25.241 Suffield HS Roof Replacement- Addendum 1.pdf

PDF 981 KB Posted

Attached to
SUFFIELD HIGH SCHOOL ROOF REPLACEMENT STATE PROJECT #139-0062 RR
Solicitation number
37758
Issued by
Hartford County, Connecticut

About this file

This is an Addendum #1 to the solicitation documents for the partial roof replacement of Suffield High School in West Suffield, Connecticut (State Project #139-0062 RR, S/P+A Project #25.241), issued by the Town of Suffield on July 8, 2026. The addendum modifies the original drawings and specifications for the project, which involves replacing pitched sections of the existing shingle roof with standing metal seam roofing. A mandatory pre-bid sign-in sheet is provided for reference. The deadline for requesting clarifications (RFIs) is Tuesday, July 21, 2026 at 10:00 a.m., and the bid submission date remains unchanged at July 28, 2026 at 10:00 a.m. EDT. The addendum supersedes previously issued documents to the extent of the modifications made.

The primary change contained in this addendum is the deletion and replacement of Drawing A4 (Roof Details) in its entirety, with a new Drawing A4 included as part of the addendum package. The addendum consists of two pages of 8" x 11" text and one 30" x 42" drawing. No pricing information, set-asides, incumbent contractor details, or contract award terms are specified in this addendum document, as it functions solely as a modification to the technical drawings and specifications previously issued in the original solicitation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM #1

State Project #139-0062 RR Suffield High School Partial Roof Replacement – Suffield Addendum #1-1

PARTIAL ROOF REPLACEMENT

SUFFIELD HIGH SCHOOL

1060 SHELDON STREET

WEST SUFFIELD, CT 06093

STATE PROJECT #139-0062 RR

S/P+A PROJECT #25.241

DATE: July 8, 2026

The following changes to the Drawings and Project Specifications shall become a part of the Drawings and Project Specifications; superseding previously issued Drawings and Project Specifications to the extent modified by Addendum #1.

General Information:

• The mandatory pre-bid sign-in sheet is attached for reference. (1)

• The deadline for RFIs is Tuesday, July 21, 10:00am.

Changes to the Drawings:

• DRAWING A4, ROOF DETAILS, has been deleted in its entirety. A new DRAWING A4 has been added and is attached as part of this addendum.*(Per Internal Review)

The bid date remains unchanged by this addendum.

The addendum consists of two (2) pages of 8½” x 11” text and one (1) 30” x 42” drawing*.

End of Addendum #1

SHSPRRADD#1
DATE: July 8, 2026
End of Addendum #1