25-8622_-_Exhibit_I_-_Supplemental_Terms_and_Conditions_final.pdf
PDF 2 MB Posted
- Attached to
- Ted Curcie Bridge Repair
- Solicitation number
- 25-8522
- Issued by
- Collier County, Florida
About this file
This document is a Supplemental Terms and Conditions and Specifications Package for the Ted Curcie Road Over Drainage Canal Rehabilitation Project (Project No. 66066.2, Bridge No. 034122) prepared by Collier County Growth Management Department Transportation Engineering Division. The project encompasses comprehensive bridge rehabilitation services including concrete spall repairs using polymer-modified Portland cement mortar, galvanic cathodic protection system installation with local zinc anodes on Bent 5, and structural pile jacket cathodic protection systems for Bents 1-4. The construction schedule is limited to 270 calendar days total (240 days for substantial completion plus 30 days for final completion) from the Notice to Proceed. A non-mandatory pre-bid meeting is scheduled for September 4, 2025, at 10:00 a.m., with sealed bids due by October 2, 2025, at 3:00 p.m. The project requires compliance with multiple permits including SFWMD ERP General Permit No. 11-110383-P, SFWMD ROW Permit, and USACOE Nationwide Permit SAJ-2024-00245, with dredge and fill activities required to be initiated before March 14, 2026, and completed by March 14, 2027. Shop drawings must be submitted and approved by the Engineer before payment authorization. Traffic control plans must conform to FDOT 2025-26 Standard Plans, with complete MOT plans signed and sealed by a Florida Professional Engineer required 21 days prior to construction.
The project imposes strict technical qualifications requiring contractor personnel with active NACE Certification and implementation of specialized cathodic protection systems under the supervision of a Cathodic Protection Specialist meeting specific credentials (AMPP CP4 certified, Florida PE with five years experience, or corrosion engineering practitioner with ten years experience). All repair materials must be from FDOT-approved product lists, and concrete patching materials must have electrical resistivity less than 15,000 ohm-cm. The contractor assumes all cost risks related to fuel and bituminous material price fluctuations, and no separate bid items are provided for electricity or water. A 10% Owner's Allowance is allocated for unforeseen conditions. As-built/record drawings in PDF, AutoCAD, and hard copy formats must be delivered within 30 days of substantial completion, with final payment withheld pending certification by the Design Professional and Project Surveyor. The estimated project budget is $873,723.54, funded directly by Collier County with no grant funding indicated. The contractor must obtain a State of Florida General or Building Contractor license, maintain FDOT Bridge Qualification status, carry $1,000,000 in commercial general liability and automobile liability insurance, post a 5% bid bond, and provide payment and performance bonds for 100% of the contract amount. Liquidated damages of $1,685 per calendar day apply for failure to achieve substantial completion within the specified timeframe. Environmental compliance requirements include adherence to Federal Endangered Species Act protections for manatees, smalltooth sawfish, sea turtles, eastern indigo snakes, and Atlantic, Gulf, and Shortnose sturgeon, with specific operational restrictions and signage requirements.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ted Curcie Road Over Drainage Canal Rehabilitation Project No. 66066.2 (Bridge No. 034122)
August 8, 2025
PREPARED BY: Mohit Soni
Chris Brockmeier
EXHIBIT I
SUPPLEMENTAL TERMS &
CONDITIONS /
SPECIFICATIONS PACKAGE
PROJECT NO. 66066.2
BRIDGE NO. 034122
COLLIER COUNTY GROWTH MANAGEMENT DEPARTMENT
TRANSPORTATION ENGINEERING DIVISION
This document was prepared under the responsible charge of the Professional Engineer shown below.
I hereby certify that this specifications package has been properly prepared by me, or under my responsible charge, in accordance with procedures adopted by the Florida Department of
Transportation.
This item has been digitally signed and sealed by Mohit Soni, P.E on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
Date: 08/08/2025
State of Florida, Professional Engineer, License No.: 65204
Firm/Agency Name: Stantec Consulting Services Inc
Firm/Agency Address: 2056 Vista Parkway, Suite 100
City, State, Zip Code: West Palm Beach, FL 33411
Page(s): 1-45
SUPPLEMENTAL TERMS AND CONDITIONS
GENERAL NOTES
PERMIT CONDITIONS
PROJECT SCHEDULE
PROJECT PHASING
SUBMITTAL OF SHOP DRAWINGS
PROTECTION OF LOCAL ROADS
ELECTRICITY
WATER
OWNER’S ALLOWANCES
FUEL & BITUMINOUS COST ADJUSTMENTS – NOT PROVIDED
CONTRACTOR PRESENTATIONS
NACE CERTIFICATION
MAINTENANCE OF TRAFFIC
MAINTAIN EXISTING BRIDGE STRUCTURE
CLEARING AND GRUBBING ACTIVITIES
UTILITY COORDINATION
AS-BUILT/RECORD DRAWINGS
SPECIAL PROVISIONS
CONTROL OF MATERIALS - SOURCE OF SUPPLY - DEPARTMENT’S
APPROVED PRODUCT LIST (APL)
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC –
LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL
ENDANGERED SPECIES ACT AND OTHER WILDLIFE
REGULATIONS (MANATEE)
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC –
LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL
ENDANGERED SPECIES ACT AND OTHER WILDLIFE
REGULATIONS (SMALLTOOTH SAWFISH)
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC –
LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL
ENDANGERED SPECIES ACT AND OTHER WILDLIFE
REGULATIONS (SEA TURTLE)
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC –
LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL
ENDANGERED SPECIES ACT AND OTHER WILDLIFE
REGULATIONS (INDIGO SNAKE)
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC –
LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL
ENDANGERED SPECIES ACT AND OTHER WILDLIFE
REGULATIONS (STURGEON)
TECHNICAL SPECIAL PROVISIONS
TECHNICAL SPECIAL PROVISIONS
SUPPLEMENTAL
TERMS AND
CONDITIONS
GENERAL NOTES
The County may, at its discretion, use VISA/MASTER card credit network as a payment vehicle for goods and/or services purchased as a part of this contract.
PERMIT CONDITIONS
See Permits for conditions which may affect project. Contractor will be responsible for obtaining any other permits necessary for the completion of their work construction.
Project Permits:
• SFWMD – ERP General Permit No. 11-110383-P (Obtained/Attached)
• SFWMD – ROW Permit (Contractor to apply/obtain if necessary)
• USACOE – Nationwide Permit SAJ-2024-00245 (NWP-AJC) (Obtained/Attached)
Contractor shall initiate all dredge and fill activities before March 14, 2026, and these activities must be completed by March 14, 2027, to maintain compliance with the Nationwide Permit SAJ- 2024-00245.
PROJECT SCHEDULE
Overall Project Schedule is (From Notice to Proceed):
• Total Construction Schedule (calendar days) shall be limited to 9-month schedule
(240 days for substantial plus 30 days for final for a total of 270 days for final completion).
• Construction Schedule TO BE ATTACHED WHEN BID IS AWARDED.
PROJECT PHASING
Due to restrictions related to temporary lane closures, certain items of construction MUST be performed in sequence.
1. Work/lane closure on the northbound and southbound sides of the bridge cannot occur at the same time due to the requirement to provide access to Curcie Road and the wildlife management area.
SUBMITTAL OF SHOP DRAWINGS
Shop drawings are required as set forth in the specifications. Payment will not be made for these items of work until shop drawings have been received, reviewed, and approved by the
Engineer.
PROTECTION OF LOCAL ROADS
This project is connected to many local roads. The contractor shall protect these roads and respect the privacy of the surrounding properties by limiting access to and egress from the project. The contractor shall post written notice of this requirement on the jobsite and include this provision in contracts with their subcontractors and suppliers.
The contractor shall be responsible for all damages to local roads as a result of their employees, subcontractors or suppliers not complying with this restriction.
ELECTRICITY
No bid item is provided for electricity. The cost of providing electricity shall be included in the unit price for work that requires it.
WATER
No bid item is provided for water. The cost of providing water shall be included in the unit price for work that requires it.
OWNER’S ALLOWANCES
Staff will allocate 10% for Owner’s Allowance – for Owner’s Use as Directed. This Allowance will be used only at the Owner’s direction to accomplish work due to unforeseen conditions and/or as directed by the Owner. Inclusion of the Allowance as part of the Contract Price is not a guarantee that the Contractor will be paid any portion or the full amount of the Allowance.
Expenditures of Owners Allowance will be made through Change Order with proper documentation of Time and Materials supporting the change.
FUEL & BITUMINOUS COST ADJUSTMENTS – NOT PROVIDED
Section 9-2.1.1 Fuels and Section 9-2.1.2 Bituminous Materials of the Florida Department of
Transportation Standard Specifications for Road and Bridge Construction, 2022, are deleted.
While it is recognized that a primary cost factor of this bid is based on the price of petroleum and that conditions in this market could become unstable and beyond the control of the bidder, it is also recognized that the availability of funding to compensate for future cost increases will be even scarcer should this occur. The county chooses not to obligate itself for these costs and has not provided for these cost adjustments in the contact. The Contractor shall take this risk into consideration when submitting their bid.
CONTRACTOR PRESENTATIONS
At the discretion of the County, the Contractor may be required to provide a brief update on the
Project to the Collier County Board of County Commissioners, “Board”, up to two (2) times per contract term. Presentations shall be made in a properly advertised Public Meeting on a schedule to be determined by the County Manager or his designee. Prior to the scheduled presentation date, the Contractor shall meet with appropriate County staff to discuss the presentation requirements and format. Presentations may include, but not be limited to, the following information: Original contract amount, project schedule, project completion date and any changes to the aforementioned since Notice to Proceed was issued. All costs associated with participating in this process will be included in the contract price of “As-Built Plans.”
NACE CERTIFICATION
Contractor NACE Certification status shall be active and copies of professional licenses and certifications included with the bid submittal.
MAINTENANCE OF TRAFFIC
Traffic Control Plans have been included to show basic phasing and access requirements. Not all required signs, striping and temporary pavement are shown. All maintenance of traffic
(MOT) shall conform to FDOT 2025-26 Standard Plans Index 102. Contractors shall submit complete MOT plans (Signed and Sealed by a Florida Professional Engineer) 21 days prior to construction for County and CEI approval. All MOT related costs not identified on the plans or in these specifications as separate pay items but deemed necessary to provide a complete traffic control plan and operation shall be included under Pay Item 102-1.
All costs for maintaining traffic, including but not limited to: temporary pavement, drainage, striping, signing etc… between phases and between milestone shall be included in the Lump
Sum price for Item 102-1 Maintenance of Traffic unless a separate pay item has been identified in the plans and these specifications as noted above.
ROAD ALERTS are prepared by the Collier County Transportation Management Services
Department staff to inform the community about scheduled road construction and road maintenance projects along major roadways in Collier County where lane closures are planned, or traffic flow may be affected. The most up to date information on road construction/maintenance projects is available on the County’s Road Alert Map located at
Collier County Transportation Management Services website.
MAINTAIN EXISTING BRIDGE STRUCTURE
The Contractor is responsible for maintaining the existing bridge structure during construction.
Phased construction has been specified to facilitate emergency services and maintain local access in this part of Collier County to avoid costly, lengthy detours. The Contractor shall maintain serviceability of the bridge so long as it is deemed safe for the traveling public. If the
Contractor suspects the condition of the bridge has deteriorated and may no longer be safe for use, the Contractor shall notify the Engineer and the County immediately for evaluation.
During construction activities upon completion of spall removal and prior to installing formwork, contractor shall provide photographic documentation with a sequential identification system to confirm compliance with contract documents. This photographic documentation shall be collected and forwarded to Collier County’s representative for confirmation of conformance prior to remedial efforts.
CLEARING AND GRUBBING ACTIVITIES
The Contractor shall perform all required clearing and grubbing activities required for the placement of fill/embankment or rip rap as shown on the plans early in the construction schedule. Clearing and Grubbing Includes but is not limited to: Vegetation Removal, Drainage
Inlet and Pipe Removal, Pavement Removal, Concrete Removal (sidewalk, curb and gutter, etc.), and Utility Removal. All erosion control measures shall be in place prior to the start of any Clearing and Grubbing activities.
UTILITY COORDINATION
The Contractor shall coordinate any and all utility relocations or proposed interruption of services with Collier County Public Utilities and other utility providers (request an official meeting) within 15 days of Notice to Proceed. This meeting will be to establish requirements with regards to any interruption of service during proposed utility relocations. Contractor shall note the severe restrictions with regards to interruption of services and limits interruptions to certain times of the year. Contractor will not be entitled to any delays caused by restrictions imposed on construction activities. If properly coordinated, the Contractor will have sufficient time within the Contract to construct required improvements.
The contractor shall call for locates prior to any excavation. The existing utilities shown on plans have been identified based on available data, the contractor shall verify all utilities and service locations when they are close enough to the work to be at risk for damage. The cost of potholing to identify and protect existing utilities shall be included in the cost of the work requiring it. The Contractor shall protect utilities from damage during construction operations at all times.
The utilities shall remain in service at all times unless otherwise approved utility provider.
Phasing will be required to ensure continuous service. Temporary relocations and connections may be necessary. All associated costs due to phasing utilities or construction shall be included in the contract unit prices for the various types of utility work to which it is incidental.
Should any utility be damaged, the contractor shall be responsible for all repairs including the need for both on-site and off-site pumper trucks.
AS-BUILT/RECORD DRAWINGS
As-Built/Record Drawings are to be provided to the County’s Project Manager within thirty (30) days of substantial project completion. One copy in the following formats: PDF, AutoCAD and a hard copy.
When changes to the plans are required after contract award, all final drawings, specifications, plans, surveys, reports, computation books, or documents shall be issued by a responsible Florida
Professional Engineer, Licensed Architect and/or Florida –licensed Surveyor and must be signed, dated, and stamped with the engineer’s and/or Surveyor’s seal as applicable. The Professional
Engineer and/or Licensed Surveyor may be part of the contractor’s staff or the Engineer of
Record for the contract plans. The Engineer of record must be notified of all revisions and/or modifications made to the contract documents.
During the construction of a bridge or any structure, all foundation construction records such as pile driving records, shaft tip elevations, and borings shall be included as part of the as-built documents. These records provide critical information necessary for future inspection, maintenance, emergency management, enhancement, reconstruction, and/or demolition of these structures. These records shall be delivered to the Owner’s representative at the completion of the project and prior to final payment to the contractor.
• Prior to construction commencement, the Contractor shall meet with the Design
Professional and P.S.M. to determine the Project’s critical points to the final As-Builts.
The Contractor shall also coordinate with the Design Professional and P.S.M. to facilitate measurement at those critical Project points.
• The Contractor’s Final Payment shall be withheld pending the Design Professional and
P.S.M. Certification of the contracted improvements is per design.
• During the progress of the work the Contractor shall keep and maintain one (1)
“Approved for Construction” copy of all project plans, drawings, specifications, and any addenda, written amendments, change orders, work directives orders, supplemental agreements and other written interpretations and clarifications.
• It is suggested that there be an “Approved for Construction Ghosted Plan Set” for the
Contractor’s use. The Contractor shall also note to show updated construction deviations annotated in red line as well as any approved design changes authorized by the Design Professional. All deviations shall be initialed and dated by the Contractor.
• All survey information depicted on the As-Built Drawings shall be collected under the direct supervision of the P.S.M. in accordance with Florida Statute Chapters 177 and
472 and Chapter 61 G-17 of the Florida Administrative Code.
• For final inspection, an As-Built set (signed and sealed not required at this point) is needed to verify the field work.
SPECIAL
PROVISIONS
CONTROL OF MATERIALS - SOURCE OF SUPPLY - DEPARTMENT’S APPROVED
PRODUCT LIST (APL).
(REV 10-10-23) (FA 10-18-23) (FY 2025-26)
SUBARTICLE 6-5.2 is deleted.
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC – LAWS TO BE
OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND
OTHER WILDLIFE REGULATIONS (MANATEE).
(REV 5-13-20) (FA 6-29-20) (FY 2025-26)
SUBARTICLE 7-1.4 is expanded by the following:
The Department has determined that the project occurs within the known habitat of manatees (Trichechus manatus).
The Department will provide instruction at a preconstruction meeting regarding:
1. The presence of the species and manatee speed zones.
2. The appearance, habits and biology of the species.
3. Their protected status.
4. The need to avoid collisions with and injury to the species.
5. The civil and criminal penalties for harming, harassing, or killing these species.
Advise all work crews of this information.
Operate all vessels at “Idle Speed/No Wake” at all times while in the construction area and while in water where the draft of the vessel provides less than a four-foot clearance from the bottom. Follow routes of deep water whenever possible.
Do not dredge river bottom for barge access.
Lower all equipment or material to the mudline in a controlled descent. Do not allow freefall of any equipment or material below the water surface.
Use fenders or buoys to prevent entrapping manatees between vessels and other structures.
Maintain taut mooring lines. If slack remains in the line, sleeve the line with PVC.
Advise all on-site project personnel they are responsible for observing water-related activities for the presence of manatees. Follow the requirements posted in the URL address in Spec 7-1.4 when manatees are observed.
Except for projects in Bay, Escambia, Franklin, Gilchrist, Gulf, Jefferson, Lafayette, Okaloosa, Santa Rosa, Suwannee and Walton:
1. Sediment or turbidity barriers shall be made of material which manatees cannot become entangled, shall be secured, and shall be monitored to avoid manatee entanglement or entrapment. Barriers must not impede manatee movement.
2. Temporary signs concerning manatees shall be posted prior to and during all in-water project activities. All signs are to be removed by the Contractor upon completion of the project. Temporary signs that have already been approved for this use by the
FWC must be used. One sign which reads “Caution: Boaters”, must be posted in a location conspicuous to boating traffic. A second sign measuring at least 8-1/2 inches by 11 inches, explaining the requirements for “Idle Speed/No Wake” and the shutdown of in-water operations, must be posted in at least one location prominently visible to all onsite project personnel engaged in water-related activities. These signs can be viewed at:
https://myfwc.com/wildlifehabitats/wildlife/manatee/education-for-marinas/
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC – LAWS TO BE
OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND
OTHER WILDLIFE REGULATIONS (SMALLTOOTH SAWFISH).
(REV 10-21-21) (FA 1-6-22) (FY 2025-26)
SUBARTICLE 7-1.4 is expanded by the following:
The Department has determined that the project occurs within the known habitat of smalltooth sawfish (Pristis pectinata).
The Department will provide instruction at a preconstruction meeting regarding:
1. The presence of species and limits of critical habitat.
2. The appearance, habits and biology of the species.
3. Their protected status.
4. The need to avoid collisions with these species.
5. The civil and criminal penalties for harming, harassing, or killing of these species.
Advise all work crews of this information.
Provide sediment and turbidity barriers constructed of material in which a smalltooth sawfish cannot become entangled. Secure and monitor the sediment and turbidity barriers to avoid protected species entrapment. Sediment and turbidity barriers may not block smalltooth sawfish entry to or exit from designated critical habitat without prior approval of the
Engineer and concurrence from the National Marine Fisheries Service’s Protected Resources
Division, St. Petersburg, Florida.
Operate all vessels at the minimum safe speed when transiting and maintain vigilant watch for smalltooth sawfish to avoid striking them. Operate at “Idle Speed/No
Wake” speeds while in the construction area and in water depths where the draft of the vessel provides less than a four-foot clearance from the bottom and in all depths after smalltooth sawfish has been observed and recently departed the area. Follow marked channels or routes of deep water whenever possible. Maintain a distance of 150 feet or greater between smalltooth sawfish and the vessel. When visibility is limited, assign a designated individual to observe for smalltooth sawfish and limit vessel operation to only daylight hours.
All on-site project personnel are responsible for observing water-related activities for the presence of smalltooth sawfish. When smalltooth sawfish are observed, follow the smalltooth sawfish guidelines posted in the URL address in 7-1.4.
OTHER WILDLIFE REGULATIONS (SEA TURTLE).
(REV 10-21-21) (1-6-22) (FY 2025-26)
SUBARTICLE 7-1.4 is expanded by the following:
The Department has determined that the project occurs within the known habitat of sea turtles (Caretta caretta, Chelonia mydas, Dermochelys coriacea, Lepidochelys kempi, Eretmochelys imbricate).
The Department will provide instruction at a pre-construction meeting regarding:
1. The presence of species and limits of critical habitat.
2. The appearance, habits and biology of the species.
3. Their protected status.
4. The need to avoid collisions with these species.
5. The civil and criminal penalties for harming, harassing, or killing these species.
Advise all work crews of this information.
Provide sediment and turbidity barriers constructed of material in which a sea turtle cannot become entangled. Secure and monitor the sediment and turbidity barriers to avoid protected species entrapment. Sediment and turbidity barriers may not block sea turtle entry to or exit from designated critical habitat without prior approval of the Engineer and concurrence from the National Marine Fisheries Service’s Protected Resources Division, St.
Petersburg, Florida.
Operate all vessels at the minimum safe speed when transiting and maintain vigilant watch for sea turtles to avoid striking them. Operate at “Idle Speed/No Wake” speeds while in the construction area in water depths where the draft of the vessel provides less than a four-foot clearance from the bottom, and in all depths after sea turtles have been observed and recently departed the area. Follow marked channels or routes of deep water whenever possible. Maintain a distance of 150 feet or greater between sea turtles and the vessel. When visibility is limited, assign a designated individual to observe for sea turtles and limit vessel operation to only daylight hours.
All on-site project personnel are responsible for observing water-related activities for the presence of sea turtles. When sea turtles are observed, follow the sea turtle species guidelines posted in the URL address in 7-1.4.
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC –LAWS TO BE
OTHER WILDLIFE REGULATIONS (INDIGO SNAKE).
(REV 5-25-17) (FA 6-13-17) (FY 2025-26)
SUBARTICLE 7-1.4 is expanded by the following:
The Department has determined that eastern indigo snake (Drymarchon corais couperi) habitat exists in the project limits. Implement the Standard Protection Measures for the
Eastern Indigo Snake published by the US Fish and Wildlife Service which are available at:
Eastern Indigo Snake Conservation | U.S. Fish & Wildlife Service (fws.gov).
OTHER WILDLIFE REGULATIONS (STURGEON).
(REV 6-24-20) (FA 8-24-20) (FY 2025-26)
SUBARTICLE 7-1.4 is expanded by the following:
The Department has determined that the project occurs within the habitat of
Atlantic, Gulf or Shortnose sturgeon.
The Department will provide instruction at a preconstruction meeting regarding:
1. The presence of the species.
2. The appearance, habits, biology, migratory patterns and preservation of the species.
3. Their protected status.
4. The need to avoid collisions with these species.
5. The civil and criminal penalties for harming, harassing, or killing these species.
Provide a spotter for the following:
Projects with Gulf sturgeon in estuarine/marine habitats from Tampa Bay
Northward to Pensacola from November 1st through April 30th.
Projects with Gulf sturgeon in riverine habitats from March 1st through
October 31st.
Projects with Atlantic and Shortnose sturgeon in all habitat types, from
Cape Canaveral Northward to Jacksonville, year-round. During required timeframe, spotter will maintain constant surveillance for the species during in water work activities, which include pile driving, vessel operations, both motorized and non-motorized, and extending equipment or material in the water, and assure adherence to the requirements posted in the URL address in
Spec 7-1.4.
Do not restrict passage for these fish.
Post signs on site warning of the presence of sturgeon and their federal protection.
Use floating turbidity barriers made of material which sturgeon cannot become entangled or entrapped. Properly secure, regularly monitor and maintain all deployed sediment and turbidity barriers. Immediately free sturgeon trapped in sediment or turbidity barriers.
Do not dredge the river bottom for barge access.
Lower all equipment or material to the mudline in a controlled descent. Do not allow freefall of any equipment or material below the water surface.
TECHNICAL
SPECIAL
PROVISIONS
TECHNICAL SPECIAL PROVISIONS.
The following Technical Special Provisions are included as part of this
Specifications Package.
TSP(T401); Page 1 of 6
TECHNICAL SPECIAL PROVISION
FOR
Concrete Spall Repairs
TED CURCIE ROAD OVER DRAINAGE CANAL
Bridge No. 034122
Collier County Project No. 66066.2
This item has been digitally signed and sealed by Mohit Soni, PE on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
Professional Engineer: Mohit Soni, PE
Date: 08/08/2025
Fla. License No.: 65204
Firm Name: Stantec Consulting Services, Inc.
Firm Address: 2056 Vista Parkway, Suite 100
City, State, Zip code: West Palm Beach, FL 33411
Certificate of Authorization: 27013
Pages: 1 through 6
TSP(T401); Page 2 of 6
Table of Contents
T401-1. Description
T401-2. Materials
T401-3. Repair Methods
T401-4. Quality Control
T401-5. Method of Measurements
T401-6. Basis of Payment
TSP(T401); Page 3 of 6
T401 – CONCRETE SPALL REPAIRS
T401-1. Description
The work under this TSP consists of restoring spalled concrete with Polymer Modified
Portland cement mortar/ concrete as directed. The work includes locating and documenting of cracked and unsound concrete, removal of cracked and unsound concrete including solid concrete behind bars (for mechanical bond) and concrete restoration by means of patching and forming.
T401-2. Materials
All materials must be supplied by the manufacturer. All admixtures shall be compatible with the repair material and shall conform to the requirements of Department Specification 346-
2.5.
All materials shall be mixed and applied in accordance with the manufacturer’s recommendations and this Technical Special Provision.
Furnish to the Engineer a certified test report for the polymer concrete above as described in this specification, indicating the materials meet all requirements specified. Include intended use for each material submitted.
T401-2.1. Repair Material: Use a pre-packaged styrene-butadiene polymer/latex modified, silica-fume enhanced mortar/concrete repair material designed for the specific application that meets the requirements of Department Specification 930. The selected material shall achieve the following requirements as a minimum.
Property Polymer Concrete
Compressive Strength
1 day 3,500 psi
7 days 5,500 psi
28 days 6,500 psi
Tensile Strength
28 days 500 psi
Flexural Strength
28 days 720 psi
T401-2.2. Welded Wire Fabric: Use galvanized welded wire fabric conforming to
American Society for Testing and Materials International (ASTM) A185.
T401-2.3. Reinforcing Steel: Meet the requirements of Department Specification 415.
T401-2.4. Coarse Aggregate: Meet the requirements of Department Specification 901.
T401-3. Repair Methods
T401-3.1. General: Locate and inspect all the deteriorated areas indicated in the contract documents or designated for repair by the Engineer. Sound test the areas and the surrounding concrete surfaces to identify the size and locations of all cracks, spalls and delaminations in need of repair.
Mark or otherwise delineate the limits of proposed demolition on the concrete surface for review and approval by the Engineer. The proposed limits shall be verified, modified as necessary, and recorded by the Engineer. Do not perform concrete demolition/removal before approval and
TSP(T401); Page 4 of 6 recording of the approved removal limits.
T401-3.2. Demolition and Surface Preparation: Sawcut along the perimeter of the area to be restored. For horizontal or vertical spalls less than 1 inch deep, saw cut the perimeter of the repair area to neat lines such that a minimum thickness of repair mortar may be hand-applied in accordance with manufacturer’s recommendations. Feathered edges will not be allowed. For spalls greater than
1-inch deep, cut the upper perimeter of sound concrete to an angle sloping slightly upward to avoid entrapping air and water.
Remove deteriorated concrete to sound material within the sawcut limits (or to other limits as described in plans or as directed). Removal shall be performed by scarification or by chipping with light duty pneumatic or electric concrete chippers (30 lb. or less in general, 15 lb. or less adjacent to strand, reinforcing steel, and structural limits of construction). Remove concrete that is contaminated with grease or oil. Exercise caution during demolition to avoid damaging the existing reinforcing steel.
These repair areas shall be roughened to International Concrete Repair Institute Technical Guideline
No. 03732 CSP No. 7 or to guidelines provided by the manufacturer of the approved repair material.
Completely remove all cracked or unsound concrete. When Class 1 (0 to 1/64-inch) cracks are encountered, notify the Engineer for inspection. Concrete with Class 1 cracks but solid sounded may be left in place if so, directed by the Engineer.
Blast clean existing concrete surfaces that will be in contact with freshly placed repair material and clean to remove loose material and dust immediately before application of repair material.
T401-3.3. Reinforcement: Remove the concrete adjacent to the bar 1-inch depth to permit bond to the entire periphery of the exposed bar. If unsound concrete goes to a depth of two inches or more beyond the reinforcement, stop for direction from the Engineer. Prevent cutting or damaging of exposed reinforcing steel. Blast clean all reinforcing bars exposed after concrete removal in accordance with Society of Protective Coatings (SSPC) SP-10 “Near White Blast” to remove all bond-inhibiting materials and take necessary precautions to avoid damaging the surrounding area. Replace bars that have lost 25% or more of their original diameter over 1-foot in length, or as determined. When using new bars spliced in place, maintain the original cover, with the minimum lap required shall be 48 times the bar diameter and, if necessary, provide additional chipping. Dual bars providing equivalent or greater cross-sectional area may be used as approved.
Where the bond between existing concrete and reinforcing steel has been destroyed, or where the steel is exposed, remove the concrete adjacent to the bar to a depth that will permit modified concrete to bond to the entire periphery of the exposed bar. A clearance of 3/4 to 1-inch behind the bar is required for this purpose. Do not remove concrete more than 1 inch beyond the first mat of reinforcing steel encountered without approval. Prevent cutting, stretching, or damaging of exposed reinforcing steel.
Welded wire fabric shall be used on repairs with depths exceeding 2 inches. The welded wire fabric placed in repairs without exposed existing reinforcing shall have a minimum 1/2-inch depth adjacent to the wires to permit bond to the entire periphery of the wire. Place the welded wire fabric after the existing rebar has been cleaned. Tie the wire fabric at regular intervals, vertically and horizontally, not to exceed 8-inches, or as directed. Field bend the welded wire fabric to conform to any changes in the concrete surface profile.
T401-3.4. Mixing: Provide a Mix and Testing Plan for quantities in excess of 1.0 cubic foot at a single location for the Engineer’s written approval including: manufacturer’s specifications, TSP(T401); Page 5 of 6 method of mixing, means of application, and placement procedure to provide a homogenous pour free of cold joints. Use clean mixers and accurately proportioned ingredients. Mix the materials at the site in accordance with the specific equipment requirements. Ensure that the material, as discharged from the mixer, is uniform in composition and consistency.
T401-3.5. Placing, Curing and Finishing: Spalled or damaged areas of concrete shall be repaired using an approved material, applied, and cured in strict accordance with the manufacturer’s specifications. The Engineer shall approve the specific material and proposed method of placement to ensure that the application is appropriate. Match repair material surface to surrounding concrete surfaces. Provide “V”-groove construction joints, drip notches, or any other features required to match the existing. Forming may be required at larger areas. Temporary shoring may be required as temporary supports.
For formed repairs, form the area to be repaired to neat lines. Form must withstand the anticipated head pressure of the repair material and a minimum pressure of 10 psi. Apply form release agent, compatible to the repair material, to the interior surfaces of the form. Pump material into forms with proper venting to ensure complete filling of voids, starting with a port at the bottom of the form.
Perform external form vibration as necessary to insure proper consolidation. Cap vents when steady flow of material is ensured then fill until an immediate increase of 3 to 5 psi is detected. At the
Engineer’s discretion, gravity fed pours may be allowed in some cases for uniform deficiency shapes where quality control can be assured after trial installations.
Repairs shall be performed to ensure the approved repair mortar/concrete is carefully worked into the repair area to achieve complete contact between the repair mortar and the substrate concrete.
T401-3.6. Materials and Acceptance Testing: The testing of the pre-packed repair material shall conform with the sampling and testing for structural concrete design mixes as set forth in Standard
Specification 346-8. Lot sizes/sampling frequency consists as a minimum of one load of field batched material per day. The Engineer may increase the frequency of testing as needed based on test results of previous batches. Compressive testing will need to be conducted in accordance with ASTM C39.
Make 4 to 6 extra test cylinders (as requested) and test for compressive strength gain determinations.
The Engineer will determine the time of testing. Any material not meeting strength requirements, shall be removed, and replaced. Cure test cylinders in air for the full curing period required before testing.
Curing of repair material shall be in accordance with the manufacturer’s recommendations. Do not place repair material at ambient temperatures outside of acceptable temperature ranges provided by the manufacturer unless adequate protection is provided against adverse effects of extreme temperature conditions.
T401-4. Quality Control
Include the work under these Technical Special Provision in the Contractor Quality Control
General requirements set forth in Department Specification 105. The Quality Control Plan shall include as a minimum, the manufacturer’s technical recommendations, formulation for the repair material the means and methods and equipment for removing the deficient concrete and cleaning the reinforcing steel, repair materials, forming and placement methods.
T401-5. Method of Measurements
The quantity to be paid for will be the volume of Latex Modified Mortar, Styrene-
TSP(T401); Page 6 of 6
Butadiene in cubic feet authorized, furnished, installed, and accepted to restore spalled areas.
The method used in determining the volume shall be the area in square feet of spalled areas, multiplied by the average depth of such areas.
T401-6. Basis of Payment
Price and payment will be full compensation for all work in this Technical Special Provision.
The price associated with the debris/spall removal shall be included with this work.
Payment will be made under:
Item No. 401-70-2 Restore Spalled Areas, Latex Modified Mortar Styrene-Butadiene
Cubic Feet.
TSP(T403), Page 1 of 10
Galvanic Cathodic Protection System
This item has been digitally signed and sealed by Mohit Soni, PE on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
Professional Engineer: Mohit Soni, PE
Date: 08/08/2025
Florida License No.: 65204
Firm Name: Stantec Consulting Services, Inc.
Firm Address: 2056 Vista Parkway, Suite 100
City, State, Zip Code: West Palm Beach, Fl 33411
Certificate of Authorization: 27013
Pages 1 through 10
TSP(T403), Page 2 of 10
T403-1 Description
T403-2 Materials
T403-2.1 Local Galvanic Anode
T403-2.2 Wire and Cable
T403-2.3 Exothermic Welding
T403-2.4 Epoxy
T403-2.5 Concrete Patching Material
T403-3 CONSTRUCTION REQUIREMENTS
T403-3.1 General Installation Requirements
T403-3.2 Performance Requirements
T403-3.3 Quality Assurance /Quality Control (QA/QC)
T403-3.3.1 Cathodic Protection Specialist (CPS):
T403-3.3.2 Cathodic Protection Technician (CPT):
T403-3.3.3 QA/QC Plan:
T403-3.3.4 QA/QC Tasks:
T403-3.3.5 Cathodic Protection Report:
T403-3.3.6 Manufacturer Representative:
T403-3.4 Submittals
T403-3.4.1 Certifications:
T403-3.4.2 Technical Data Sheets:
T403-3.4.3 QA/QC Plan and Cathodic Protection Report:
T403-3.4.4 Qualifications:
T403-3.4.5 Inspections Report:
T403-3.5 Related Sections
T403-3.6 Concrete Repairs
T403-3.7 Continuity Testing
T403-3.8 Exothermic Welding
T403-3.9 Continuity Bond
T403-3.10 System Ground
T403-3.11 Installation of the Local Anodes
T403-4 Method of Measurement
T403-5 Basis of Payment
TSP(T403), Page 3 of 10
T403 – GALVANIC CATHODIC PROTECTION SYSTEM
T403-1 DESCRIPTION
The scope of work under this Section includes furnishing all labor, tools, materials, equipment, and services necessary to properly install local galvanic zinc anodes on piles of Bent 5. Only one face of the piles is accessible. The other three faces are covered and not accessible. The local galvanic anodes shall be installed on the accessible face only. The anodes shall be installed on the entire accessible face in a grid pattern. The number of anodes required per pile shall be determined by the Contractor.
Perform concrete repairs on all elements in accordance with TSP 401 - Concrete Spall Repairs.
T403-2 MATERIALS
If any of the material types described below are on the District Approved Materials List (APL), then only those specific materials listed shall be used in the project.
Provide manufacturer certified test reports for specific materials as required. Notify the
Engineer when the quality control testing is being performed (as specified in this Technical
Special Provision). Use certified materials or materials from the Department approved source when applicable. Upon completion of all work, furnish the Department with a notarized certification on their letterhead that reads as follows:
"We do hereby certify that the materials and work incorporated into any and all elements of this Technical Special Provision meet FDOT Specifications and Plans thereto".
T403-2.1 Local Galvanic Anode
The galvanic anodes shall be pre-manufactured and consist of zinc conforming to ASTM B6
Special High Grade, cast around a pair of steel wires conforming to bright annealed ASTM
A82. The zinc shall be embedded in cementitious material capable of keeping the zinc anode active and be sufficiently permeable to allow migration of zinc corrosion products. The anodes shall have a minimum life of 20 years for chloride content greater than 1.5% weight of binder.
The anode shall be cylindrical in shape with a diameter not exceeding 1.5 inches.
T403-2.2 Wire and Cable
The wires used to connect the anodes to the reinforcement shall meet the requirements of the manufacturer of the local anode.
T403-2.3 Exothermic Welding
The exothermic weld kit shall consist of a mold and powder charge of suitable size for the wire and reinforcing rod. The mold shall rest on the rod and securely hold the wire in place. When
TSP(T403), Page 4 of 10 ignited, the charge in the mold shall burn and result in a mechanically secure and electrically conductive weld of the wire to the reinforcing rod.
T403-2.4 Epoxy
The epoxy material shall be non-conductive, 100 percent solid, and moisture and chemical resistant. The epoxy shall initially cure in 20 minutes at 70℉ and cure to an ultimate compressive strength of at least 8000 psi in 24 hours at 70℉.
T403-2.5 Concrete Patching Material
The concrete used for patching all repairs, system ground installations, or any other excavation in the areas where zinc anode is to be installed shall not contain any fly-ash, micro-silica fume, fibers, latex modifier, epoxy, urethane, or corrosion inhibitors. The electrical resistivity of this material shall be less than 15,000 ohm-cm. The material shall be tested, and a certificate provided stating that its resistivity is less than 15,000 ohm-cm. The patch material to be used under the zinc mesh anode shall also not contain magnesium phosphate.
T403-3 CONSTRUCTION REQUIREMENTS
T403-3.1 General Installation Requirements
All work shall be performed from the water using a barge or a suitable boat.
No CP work will be allowed at any time if an approved Cathodic Protection Specialist (CPS) is not active or otherwise not involved in the work.
The Contractor shall always maintain his/her own skilled personnel on the job site. The
Contractor shall be responsible for proper installation of the cathodic protection system and proper maintenance of the installation equipment.
T403-3.2 Performance Requirements
Engage a qualified foreman to supervise, test, and inspect installation of cathodic protection systems.
1. The foreman shall have experience installing galvanic anode cathodic protection systems.
2. The foreman must have installed at least 5 galvanic anode based cathodic protection systems on reinforced concrete structures over the last 5 consecutive years.
T403-3.3 Quality Assurance /Quality Control (QA/QC)
T403-3.3.1 Cathodic Protection Specialist (CPS):
The Contractor shall secure the services of a Cathodic Protection Specialist (CPS) having one or more of the following qualifications:
TSP(T403), Page 5 of 10
i. Association of Materials Protection and Performance (AMPP) certified Cathodic
Protection Specialist Level 4 (CP4) with verifiable experience designing, installing, and testing galvanic CP systems to protect steel in concrete. Must have verifiable experience on at least two similar projects in the last five years.
ii. A Florida registered professional engineer with a minimum of five years of verifiable experience designing, installing, and testing galvanic CP systems to protect steel in concrete. Must have verifiable experience on at least five similar projects in the last five years.
iii. A corrosion engineering practitioner with no less than 10 years of verifiable experience in the field of cathodic protection on concrete. The CPS shall have performed quality control and performance testing of five galvanic CP systems for concrete structures within the last 10 years.
The CPS shall be independent from the cathodic protection manufacturer, supplier, Contractor, and the construction operation. The CPS shall not be an officer, shareholder, principal, or an employee of the cathodic protection manufacturer, any material supplier, Contractor, or any entities which are related to or are subsidiaries of the cathodic protection manufacturer, equipment and material manufacturer or supplier, or the Contractor. The
CPS or their organization shall not be involved in any construction work in this project.
Submit, in writing, the qualifications of the individual satisfying these requirements for approval by the Engineer.
Acceptance of the CPS shall be subject to approval of the Engineer. No CP work will be allowed at any time if an approved CPS is not active or otherwise not involved in the work.
T403-3.3.2 Cathodic Protection Technician (CPT):
An AMPP-certified CPT Level 1 (CP1) or higher with a minimum of two verifiable project experience in the last five years in CP may assist and perform field measurements on behalf of the CPS. Submit, in writing, the qualifications of the individual satisfying these requirements for the Engineer’s approval. Acceptance of the CPT shall be subject to the approval of the Engineer.
Submitted experience from the CPT shall include projects in which the CPT performed
QA/QC of CP systems installation and monitoring. Each project reference shall include the project name, scope of work, dates performed, and project reference with contact information. All project references must be for the CP of steel reinforced concrete structures.
T403-3.3.3 QA/QC Plan:
A QA/QC Plan provided by the CPS and approved by the Contractor shall be submitted to the Department for review. The QC plan shall include method and frequency of
Contractor's QC testing, frequency of testing by the CPS, performing testing on the Test
Sections, procedures for performing and verifying acceptability of continuity testing and correction, verifying proper installation of the zinc anodes, procedure for developing the production target bond strength, thickness measurement protocol, bond strength testing
TSP(T403), Page 6 of 10 protocol, and method for updating the Engineer. Coordinate the intended installation schedule with the CPS prior to preparing the bid to ensure that the intended schedule does not conflict with the QC Plan.
T403-3.3.4 QA/QC Tasks:
The CPS shall provide the following services as a minimum:
1. Prepare the QA/QC Plan.
2. Review all CP-related submittals before they are submitted to the Department for approval.
3. CPS shall supervise every phase of the installation of both types of cathodic protection systems.
4. CPS shall perform all the continuity testing and check all the continuity corrections.
5. Train the Contractor's and Department's personnel in performing the required quality control (QC) testing.
6. Oversee the quality of surface preparation and the installation of zinc mesh anodes.
7. Perform testing required to meet the contract conditions.
8. Visit the project site, as needed, to perform testing and update the Engineer regarding the quality of the work in progress. Written field reports will be required after each field visit and as a follow-up to any verbal communication. The report shall document all construction reviewed and tests performed.
T403-3.3.5 Cathodic Protection Report:
The CPS shall prepare a report documenting all CP data collected during installation, any anomalies encountered, deviations from Plans and this Technical Special Provision, and the quality of the overall installation. The report shall also include the following statement signed and notarized by the CPS:
“I hereby certify that the facilities constructed under Collier County Project No. 66066.2 have been completed and are functionally complete. I further certify that construction on these facilities has proceeded substantially in accordance with the Contract Documents and that any deviations which are noted below will not prevent the system from functioning in compliance with the intent of the Contract when properly operated and maintained. These determinations have been based upon my on-site observation of construction, which were scheduled and conducted by myself or by a project representative under my direct supervision, for the purpose of determining if the work proceeded is in compliance with the Contract Documents.”
Four bound copies of the typed report shall be submitted along with a digital version to the
Department.
Submit a copy of the report for approval to:
State Materials Office (SMO)
Corrosion and Materials Durability
Field Operations
TSP(T403), Page 7 of 10
5007 NE 39th Avenue
Gainesville, Florida 32609 sm-corrosionfieldops@dot.state.fl.us
The project is not deemed complete unless the Cathodic Protection Report is approved by the Engineer and SMO.
T403-3.3.6 Manufacturer Representative:
The zinc mesh anode manufacturer representative must be available for consultation with the Contractor or Engineer. The manufacturer representative must be available for field visits as needed. The Contractor may require assistance from the manufacturer to properly install the system.
T403-3.4 Submittals
T403-3.4.1 Certifications:
Submit certified results of the chemical composition for the concrete patching material resistivity. Results of tests performed more than two years prior to shipment of the concrete patching material will not be accepted.
T403-3.4.2 Technical Data Sheets:
Submit technical data sheets for the following:
1. Localized zinc anode.
2. Thermal Welding equipment and procedure.
3. Epoxy.
4. Cementitious patch material.
5. QC/QA Testing Equipment.
6. Electrical Wire.
T403-3.4.3 QA/QC Plan and Cathodic Protection Report:
Submit a QA/QC Plan prior to start of work and the Cathodic Protection Report after completion of the project.
T403-3.4.4 Qualifications:
Submit qualifications of the proposed cathodic protection specialist, cathodic protection technician, and the foreman.
T403-3.4.5 Inspections Report:
A final report detailing locations and size of all delaminations, spalls, and cracks shall be provided by the Contractor at the end of the project as an addendum to the Cathodic
Protection Report.
TSP(T403), Page 8 of 10
T403-3.5 Related Sections
1. Technical Special Provisions TSP 401 - Concrete Spall Repairs.
T403-3.6 Concrete Repairs
All damaged concrete shall be removed and repaired in accordance with the TSP 401 -
Concrete Spall Repairs. The repair material shall meet the requirements of paragraph T401-
2.1. Repair Material.
No insulating bonding material shall be used in the application of the patch material.
T403-3.7 Continuity Testing
Electrical continuity testing shall be performed by the CPS within the repair area. After all spalled and delaminated concrete has been removed, reinforcement is cleaned, and the area has been prepared for patching, all exposed reinforcement shall be tie-wired together. Electrical continuity testing shall be performed on all exposed reinforcement. Any discontinuity found shall be corrected and approved by the CPS.
If no reinforcement is exposed during repairs, excavate and expose two independent vertical strands and spiral ties at two different locations on the accessible face, and test…
This is the start of the file's text. The full file is on GovTribe.