25-8622_-_Exhibit_N_-_EHS_Contractor_Requirements_Master_2021_rev.pdf

PDF 130 KB Posted

Attached to
Ted Curcie Bridge Repair
Solicitation number
25-8522
Issued by
Collier County, Florida

About this file

This is an Environmental, Health and Safety (EHS) Contractor Requirements document issued by Collier County, Florida for all construction projects undertaken by Collier County Construction & Maintenance (BCC). The document establishes comprehensive compliance requirements for all contractors performing work on county projects, mandating adherence to applicable federal, state, and local regulations including OSHA, DOT, EPA, DHS, ANSI, FDEP, and NFPA standards. Contractors must comply with Collier County EHS Standard Operating Procedures and Job Safety Analysis protocols, which include wearing vendor badges, obtaining powered industrial vehicle certifications, managing hazardous materials storage and handling, reporting incidents and accidents daily, conducting weekly internal safety inspections, implementing fall protection above six feet, following electrical safety and lockout/tagout procedures, maintaining proper personal protective equipment, securing ladders and equipment, and guarding excavations and wall/floor openings. For work conducted within rights-of-way such as roads, sidewalks, and bike paths, contractors must follow all FDOT and MUTCD requirements including ANSI/ISEA 107-2010 compliant Class 2 or 3 high-visibility safety garments, appropriate work zone signage and traffic control devices, and maintenance of traffic plans based on FDOT and MUTCD standards.

Contractors must develop site-specific EHS plans addressing safety, security, hurricane preparedness, pandemic safety protocols, respirable crystalline silica exposure, confined space entry, asbestos management, mold remediation, and environmental protection including spill cleanup and SPCC compliance as applicable to the project scope. Risk management must be incorporated into all pre-activity, activity, and post-activity construction meetings. Contractors are responsible for safeguarding construction sites by protecting hazardous locations with orange barricade fencing, yellow or red tape based on hazard level, and white closure signs with black lettering on both sides of affected sidewalks and pedestrian zones. Excavations left open overnight or during non-work periods must be similarly protected. All work must meet or exceed standards established in Collier County Vertical Construction Standards and IT Construction Standards unless specifically exempted in writing by the Facilities Management Division Director and Risk Management Director. These requirements apply comprehensively to the Ted Curcie Bridge Repair project (Bid No. 25-8522) and all other county construction initiatives.

View the file

Other files

File Type Posted
25-8522_-_Solicitation_R3.pdf PDF
25-8522_-_Solicitation_R3.pdf PDF
25-8522_-_Solicitation_R3.pdf PDF
Construction_Bid_Instructions_Version_1.pdf PDF
Construction_Bid_Instructions_Version_1.pdf PDF
Construction_Bid_Instructions_Version_1.pdf PDF
25-8522_-_Authorization_to_Advertise_-_Executed.pdf PDF
25-8522_Bid_Schedule.xlsx XLSX spreadsheet
25-8522_Bid_Schedule.xlsx XLSX spreadsheet
25-8522_-_Authorization_to_Advertise_-_Executed.pdf PDF
25-8522_-_Authorization_to_Advertise_-_Executed.pdf PDF
25-8522_-_Supplemental_Qualifications.pdf PDF
25-8522_Bid_Schedule.xlsx XLSX spreadsheet
25-8522_-_Supplemental_Qualifications.pdf PDF
25-8522_-_Supplemental_Qualifications.pdf PDF
25-8622_-_Exhibit_K_1_-_Permit_20240325.pdf PDF
25-8622_-_Exhibit_I_-_Supplemental_Terms_and_Conditions_final.pdf PDF
25-8622_-_Exhibit_K_1_-_Permit_20240325.pdf PDF
25-8622_-_Exhibit_M_-_Final_Plans_20250723.pdf PDF
25-8622_-_Exhibit_N_-_EHS_Contractor_Requirements_Master_2021_rev.pdf PDF
25-8622_-_Exhibit_K_1_-_Permit_20240325.pdf PDF
25-8622_-_Exhibit_I_-_Supplemental_Terms_and_Conditions_final.pdf PDF
25-8622_-_Exhibit_K_2_-_Permit.pdf PDF
25-8622_-_Exhibit_N_-_EHS_Contractor_Requirements_Master_2021_rev.pdf PDF
25-8622_-_Exhibit_K_2_-_Permit.pdf PDF
25-8622_-_Exhibit_M_-_Final_Plans_20250723.pdf PDF
25-8622_-_Exhibit_I_-_Supplemental_Terms_and_Conditions_final.pdf PDF
25-8622_-_Exhibit_M_-_Final_Plans_20250723.pdf PDF
25-8622_-_Exhibit_K_2_-_Permit.pdf PDF
PO_Terms_and_Conditions_Rev.3.pdf PDF
PO_Terms_and_Conditions_Rev.3.pdf PDF
PO_Terms_and_Conditions_Rev.3.pdf PDF
Construction_Services_Agreement_2025_ver._3.pdf PDF
Construction_Services_Agreement_2025_ver._3.pdf PDF
Construction_Services_Agreement_2025_ver._3.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Environmental, Health and Safety

Contractor Requirements for all BCC Construction Projects

1. Contractors will be required to understand and comply with all applicable laws and regulations of any governmental entity (OSHA, DOT, EPA, DHS, ANSI, FDEP. NFPA, etc.) and

Collier County CMA’s, EHS Standard Operating Procedures (SOP’s) or Job Safety Analysis

(JSA’s) that that pertain to environmental, health and safety standards and/or work practices applicable to the activities they perform for Collier County. These include but are not limited to:

• Must wear a BCC provided Vendor Badge at all times while on BCC property.

• Powered Industrial Vehicle Certifications (Heavy Equipment, Cranes, etc.)

• Storage, handling, and use of flammable liquids and hazardous materials, including fuels and compressed gas cylinders.

• Daily reporting of any incidents/accidents or any OSHA safety inspections of equipment and worksites.

• Weekly reporting of at least one internal safety inspection of equipment and worksite.

• Use of Personal Fall Protection Devices while working at heights above 6 feet.

• Following Electrical Safety Practices, Arc Flash and Lockout/Tagout procedures.

• Proper use of Personal Protective Equipment. (PPE)

• Proper maintenance and use of ladders and other equipment.

• Guarding of wall and floor openings, open trenches, and excavations.

• Environmental Requirements (Permitting, Tanks, etc.)

2. Required Site EHS Plans for:

• Site Specific Safety Plan

• Site Specific Security Plan

• Site Specific Hurricane Plan

• Site Specific Pandemic Safety Plan (COVID-19) (If Applicable)

• Site Specific Respirable Crystalline Silica Plan (If Applicable)

• Site Specific Confined Space Entry Plan (If Applicable)

• Site Specific Asbestos Management Plan (If Applicable)

• Site Specific Mold Testing and Remediation Management Plan (If Applicable)

• Site Specific Environmental Protection Plan (Spill Cleanup, SPCC, etc.) (If

Applicable)

3. When working within a right-of-way (i.e. roads, sidewalks, bike paths, etc) – All applicable

FDOT and/or MUTCD requirements are to be followed at all times. Specifics include but are not limited to:

• ANSI/ISEA 107-2010 Compliant Class 2 or 3 Hi-Visibility Safety Garments.

• Applicable work zone signage, cones, barricades or barrels, arrow panels, flagging personnel and Stop/Slow Paddles, where necessary, required by law or the BCC.

• An applicable work zone (Maintenance of traffic) plan based on FDOT and/or

MUTCD designs on site.

4. Risk Management is included in all Pre-Activity/Construction, Activity/Construction and

Post Activity/Construction Meetings.

5. Safeguarding construction sites – Protecting the jobsite and preventing or inhibiting public access after activities are finished for the day is equally important. Therefore, all hazardous locations within construction sites and rights-of-ways are to be adequately protected.

Specifics include but are not limited to:

• Damaged, blocked, or missing sections of sidewalks, bike paths or other pedestrian access zones shall be protected with orange barricade fencing, barricades with yellow or red tape (depending on the hazard) or an equivalent means of protection. Sidewalks must also be posted as being closed on both sides with a white sign with black letters.

• Excavations must be protected in a similar manner as listed above if they must be left open overnight, during weekend hours, etc.

• All other hazards shall be evaluated by the contractor to ensure there are no dangerous conditions remaining that could be inadvertently encountered by collier county employees and/or the public while the construction site is not active (i.e., when no construction work is taking place).

6. Contractor must agree that all work must meet or exceed the standards set forth in the

Collier County Vertical Construction Standards and Collier County IT Construction Standards

(if applicable) unless specifically exempted in writing by Facilities Management Division

Director and Risk Management Director.

File details come from the government source that posted it. Updated .