The document is a Bid Schedule for the City of Arvada's 2024 Sanitary Sewer Open Cut Construction Services (Project 24-SR-01), detailing a comprehensive infrastructure rehabilitation project across multiple areas (Areas A-H). The project involves extensive sanitary sewer replacement and rehabilitation, including removing and replacing existing sewer pipes, maintenance holes, and associated infrastructure at various locations throughout the city. The bid schedule includes eight distinct project areas with specific line items for tasks such as temporary bypass pumping, pipe removal, new pipe installation (using SDR35 PVC and C900 PVC), maintenance hole replacements, asphalt removal and patching, and utility connections. The project includes alternate bid items for storm sewer work and encompasses a total of 180 unique line items across general, sewer, and waterline construction activities.
The bid schedule indicates a total base bid amount of $180,000, with a specific line item for Owner Controlled Minor Contract Revisions at $180,000. While the unit prices are currently set at $0.00, suggesting this is a template or preliminary document, the bid covers extensive infrastructure work including removing and replacing approximately 4,371 linear feet of sewer pipe, installing new maintenance holes, performing utility connections, and conducting associated roadway and landscape restoration. The project includes provisions for temporary bypass pumping, utility locating, construction surveys, and traffic control, indicating a comprehensive approach to municipal infrastructure rehabilitation that considers both technical execution and community impact.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 25-ENG-039 CSB 2024 Sanitary Sewer Open Cut Construction Services 24-SR-01.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| BID SCHEDULE |
| 25-ENG-039 2024 Sanitary Sewer Open Cut Construction Services |
| 24-SR-01 |
| 2024 OPEN CUT |
| CONTRACTOR: | |
| DATE: | |
| BID PREPARED BY: |
| ITEM | TOTAL | UNIT | |||
| NO. | ITEM | UNIT | QUANTITY | PRICE | COST |
| General | |||||
| 1 | Mobilization, Demobilization, Permits, Fees, Licenses, Administration | LS | 1 | $0.00 | $0.00 |
| 2 | Traffic and Pedestrian Control | LS | 1 | $0.00 | $0.00 |
| 3 | Sediment and Erosion Control | LS | 1 | $0.00 | $0.00 |
| 4 | Utility Locate Potholing | LS | 1 | $0.00 | $0.00 |
| 5 | Construction Survey | LS | 1 | $0.00 | $0.00 |
| 6 | Owner Controlled Minor Contract Revisions | ALLOW | 1 | $180,000.00 | $180,000.00 |
| GENERAL COST SUB-TOTAL | 0 | 0 | $180,000.00 |
| Area A (Olde Wadsworth and W 64th Ave) | |||||
| 7 | Temporary Bypass Pumping Sewer | LS | 1 | $0.00 | $0.00 |
| 8 | Remove 10" VCP Sanitary Sewer Pipe | LF | 343 | $0.00 | $0.00 |
| 9 | Remove Sanitary Sewer Maintenance Hole - 4' Diameter (Depth < 10') | EA | 2 | $0.00 | $0.00 |
| 10 | Remove Sanitary Sewer Maintenance Hole - 4' Diameter (Depth > 10') | EA | 1 | $0.00 | $0.00 |
| 11 | Sanitary Sewer Maintenance Hole - 4' Diameter (Depth < 10'), Complete In Place | EA | 2 | $0.00 | $0.00 |
| 12 | Sanitary Sewer Maintenance Hole - 4' Diameter (Depth > 10'), Complete In Place | EA | 1 | $0.00 | $0.00 |
| 13 | 12" SDR35 PVC, Complete in Place | LF | 44 | $0.00 | $0.00 |
| 14 | 12" C900 PVC, Complete in Place | LF | 299 | $0.00 | $0.00 |
| 15 | Connect to Existing Sanitary Sewer Maintenance Hole | EA | 1 | $0.00 | $0.00 |
| 16 | 6" Asphalt Removal and Patching, Complete in Place | SY | 327 | $0.00 | $0.00 |
| Alternate Bid Items | |||||
| 17A | Option 1: Remove and Replace Existing 18" Stormsewer CMP with 18" Class III RCP | LF | 50 | $0.00 | $0.00 |
| 17B | Option 2: Option 2: Line Existing 18" Stormsewer CMP with Cure-in-Place Pipe Liner | LF | 50 | $0.00 | $0.00 |
| AREA A SEWER COST SUB-TOTAL | 0 | 0 | $0.00 |
| Area B (W 74th Circle and Jay Ct.) | |||||
| 18 | Temporary Bypass Pumping Sewer | LS | 1 | $0.00 | $0.00 |
| 19 | Remove 8" CIPP Sanitary Sewer Pipe | LF | 993 | $0.00 | $0.00 |
| 20 | Remove Sanitary Sewer Maintenance Hole - 4' Diameter (Depth < 10') | EA | 3 | $0.00 | $0.00 |
| 21 | Remove Sanitary Sewer Maintenance Hole - 4' Diameter (Depth > 10') | EA | 6 | $0.00 | $0.00 |
| 22 | Sanitary Sewer Maintenance Hole - 4' Diameter (Depth < 10'), Complete In Place | EA | 3 | $0.00 | $0.00 |
| 23 | Sanitary Sewer Maintenance Hole - 4' Diameter (Depth > 10'), Complete In Place | EA | 6 | $0.00 | $0.00 |
| 24 | 8" SDR35 PVC, Complete in Place | LF | 904 | $0.00 | $0.00 |
| 25 | 8" C900 PVC, Complete in Place | LF | 89 | $0.00 | $0.00 |
| 26 | Connect Sanitary Sewer Service | EA | 20 | $0.00 | $0.00 |
| 27 | 6" Asphalt Removal and Patching, Complete in Place | SY | 931 | $0.00 | $0.00 |
| 28 | Concrete Pan, Sidewalk, & Curb Ramp Remove and Replace, Complete in Place | SY | 45 | $0.00 | $0.00 |
| AREA B SEWER COST SUB-TOTAL | 0 | 0 | $0.00 |
| Area B 8" AC Waterline Replacement | |||||
| 29 | Remove Existing Fire Hydrant | EA | 1 | $0.00 | $0.00 |
| 30 | 8" C900 PVC and fittings, Complete in Place | LF | 1,080 | $0.00 | $0.00 |
| 31 | Fire Hydrant Assembly | EA | 2 | $0.00 | $0.00 |
| 32 | Chlorination and Pressure Test | LS | 1 | $0.00 | $0.00 |
| 33 | Connect to Existing 8" AC Waterline | EA | 2 | $0.00 | $0.00 |
| 34 | Water Service Tap Reconnection | EA | 19 | $0.00 | $0.00 |
| 35 | 6" Asphalt Removal and Patching, Complete in Place | SY | 931 | $0.00 | $0.00 |
| 36 | 6" Thick Concrete Sidewalk Removal and Replacement | SY | 7 | $0.00 | $0.00 |
| 37 | 2" Depth Milling (full width) | SY | 3,790 | $0.00 | $0.00 |
| 38 | 2" SX PG 64-22 Top Course | TON | 451 | $0.00 | $0.00 |
| 39 | HMA Patching (Grading S) (75) PG 64-22 | TON | 22 | $0.00 | $0.00 |
| AREA B WATERLINE COST SUB-TOTAL | 0 | 0 | $0.00 |
| Area C (Yukon St near W 65th Ave ) | |||||
| 40 | Temporary Bypass Pumping Sewer | LS | 1 | $0.00 | $0.00 |
| 41 | Remove 8" VCP Sanitary Sewer Pipe | LF | 94 | $0.00 | $0.00 |
| 42 | Remove Sanitary Sewer Cleanout | EA | 1 | $0.00 | $0.00 |
| 43 | Remove Sanitary Sewer Maintenance Hole - 4' Diameter (Depth > 10') | EA | 1 | $0.00 | $0.00 |
| 44 | Sanitary Sewer Maintenance Hole - 4' Diameter (Depth > 10'), Complete In Place | EA | 2 | $0.00 | $0.00 |
| 45 | 8" SDR35 PVC, Complete in Place | LF | 94 | $0.00 | $0.00 |
| 46 | Connect Sanitary Sewer Service | EA | 1 | $0.00 | $0.00 |
| 47 | 6" Asphalt Removal and Patching, Complete in Place | SY | 100 | $0.00 | $0.00 |
| AREA C SEWER COST SUB-TOTAL | 0 | 0 | $0.00 |
| Area D (Welch St & W 67th Ave) | |||||
| 48 | Temporary Bypass Pumping Sewer | LS | 1 | $0.00 | $0.00 |
| 49 | Remove 8" VCP Sanitary Sewer Pipe | LF | 150 | $0.00 | $0.00 |
| 50 | Remove 8" SLIP Sanitary Sewer Pipe | LF | 1,004 | $0.00 | $0.00 |
| 51 | Remove Sanitary Sewer Cleanout | EA | 2 | $0.00 | $0.00 |
| 52 | Remove Sanitary Sewer Maintenance Hole - 4' Diameter (Depth < 10') | EA | 6 | $0.00 | $0.00 |
| 53 | Remove Sanitary Sewer Maintenance Hole - 4' Diameter (Depth > 10') | EA | 2 | $0.00 | $0.00 |
| 54 | Sanitary Sewer Maintenance Hole - 4' Diameter (Depth < 10'), Complete In Place | EA | 6 | $0.00 | $0.00 |
| 55 | Sanitary Sewer Maintenance Hole - 4' Diameter (Depth > 10'), Complete In Place | EA | 2 | $0.00 | $0.00 |
| 56 | 8" SDR35 PVC, Complete in Place | LF | 1,154 | $0.00 | $0.00 |
| 57 | Connect to Existing Sanitary Sewer Maintenance Hole | EA | 1 | $0.00 | $0.00 |
| 58 | Connect Sanitary Sewer Service | EA | 28 | $0.00 | $0.00 |
| 59 | 6" Asphalt Removal and Patching, Complete in Place | SY | 1,096 | $0.00 | $0.00 |
| AREA D SEWER COST SUB-TOTAL | 0 | 0 | $0.00 |
| Area E (Estes St & W 66th Ave) | |||||
| 60 | Temporary Bypass Pumping Sewer | LS | 1 | $0.00 | $0.00 |
| 61 | Remove 8" SLIP Sanitary Sewer Pipe | LF | 942 | $0.00 | $0.00 |
| 62 | Remove Sanitary Sewer Maintenance Hole - 4' Diameter (Depth < 10') | EA | 5 | $0.00 | $0.00 |
| 63 | Sanitary Sewer Maintenance Hole - 4' Diameter (Depth < 10'), Complete In Place | EA | 5 | $0.00 | $0.00 |
| 64 | 8" SDR35 PVC, Complete in Place | LF | 942 | $0.00 | $0.00 |
| 65 | Connect Sanitary Sewer Service | EA | 3 | $0.00 | $0.00 |
| 66 | 6" Asphalt Removal and Patching, Complete in Place | SY | 870 | $0.00 | $0.00 |
| AREA E SEWER COST SUB-TOTAL | 0 | 0 | $0.00 |
| Area F (67th Ave & Van Gordon Ct. ) | |||||
| 67 | Temporary Bypass Pumping Sewer | LS | 1 | $0.00 | $0.00 |
| 68 | Remove 8" VCP Sanitary Sewer Pipe | LF | 195 | $0.00 | $0.00 |
| 69 | Remove Sanitary Sewer Cleanout | EA | 3 | $0.00 | $0.00 |
| 70 | Remove Sanitary Sewer Maintenance Hole - 4' Diameter (Depth < 10') | EA | 3 | $0.00 | $0.00 |
| 71 | Rehabilitate Sanitary Sewer Maintenance Hole - 4' Diameter (Depth < 10') | EA | 1 | $0.00 | $0.00 |
| 72 | Sanitary Sewer Maintenance Hole - 4' Diameter (Depth < 10'), Complete In Place | EA | 5 | $0.00 | $0.00 |
| 73 | 8" SDR35 PVC, Complete in Place | LF | 195 | $0.00 | $0.00 |
| 74 | Connect to Existing Sanitary Sewer Maintenance Hole | EA | 1 | $0.00 | $0.00 |
| 75 | Connect Sanitary Sewer Service | EA | 3 | $0.00 | $0.00 |
| 76 | 6" Asphalt Removal and Patching, Complete in Place | SY | 227 | $0.00 | $0.00 |
| AREA F SEWER COST SUB-TOTAL | 0 | 0 | $0.00 |
| Area G (W 62nd Ave. and Webster St.) | |||||
| 77 | Temporary Bypass Pumping Sewer | LS | 1 | $0.00 | $0.00 |
| 78 | Native Landscaping & Restoration (Includes Seeding, Topsoil & Mulch) | SY | 95 | $0.00 | $0.00 |
| 79 | Overhead Utility Pole Protection | LS | 1 | $0.00 | $0.00 |
| 80 | Sanitary Sewer Maintenance Hole - 4' Diameter (Depth > 10'), Complete In Place | EA | 1 | $0.00 | $0.00 |
| 81 | Protective Lining of 4' Maintenance Hole | EA | 1 | $0.00 | $0.00 |
| 82 | 6" SDR35 PVC, Complete in Place | EA | 200 | $0.00 | $0.00 |
| 83 | 8" C900 PVC and fittings, Complete in Place | LF | 79 | $0.00 | $0.00 |
| 84 | Connect Sanitary Sewer Service | EA | 3 | $0.00 | $0.00 |
| 85 | 6" Asphalt Removal and Patching, Complete in Place | SY | 60 | $0.00 | $0.00 |
| 86 | Remove 6" VCP Sanitary Sewer Pipe | LF | 79 | $0.00 | $0.00 |
| 87 | Remove Sanitary Sewer Cleanout | EA | 1 | $0.00 | $0.00 |
| 88 | Abandon Sanitary Sewer (Plug) | EA | 1 | $0.00 | $0.00 |
| 89 | Abandon Sanitary Sewer (CLSM Fill) | CY | 312 | $0.00 | $0.00 |
| AREA G SEWER COST SUB-TOTAL | 0 | 0 | $0.00 |
| Area H (Oak St & W 69th Ave) | |||||
| 90 | Temporary Bypass Pumping Sewer | LS | 1 | $0.00 | $0.00 |
| 91 | Remove 8" SLIP Sanitary Sewer Pipe | LF | 1,602 | $0.00 | $0.00 |
| 92 | Remove Sanitary Sewer Maintenance Hole - 4' Diameter (Depth < 10') | EA | 3 | $0.00 | $0.00 |
| 93 | Remove Sanitary Sewer Maintenance Hole - 4' Diameter (Depth > 10') | EA | 2 | $0.00 | $0.00 |
| 94 | Remove Drop Sanitary Sewer Maintenance Hole - 4' Diameter (Depth < 10') | EA | 1 | $0.00 | $0.00 |
| 95 | Sanitary Sewer Maintenance Hole - 4' Diameter (Depth < 10'), Complete In Place | EA | 3 | $0.00 | $0.00 |
| 96 | Sanitary Sewer Maintenance Hole - 4' Diameter (Depth > 10'), Complete In Place | EA | 2 | $0.00 | $0.00 |
| 97 | Drop Sanitary Sewer Maintenance Hole - 4' Diameter (Depth < 10') | EA | 1 | $0.00 | $0.00 |
| 98 | Rehabilitate Sanitary Sewer Maintenance Hole - 4' Diameter (Depth < 10') | EA | 3 | $0.00 | $0.00 |
| 99 | Protective Lining of 4' Maintenance Hole | EA | 1 | $0.00 | $0.00 |
| 100 | 8" C900 PVC, Complete in Place | LF | 794 | $0.00 | $0.00 |
| 101 | 8" SDR35 PVC, Complete in Place | LF | 808 | $0.00 | $0.00 |
| 102 | Connect to Existing Sanitary Sewer Maintenance Hole | EA | 2 | $0.00 | $0.00 |
| 103 | Connect Sanitary Sewer Service | EA | 29 | $0.00 | $0.00 |
| 104 | 6" Asphalt Removal and Patching, Complete in Place | SY | 1,492 | $0.00 | $0.00 |
| AREA H SEWER COST SUB-TOTAL | 0 | 0 | $0.00 |
| TOTAL BASE BID | $180,000.00 |
| TOTAL BASE BID WRITTEN : |