted Contractor will be required to furnish the bonds prior to the start of the project. The Labor & Material Payment bond shall comply with Michigan Public Act 213 of 1963 and the Performance bond will comply will Michigan Public Act 32 of 1956.

Mobilization to the project site will not begin until acceptable bonds are furnished by the accepted Contractor.

Insurance Requirements:

LCS requires that all bidders submit proof of insurance with the requirements summarized below:

1. The bidder shall maintain the following limits of insurance which will protect them from liability under workers’ compensation acts and other employee benefits acts in accordance with the law in force where the building or structure is to be renovated and from liability for damages because of personal injury including death and property damage which includes accident claims due to motor vehicles, off road vehicles, all under commercial general and automobile bodily injury and property damage forms of policies, which may arise both out of and during work under this contract, whether such work be by the bidder, contractor or subcontractor, or anyone directly employed by any of them.

• Workers’ Compensation as required by the State of Michigan and employer’s liability with minimum limits of $500,000 each accident, $500,000 disease policy limit and $500,000 disease each employee.

• Commercial General Liability with minimum limits of $1,000,000 general aggregate, $1,000,000 products/completed operations, $1,000,000 personal and advertising liability, and $1,000,000 each occurrence. This insurance shall include coverage for damage to utilities and explosion hazards, collapse, and excavating hazards and undermining hazards (XCU).

2. The State of Michigan has a no-fault automobile insurance requirement. The bidder/contractor shall be certain coverage is provided which conforms to any specific stipulation in the law.

3. Automobile Personal Injury and Property Damage Liability with a combined single limit of $1,000,000 each occurrence.

https://www.fiscal.treasury.gov/surety-bonds/list-certified-companies.html https://www.fiscal.treasury.gov/surety-bonds/list-certified-companies.html

4. Excess Liability with minimum limits of $5,000,000, providing excess over all of the above liability coverages.

5. Linden Community Schools must be listed as an additional insured on the Contractor's General Liability coverage.

Bidders must agree to this in their bid.

6. All certificates must have the cancellation clause amended to read as follows: “Should any of the above policies be cancelled before the expiration date thereof, the issuing company will mail 30 day written notice to the certificate holders.”

7. The certificates of insurance shall be provided to LCS.

8. The bidder, contractor and subcontractors shall, at their option, separately insure all of their respective equipment such as tools, equipment scaffolding towers, staging and other temporary buildings owned, borrowed or rented and all materials which do not become a part of the construction.

9. The Contractor must agree to hold LCS harmless and to indemnify LCS for losses from contractor negligence as follows:

a. The waiver of subrogation clause in the AIA contract (A-201 or A-232) “General Conditions”, and/or any other contract regarding this project, must be deleted.

b. The parties agree that LCS is not waiving any rights its insurers may have to subrogation. To the extent any term in the Agreement is contrary to this provision, such term is void and unenforceable.

Additional Information for Bidders:

Please note that all bids are valid for 60 days from submittal deadline. Bidders must submit copies of the current State of Michigan Asbestos Abatement License. This project is not tax exempt from state sales tax and/or use tax. All materials and supplies incorporated and used in construction and becoming a permanent part of this project will not be exempt from state sales tax and/or use tax. Prevailing wages are not required for this project.

All bid proposals must include the bidder’s Federal Employer ID number and a completed W-9 form.

Confidentiality

The proposals and supporting materials become the property of the LCS and are subject to public access according to the Freedom of Information Act, MCL 15.231 et. Seq.

Request for Proposal Packet - Submittal Requirements:

The RFP Packet shall be submitted on the forms furnished in this Request for Proposal. The RFP Packet must be submitted in duplicate. The RFP Packet and all additional information requested must be submitted as follows:

Item Item Description

1. RFP Submittal Packet Cover Sheet

2. Bidder’s Agreement and Certification and Bidder Acknowledgment

3. Bid No. 20.01 – Central Elementary School (Base Bid)

4. Bid No. 20.02 – Unit Price Schedule

5. Familial Relationship Disclosure Statement [STATE REQUIREMENT - BID WILL NOT BE ACCEPTED WITHOUT THIS SIGNED AND NOTARIZED STATEMENT]

6. Affidavit of Compliance – Iran Economics Sanctions Act [STATE REQUIREMENT - BID WILL NOT BE ACCEPTED WITHOUT THIS SIGNED AND NOTARIZED STATEMENT]

7. Bidder’s Statement of Qualifications and Statement of Bid Preparation

8. Bidder’s Response to Statement of Qualifications and Statement of Bid Preparation

9. Bid Security

10. Contractor’s Current State of Michigan Asbestos Abatement License

11. Proof of Insurance

12. Additional Information Submitted by Bidder

Performance and the LCS request that the Bidder enter “NO BID” on the bid forms in lieu of omitting any page.

PROJECT DETAILS

This section provides a summary of the asbestos-containing materials which will be addressed as part of the bid. The scope of work and general work practice requirements are provided in the Asbestos Specification and other construction documents and attached to this Request for Proposal. The Contractor is encouraged to review all aspects of the scope of work when preparing the bid. Please include your proposed schedule in your bid documents.

20.01 Central Elementary School

Performance Environmental Services, Inc. (Performance) identified various asbestos-containing flooring mastics within the main section of the school building (refer to Performance Project #2510112, report dated 01/21/25, and Performance Project #2510164, report dated 02/04/25, copies are located in Appendix 1). The abatement will include removal of all installed flooring materials including carpeting, floor tiles, floor mastics, and covebase materials but the scope of work will exclude ceramic floor tiles and associated bedding materials. Please note that the approximate quantities were detailed within the original report #2510112. The approximate quantities within report #2510164 are not additional quantities; instead, they were accounted for within the first report (#2510112).

No asbestos abatement activities will be required within the gymnasium and the adjacent hallway/rooms directly to the west.

The entire area cannot be released for work at one time; therefore, the work will be completed in phases although the phases will be larger. In addition, the flooring in the multi-purpose room will need to be abated during spring break (Sunday, March 29 – Sunday, April 6, 2025) when the building will become available (refer to map in Performance #2510112 report within Appendix 1 or the map in Appendix 2). Please note that the abatement of the asbestos-containing flooring mastics will require non-chemical methods (i.e. grinding).

The accessible work hours allow for a M-F, 7:00 a.m. to 5:00 p.m. schedule to complete the project. Initial work at the site can begin during spring break (Sunday, March 29 – Sunday, April 6, 2025) with the remainder of the work beginning on Tuesday, June 10, 2025 after school year has ended. Please include your proposed schedule for project completion in your bid documents.

REQUEST FOR PROPOSAL PACKET

CENTRAL ELEMENTARY SCHOOL

7199 SILVER LAKE ROAD

LINDEN, MICHIGAN 48451

For

Linden Community Schools 7205 W. Silver Lake Road

Linden, MI

Representative:

E-Mail:

P: F: Phone/Fax:

Address:

Contractor Name:

BIDDER INFORMATION

BIDDER’S AGREEMENT AND CERTIFICATION

The undersigned Bidder, having fully examined the project detail documents as well as all other associated information including the addenda listed (if any), and having familiarized himself with the conditions to be encountered affecting the cost of the work, does hereby propose to satisfactorily complete all activities required to be performed and to furnish all of the labor, materials, tools, equipment and all other necessary additional services needed to complete the asbestos abatement activities required in connection with this project. Addenda issued by Linden Community Schools (LCS) or Performance Environmental Services, Inc. (Performance) and acknowledged by the Bidder, are made part of the project documents and are listed on the following page.

All Bidders were provided the opportunity to attend the pre-Bid Proposal meeting and provided the opportunity for an accompanied tour of the building, and all Bidders have been encouraged and provided the opportunity to examine the project site/building and familiarize themselves with the work described in the project detail documents. The submission of a bid for the project(s) described in the project detail documents shall be deemed conclusive evidence that the Bidder has thoroughly examined all documents constituting this project (including, but not limited to, those items listed above), has familiarized himself with the work and requirements described, and shall constitute a waiver by each of all claims of error in bid, withdrawal of bid, or payment of extras, or combination thereof, under the executed contract, or any revision thereof. All figures set forth in the project detail documents referencing sizes, amounts, or materials are estimates only and are provided for the convenience of the Bidder. The Bidder is solely and completely responsible for reviewing the construction documents and verifying his own measurements regarding the scope of the project(s).

These project detail documents including, but not limited to, the Bid Advertisement, the Project Details, the General Conditions and the Asbestos Specification for Abatement, have attempted to detail and address all aspects of the projects being performed for LCS. Nonetheless, the successful completion of the projects in a safe manner and in compliance with all applicable regulations remains the foremost concern of LCS. To ensure that this goal is met, it is expressly agreed by and between the parties to the contract, hereinafter to be signed between Linden Community Schools and the Contractor, that LCS and/or Performance, as the Owner’s Representative, have complete control over the manner in which the projects shall proceed and may, in their sole discretion, waive provisions of these project detail documents or require and enforce more stringent or different provisions should they, in their discretion, determine that such changes will or may more fully protect LCS, the Contractor, their subcontractors, agents, servants or others under their control or direction or the general public from any risks and/or situations associated with the said projects.

This provision in no way constitutes a waiver by the Contractor of his/her responsibilities to conduct said projects in accordance with all applicable regulations and in accordance with these specifications. This provision is set forth and is intended to provide LCS and/or Performance with the power to require additional steps to be taken to ensure that the projects proceed in a manner to fully, to the utmost extent possible, protect LCS and/or Performance, as well as the general public, from risks and liability associated with such projects.

After the bids are received, tabulated and evaluated by LCS and/or Performance, and the apparent lowest qualified Bidder(s) for each Bid item has been determined, the Bidder(s) agrees to meet with LCS and/or Performance, if so requested. For purposes of these meetings, the Bidder agrees to provide any post bid information as listed in the General Conditions. The Bidder, if awarded a contract, agrees to commence all pre-project planning and preparation activities upon receipt of a written “Notice to Proceed/Letter of Intent” and to fully complete their work in accordance with and to conform to the activity dates and durations set forth in the project detail documents.

The signature of a representative for the Bidder on each applicable project constitutes a full and complete agreement with the Project Specifications and the Bidder’s Agreement and Certification. All Bid Forms must be completed. Bids which are not submitted should be marked “No Bid”, “N/A” or have similar notations.

Type of Bid Security Please indicate type of bid security provided: [ ] 5% Bid Bond [ ] Certified Check

Acknowledgment of Addenda:

The Bidder has received and reviewed the following addenda:

Addendum No.: Addendum No.: Addendum No.:

Dated: Dated: Dated:

Type of Business:

The Bidder is a (check one): Partnership Corporation

The Bidder is (check all that apply):

Minority Woman Owned Small Business Enterprise

Identification of Potential Conflict of Interest The Bidder hereby discloses and describes any business, financial, or pecuniary relationship existing between the Bidder (or any officer, agent, or employee of the Bidder) and any officer, employee, agent, board member, or owner of Linden Community Schools, Performance, the Construction Manager/General Contractor, or Architect. If no such relationship exists, so state in the space provided.

Attach additional pages if necessary

Signature of Chief Executive Office (or equivalent)

BIDDER ACKNOWLEDGMENTS

Acknowledgment of Specification Details/Bid Preparation:

The Bidder acknowledges that the Bidder has reviewed each section of the bid documents relating to each of the Bids and understands that the Bidder will not be released from the Bid(s) due to missed abatement related activities or other similar oversights. The Bidder also acknowledges that he has checked each bid and that all figures are correctly listed on the bid forms.

Signature of Chief Executive Office (or equivalent)

BID NO. 20.01 – CENTRAL ELEMENTARY SCHOOL (BASE BID)

The Bidder hereby agrees and certifies to comply with all requirements described within the project detail documents and the listed and acknowledged Addenda and agrees to accept a payment of:

for all work regarding this bid as described in the project detail documents.

The Bidder agrees and certifies that the above stated cost includes all charges for all wages, overtime, taxes, materials, supplies, equipment, disposal costs, general conditions, supervision, insurance, overhead, profit and incidental expenses and fees. The Bidder hereby agrees and certifies that if the projects are not completed by the final due date the Bidder will accept a penalty as described in the project documents.

The Undersigned, a Representative of the Bidder, hereby authorizes and requests any person, firm, or corporation to furnish any information requested by Linden Community Schools and/or their representatives in verification of the recitals comprising the Bidder’s Statement of Qualifications. When requested, a breakdown of the bid by building will be submitted following award of a contract.

COMPANY NAME

PRINT NAME

TITLE

SIGNATURE

Alternate Bids Provided:

[ ] None [ ] Attached - List Below:

Bidder Noted Conditions/Restrictions on Bid:

[ ] None [ ] Listed Below:

dollars ($ )

BID NO. 20.02 – UNIT PRICE SCHEDULE

Furnish all labor, materials, equipment and services necessary for and incidental to the project as directed in the contract documents. All applicable taxes and bond costs are to be included in the Unit Price Schedule. Unit prices shall be utilized in the event additional removal work and/or deletions of work are included at the Owner’s and/or consultant’s discretion.

Unit Price Schedule:

12” x 12” Floor Tile and Yellow/Black Mastic Removal, Per Square Foot:

(includes materials, labor and disposal)

Carpet over Yellow Carpet Glue and Black Mastic on Concrete Floor Removal, Per Square Foot:

(includes materials, labor and disposal)

Remobilize to continue ACM abatement work on additional items, in the event that the scheduled work is interrupted, or additional material is found:

FAMILIAL RELATIONSHIP DISCLOSURE STATEMENT

Important: This disclosure statement must be included with your bid as required by state law (Michigan Compiled Law Section 380.1267).

As required by Michigan Compiled Law Section 380.1267, all bids shall be accompanied by a sworn and notarized statement disclosing any familial relationship that exists between the owner or any employee of the bidder and any member of the Linden Community School’s Board of Education or the Superintendent of Schools. The Board of Education shall not accept a bid that does not include this sworn and notarized disclosure statement.

The undersigned, the owner or authorized officer of (the “Bidder”), pursuant to the familial disclosure requirement provided in the Linden Community School advertisement for construction bids, hereby represent and warrant, except as provided below, that no familial relationships exist between the owner(s) or any employee of the company and any member of the Linden Community School’s Board of Education or the Superintendent of Schools. If such a relationship exists, please explain:

Attach additional pages if necessary

By: (bidder signature)

Title: (type or print)

Date:

Subscribed and Sworn to Before Me:

This day of , 20 A.D., in and for the County of , Michigan.

My commission expires:

Acting in the County of:

AFFIDAVIT OF COMPLIANCE - IRAN ECONOMIC SANCTIONS ACT

Important: This disclosure statement must be included with your bid as required by state law (Michigan Public Act 517 of 2012).

The undersigned, the owner or authorized officer of (the “Contractor”), hereby certifies, represents and warrants that the Contractor (including its officers, directors and employees) is not an “Iran linked business” within the meaning of the Iran Economic Sanctions Act, Michigan Public Act 517 of 2012 (the “Act”), and that, in the event Contractor is awarded a contract as a result of the aforementioned Request For Proposal, the Contractor will not become an “Iran linked business” at any time during the course of performing the Work or any services under the contract.

The Contractor understands and agrees that, if Linden Community School receives credible information that this Affidavit includes false information, Linden Community School will conduct an investigation that may lead to the termination of this contract as provided in the Act. The Contractor agrees to indemnify Linden Community School (including its agents, employees and representatives), and hold them harmless, for all actual attorneys’ fees and costs, settlements, awards, judgments, interest and bonds arising from or relating to any such investigation.

The Contractor further acknowledges that any person who is found to have submitted a false certification may be responsible for a civil penalty of not more than $250,000.00 or 2 times the amount of the contract or proposed contract for which the false certification was made, whichever is greater, the cost of the Linden Community School’s investigation, and reasonable attorney fees, in addition to the fine. Moreover, any person who submitted a false certification shall be ineligible to bid on a request for proposal for three

(3) years from the date it is determined that the person has submitted the false certification.

By: (bidder signature)

Title: (type or print)

Date:

Subscribed and Sworn to Before Me:

This day of , 20 A.D., in and for the County of , Michigan.

My commission expires:

Acting in the County of:

BIDDER’S STATEMENT OF QUALIFICATIONS and STATEMENT OF BID PREPARATION

All questions must be answered clearly and in a comprehensive manner on these sheets (if additional space is needed, attach at the end). Any Bidder failing to answer all questions may be rejected on these grounds. It is understood that by submitting a signed bid, the Bidder is certifying the correctness of all statements and is hereby under oath. All answers that are used must have a reference to this Statement of Qualifications and/or a reference to the project or Linden Community School. The Bidder may submit any additional information which may be of assistance in evaluating the qualification of the Bidder. Information will only be released by Linden Community School following a written request.

Corporate Information

1. Name of Bidder

2a. Main Office (Address, Phone Number and Fax Number)

2b. Additional Offices (Number, Locations, Addresses, Phone Numbers and Fax Numbers)

Corporate History

3. When was (Name of Bidder) organized?

4. If a corporation, where is (Name of Bidder) incorporated?

5. How many years has (Name of Bidder) been operating under the (Name of Bidder) name?

6. How many years has (Name of Bidder) been licensed in the State of Michigan for Asbestos Abatement?

7a. What other names are the principals of (Name of Bidder) operating under that are associated with the asbestos abatement industry?

7b. What other names have the principals of (Name of Bidder) operated under that have been associated with the asbestos abatement industry?

8. Have the principals of (Name of Bidder) filed for Chapter 11 or Chapter 13 for protection of (Name of Bidder) or for any other asbestos abatement related firm, company or organization, in the last five years? Describe.

Corporate Experience and References

9. Please list contracts currently on hand, including those projects which are in progress. Please provide a schedule (with actual or anticipated commencement and completion dates) and approximate gross dollar amount of each contract. Specifically highlight non-LCS projects which will be conducted at the same time as this project.

10. Please list all specifications (Name of Bidder) is currently submitting bids for which have overlapping project dates. Please provide a schedule with anticipated commencement and completion dates.

11. Have you (Name of Bidder and other entities identified in Questions 7a and 7b answers) ever failed to complete any work awarded to you?

12. Have you (Name of Bidder and other entities identified in Questions 7a and 7b answers) ever been disqualified from bidding from LCS?

13. Have you (Name of Bidder and other entities identified in Questions 7a and 7b answers) ever not been recommended for bid contracts when you were the low bidder in the LCS?

14. Have you (Name of Bidder and other entities identified in Question 7a and 7b answers) ever not been recommended for bid contracts when you were the low bidder on a project designed by Performance.

15. Please list all projects (Name of Bidder) completed in the LCS in the last three (3) years.

16. Please list all projects over $15,000 completed by (Name of Bidder) in the last twelve (12) months (projects with LCS do not need to be listed in response to this question), stating approximate gross dollar amount, and the month and year completed.

17. Please list the experience of (Name of Bidder) in work similar to this project. Project references must include the following: names, addresses, and phone numbers of Building Owner's for whom projects were performed (minimum of four) and this list should include only AHERA projects.

Corporate Compliance History

18. Please list any and all citations with or without monetary penalty received, pending, paid or disputed by

(Name of Bidder and other entities identified in Question 7a and 7b answers) during the past 3 years for failure to comply with applicable federal, state or local regulations. Describe in detail the type of citation, the reason for the citation and the ultimate disposition of same. Provide copies of all citations received in the last three (3) years and all correspondence associated with the citations.

19. Please provide the dates and results of the last on-site inspection by the Michigan Department of Labor and

Economic Opportunity (LEO) and the Michigan Department of Environment, Great Lakes and Energy (EGLE).

20. Please list all penalties incurred through non-compliance with asbestos abatement project specifications, including projects designed by firms other than Performance, including liquidated damages/penalties, overruns in scheduled time limitations and any subsequent resolutions for (Name of Bidder) in the last three

(3) years.

Corporate Resources

21. Please list (Name of Bidder)’s staff size, including number of foreman (accredited competent persons), number of workers and common sources for additional manpower. Estimated number of new hires for “peak” season may be listed with this response.

22. Please list (Name of Bidder)’s staff size, including number of foreman (accredited competent persons), number of workers and common sources for additional manpower that will be used for this project. List information for all buildings.

23. Please list of (Name of Bidder)’s major equipment (as of the submitting of this bid) which will be available specifically for this contract. Do not provide an inventory list. The response to this question must specifically reference the equipment which will be available for this project. Please indicate the number of equipment, such as AFDs, showers, scaffolds, etc. which will be on-site for the duration of the project.

24. Please provide (Name of Bidder)’s bank references.

25. Please provide the name of the Bonding Company and the name and address of agent used for this bid.

Bidder’s Bid Preparation Information and Miscellaneous Acknowledgments

26. Did a representative of the Bidder attend the mandatory Pre-Bid meeting?

27. Did a representative of the Bidder conduct a field review to review the project scope of work? If yes, list the dates and times of each visit.

28. After a thorough review of the project detail documents, did the Bidder note any project scope of work discrepancies or omissions?

29. Did the Bidder review and understand the “Specifications for Asbestos Abatement”?

30. Did a representative of the Bidder review the Project Notifications section? Will the Contractor be able to submit the notification prior to the start of the project? Please provide any conditions relevant to the project notification.

31. Did a representative of the Bidder review the information regarding insurance and bonding? Does the

Bidder understand that the project cannot begin until the requested Certificate of Insurance and the Performance/Payment Bonds have been submitted and approved?

32. Does the bid provided by the Bidder contain any work scope adjustments or qualifications, such as locations of material/quantity inconsistencies or locations of omitted materials?

33. Are there any submittals that the Contractor will not be able to submit prior to the start of the project?

34. Please list all work hour restrictions that the Bidder proposes, such as days the Contractor will not work in the event of meeting the project schedule.

35. Please provide a summary of all bid limitations.

Additional Information

36. Please provide a Bidder’s Statement of Qualifications for all sub-contractors who will be used on this project.

(A subcontractor does not include suppliers). Subcontractors not listed in this response will not be allowed for use on the project without the expressed written permission of Performance and the Owner.

37. Please feel free to provide any additional information which may assist the Owner and Performance with a complete and thorough evaluation of the bids including proposed alternates.

SECTION II – GENERAL INFORMATION AND REQUIREMENTS

ABATEMENT WORK PLAN

The Contractor must submit an abatement work plan as an element of the bid. Bids not accompanied by a workplan will be considered incomplete. At minimum, the work plan shall include the following:

• type of enclosure system including negative air machine placement and exhausting locations;

• work area preparation details;

• removal techniques;

• decontamination procedures;

• waste handling procedures;

• proposed landfill including type, name, and address;

• schedule including manpower loading;

• emergency planning procedures;

• personal air monitoring practices; and,

• proposed schedule for completion and phasing.

The work plan submitted with the bid will be utilized to qualify the bid. The Contractor must qualify their cost estimate by providing the elements of the work plan above. A bid not supported by a work plan addressing the elements above will not be evaluated.

PROJECT SCHEDULE

Submit your proposed project schedule (including phasing):

Phase Start End # Days

GENERAL REQUIREMENTS FOR ALL PROJECTS

The following general project requirements pertain to all of the asbestos abatement projects at the LCS building covered by this Request for Bid.

1. The Contractor is strongly encouraged to document all existing conditions prior to the start of the project in order to support pre-project damage. In all situations where damages are listed on work lists or punch lists by the Owner, the Contractor will be provided one week (seven - 7 - calendar days) to complete corrective measures. After the seven-day period, the Owner or Performance will complete the corrective measures at the Contractor’s expense. The Contractor will be required to dedicate two laborers for general clean-up activities throughout the building (as directed by the Owner or Performance) for two days for each project to address “punch list” type items such as pieces of tape/poly or tape/glue residue. The dates will be coordinated at the completion of all abatement activities.

2. The Owner reserves the right to re-order projects following award of contract. Should the order of any projects change, all durations, including scheduled Saturday workdays, will remain the same.

3. The Contractor will not close or obstruct roadways or sidewalks without proper permission and will not obstruct required exits at any time. The Contractor will conduct operations in a manner to minimize obstruction of public and private entrances and exits.

4. The Contractor must provide a site-specific Health and Safety Plan and written Respiratory Protection

Program to Performance prior to any work beginning on-site.

5. Additional testing of materials for asbestos-content may only be completed by the owner’s representative.

Contractor is not permitted to sample materials for asbestos content within the owner’s facility nor contract sampling to a third-party.

6. The owner’s representative will provide environmental area and clearance air monitoring. The Contractor will be responsible for compliance to personal breathing zone air monitoring as detailed in 29 CFR

1926.1101 and the Asbestos Specification.

7. Power and water will be available onsite.

ASBESTOS PROJECT NOTIFICATIONS

All regulatory agencies including, but not limited to, the Environmental Protection Agency, the Michigan Department of Labor and Economic Opportunity, the Michigan Department of Environment, Great Lakes and Energy and/or all other applicable Federal, State, County or City municipalities should be notified within the proper notification period in order to start on the first start date, if applicable. The Contractor shall also be solely responsible for payment of all applicable fees and charges. Failure to notify in a timely manner will not excuse a Contractor from project penalties or from any citations for performing abatement activities without a proper notification. The Contractor(s) shall be responsible for submitting a notification which adequately covers all projects at the building. By submitting a bid, the Contractor agrees to be fully responsible for the notification process.

The Contractor must submit a copy of any notification to the Owner and Performance prior to commencement of the project and in sufficient time to make corrections, if necessary. Copies of all revised notifications should also be provided in a timely manner.

SECTION III – SPECIFICATIONS FOR ASBESTOS ABATEMENT

SPECIFICATIONS FOR ABATEMENT OF

ASBESTOS–CONTAINING MATERIALS

Central Elementary School

7199 Silver Lake Road, Linden, MI 48451

Performance Environmental Services, Inc. Project Number #2510200

PREPARED FOR:

PREPARED BY:

Mr. Greg Vadasz Director of Operations Linden Community Schools 7205 W. Silver Lake Road Linden, MI 48451

Performance Environmental Services, Inc.

28004 Center Oaks Court Suite 201 Wixom, Michigan 48393

(248) 926–3800

Jeffrey S. Gross Senior Project Manager Asbestos Project Designer MI Accreditation No. A11261

Dennis A. Wood Senior Project Manager MI Accreditation No. A12504

Dated: February 4, 2025

CENTRAL ELEMENTARY SCHOOL SPECIFICATIONS FOR ABATEMENT OF ASBESTOS-CONTAINING MATERIALS

7199 SILVER LAKE ROAD, LINDEN, MI

ASBESTOS SPECIFICATIONS FEBRUARY 4, 2025

i

TABLE OF CONTENTS

SECTION A – SCOPE

SECTION B – GENERAL REQUIREMENTS

SECTION B1 – GENERAL DEFINITIONS

Section B1.1 – General Explanation Section B1.2 – Personnel Section B1.3 – Summary of the Work Covered by Technical Specifications Section B1.4 – Applicable Regulatory Publications Section B1.5 – Permits & Regulations Section B1.6 – Project Meeting Section B1.7 – Testing Laboratory Section B1.8 – Owner’s Representative Section B1.9 – Abbreviations and Names Section B1.10 – Definitions

SECTION B2 – USE OF FOOD, DRINK AND TOBACCO

SECTION B3 – REQUIRED SUBMITTALS TO THE OWNER’S REPRESENTATIVE

SECTION B4 – FACILITIES, CONTROLS, MATERIAL AND EQUIPMENT HANDLING

Section B4.1 – Construction Facilities, Temporary Controls and Temporary Utilities Section B4.2 – Construction Aids, Scaffolding, and Platforms Section B4.3 – Warning Signs and Labels Section B4.4 – Emergency, Health and Safety Precautions Section B4.5 – Temporary Fire Protection Section B4.6 – Adjacent Areas Section B4.7 – Temporary Controls/Construction Cleaning Section B4.8 – Material and Equipment Section B4.9 – Storage and Protection

SECTION C – SITE WORK

SECTION C1 – SCOPE OF WORK

Section C1.1 – General Section C1.2 – Miscellaneous Clarifying Instructions

SECTION C2 – HAZARDOUS SUBSTANCES NOTIFICATION

SECTION C3 – PROJECT PREPARATION

Section C3.1 – Project Coordination Section C3.2 – Submittals and Notices Section C3.3 – Air Monitoring – Personal Breathing Zone Sampling Section C3.4 – Air Monitoring – Background/Area/Clearance Sampling Section C3.5 – Emergency Procedures Section C3.6 – Materials Section C3.7 – Equipment (provided by Abatement Contractor) Section C3.8 – Personnel Protection Section C3.9 – Prohibited Work Practices

SECTION C4 – EXECUTION

Section C4.1 – General Removal Procedures Section C4.1.1 – Class I Work Activities – Negative Pressure Enclosure Removal – Option 1 Section C4.1.2 – Class I Work Activities – Glovebag Removal – Option 2 Section C4.1.3 – Class II Work Activities ii

Section C4.2 – Concluding Abatement Procedures Section C4.3 – Disposal Section C4.4 – Re-establishment of the Work Area Systems Section C4.5 – Site Restoration

SECTION A – SCOPE

These technical specifications cover all work performed by the Asbestos Abatement Contractor (hereinafter referred to as “Abatement Contractor”) including the removal of friable and nonfriable asbestos-containing materials at the subject property as described in the bid documents. These specifications cover the following types of abatement:

• Abatement of friable materials;

• Abatement of nonfriable materials;

• Cleanup of asbestos-containing debris;

• Containerization of all asbestos-containing waste; and,

• Disposal of all asbestos-containing waste.

The Abatement Contractor will be responsible for all regulatory requirements where abatement activities are to occur. In all cases, the Abatement Contractor is to be in full compliance with the most stringent regulatory requirements whether they are federal, state, county, or locally mandated.

The Abatement Contractor shall carefully examine all contract documents, including the contents of these specifications including Section A – Scope, Section B – General Requirements and Section C – Site Work, to be thoroughly familiar with the requirements of this project. The Abatement Contractor shall visit the site to become acquainted with all the site-specific conditions affecting the work, including the structure of the buildings, existing utilities and services, the obstacles that may be encountered, and all other conditions relative to the work to be performed.

In addition, the Abatement Contractor shall completely familiarize itself with all federal, state and local regulations, rules, laws and ordinances, respectively, affecting the performance of the work and familiarize itself with the project site to ascertain the possible existence of any services that may be required but are not included in these specifications. Should the Abatement Contractor find discrepancies between these specifications and the actual field conditions or should the Abatement Contractor be in doubt as to the intent of these specifications, the Abatement Contractor shall, at once, notify the Owner or the Owner’s Representative (if one is determined), who, if necessary, may issue a change order and/or provide written instructions. The Abatement Contractor shall not be allowed any additional compensation without prior approval by the Owner or Owner’s Representative.

Apparent variance in specifications from conditions as they exist at the site shall be called to the attention of the Owner or Owner’s Representative before the commencement of work or as soon as they are discovered.

Failure to notify the Owner or Owner’s Representative of any variances shall be at the Abatement Contractor’s risk.

The General Contractor (if one is retained by the Owner) shall be deemed to exercise supervisory authority over the asbestos abatement project, even though the General Contractor may not be qualified to serve as the project’s “competent person” as defined by the Occupational Safety and Health Administration.

SECTION B – GENERAL REQUIREMENTS

SECTION B1 – GENERAL DEFINITIONS

Section B1.1 – General Explanation

A substantial amount of specification language constitutes definitions for terms found in this specification and other applicable documents. Certain terms used in these specifications are defined in section B1.7 through B1.10. Definitions and explanations in this section are not necessarily either complete or exclusive but are general for the work to the extent they are not stated more explicitly in another element of the specifications.

Section B1.2 – Personnel

A. Supervisors shall have –

1) Training and knowledge of applicable regulations and expertise in safety and environmental protection;

2) Training as evidenced by participation and successful completion of a 40–hour EPA approved training course for an asbestos contractor/supervisor;

3) Skills and experience with all phases of abatement work;

4) Experience with abatement work as evidenced through participation in at least two previous asbestos abatement projects;

5) Records of medical examination required under applicable federal or state regulations;

6) Records of respiratory fit testing required under applicable federal or state regulations; and,

7) State accreditation from Michigan as an asbestos contractor/supervisor.

B. Workers shall have –

1) Training as evidenced by participation and successful completion of a 32–hour EPA approved training course for asbestos abatement workers or a 40–hour EPA approved training course for an asbestos contractor/supervisor;

2) Skills and experience with all phases of abatement work;

3) Records of medical examination required under applicable federal and state regulations;

4) Records of respiratory fit testing required under applicable federal or state regulations; and,

5) State accreditation from Michigan as an asbestos abatement worker or contractor/supervisor.

C. Abatement Contractor shall maintain a sufficient number of trained and qualified workers and supervisors to accomplish the work.

D. Abatement Contractor shall be licensed by the State of Michigan as an Asbestos Abatement Contractor.

Section B1.3 – Summary of the Work Covered by Specifications

Abatement Contractor shall furnish all labor, materials, facilities, equipment, services, employee training and testing, permits and agreements necessary to safely access and remove all asbestos-containing materials in the areas identified and in accordance with these specifications, project bid invitation documentation, EPA, OSHA, and DOT regulations and any other applicable federal, state, city and local government regulations.

Whenever there is a conflict or overlap of the above references, the most stringent provisions are applicable and prevail.

Section B1.4 – Applicable Regulatory Publications

The Environmental Protection Agency (EPA), Occupational Safety and Health Administration (OSHA), and Department of Transportation (DOT) are the primary federal agencies that have promulgated regulations to prevent contamination of the environment and to protect asbestos workers and the general public from exposure to asbestos. The primary state agencies that enforce asbestos related regulations for Michigan are the Michigan Department of Environment, Great Lakes and Energy (EGLE) and the Michigan Department of Labor and Economic Opportunity (LEO).

The publications listed below are a part of this specification to the extent referenced.

Environmental Protection Agency (EPA) 40 CFR Part 61 Subpart M – National Emission Standards for Hazardous Air Pollutants 40 CFR Part 257 – Solid Waste Disposal

Occupational Safety and Health Administration (OSHA) 29 CFR 1910.134 – General Industry Standard for Respiratory Protection 29 CFR 1910.1200 – Hazard Communication 29 CFR 1926.1101 – Asbestos Standard for the Construction Industry

Department of Transportation (DOT) 49 CFR Parts 171–173 – Hazardous Materials Regulations

Michigan State Agencies Michigan Public Act 135 – Asbestos Abatement Contractor’s Licensing Act Michigan Public Act 154 – Occupational Safety and Health Act Michigan Public Act 440 – Asbestos Worker Accreditation Act MIOSHA Part 42 – Hazard Communication MIOSHA Part 451 – Respiratory Protection MIOSHA Part 602 – Asbestos Standards for Construction All asbestos abatement rules and regulations including amendments through the most current sessions for EGLE and LEO, as adopted.

Section B1.5 – Permits & Regulations

A. All work under this contract shall be done in strict accordance with these specifications and with all applicable federal, state, city and local regulations, standards and codes governing asbestos abatement and any other trade work done in conjunction with the abatement;

B. The most recent edition of any relevant regulation, standard, document or code shall be in effect. Where conflict among the requirements or with these specifications exists, the most stringent requirements shall be utilized.

C. Abatement Contractor shall obtain and pay the cost of permits and…