250036C001 OMD Salem Armory Backup Generator Specs_PS.pdf
PDF 3 MB Posted
- Attached to
- 17th Street Armory Standby Generator addition
- Solicitation number
- S-24800-00017710
- Issued by
- Oregon
About this file
This is a technical specifications document prepared by R&W Engineering, Inc. for the Oregon Military Department regarding the 17th Street Armory Standby Generator Addition project in Salem, Oregon. The project consists of providing one emergency generator with a service-rated automatic transfer switch and sub-base diesel fuel tank to serve as backup power for the 17th Street Armory. The work encompasses civil, electrical, and structural additions and revisions, with construction operations limited to designated areas while accommodating owner occupancy during the project. The specifications establish comprehensive administrative requirements including preconstruction meetings, progress meetings, construction progress schedules, and submittal procedures for shop drawings, product data, samples, and test reports. The contractor must submit a preliminary 60-day schedule within five days of the agreement, with a complete schedule required within ten days of joint review. Progress photographs must be submitted with each application for payment, taken no more than three days prior to submission and provided in digital format with minimum resolution of 1024 by 768 pixels in JPG format.
The specifications establish detailed quality requirements, testing and inspection procedures, and code compliance standards including reference to the current Oregon Structural Specialty Code, Oregon Electrical Specialty Code, NFPA codes, and ADA accessibility standards. Special inspections for concrete construction are mandated as continuous or periodic based on work type, with the contractor responsible for employing an independent testing agency and bearing associated costs. The project includes mandatory waste management and recycling requirements, prohibiting landfill disposal of recyclable materials including aluminum and plastic beverage containers, corrugated cardboard, wood pallets, clean dimensional wood, and metals. Contractor must submit periodic waste disposal reports detailing quantities, disposal methods, and associated costs. The specifications require a one-year maintenance period from substantial completion or the length of the warranty, whichever is longer, with the contractor providing service, repairs, and replacement parts produced by original manufacturers.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ITB 250036C001 final for posting.pdf | ||
| 250036C001 OMD Salem Armory Backup Generator Dwgs_PS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OMD - 17th St Armory
PROJECT MANUAL
Oregon Military
Department - 17th St Armory
PROJECT MANAGER
Patrick Stine
1776 Militia Way SE
Salem, Oregon 97301-6888
PHONE
503-302-1317 patrick.h.stine2.nfg@army.mil
ELECTRICAL ENGINEER
Jonathan Lilly
R&W, Inc.
9615 SW Allen Blvd, Suite 107
Beaverton, OR 97005
PHONE
503-292-6000 jlilly@rwengineering.com
STRUCTURAL ENGINEER
Curtis D. Gagner
CIDA
15895 SW 72nd Ave, Ste 200
Portland, OR 97224
PHONE
503-226-1285 curtisg@cidainc.com mailto:patrick.h.stine2.nfg@mail.mil mailto:stevel@mke-inc.com mailto:michaelp@aks-eng.com mailto:kevink@vlmk.com
TECHNICAL SPECIFICATIONS
DIYISION 01 GENERAL REQUIREMENTS
01 1100 01 2300 01 2500 01 3000 01 4000 01 4216 01 4533 01 5000 01 6000 01 7000 01 7419
Summary of Work Alternates Substitution Procedures Administrative Requirements Quality Requirements Definitions Code Required Special Inspections and Procedures Temporary Facilities and Controls Product Requirements Execution and Closeout Requirements Construction Waste Management and Disposal
DIVISION 26 ELECTRICAL
26 0519 26 0526 26 0529 26 0533.13 26 0533.16 26 0553 26 3213 26 3600
Selective Demoltion for Electrical Low-Voltage Electrical Power Conductors and Cables Grounding and Bonding for Electrical Systems Hangers and Supports for Electrical Systems Conduit for Electrical Systems Boxes for Electrical Systems Electrical Identification Engine Generators Transfer Switches
TABLE OF CONTENTS
26 0505
RENEWAL DATE: 12/31/2026
2026.08.05 18:42:00-07'00'
OMD - 17th St Armory 01 1000 - 1 SUMMARY
SECTION 01 1000
SUMMARY
PART 1 GENERAL
1.01 PROJECT
A. Project Name: 17th Street Armory Standby Generator Addition.
B. Owner's Name: Oregon Military Department.
C. Engineer's Name: R&W Engineering, Inc.
D. The Project consists of providing of one (1) emergency generator.
1.02 CONTRACT DESCRIPTION
A. Contract Type: A single prime contract based on a Stipulated Price as described in Document
00 5200 - Agreement Form.
1.03 OWNER OCCUPANCY
A. Owner intends to occupy the Project during construction.
B. Cooperate with Owner to minimize conflict and to facilitate Owner's operations.
C. Schedule the Work to accommodate Owner occupancy and use of the buildings.
1.04 CONTRACTOR USE OF SITE AND PREMISES
A. Construction Operations: Limited to areas noted on Drawings.
1. Locate and conduct construction activities in ways that will limit disturbance to site.
B. Arrange use of site and premises to allow:
1. Owner occupancy.
C. Provide access to and from site as required by law and by Owner:
1. Emergency Building Exits During Construction: Keep all exits required by code open during construction period; provide temporary exit signs if exit routes are temporarily altered.
2. Do not obstruct roadways, sidewalks, or other public ways without permit.
D. Existing building spaces may not be used for storage.
E. Time Restrictions:
1. Limit work to times when Security personnel are operating the site entry gate.
F. Utility Outages and Shutdown:
1. Prevent accidental disruption of utility services to other facilities.
2. Coordinate scheduled outages with Project Coordinator.
3. Schedule for nights and weekends.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION - NOT USED
END OF SECTION 01 1000
OMD - 17th St Armory 01 2300 - 1 ALTERNATES
SECTION 01 2300
ALTERNATES
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Description of Alternates.
B. Procedures for pricing Alternates.
1.02 ACCEPTANCE OF ALTERNATES
A. Alternates quoted on Bid Forms will be reviewed and accepted or rejected at Owner's option.
Accepted Alternates will be identified in the Owner-Contractor Agreement.
B. Coordinate related work and modify surrounding work to integrate the Work of each Alternate.
1.03 SCHEDULE OF ALTERNATES
A. Alternate No. 1 - N/A.
B. Alternate No. 2 - N/A.
PART 2 PRODUCTS
2.01 GENERAL:
A. Applies to Alternate 1 & Alternate 2.
B. 72-hour tank will be required to meet UL 2085 requirements including but not limited to 2-hour fire rating requirements.
C. Contractor is responsible to increase the size and structural integrity of the generator's reinforced concrete pads.
D. Any other costs not specifically noted above.
END OF SECTION 01 2300
OMD -17th St Armory 01 2500 - 1 SUBSTITUTION PROCEDURES
SECTION 01 2500
SUBSTITUTION PROCEDURES
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Procedural requirements for proposed substitutions.
1.02 DEFINITIONS
A. Substitutions: Changes from Contract Documents requirements proposed by Contractor to materials, products, assemblies, and equipment.
1. Substitutions for Cause: Proposed due to changed Project circumstances beyond
Contractor's control.
a. Unavailability.
b. Regulatory changes.
2. Substitutions for Convenience: Proposed due to possibility of offering substantial advantage to the Project.
a. Substitution requests offering advantages solely to the Contractor will not be considered.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION
3.01 GENERAL REQUIREMENTS
A. A Substitution Request for products, assemblies, materials, and equipment constitutes a representation that the submitter:
1. Has investigated proposed product and determined that it meets or exceeds the quality level of the specified product, equipment, assembly, or system.
2. Agrees to provide the same warranty for the substitution as for the specified product.
3. Agrees to provide same or equivalent maintenance service and source of replacement parts, as applicable.
4. Agrees to coordinate installation and make changes to other work that may be required for the work to be complete, with no additional cost to Owner.
5. Waives claims for additional costs or time extension that may subsequently become apparent.
6. Agrees to reimburse Owner and Engineer for review or redesign services associated with re-approval by authorities.
B. A Substitution Request for specified installer constitutes a representation that the submitter:
1. Has acted in good faith to obtain services of specified installer, but was unable to come to commercial, or other terms.
C. Document each request with complete data substantiating compliance of proposed substitution with Contract Documents. Burden of proof is on proposer.
1. Note explicitly any non-compliant characteristics.
D. Content: Include information necessary for tracking the status of each Substitution Request, and information necessary to provide an actionable response.
1. No specific form is required. Contractor's Substitution Request documentation must include the following:
a. Project Information:
1) Official project name and number, and any additional required identifiers established in Contract Documents.
b. Substitution Request Information:
1) Discrete and consecutive Substitution Request number, and descriptive subject/title.
2) Indication of whether the substitution is for cause or convenience.
3) Issue date.
OMD - 17th St Armory 01 2500 - 2 SUBSTITUTION PROCEDURES
4) Reference to particular Contract Document(s) specification section number, title, and article/paragraph(s).
5) Description of Substitution.
6) Reason why the specified item cannot be provided.
7) Differences between proposed substitution and specified item.
8) Description of how proposed substitution affects other parts of work.
c. Attached Comparative Data: Provide point-by-point, side-by-side comparison addressing essential attributes specified, as appropriate and relevant for the item:
1) Physical characteristics.
2) In-service performance.
3) Expected durability.
4) Visual effect.
5) Sustainable design features.
6) Warranties.
7) Other salient features and requirements.
8) Include, as appropriate or requested, the following types of documentation:
(a) Product Data:
(b) Samples.
(c) Certificates, test, reports or similar qualification data.
(d) Drawings, when required to show impact on adjacent construction elements.
d. Impact of Substitution:
1) Savings to Owner for accepting substitution.
2) Change to Contract Time due to accepting substitution.
E. Limit each request to a single proposed substitution item.
1. Submit an electronic document, combining the request form with supporting data into single document.
3.02 SUBSTITUTION PROCEDURES DURING PROCUREMENT
A. Instructions to Bidders specifies time restrictions for submitting requests for substitutions during the bidding period, and the documents required.
3.03 SUBSTITUTION PROCEDURES DURING CONSTRUCTION
A. Submit request for Substitution for Cause within 14 days of discovery of need for substitution, but not later than 14 days prior to time required for review and approval by Engineer, in order to stay on approved project schedule.
B. Substitutions will not be considered under one or more of the following circumstances:
1. When they are indicated or implied on shop drawing or product data submittals, without having received prior approval.
2. Without a separate written request.
3. When acceptance will require revisions to Contract Documents.
3.04 RESOLUTION
A. Engineer may request additional information and documentation prior to rendering a decision.
Provide this data in an expeditious manner.
3.05 ACCEPTANCE
A. Accepted substitutions change the work of the Project. They will be documented and incorporated into work of the project by Change Order, Construction Change Directive, Architectural Supplementary Instructions, or similar instruments provided for in the Conditions of the Contract.
3.06 CLOSEOUT ACTIVITIES
A. See Section 01 7800 - Closeout Submittals, for closeout submittals.
OMD - 17th St Armory 01 2500 - 3 SUBSTITUTION PROCEDURES
B. Include completed Substitution Request Forms as part of the Project record.
END OF SECTION 01 2500
OMD - 17th St Armory 01 3000 - 1 ADMINISTRATIVE
REQUIREMENTS
SECTION 01 3000
ADMINISTRATIVE REQUIREMENTS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. General administrative requirements.
B. Preconstruction meeting.
C. Progress meetings.
D. Construction progress schedule.
E. Contractor's daily reports.
F. Progress photographs.
G. Coordination drawings.
H. Submittals for review, information, and project closeout.
I. Number of copies of submittals.
J. Requests for Interpretation (RFI) procedures.
K. Submittal procedures.
1.02 RELATED REQUIREMENTS
A. Section 01 6000 - Product Requirements: General product requirements.
1.03 GENERAL ADMINISTRATIVE REQUIREMENTS
A. Comply with requirements of Section 01 7000 - Execution and Closeout Requirements for coordination of execution of administrative tasks with timing of construction activities.
B. Make the following types of submittals to Engineer:
1. Requests for Interpretation (RFI).
2. Requests for substitution.
3. Shop drawings, product data, and samples.
4. Test and inspection reports.
5. Design data.
6. Manufacturer's instructions and field reports.
7. Applications for payment and change order requests.
8. Progress schedules.
9. Coordination drawings.
10. Correction Punch List and Final Correction Punch List for Substantial Completion.
11. Closeout submittals.
1.04 PROJECT COORDINATOR
A. Project Coordinator: Construction Manager.
B. Cooperate with the Project Coordinator in allocation of mobilization areas of site; for field offices and sheds, for personnel access, traffic, and parking facilities.
C. During construction, coordinate use of site and facilities through the Project Coordinator.
D. Comply with Project Coordinator's procedures for intra-project communications; submittals, reports and records, schedules, coordination drawings, and recommendations; and resolution of ambiguities and conflicts.
E. Comply with instructions of the Project Coordinator for use of temporary utilities and construction facilities. Responsibility for providing temporary utilities and construction facilities is identified in Section 01 1000 - Summary.
F. Coordinate field engineering and layout work under instructions of the Project Coordinator.
G. Make the following types of submittals to Engineer through the Project Coordinator:
1. Requests for Interpretation.
OMD - 17th St Armory 01 3000 - 2 ADMINISTRATIVE
2. Requests for substitution.
3. Shop drawings, product data, and samples.
4. Test and inspection reports.
5. Design data.
6. Manufacturer's instructions and field reports.
7. Applications for payment and change order requests.
8. Progress schedules.
9. Coordination drawings.
10. Correction Punch List and Final Correction Punch List for Substantial Completion.
11. Closeout submittals.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION
3.01 PRECONSTRUCTION MEETING
A. Attendance Required:
1. Owner.
2. Engineer.
3. Contractor.
B. Agenda:
1. Execution of Owner-Contractor Agreement.
2. Submission of executed bonds and insurance certificates.
3. Distribution of Contract Documents.
4. Submission of list of subcontractors, list of products, schedule of values, and progress schedule.
5. Designation of personnel representing the parties to Contract and Engineer.
6. Procedures and processing of field decisions, submittals, substitutions, applications for payments, proposal request, Change Orders, and Contract closeout procedures.
7. Scheduling.
C. Record minutes and distribute electronically via email copies within two days after meeting to participants, Engineer, Owner, participants, and those affected by decisions made.
3.02 PROGRESS MEETINGS
A. Attendance Required:
1. Contractor.
2. Owner.
3. Engineer.
4. Contractor's superintendent.
5. Major subcontractors.
B. Agenda:
1. Review minutes of previous meetings.
2. Review of work progress.
3. Field observations, problems, and decisions.
4. Identification of problems that impede, or will impede, planned progress.
5. Review of submittals schedule and status of submittals.
6. Review of RFIs log and status of responses.
7. Review of off-site fabrication and delivery schedules.
8. Maintenance of progress schedule.
9. Corrective measures to regain projected schedules.
10. Planned progress during succeeding work period.
11. Coordination of projected progress.
12. Maintenance of quality and work standards.
13. Effect of proposed changes on progress schedule and coordination.
14. Other business relating to work.
OMD - 17th St Armory 01 3000 - 3 ADMINISTRATIVE
C. Record minutes and distribute copies electronically via email within two days after meeting to participants, Engineer, Owner, participants, and those affected by decisions made.
3.03 CONSTRUCTION PROGRESS SCHEDULE
A. Within 5 days after date of the Agreement, submit preliminary schedule defining planned operations for the first 60 days of work, with a general outline for remainder of work.
B. If preliminary schedule requires revision after review, submit revised schedule within 5 days.
C. Within 5 days after review of preliminary schedule, submit draft of proposed complete schedule for review.
1. Include written certification that major contractors have reviewed and accepted proposed schedule.
D. Within 10 days after joint review, submit complete schedule.
E. Submit updated schedule with each Application for Payment.
3.04 PROGRESS PHOTOGRAPHS
A. Submit photographs with each application for payment, taken not more than 3 days prior to submission of application for payment.
B. Photography Type: Digital; electronic files.
C. Provide photographs of site and construction throughout progress of work produced by an experienced photographer, acceptable to Engineer.
D. In addition to periodic, recurring views, take photographs of each of the following events:
1. Excavations in progress.
2. Foundations in progress and upon completion.
3. Structural framing in progress and upon completion (generator pads).
4. Open trenches.
5. Final completion, minimum of ten (10) photos.
E. Views:
1. Provide non-aerial photographs from four cardinal views at each specified time, until date of Substantial Completion.
2. Consult with Engineer for instructions on views required.
3. Provide factual presentation.
4. Provide correct exposure and focus, high resolution and sharpness, maximum depth of field, and minimum distortion.
F. Digital Photographs: 24 bit color, minimum resolution of 1024 by 768, in JPG format; provide files unaltered by photo editing software.
1. Delivery Medium: Via email.
2. File Naming: Include project identification, date and time of view, and view identification.
3. PDF File: Assemble all photos into printable pages in PDF format, with 2 to 3 photos per page, each photo labeled with file name; one PDF file per submittal.
4. Hard Copy: Printed hardcopy (grayscale) of PDF file and point of view sketch.
3.05 COORDINATION DRAWINGS
A. Provide information required by Project Coordinator for preparation of coordination drawings.
B. Review drawings prior to submission to Engineer.
3.06 REQUESTS FOR INTERPRETATION (RFI)
A. Definition: A request seeking one of the following:
1. An interpretation, amplification, or clarification of some requirement of Contract Documents arising from inability to determine from them the exact material, process, or system to be installed; or when the elements of construction are required to occupy the same space (interference); or when an item of work is described differently at more than one place in Contract Documents.
2. A resolution to an issue which has arisen due to field conditions and affects design intent.
OMD - 17th St Armory 01 3000 - 4 ADMINISTRATIVE
B. Whenever possible, request clarifications at the next appropriate project progress meeting, with response entered into meeting minutes, rendering unnecessary the issuance of a formal RFI.
C. Preparation: Prepare an RFI immediately upon discovery of a need for interpretation of Contract Documents. Failure to submit a RFI in a timely manner is not a legitimate cause for claiming additional costs or delays in execution of the work.
1. Prepare a separate RFI for each specific item.
a. Review, coordinate, and comment on requests originating with subcontractors and/or materials suppliers.
b. Do not forward requests which solely require internal coordination between subcontractors.
2. Prepare in a format and with content acceptable to Owner.
3. Combine RFI and its attachments into a single electronic file. PDF format is preferred.
D. Reason for the RFI: Prior to initiation of an RFI, carefully study all Contract Documents to confirm that information sufficient for their interpretation is definitely not included.
1. Include in each request Contractor's signature attesting to good faith effort to determine from Contract Documents information requiring interpretation.
2. Unacceptable Uses for RFIs: Do not use RFIs to request the following::
a. Approval of submittals (use procedures specified elsewhere in this section).
b. Approval of substitutions (see Section - 01 6000 - Product Requirements)
c. Changes that entail change in Contract Time and Contract Sum (comply with provisions of the Conditions of the Contract).
d. Different methods of performing work than those indicated in the Contract Drawings and Specifications (comply with provisions of the Conditions of the Contract).
3. Improper RFIs: Requests not prepared in compliance with requirements of this section, and/or missing key information required to render an actionable response. They will be returned without a response, with an explanatory notation.
4. Frivolous RFIs: Requests regarding information that is clearly indicated on, or reasonably inferable from, Contract Documents, with no additional input required to clarify the question. They will be returned without a response, with an explanatory notation.
a. The Owner reserves the right to assess the Contractor for the costs (on time-and-materials basis) incurred by the Engineer, and any of its consultants, due to processing of such RFIs.
E. Content: Include identifiers necessary for tracking the status of each RFI, and information necessary to provide an actionable response.
1. Official Project name and number, and any additional required identifiers established in
Contract Documents.
2. Owner's, Engineer's, and Contractor's names.
3. Discrete and consecutive RFI number, and descriptive subject/title.
4. Issue date, and requested reply date.
5. Reference to particular Contract Document(s) requiring additional information/interpretation. Identify pertinent drawing and detail number and/or specification section number, title, and paragraph(s).
6. Annotations: Field dimensions and/or description of conditions which have engendered the request.
7. Contractor's suggested resolution: A written and/or a graphic solution, to scale, is required in cases where clarification of coordination issues is involved, for example; routing, clearances, and/or specific locations of work shown diagrammatically in Contract Documents. If applicable, state the likely impact of the suggested resolution on Contract Time or the Contract Sum.
F. Attachments: Include sketches, coordination drawings, descriptions, photos, submittals, and other information necessary to substantiate the reason for the request.
G. RFI Log: Prepare and maintain a tabular log of RFIs for the duration of the project.
1. Indicate current status of every RFI. Update log promptly and on a regular basis.
OMD - 17th St Armory 01 3000 - 5 ADMINISTRATIVE
2. Note dates of when each request is made, and when a response is received.
3. Highlight items requiring priority or expedited response.
4. Highlight items for which a timely response has not been received to date.
5. Identify and include improper or frivolous RFIs.
H. Review Time: Engineer will respond and return RFIs to Contractor within seven calendar days of receipt. For the purpose of establishing the start of the mandated response period, RFIs received after 12:00 noon will be considered as having been received on the following regular working day.
1. Response period may be shortened or lengthened for specific items, subject to mutual agreement, and recorded in a timely manner in progress meeting minutes.
I. Responses: Content of answered RFIs will not constitute in any manner a directive or authorization to perform extra work or delay the project. If in Contractor's belief it is likely to lead to a change to Contract Sum or Contract Time, promptly issue a notice to this effect, and follow up with an appropriate Change Order request to Owner.
1. Response may include a request for additional information, in which case the original RFI will be deemed as having been answered, and an amended one is to be issued forthwith.
Identify the amended RFI with an R suffix to the original number.
2. Do not extend applicability of a response to specific item to encompass other similar conditions, unless specifically so noted in the response.
3. Upon receipt of a response, promptly review and distribute it to all affected parties, and update the RFI Log.
4. Notify Engineer within seven calendar days if an additional or corrected response is required by submitting an amended version of the original RFI, identified as specified above.
3.07 SUBMITTALS FOR REVIEW
A. When the following are specified in individual sections, submit them for review:
1. Product data.
2. Shop drawings.
3. Samples for selection.
4. Samples for verification.
B. Submit to Engineer for review for the limited purpose of checking for compliance with information given and the design concept expressed in Contract Documents.
C. Samples will be reviewed for aesthetic, color, or finish selection.
D. After review, provide copies and distribute in accordance with SUBMITTAL PROCEDURES article below and for record documents purposes described in Section 01 7800 - Closeout Submittals.
3.08 SUBMITTALS FOR INFORMATION
A. When the following are specified in individual sections, submit them for information:
1. Design data.
2. Certificates.
3. Test reports.
4. Inspection reports.
5. Manufacturer's instructions.
6. Manufacturer's field reports.
7. Other types indicated.
B. Submit for Engineer's knowledge as contract administrator or for Owner.
3.09 SUBMITTALS FOR PROJECT CLOSEOUT
A. Submit Correction Punch List for Substantial Completion.
B. Submit Final Correction Punch List for Substantial Completion.
OMD - 17th St Armory 01 3000 - 6 ADMINISTRATIVE
C. When the following are specified in individual sections, submit them at project closeout in compliance with requirements of Section 01 7800 - Closeout Submittals:
1. Project record documents.
2. Operation and maintenance data.
3. Warranties.
4. Bonds.
5. Other types as indicated.
D. Submit for Owner's benefit during and after project completion.
3.10 NUMBER OF COPIES OF SUBMITTALS
A. Electronic Documents: Submit one electronic copy in PDF format; an electronically-marked up file will be returned. Create PDFs at native size and right-side up; illegible files will be rejected.
B. Samples: Submit the number specified in individual specification sections; one of which will be retained by Engineer.
1. After review, produce duplicates.
2. Retained samples will not be returned to Contractor unless specifically so stated.
3.11 SUBMITTAL PROCEDURES
A. General Requirements:
1. Use a separate transmittal for each item.
2. Submit separate packages of submittals for review and submittals for information, when included in the same specification section.
3. Transmit using approved form.
4. Sequentially identify each item. For revised submittals use original number and a sequential numerical suffix.
a. File Naming: XX XXXX-001 Alpha numeric descriptor; Section number followed by sequential submittal number within the section, followed by an alphanumeric description of the submittal.
5. Identify: Project; Contractor; subcontractor or supplier; pertinent drawing and detail number; and specification section number and article/paragraph, as appropriate on each copy.
6. Apply Contractor's stamp, signed or initialed certifying that review, approval, verification of products required, field dimensions, adjacent construction work, and coordination of information is in accordance with the requirements of the work and Contract Documents.
a. Submittals from sources other than the Contractor, or without Contractor's stamp will not be acknowledged, reviewed, or returned.
7. Deliver each submittal on date noted in submittal schedule, unless an earlier date has been agreed to by all affected parties, and is of the benefit to the project.
a. Deliver submittals to Engineer at via electronic file sharing site.
8. Schedule submittals to expedite the Project, and coordinate submission of related items.
a. For each submittal for review, allow 10 days excluding delivery time to and from the
Contractor.
b. For sequential reviews involving Engineer's consultants, Owner, or another affected party, allow an additional 7 days.
9. Identify variations from Contract Documents and product or system limitations that may be detrimental to successful performance of the completed work.
10. Provide space for Contractor and Engineer review stamps.
11. When revised for resubmission, identify all changes made since previous submission.
12. Distribute reviewed submittals. Instruct parties to promptly report inability to comply with requirements.
13. Incomplete submittals will not be reviewed, unless they are partial submittals for distinct portion(s) of the work, and have received prior approval for their use.
14. Submittals not requested will be recognized, and will be returned "Not Reviewed", B. Product Data Procedures:
OMD - 17th St Armory 01 3000 - 7 ADMINISTRATIVE
1. Submit only information required by individual specification sections.
2. Collect required information into a single submittal.
3. Submit concurrently with related shop drawing submittal.
4. Do not submit (Material) Safety Data Sheets for materials or products.
C. Shop Drawing Procedures:
1. Prepare accurate, drawn-to-scale, original shop drawing documentation by interpreting
Contract Documents and coordinating related work.
2. Do not reproduce Contract Documents to create shop drawings.
3. Generic, non-project-specific information submitted as shop drawings do not meet the requirements for shop drawings.
D. Samples Procedures:
1. Transmit related items together as single package.
2. Identify each item to allow review for applicability in relation to shop drawings showing installation locations.
3. Include with transmittal high-resolution image files of samples to facilitate electronic review and approval. Provide separate submittal page for each item image.
3.12 SUBMITTAL REVIEW
A. Submittals for Review: Engineer will review each submittal, and approve, or take other appropriate action.
B. Submittals for Information: Engineer will acknowledge receipt and review. See below for actions to be taken.
C. Engineer's actions will be reflected by marking each returned submittal using virtual stamp on electronic submittals.
D. Engineer's and consultants' actions on items submitted for review:
1. Authorizing purchasing, fabrication, delivery, and installation:
a. "Approved", or language with same legal meaning.
b. "Approved as Noted, Resubmission not required", or language with same legal meaning.
1) At Contractor's option, submit corrected item, with review notations acknowledged and incorporated.
c. "Approved as Noted, Resubmit for Record", or language with same legal meaning.
2. Not Authorizing fabrication, delivery, and installation:
a. "Revise and Resubmit".
1) Resubmit revised item, with review notations acknowledged and incorporated.
2) Non-responsive resubmittals may be rejected.
b. "Rejected".
1) Submit item complying with requirements of Contract Documents.
E. Engineer's and consultants' actions on items submitted for information:
1. Items for which no action was taken:
a. "Received" - to notify the Contractor that the submittal has been received for record only.
2. Items for which action was taken:
a. "Reviewed" - no further action is required from Contractor.
END OF SECTION 01 3000
OMD - 17th St Armory 01 4000 - 1 QUALITY REQUIREMENTS
SECTION 01 4000
QUALITY REQUIREMENTS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Submittals.
B. Quality assurance.
C. References and standards.
D. Testing and inspection agencies and services.
E. Control of installation.
F. Tolerances.
G. Manufacturers' field services.
H. Defect Assessment.
1.02 RELATED REQUIREMENTS
A. Section 01 4216 - Definitions.
1.03 REFERENCE STANDARDS
A. ASTM C1077 - Standard Practice for Agencies Testing Concrete and Concrete Aggregates for
Use in Construction and Criteria for Testing Agency Evaluation; 2017.
B. ASTM D3740 - Standard Practice for Minimum Requirements for Agencies Engaged in the
Testing and/or Inspection of Soil and Rock as Used in Engineering Design and Construction;
2019.
C. ASTM E329 - Standard Specification for Agencies Engaged in Construction Inspection, Testing, or Special Inspection; 2020.
1.04 SUBMITTALS
A. See Section 01 3000 - Administrative Requirements, for submittal procedures.
B. Design Data: Submit for Engineer's knowledge as contract administrator for the limited purpose of assessing compliance with information given and the design concept expressed in the Contract Documents, or for Owner's information.
1. Include required product data and shop drawings.
C. Test Reports: After each test/inspection, promptly submit report electronically via email to Engineer and to Contractor.
1. Include:
a. Date issued.
b. Project title and number.
c. Name of inspector.
d. Date and time of sampling or inspection.
e. Identification of product and specifications section.
f. Location in the Project.
g. Type of test/inspection.
h. Date of test/inspection.
i. Results of test/inspection.
j. Compliance with Contract Documents.
k. When requested by Engineer, provide interpretation of results.
D. Certificates: When specified in individual specification sections, submit certification by the manufacturer and Contractor or installation/application subcontractor to Engineer, in quantities specified for Product Data.
1. Indicate material or product complies with or exceeds specified requirements. Submit supporting reference data, affidavits, and certifications as appropriate.
OMD - 17th St Armory 01 4000 - 2 QUALITY REQUIREMENTS
2. Certificates may be recent or previous test results on material or product, but must be acceptable to Engineer.
E. Manufacturer's Instructions: When specified in individual specification sections, submit printed instructions for delivery, storage, assembly, installation, start-up, adjusting, and finishing, for the Owner's information. Indicate special procedures, perimeter conditions requiring special attention, and special environmental criteria required for application or installation.
F. Manufacturer's Field Reports: Submit reports for Engineer's benefit as contract administrator or for Owner.
1. Submit for information for the limited purpose of assessing compliance with information given and the design concept expressed in the Contract Documents.
1.05 REFERENCES AND STANDARDS
A. For products and workmanship specified by reference to a document or documents not included in the Project Manual, also referred to as reference standards, comply with requirements of the standard, except when more rigid requirements are specified or are required by applicable codes.
B. Comply with reference standard of date of issue current on date of Contract Documents, except where a specific date is established by applicable code.
C. Should specified reference standards conflict with Contract Documents, request clarification from Engineer before proceeding.
D. Neither the contractual relationships, duties, or responsibilities of the parties in Contract nor those of Engineer shall be altered from Contract Documents by mention or inference otherwise in any reference document.
1.06 TESTING AND INSPECTION AGENCIES AND SERVICES
A. Contractor will employ services of an independent testing agency to perform certain specified testing; payment for cost of services will be derived from allowance.
B. Contractor shall provide an allowance of $XXX,XXX for special testing as specified in Civil and
Structural drawings.
C. As indicated in individual specification sections, Owner shall employ and pay for services of an independent testing agency to perform other specified testing.
D. Employment of agency in no way relieves Contractor of obligation to perform Work in accordance with requirements of Contract Documents.
E. Contractor Employed Agency:
1. Testing agency: Comply with requirements of ASTM E329, ASTM C1077, and ASTM D3740.
PART 3 EXECUTION
2.01 CONTROL OF INSTALLATION
A. Monitor quality control over suppliers, manufacturers, products, services, site conditions, and workmanship, to produce work of specified quality.
B. Comply with manufacturers' instructions, including each step in sequence.
C. Should manufacturers' instructions conflict with Contract Documents, request clarification from
Engineer before proceeding.
D. Comply with specified standards as minimum quality for the work except where more stringent tolerances, codes, or specified requirements indicate higher standards or more precise workmanship.
E. Have work performed by persons qualified to produce required and specified quality.
F. Verify that field measurements are as indicated on shop drawings or as instructed by the manufacturer.
OMD - 17th St Armory 01 4000 - 3 QUALITY REQUIREMENTS
G. Secure products in place with positive anchorage devices designed and sized to withstand stresses, vibration, physical distortion, and disfigurement.
2.02 TOLERANCES
A. Monitor fabrication and installation tolerance control of products to produce acceptable Work.
Do not permit tolerances to accumulate.
B. Comply with manufacturers' tolerances. Should manufacturers' tolerances conflict with Contract
Documents, request clarification from Engineer before proceeding.
C. Adjust products to appropriate dimensions; position before securing products in place.
2.03 TESTING AND INSPECTION
A. See individual specification sections for testing and inspection required.
B. Testing Agency Duties:
1. Test samples of mixes submitted by Contractor.
2. Provide qualified personnel at site. Cooperate with Engineer and Contractor in performance of services.
3. Perform specified sampling and testing of products in accordance with specified standards.
4. Ascertain compliance of materials and mixes with requirements of Contract Documents.
5. Promptly notify Engineer and Contractor of observed irregularities or non-compliance of
Work or products.
6. Perform additional tests and inspections required by Engineer.
7. Submit reports of all tests/inspections specified.
C. Limits on Testing/Inspection Agency Authority:
1. Agency may not release, revoke, alter, or enlarge on requirements of Contract Documents.
2. Agency may not approve or accept any portion of the Work.
3. Agency may not assume any duties of Contractor.
4. Agency has no authority to stop the Work.
D. Contractor Responsibilities:
1. Deliver to agency at designated location, adequate samples of materials proposed to be used that require testing, along with proposed mix designs.
2. Cooperate with laboratory personnel, and provide access to the Work and to manufacturers' facilities.
3. Provide incidental labor and facilities:
a. To provide access to Work to be tested/inspected.
b. To obtain and handle samples at the site or at source of Products to be tested/inspected.
c. To facilitate tests/inspections.
d. To provide storage and curing of test samples.
4. Notify Engineer and laboratory 24 hours prior to expected time for operations requiring testing/inspection services.
5. Employ services of an independent qualified testing laboratory and pay for additional samples, tests, and inspections required by Contractor beyond specified requirements.
6. Arrange with Owner's agency and pay for additional samples, tests, and inspections required by Contractor beyond specified requirements.
E. Re-testing required because of non-compliance with specified requirements shall be performed by the same agency on instructions by Engineer.
F. Re-testing required because of non-compliance with specified requirements shall be paid for by Contractor.
2.04 MANUFACTURERS' FIELD SERVICES
A. When specified in individual specification sections, require material or product suppliers or manufacturers to provide qualified staff personnel to observe site conditions, conditions of
OMD - 17th St Armory 01 4000 - 4 QUALITY REQUIREMENTS surfaces and installation, quality of workmanship, start-up of equipment, test, adjust, and balance equipment as applicable, and to initiate instructions when necessary.
B. Report observations and site decisions or instructions given to applicators or installers that are supplemental or contrary to manufacturers' written instructions.
2.05 DEFECT ASSESSMENT
A. Replace Work or portions of the Work not complying with specified requirements.
END OF SECTION 01 4000
OMD - 17th St Armory 01 4100 - 1 REGULATORY REQUIREMENTS
SECTION 01 4100
REGULATORY REQUIREMENTS
PART 1 GENERAL
1.01 SUMMARY OF REFERENCE STANDARDS
A. Regulatory requirements applicable to this project are the following:
B. 36 CFR 1191 - Americans with Disabilities Act (ADA) Accessibility Guidelines for Buildings and
Facilities; Architectural Barriers Act (ABA) Accessibility Guidelines; current edition.
C. ADA Standards - Americans with Disabilities Act (ADA) Standards for Accessible Design.
D. 29 CFR 1910 - Occupational Safety and Health Standards; current edition.
E. ICC A117.1 - Accessible and Usable Buildings and Facilities; Current.
F. Building Code: Current Oregon Structural Specialty Code OSSC.
G. Plumbing Code: Current Oregon Plumbing Specialty Code OPSC.
H. Mechanical Code: Current Oregon Mechanical Specialy Code OMSC.
I. Energy Code: CurrentOregon Zero Energy Ready Commerical Code.
J. Electrical Code: Current Oregon Electrical Specialty Code OESC.
K. City of Salem Municipal Codes.
L. Current National Fire Protection Association (NFPA) Codes and Standards.
1.02 RELATED REQUIREMENTS
A. Section 01 4000 - Quality Requirements.
1.03 QUALITY ASSURANCE
A. Contractor's Designer Qualifications: Refer to Section - 01 4000 - Quality Requirements.
PART 2 PRODUCTS - NOT USED
END OF SECTION 01 4100
OMD - 17th St Armory 01 4216 - 1 DEFINITIONS
SECTION 01 4216
DEFINITIONS
PART 1 GENERAL
1.01 SUMMARY
A. Other definitions are included in individual specification sections.
1.02 DEFINITIONS
A. Furnish: To supply, deliver, unload, and inspect for damage.
B. Install: To unpack, assemble, erect, apply, place, finish, cure, protect, clean, start up, and make ready for use.
C. Product: Material, machinery, components, equipment, fixtures, and systems forming the work result. Not materials or equipment used for preparation, fabrication, conveying, or erection and not incorporated into the work result. Products may be new, never before used, or re-used materials or equipment.
D. Provide: To furnish and install.
E. Supply: Same as Furnish.
PART 2 PRODUCTS - NOT USED
END OF SECTION 01 4216
OMD - 17th St Armory 01 4533 - 1 CODE-REQUIRED SPECIAL
INSPECTIONS AND
PROCEDURES
SECTION 01 4533
CODE-REQUIRED SPECIAL INSPECTIONS AND PROCEDURES
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Code-required special inspections.
B. Testing services incidental to special inspections.
C. Submittals.
D. Manufacturers' field services.
E. Fabricators' field services.
1.02 DEFINITIONS
A. Code or Building Code: ICC (IBC)-2015, Edition of the International Building Code and specifically, Chapter 17 - Special Inspections and Tests.
B. Authority Having Jurisdiction (AHJ): Agency or individual officially empowered to enforce the building, fire and life safety code requirements of the permitting jurisdiction in which the Project is located.
C. National Institute of Standards and Technology (NIST).
D. Special Inspection:
1. Special inspections are inspections and testing of materials, installation, fabrication, erection or placement of components and connections mandated by the AHJ that also require special expertise to ensure compliance with the approved Contract Documents and the referenced standards.
2. Special inspections are separate from and independent of tests and inspections conducted by Owner or Contractor for the purposes of quality assurance and contract administration.
1.03 REFERENCE STANDARDS
A. ACI 318 - Building Code Requirements for Structural Concrete and Commentary; Current.
B. ASTM C31/C31M - Standard Practice for Making and Curing Concrete Test Specimens in the
Field; Current.
C. ASTM C172/C172M - Standard Practice for Sampling Freshly Mixed Concrete; Current.
D. ASTM D3740 - Standard Practice for Minimum Requirements for Agencies Engaged in the
Testing and/or Inspection of Soil and Rock as Used in Engineering Design and Construction;
Current.
E. ASTM E329 - Standard Specification for Agencies Engaged in Construction Inspection, Testing, or Special Inspection; Current.
F. ICC (IBC) - International Building Code; Current.
1.04 SUBMITTALS
A. See Section 01 3000 - Administrative Requirements, for submittal procedures.
B. Special Inspection Agency Qualifications: Prior to the start of work, the Special Inspection
Agency is required to:
1. Submit agency name, address, and telephone number, names of full time registered
Engineer and responsible officer.
2. Submit copy of report of laboratory facilities inspection made by NIST Construction
Materials Reference Laboratory during most recent inspection, with memorandum of remedies of any deficiencies reported by the inspection.
3. Submit certification that Special Inspection Agency is acceptable to AHJ.
C. Testing Agency Qualifications: Prior to the start of work, the Testing Agency is required to:
OMD - 17th St Armory 01 4533 - 2 CODE-REQUIRED SPECIAL
PROCEDURES
1. Submit agency name, address, and telephone number, and names of full time registered Engineer and responsible officer.
2. Submit copy of report of laboratory facilities inspection made by NIST Construction Materials Reference Laboratory during most recent inspection, with memorandum of remedies of any deficiencies reported by the inspection.
3. Submit certification that Testing Agency is acceptable to AHJ.
D. Special Inspection Reports: After each special inspection, Special Inspector is required to promptly submit at least two copies of report; one to Engineer and one to the AHJ.
1. Include:
a. Date issued.
b. Project title and number.
c. Name of Special Inspector.
d. Date and time of special inspection.
e. Identification of product and specifications section.
f. Location in the Project.
g. Type of special inspection.
h. Date of special inspection.
i. Results of special inspection.
j. Compliance with Contract Documents.
2. Final Special Inspection Report: Document special inspections and correction of discrepancies prior to the start of the work.
1.05 SPECIAL INSPECTION AGENCY
A. Contractor will employ services of a Special Inspection Agency to perform inspections and associated testing and sampling in accordance with ASTM E329 and required by the building code.
B. Employment of agency in no way relieves Contractor of obligation to perform work in accordance with requirements of Contract Documents.
1.06 TESTING AND INSPECTION AGENCIES
A. Owner may employ services of an independent testing agency to perform additional testing and sampling associated with special inspections but not required by the building code.
B. Employment of agency in no way relieves Contractor of obligation to perform work in accordance with requirements of Contract Documents.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION
3.01 SCHEDULE OF SPECIAL INSPECTIONS, GENERAL
A. Frequency of Special Inspections: Special Inspections are indicated as continuous or periodic.
1. Continuous Special Inspection: Special Inspection Agency is required to be present in the area where the work is being performed and observe the work at all times the work is in progress.
2. Periodic Special Inspection: Special Inspection Agency is required to be present in the area where work is being performed and observe the work part-time or intermittently and at the completion of the work.
3.02 SPECIAL INSPECTIONS FOR CONCRETE CONSTRUCTION
A. Bolts Installed in Concrete: Where allowable loads have been increased or where strength design is used, verify compliance with approved Contract Documents and ACI 318, Sections
8.1.3 and 21.2.8 prior to and during placement of concrete; continuous.
B. Anchors Installed in Hardened Concrete: Verify compliance with ACI 318, Sections 3.8.6, 8.1.3, and 21.2.8; periodic.
C. Design Mix: Verify plastic concrete complies with the design mix in approved Contract Documents and with ACI 318, Chapter 4 and 5.2; periodic.
OMD - 17th St Armory 01 4533 - 3 CODE-REQUIRED SPECIAL
PROCEDURES
D. Concrete Sampling Concurrent with Strength Test Sampling: Each time fresh concrete is sampled for strength tests, verify compliance with ASTM C172/C172M, ASTM C31/C31M and ACI 318, Sections 5.6 and 5.8 and record the following, continuous:
1. Slump.
2. Air content.
3. Temperature of concrete.
E. Specified Curing Temperature and Techniques: Verify compliance with approved Contract Documents and ACI 318, Sections 5.11 through 5.13; periodic.
F. Concrete Strength in Situ: Verify concrete strength complies with approved Contract Documents and ACI 318, Section 6.2, for the following.
G. Formwork Shape, Location and Dimensions: Verify compliance with approved Contract Documents and ACI 318, Section 6.1.1; periodic.
3.03 SPECIAL INSPECTIONS FOR SOILS
A. Materials and Placement: Verify each item below complies with approved construction documents and approved geotechnical report.
1. Design bearing capacity of material below shallow foundations; periodic.
2. Design depth of excavations and suitability of material at bottom of excavations; periodic.
3. Materials, densities, lift thicknesses; placement and compaction of backfill: continuous.
4. Subgrade, prior to placement of compacted fill verify proper preparation; periodic.
B. Testing: Classify and test excavated material; periodic.
3.04 SPECIAL INSPECTION AGENCY DUTIES AND RESPONSIBILITIES
A. Special Inspection Agency shall:
1. Provide qualified personnel at site. Cooperate with Engineer and Contractor in performance of services.
2. Perform specified sampling and testing of products in accordance with specified reference standards.
3. Ascertain compliance of materials and products with requirements of Contract Documents.
4. Promptly notify Engineer and Contractor of observed irregularities or non-compliance of work or products.
5. Perform additional tests and inspections required by Engineer.
6. Submit reports of all tests or inspections specified.
B. Limits on Special Inspection Agency Authority:
1. Agency may not release, revoke, alter, or enlarge on requirements of Contract Documents.
2. Agency may not approve or accept any portion of the work.
3. Agency may not assume any duties of Contractor.
4. Agency has no authority to stop the work.
C. Re-testing required because of non-compliance with specified requirements shall be performed by the same agency on instructions by Engineer.
D. Re-testing required because of non-compliance with specified requirements shall be paid for by Contractor.
3.05 TESTING AGENCY DUTIES AND RESPONSIBILITIES
A. Testing Agency Duties:
1. Provide qualified personnel at site. Cooperate with Engineer and Contractor in performance of services.
2. Perform specified sampling and testing of products in accordance with specified standards.
3. Ascertain compliance of materials and mixes with requirements of Contract Documents.
4. Promptly notify Engineer and Contractor of observed irregularities or non-compliance of work or products.
5. Perform additional tests and inspections required by Engineer.
https://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ACI%20318 https://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ACI%20318 https://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ACI%20318 https://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ACI%20318 https://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ACI%20318 https://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ACI%20318 https://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ACI%20318 https://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ACI%20318 https://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ACI%20318 https://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ACI%20318 https://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ACI%20318 https://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ACI%20318 https://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ACI%20318 https://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ACI%20318…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .