This document is a Request for Bidder Pre-Qualification Applications (RFPQ) issued by the Unified Government of Athens-Clarke County, Georgia (ACCUG) for the Middle Oconee East Trunk Sanitary Sewer Improvements project. ACCUG is seeking pre-qualified general contractors to provide construction services to replace an aging 30-inch concrete pipe trunk line and manholes with approximately 8,400 linear feet of 48-inch ductile iron pipe and new precast manholes. The project also includes 875 linear feet of 72-inch casings for stream crossings, 500 linear feet of 12-inch ductile iron pipe, traffic control, bypass pumping, and other appurtenant work. Bids for the work will be reviewed from qualified bidders on or around August 23, 2024, and the anticipated notice to proceed is December 2024. The estimated construction value range is $6.4 million to $7.9 million.

The RFPQ outlines project construction experience and corporate criteria that general contractors must meet to be considered qualified, including experience with gravity sewer installation, ductile iron pipe, and bypass pumping. Applicants must submit required documentation demonstrating their qualifications by June 6, 2024. ACCUG reserves the right to reject any or all applications and will make the final determination of an applicant's qualification status.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR BIDDER PRE-QUALIFICATION APPLICATIONS

GENERAL CONTRACTOR

FOR

MIDDLE OCONEE EAST TRUNK SANITARY SEWER IMPROVEMENTS

ATHENS-CLARKE COUNTY (ACCUG)

RFPQ #25007

I. General

A. The Unified Government of Athens-Clarke County (“ACCUG” or “Owner”) is a unified city/county government located in the northeast section of the state of Georgia and is approximately sixty (60) miles northeast of Atlanta, Georgia. The ACCUG was formed in 1991 by a referendum which required the combining of the City of Athens and Clarke County. ACCUG serves an area population of approximately 140,000 with annual growth projected at 1% per year. ACCUG provides a multitude of local and state funded services, which includes, but is not limited to, Public Safety, Utility, Courts, Corrections, Tax and Fire Services. ACCUG employs approximately 2,000 people.

B. The ACCUG desires to solicit Pre-Qualification Applications in accordance with the Georgia Local Government Public Works Construction Law (the “Georgia Public Works Law”) from responsible Construction General Contractors.

C. Responsible General Contractors are to provide all construction, materials, equipment, and labor to complete the Middle Oconee East Truck Sanitary Sewer Improvements:

This work shall replace an aging 30-inch concrete pipe trunk line and manholes located along the Middle Oconee River with a proposed 48-inch ductile iron pipe (DIP) and new 9ft diameter precast structures. This shall include the installation of approximately 8,400 linear feet (LF) of 48-inch Ductile Iron Pipe (DIP), 875 linear feet of 72-inch casings with anchors for stream crossings, and 50 precast concrete manholes. This work starts at the Middle Oconee Water Reclamation plant and ends in the vicinity of Dogwood Drive. Much of this work shall be new trench work located parallel to the existing facilities. There is one approximately 160 linear foot (LF) jack and bore under Macon Highway. All interconnections to the truck line shall be replaced a minimum 50 linear feet (LF) up stream from the trunk line with 12-inch Ductile Iron Pipe (DIP) or larger and a manhole installed.

Along with this, work shall include erosion control and landscaping, several creek crossings, groundwater dewatering, as well as repair or replacement of items such as pavement, sidewalk, fences, and curbs. This work shall require large scale bypass pumping for the duration of the project.

• Work includes traffic control and requires larger scale bypass pump arounds for the duration of the project.

• Summary: The work to be performed will contain the following sizes and approximate length (lf) of DIP:

a. 48” = 8,400 LF (DIP)

b. 12” = 500 LF (DIP)

All Work described above shall be performed as shown on the Drawings and as specified.

RFPQ #25007 Page - 2

Interested bidders are invited to attend a meeting to be held on May 23, 2024 at 11:00 A.M. at the Athens-Clarke County Public Utilities Training room on 124 E. Hancock Avenue, Athens, GA 30601 to review an overview of the scope of the work.

All construction must be carried out in coordination with the Owner to minimize operational impacts to the Owner’s facilities and Athens-Clarke County street and public work facilities.

1. Anticipated Schedule:

i. The Invitation to Bid and Final Construction Documents including Drawings and Specifications are expected to be available for approved bidders on or around July 8, 2024.

ii. Project Notice to Proceed anticipated to be awarded to start construction as early as December 2024

iii. The estimated project construction value range is $6,400,000 to $7,900,000 US Dollars for the construction of the gravity sewer lines and other necessary appurtenances. ACCUG reserves the right to split the contract work into phases to accommodate project schedule and to eliminate or add to any portion of any of the designated lines.

D. Previous pre-qualification of contractors or Application for Qualification on other projects for the ACCUG will not be considered for this project. Applications must be made for this project separate from any other project.

E. Documentation provided must be specific and the data given must be clear and comprehensive. Documentation provided must pertain specifically to the entity that will bid for and construct the project, not an affiliated company, parent firm, or other entity.

F. No interpretation of the meaning of this Application will be made to any Applicant orally. Every request for such interpretation should be made in writing and addressed to Edward Tulenko, Senior Buyer, at 706-613-3068, or accbids@accgov.com. To be given consideration, the request must be received at least five business days prior to the date fixed for Application submittal. Any and all such interpretations and any supplemental instructions will be in the form of written Addenda to the Application which, if issued, will be mailed, emailed, shipped or faxed to all prospective Applicants (at the respective addresses furnished) prior to the date fixed for the receiving Applications.

Failure of Applicants to receive or acknowledge any Addendum shall not relieve them of any obligation under the Application. All Addenda shall become part of the Application.

G. SUBMITTAL INSTRUCTIONS: ALL Application copies must be submitted in a sealed envelope or container with the OUTER MOST Container stating title as follows: RFPQ #25007 MIDDLE OCONEE EAST TRUNK

SANITARY SEWER IMPROVMENTS.

Submit the Application documents as follows:

Two (2) hard copies of the complete signed application One (1) USB Flash Drive PDF format copy of the complete signed application

Applications are to be delivered to:

Unified Government of Athens-Clarke County Finance Department, Purchasing Division 375 Satula Avenue Athens, Georgia 30601

Not later than 3:00 P.M. ET, June 6, 2024

Applications received after 3:00 P.M. will not be considered.

mailto:accbids@accgov.com

RFPQ #25007 Page - 3

Bids for the Work will be reviewed from qualified bidders on or around August 23, 2024.

II. Determination of Qualified General Contractors By ACCUG

It is the intent of the ACCUG to identify and qualify as many General Contractors as possible.

ACCUG has established optimal Project Construction Experience and Corporate Criteria against which ACCUG will compare the actual project construction experience and corporate information offered by each Applicant to evaluate and determine whether the Applicant possesses sufficient and appropriate qualifications to offer a Bid and to provide the desired construction services.

The stated Criteria IS NOT considered PASS/FAIL Criteria, but represents the project construction experience and corporate criteria desired and deemed suitable by ACCUG for qualified Applicants. The ACCUG will consider Applicants having construction experience that differs from the optimal Project Construction Experience and Corporate Criteria described below provided the Applicant has substantial experience in such areas.

The ACCUG reserves the right to reject any one or all Applications for Pre-Qualification submitted and to waive technicalities and informalities in making its evaluation of applications and determination of qualified applicants. The final determination of any Applicant's qualification status rests solely with the ACCUG.

Prior to solicitation of construction bids for the Project, it is the intent of ACCUG to publish and make known to all Applicants that are determined by ACCUG to be qualified to bid and to provide the required construction services.

III. Pre-Qualification Process

A. Applicants may not be deemed qualified by ACCUG if:

1. Applicants fail to submit a responsive Application, including failing to provide all required documentation;

Applicants shall confirm response to all noted criteria.

2. Applicants fail to reasonably meet the Project Construction Experience Criteria. Any determination that an Applicant meets or fails to meet the Criteria rests solely with the ACCUG.

3. Applicants fail to reasonably meet the Corporate Criteria. Any determination that an Applicant meets or fails to meet the Criteria rests solely with the ACCUG.

4. The General Contractor Applicant, or any of its affiliated companies, is a party as the General Contractor to more than one Application. Applicant may apply as a General Contractor and as a subcontractor through the concurrent RFPQ applications for the subcontractor trades. The Applicant will not be considered for pre-qualification as a General Contractor unless they submit an application through the General Contractor RFPQ.

5. Reasonable grounds exist that Applicant(s) are involved in collusion among other applicants; or

6. Applicants fail to execute the Disclosure Affidavit.

B. Final determination of Applicant's qualification status rests solely with the ACCUG.

IV. Qualification Criteria

A. Project Construction Experience Criteria – General Contractor or General Contractor and Subcontractor team must meet ALL of the requirements below.

1. The General Contractor Applicant, has corporate experience gained from having successfully completed at least three (3) gravity sewer installation projects within the past five (5) years. The Applicant shall show experience among these projects that include the following:

i. All three projects shall include construction of at least 3,000 linear feet of gravity sewer in heavily traffic congested areas.

RFPQ #25007 Page - 4

ii. At least two of the three projects shall include construction of at least 2,000 linear feet of ductile iron pipe gravity sewer with a diameter of 24 to 30 inches or larger.

iii. At least one successful wastewater bypass pumping operation of flows greater than 6,600 gpm. Bypass pumping experience may be performed/provided by a Subcontractor Applicant included as a part of this RFPQ application.

Completed work submitted for references should be of the type and complexity comparable to the ACCUG Project scope description as identified in Section I.

2. The General Contractor and Project Superintendent have successfully completed at least

i. Three (3) gravity sewer construction projects of the size and complexity comparable to the ACCUG Project scope description included in this RFPQ and that at least one of projects includes the required bypass pumping component of a capacity listed in the above criteria.

3. The General Contractor Applicant has an available Project Manager and an onsite Construction Superintendent to be employed on the Project with at least ten (10) years of project management and/or construction experience that includes Project Construction experience that is comparable to the descriptions above.

B. Corporate Criteria – General Contractar (GC)

1. The GC has operated under the current corporate name for the last three years and the GC president and identified project manager have at least ten years of experience each.

2. The GC currently has sufficient bonding capacity to provide performance and payment bonds, both in the amount of 100 percent of the applicable contract amount.

3. The GC currently has sufficient resources to provide insurance requirements for the project (see note Section V.C.12).

4. The GC has not defaulted on a project or failed to complete a project within the last ten years.

5. The GC has not filed for bankruptcy nor been judged bankrupt at any time over the last nine years.

6. The GC has a history of completing projects consistently on time and within the bid amount.

7. The GC has never abandoned a project (even temporarily) during a dispute.

8. The GC does not have a history of being involved in litigation or filing claims against owners, construction contract administration firms, or design firms.

9. The GC, nor any of its affiliated companies, is currently involved in a dispute, formal claim, or litigation with ACCUG, or with any authority or organization with which ACCUG has a vested interest.

10. The GC is a Licensed General Contractor in the State of Georgia or Licensed Georgia Utility Contractor.

11. The GC has a written Safety Programs for their work.

12. The GC Applicant has the ability to provide a proper and logical schedule to demonstrate the effort required to complete the project in a timely manner.

V. Required Documentation - Application for Pre-qualification

A. Application Cover & Disclosure Affidavit – to be completed by all applicants

Applicant must complete and submit the Contractor Pre-Qualification Application Cover and Disclosure Affidavit (page 10 of the RFPQ).

B. Project Construction Experience – General Contractor and/or Subcontractor

Complete and submit Project Construction Experience - Project Information Form (Page 11 & 12 of the RFPQ) for

RFPQ #25007 Page - 5 each project referenced as documentation of meeting the Criteria; provide all the information specified in items 1-10 listed below for each Project. (The form may be expanded to accommodate information)

1. Name of project as bid, name of owner, owner contact and contact information (current address, phone number and email), name of design firm (lead designer name, phone number and email), name of construction contract administration firm (lead project manager, phone number and email).

2. A summary project description including work performed, major components of the project, equipment utilized, etc.

3. Percent and description of labor-related items performed by the Applicant's own work force.

4. If the project was performed as a joint venture, provide the name of the joint venture partner and the percentage of the Applicant’s joint venture responsibility; describe the responsible scope of work conducted by the Applicant and its relationship to qualification of the Applicant.

5. If the Project Construction Experience offered in the Application is that of a Parent Company, sister corporation or subsidiary corporation associated with the General Contractor Applicant describe the associated experience for each entity and its relationship to qualification of the Applicant.

6. Names and contact information for major subcontractors, including earthwork, reinforced concrete, jack and bore, bypass pumping, storm sewer, paving, landscape, etc. If work was self-performed, please indicate such.

7. The bid date, bid amount and final cost to owner.

8. The contract performance time as bid, actual time to complete project and completion date.

9. Description and associated value of major Change Orders including impacts/adjustments to contract time.

10. Provide experience, resumes, of proposed on-site Project Manager and Construction Superintendent who would be involved in this project. Experience can be from previous employment but must be pertinent to technical characteristics listed under the Project Construction Experience Criteria. Also provide a staffing plan, if appropriate, identifying other key personnel anticipated to be assigned to the Project. Provide a brief description and title for each position identified in the staffing plan.

C. Corporate Criteria – General Contractor

Complete and submit a narrative response to the following directions/instructions for the GC and any subcontractors.

1. Provide name, address and telephone number of Applicant's corporate headquarters, regional offices, subsidiaries and affiliates, if any. Provide name, title, and biographical summary of pertinent corporate officers. Provide a statement that Applicant has operated under the current corporate name for the last five years.

2. Provide a statement of bonding capacity, name of Surety Company, with agent contact persons, and telephone numbers. Define current maximum approved bonding program, allowable single project limit and current bonded work backlog.

3. Provide a statement that Applicant has not defaulted on a project nor failed to complete a project within the past ten years. If this is not the case, explain.

4. Provide a statement that Applicant has not filed for bankruptcy or been judged bankrupt at any time over the past nine years. If this is not the case, explain.

5. Provide a statement that Applicant has not been involved in liquidated damages in the past five years. If this is not the case, explain.

6. Provide a statement that the Applicant has never abandoned a project, even temporarily, during a dispute. If this is not the case, please explain.

7. Provide a statement whether Applicant has or has not been involved in litigation as a plaintiff against an owner, design firm or construction contract administration firm, or served an owner with a claim for additional compensation prepared by an attorney or a claims consultant, excluding routine change order

RFPQ #25007 Page - 6 requests, in the past five years. If Applicant has had such involvement, explain. List any lawsuits or administrative actions to which the Applicant is currently a party or has been a party (as either a plaintiff or defendant) during the past ten years. For each suit, list all parties and indicate whether any party was a bonding company, insurance company, an owner, or other. Identify the project giving rise to the suit or administrative action; explain the basis of the claim, and whether a settlement was reached or a judgment entered into for or against the Applicant, or the Applicant’s bonding company or Insurance Company.

8. Provide a statement that the Applicant, as well as all of its affiliated companies, is not involved in any dispute, formal claim, or litigation with neither the ACCUG, nor any authority or organization with which the ACCUG has a vested interest. If this is not the case, please explain.

9. Provide a statement that the Applicant has a Safety Program. Also provide the date it was last updated. If this is not the case, please explain.

10. Include a copy of the Applicant’s Georgia General Contractor License or Georgia Utility Contractor’s License.

11. Provide a list of all projects currently under contract with a construction contract amount in excess of $1 million. Provide Project Name /Title, Project Owner, contract amount and scheduled completion dates.

12. Provide a letter of good standing and capacity to provide the policies below with an insurance provider of Current Best's Rating not less that A, and Current Best's Financial Size Category not less than Class VII, and Current authorization to conduct and transact insurance contracts by the Insurance Commissioner, State of Georgia. It is expected that this project will require policy limits typical to ACCUG projects or as generally summarized herein: $1,000,000 for Workers Compensation, $10,000,000 for General Liability (including underground and explosion/collapse), $5,000,000 for Excess Liability, $1,000,000 for Automotive Liability, and $5,000,000 for Pollution Liability.

These limits are subject to review/ adjustment and will be provided to the prequalified contractors as part of the bid documents.

VI. Supplemental Information

A. ACCUG will not be liable in any way for any costs incurred by any Applicant in the preparation of its Pre- Qualification Application nor participation in any discussions.

B. ACCUG reserves the right to accept or reject any one or all Pre-Qualification Applications. ACCUG, upon receipt of the Application, shall have the right to investigate the information set forth on the Application, including work performed by the Applicant on projects referenced by the Applicant, or any other projects performed by the Applicant. Investigations will be performed by Owner’s personnel or their representatives as deemed appropriate by ACCUG which may include site visits and interviews with project owners and construction contract administration staff. ACCUG has the right to consider any additional information obtained about an Applicant’s qualifications through this process.

C. Application Format: The Application must include responses to all information requested. The Application shall address required documentation in the order identified above, indexed and clearly identified. Additional data may be submitted as deemed appropriate to support or augment the required documentation. Submittal shall be prepared on standard 8-1/2” x 11” letter size paper, with text on one side, using 12-point font, and bound on the left side. No page limitation has been established for the application submission, but non-pertinent “boilerplate” materials are discouraged.

D. Should any Applicant not be deemed pre-qualified by ACCUG, the Applicant may respond within three business days of being notified of pre-qualification status to ACCUG Administrator requesting reasons for not being deemed pre-qualified. The Applicant may then provide further written information in an attempt to correct such deficiencies within three business days of receiving reasons for not being deemed pre-qualified. This will be an informal appeals process.

E. For the purposes of this Application and its review, “project” shall be defined as a single construction contract, RFPQ #25007 Page - 7 including all associated change orders.

F. Applicants will be advised of their status approximately two to three weeks after the submittal deadline.

G. The words “corporation” or “corporate” as used herein shall include limited liability companies, limited partnerships and other similar for-profit business entities organized and existing under the laws of a state government.

RFPQ #25007 Page - 8

SECTION VII – PROPOSAL FORMS

GEORGIA SECURITY & IMMIGRATION COMPLIANCE (GSIC) AFFIDAVIT

The Unified Government of Athens-Clarke County and Contractor agree that compliance with the requirements of O.C.G.A. § 13-10-91, as amended, are conditions of this Agreement for the physical performance of services.

If employing or contracting with any subcontractor(s) in connection with this Agreement, Contractor further agrees:

(1) To secure from the subcontractor(s) an affidavit attesting to the subcontractor’s compliance with by O.C.G.A. § 13-10-91(b), as amended; such affidavit being in a form similar to and containing the same information as the form attached hereto; and

(2) To obtain such subcontractor affidavit(s) when the subcontractor(s) is retained. Contractor shall have such forms available for inspection and submit to the Owner, if so requested by the Owner.

The failure of Contractor to supply the affidavit of compliance at the time of the bid will be cause for the bid being deemed non-responsive. Failure of Contractor to continue to satisfy the obligations of O.C.G.A. § 13-10-91, as amended throughout the entire contract period shall constitute a material breach of the contract. Upon notice of such breach, Contractor shall be entitled to cure the breach within ten days, upon providing satisfactory evidence of compliance with the terms of this Agreement and State law. Should the breach not be cured, Athens-Clarke County shall be entitled to all available remedies, including termination of the contract and damages.

SEE AFFIDAVITS ON FOLLOWING PAGES

MANDATORY SUBMITTAL

RFPQ #25007 Page - 9

CONTRACTOR AFFIDAVIT & AGREEMENT UNDER O.C.G.A. § 13-10-91(b)(1)

(effective July 1, 2013)

By executing this affidavit, the undersigned contractor verifies its compliance with O.C.G.A. § 13-10-91, as amended, stating affirmatively that the individual, firm or corporation which is engaged in the physical performance of services on behalf of The Unified Government of Athens-Clarke County, Georgia, has registered with, is authorized to use, and uses the federal work authorization program commonly known as E- Verify, or any subsequent replacement program, in accordance with the provisions and deadlines established in O.C.G.A. § 13-10-91, as amended.

Furthermore, the undersigned will continue to use the federal work authorization program throughout the contract period and the undersigned contractor will contract for the physical performance of services in satisfaction of such contract only with subcontractors who present an affidavit to the contractor with the information required by O.C.G.A. § 13-10-91(b). Contractor hereby attests that its federal work authorization user identification number and date of authorization are as follows:

Federal Work Authorization User Identification Number Date of Authorization

Name of Contractor: _______________________________________________________________

Name of Project: Middle Oconee East Trunk Sanitary Sewer Improvements____________________ Name of Public Employer: The Unified Government of Athens – Clarke County Georgia _

I hereby declare under penalty of perjury that the foregoing is true and correct.

Executed on ____, ___________, 20___ in _______________________, _____________________.

Signature of Authorized Officer or Agent

Printed Name and Title of Authorized Officer or Agent

SUBSCRIBED AND SWORN BEFORE ME ON THIS THE

____ DAY OF ____________, 202_

Notary Public My Commission Expires:

RFPQ #25007 Page - 10

MIDDLE CONEE EAST TRUNK SANITARY SEWER IMPROVMENTS

CONTRACTOR PREQUALIFICATION APPLICATION COVER

Application for: General Contractor

Applicant (Company) Name:

Applicant Home Address:

Applicant Branch Office Responsible for Project, if different:

Applicant Contact (Person) Name:

Applicant Contact Title:

Applicant Contact Phone Number:

Applicant Contact Email Address:

DISCLOSURE AFFIDAVIT

The undersigned hereby authorizes and requests any person, firm, or corporation to furnish any information requested by the local public agency in verification of the recitals comprising this Application for Bidder's Pre-Qualification. I have read the Project Construction Experience and Corporate Criteria, and have provided documentation as outlined in this RFPQ. By this signature, the signer affirms that the information provided herein is true and correct to the best of his/her knowledge and belief.

Applicant:

By:

(name signed)

(name printed or typed) Title:

Date:

Subscribed and sworn to me this ___ day of ______________, 20___.

NOTARY PUBLIC:

Commission Expires:

(SEAL)

RFPQ #25007 Page - 11

PROJECT CONSTRUCTION EXPERIENCE INFORMATION FORM

Applicant Name:

Project Name/Title:

Project Owner:

Owner Name: ______________________________ Owner’s Responsible Contact Person: ______________________________ Address / Phone Number: _____________________________________________________________

Design Firm:

Company Name:

Contact Person:

Phone Number:

Construction Contract Administration Firm:

Company Name:

Contact Person:

Phone Number: __________________________________

Project Description: _____________________________________________________________________

Percentage of Work performed by Applicant: __________% Work Description: ________________________________________________________________________ Joint Venture: No_____ Yes___ Percentage of Applicant’s Joint Venture responsibility______% Name of Joint Venture partner(s) (If applicable): ______________________ Description of JV Work; Basis of Qualification (if applicable); _____________________________________

Major Subcontractors or self perform:

Storm Sewer: _____________________ Reinforced Concrete: _______________________________________________________________ Earthwork:________________________________________________________________________ Paving: __________________________________________________________________________ Jack and Bore:_____________________________________________________________________ Landscaping:______________________________________________________________________ Bypass Pumping:___________________________________________________________________

RFPQ #25007 Page - 12

PROJECT CONSTRUCTION EXPERIENCE INFORMATION FORM

(cont)

Construction Contract:

Bid Date: _____________________________________________________________________________ Bid Price / Initial Contract Price:

Final Contract Price:

Contract Time:

Initial Performance Time:

Actual Time to Complete Construction:

Completion Date:

Value / Description of Major Change Orders__________________________________________________________

RFPQ #25007 Page - 13

JOINT VENTURE

STATEMENT OF INTENT

The undersigned firms certify and hereby provide a notice and statement of their intent to enter into a Joint Venture Agreement for the purpose of pre-qualifying and bidding on the ACCUG Middle Oconee East Trunk Sanitary Sewer Improvements as a joint venture.

Failure of the Joint Venture entity to qualify will preclude any of the participating firms from bidding as a single entity.

MEMBER FIRM:

Date:

MEMBER FIRM:

Date:

Subscribed and sworn to me this ___ day of ______________, 20___.

NOTARY PUBLIC:

Commission Expires:

(SEAL)

Work includes traffic control and requires larger scale bypass pump arounds for the duration of the project.
Summary: The work to be performed will contain the following sizes and approximate length (lf) of DIP:
a. 48” = 8,400 LF (DIP)
b. 12” = 500 LF (DIP)
All Work described above shall be performed as shown on the Drawings and as specified.
PROJECT CONSTRUCTION EXPERIENCE INFORMATION FORM
PROJECT CONSTRUCTION EXPERIENCE INFORMATION FORM