This is a comprehensive Fee Schedule (Exhibit B) for a Disaster Debris Removal and Disposal Services contract issued by Collier County, Florida, targeting multiple experienced Disaster Debris Contractors (DDCs) to assist with debris management during disasters or emergency events. The document outlines detailed pricing schedules across four primary service areas: Land Debris Removal, Waterway Debris Removal, Labor and Equipment, and Generators/Pumps/Fuel, with extensive line-item pricing for various debris removal, transportation, processing, and specialty removal services.
The fee schedule includes estimated quantities for services such as vegetative and construction debris removal, hazardous materials disposal, white goods removal, tree and stump extraction, and specialized removal of items like concrete, vehicles, and vessels. Pricing is inclusive of labor, equipment, fuel, supplies, overhead, and incidental costs, with final disposal costs to be passed through to the county without markup. The document emphasizes that estimated quantities are for bid evaluation purposes only and may not reflect actual usage, and it places the responsibility on contractors to verify all pricing and calculations. The pricing structure allows for flexible emergency response, DMS (Debris Management Site) preparation, and miscellaneous services with competitive rates following FEMA guidelines.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Land
| LAND DEBRIS REMOVAL | ||||||
| Pricing shall be inclusive of all labor, equipment, fuel, supplies, overhead, profit, material, and any other incidental costs required to perform and complete all work as specified in the Contract Documents. Final disposal costs, such as tipping fees, shall be passed through to the County without mark-up on the monthly invoices. | ||||||
| Line Items are inclusive of debris removal from ROW, Public Road, Commercial, Private Property, Roads, and Gated Community Debris. | ||||||
| The Estimated Quantities and Total Cost listed below are for bid evaluation purposes only and may not reflect actual usage. | ||||||
| The Excel document contains formulas for convenience, however it is the Contractor’s/Vendor's responsibility to verify all pricing and calculations are CORRECT. Collier County is not responsible for errors in formulas or calculations contained within Excel document(s). | ||||||
| In the event there is a discrepancy between a subtotal or total amount and the unit prices and extended amounts, the unit prices will prevail and the corrected extension(s) and total(s) will be considered the price. The County will only accept proposals submitted on the forms provided by the County. Proposals submitted on other forms, other than those provided by the County, will be deemed non-responsive and ineligible for award. Proposers may not adjust or modify data provided within the Price Proposal Form. Proposals received with modified data may deem the Proposer as non-responsive and ineligible for award. | ||||||
| Schedule A - General Debris Removal Operations | ||||||
| Line Item | Description | Unit of Measure | Estimated Quantity | Rate ($) | TOTAL | |
| A.1 | Vegetative debris to Debris Management Site (DMS) | CY | 350,000 | $ - 0 | ||
| A.2 | Construction and Demolition (C&D)/mixed debris to Debris Management Site (DMS) | CY | 600,000 | $ - 0 | ||
| A.3 | Removal and disposal/recycling of white goods/appliances | Each | 2,800 | $ - 0 | ||
| A.4 | Removal of freon | Each | 1,680 | $ - 0 | ||
| A.5 | Removal and disposal of hazardous materials | lb | 38,000 | $ - 0 | ||
| A.6 | Removal and disposal/recycling of electonics | Each | 100 | $ - 0 | ||
| A.7 | Removal and disposal of dead animal carcasses | lb | 10 | $ - 0 | ||
| A.8 | Removal and disposal/recycling of tires | Each | 15 | $ - 0 | ||
| Direct Hauling and Transportation to Final Disposal Site (FDS) | ||||||
| A.9 | Direct Haul of Unprocessed Vegetative debris from point of collection to Final Disposal Site (FDS) | CY | 200 | $ - 0 | ||
| A.10 | Direct Haul of Unprocessed Construction and Demolition (C&D)/mixed debris from point of collection to Final Disposal Site (FDS) | CY | 200 | $ - 0 | ||
| A.11 | Direct haul of sand, soil, debris from point of collection to Final Disposal Site (FDS) | CY | 10,000 | $ - 0 | ||
| Schedule B - Hazardous Trees, Limbs, Stumps | ||||||
| Line Item | Description | Trunk Diameter | Unit of Measure | Estimated Quantity | Rate ($) | TOTAL |
| Hazardous Limb(s) Removal | measured 2' above ground | |||||
| B.1 | Branches that pose an immediate threat (i.e. hanging over public use areas, or improved property). Work consists of removing eligible hazardous limbs to be collected for processing. | Accessable w/o mechanical equipment | Per Tree | 200 | $ - 0 | |
| B.2 | Accessable only by mechanical equipment | Per Tree | 200 | $ - 0 | ||
| Hazardous Tree Removal w/ <50% of rootball exposed | measured 2' above ground | |||||
| B.3 | (e.g., tree snapped in half).Physical damage to root system, trunk, stem, or limbs; or direction and lean is a safety risk. Work consists of removing eligible hazardous trees. Work consists of flush cut and disposal in accordance with FEMA guidance. | < = 24 | Each | 200 | $ - 0 | |
| B.4 | 24.1-36 | Each | 200 | $ - 0 | ||
| B.5 | >36.1 | Each | 200 | $ - 0 | ||
| Hazardous Tree Removal w/ 50% or more of rootball exposed | measured 2' above ground | |||||
| B.6 | (e.g., uprooted tree). Physical damage to root system, trunk, stem, or limbs; or direction and lean is a safety risk. Work consists of removing eligible hazardous trees. Work consists of removal, grinding, and hole filling of rootball in accordance with FEMA guidance. | < = 24 | Each | 150 | $ - 0 | |
| B.7 | 24.1-36 | Each | 150 | $ - 0 | ||
| B.8 | >36.1 | Each | 150 | $ - 0 | ||
| Stump Removal | measured at ground level | |||||
| B.9 | Stump Extraction, removal, hauling, and disposal | < = 24 | Each | 50 | $ - 0 | |
| B.10 | 24.1-36 | Each | 50 | $ - 0 | ||
| B.11 | >36.1 | Each | 50 | $ - 0 | ||
| B.12 | Grinding stump, backfilling, and grading stump hole | Each | 50 | $ - 0 | ||
| Schedule C - Specialty Removal | ||||||
| Line Item | Description | Unit of Measure | Estimated Quantity | Rate ($) | TOTAL | |
| C.1 | Removal and disposal/recycling of concrete | CY | 13,000 | $ - 0 | ||
| C.2 | Removal and disposal of asbestos | lb | 200 | $ - 0 | ||
| C.3 | Removal and disposal of Vehicle | Each | 2 | $ - 0 | ||
| C.4 | Removal and disposal of Vessels | < = 30' | Each | 2 | $ - 0 | |
| C.5 | Removal and disposal of Vessels | > 30' | Each | 2 | $ - 0 | |
| C.6 | Removal of wooden light or utility poles | Each | 2 | $ - 0 | ||
| Schedule D - DMS Site Operation and Haulout | ||||||
| Line Item | Description | Unit of Measure | Estimated Quantity | Rate ($) | TOTAL | |
| D.1 | DMS Management | CY | 1,000,000 | $ - 0 | ||
| D.2 | C&D Processing- Compaction | CY | 40,000 | $ - 0 | ||
| D.3 | Vegetation Processing - Grinding | CY | 15,000 | $ - 0 | ||
| D.4 | Vegetation Processing - Air Curtain Incineration (ACI) | CY | 15,000 | $ - 0 | ||
| D.5 | Vegetation Processing - Open Burn | CY | 15,000 | $ - 0 | ||
| D.6 | Processed Vegetative debris from DMS to Final Disposal Site (FDS) | CY/Mile | 40,000 | $ - 0 | ||
| D.7 | Processed Construction and Demolition (C&D) debris from DMS to Final Disposal Site (FDS) | CY/Mile | 200,000 | $ - 0 | ||
| Land Debris Removal - TOTAL COST | $ - 0 | |||||
| END LAND |
WaterWay
| WATERWAY DEBRIS REMOVAL | ||||||
| Pricing shall be inclusive of all labor, equipment, fuel, supplies, overhead, profit, material, and any other incidental costs required to perform and complete all work as specified in the Contract Documents. Final disposal costs, such as tipping fees, shall be passed through to the County without mark-up on the monthly invoices. | ||||||
| Line Items are inclusive of debris removed from storm conveyances, waterways, and beaches from ROW, Public Road, Commercial, Private Property, Roads, and Gated Community Debris. | ||||||
| The Estimated Quantities and Total Cost listed below are for bid evaluation purposes only and may not reflect actual usage. | ||||||
| The Excel document contains formulas for convenience, however it is the Contractor’s/Vendor's responsibility to verify all pricing and calculations are CORRECT. Collier County is not responsible for errors in formulas or calculations contained within Excel document(s). | ||||||
| In the event there is a discrepancy between a subtotal or total amount and the unit prices and extended amounts, the unit prices will prevail and the corrected extension(s) and total(s) will be considered the price. The County will only accept proposals submitted on the forms provided by the County. Proposals submitted on other forms, other than those provided by the County, will be deemed non-responsive and ineligible for award. Proposers may not adjust or modify data provided within th ePrice Proposal Form. Proposals received with modified data may deem the Proposer as non-responsive and ineligible for award. | ||||||
| Schedule E - General Debris Removal Operations | ||||||
| Line Item | Description | Unit of Measure | Estimated Quantity | Rate ($) | TOTAL | |
| E.1 | Vegetative debris to Debris Management Site (DMS) | CY | 200,000 | $ - 0 | ||
| E.2 | Construction and Demolition (C&D)/mixed debris to Debris Management Site (DMS) | CY | 150,000 | $ - 0 | ||
| E.3 | Removal and disposal/recycling of white goods/appliances | Each | 200 | $ - 0 | ||
| E.4 | Removal of freon | Each | 5 | $ - 0 | ||
| E.5 | Removal and disposal of hazardous materials | lb | 10,000 | $ - 0 | ||
| E.6 | Removal and disposal/recycling of electonics | Each | 100 | $ - 0 | ||
| E.7 | Removal and disposal of dead animal carcasses | lb | 10 | $ - 0 | ||
| E.8 | Removal and disposal/recycling of tires | Each | 15 | $ - 0 | ||
| Direct Hauling and Transportation to Final Disposal Site (FDS) | ||||||
| E.9 | Direct Haul of Unprocessed Vegetative debris from point of collection to Final Disposal Site (FDS) | CY | 200 | $ - 0 | ||
| E.10 | Direct Haul of Unprocessed Construction and Demolition (C&D)/mixed debris from point of collection to Final Disposal Site (FDS) | CY | 200 | $ - 0 | ||
| E.11 | Direct haul of sand, soil, debris from point of collection to Final Disposal Site (FDS) | CY | 10,000 | $ - 0 | ||
| Schedule F - Hazardous Trees, Limbs, Stumps | ||||||
| Line Item | Description | Trunk Diameter | Unit of Measure | Estimated Quantity | Rate ($) | TOTAL |
| Hazardous Limb(s) Removal | measured 2' above ground | |||||
| F.1 | Branches that pose an immediate threat (i.e. hanging over public use areas, or improved property). Work consists of removing eligible hazardous limbs to be collected for processing. | Accessable w/o mechanical equipment | Per Tree | 5 | $ - 0 | |
| F.2 | Accessable only by mechanical equipment | Per Tree | 5 | $ - 0 | ||
| Hazardous Tree Removal w/ <50% of rootball exposed | measured 2' above ground | |||||
| F.3 | (e.g., tree snapped in half).Physical damage to root system, trunk, stem, or limbs; or direction and lean is a safety risk. Work consists of removing eligible hazardous trees. Work consists of flush cut and disposal in accordance with FEMA guidance. | < = 24 | Each | 5 | $ - 0 | |
| F.4 | 24.1-36 | Each | 5 | $ - 0 | ||
| F.5 | >36.1 | Each | 5 | $ - 0 | ||
| Hazardous Tree Removal w/ 50% or more of rootball exposed | measured 2' above ground | |||||
| F.6 | (e.g., uprooted tree). Physical damage to root system, trunk, stem, or limbs; or direction and lean is a safety risk. Work consists of removing eligible hazardous trees. Work consists of removal, grinding, and hole filling of rootball in accordance with FEMA guidance. | < = 24 | Each | 1 | $ - 0 | |
| F.7 | 24.1-36 | Each | 1 | $ - 0 | ||
| F.8 | >36.1 | Each | 1 | $ - 0 | ||
| Stump Removal | measured at ground level | |||||
| F.9 | Stump Extraction, removal, hauling, and disposal | < = 24 | Each | 5 | $ - 0 | |
| F.10 | 24.1-36 | Each | 5 | $ - 0 | ||
| F.11 | >36.1 | Each | 5 | $ - 0 | ||
| F.12 | Grinding stump, backfilling, and grading stump hole | Each | 5 | $ - 0 | ||
| Schedule G - Specialty Removal | ||||||
| Line Item | Description | Unit of Measure | Estimated Quantity | Rate ($) | TOTAL | |
| G.1 | Removal and disposal/recycling of concrete | CY | 100 | $ - 0 | ||
| G.2 | Removal and disposal of asbestos | lb | 10 | $ - 0 | ||
| G.3 | Removal and disposal of Vehicle | Each | 20 | $ - 0 | ||
| G.4 | Removal and disposal of Vessels | < = 30' | Each | 20 | $ - 0 | |
| G.5 | Removal and disposal of Vessels | > 30' | Each | 25 | $ - 0 | |
| G.6 | Removal of wooden light or utility poles | Each | 2 | $ - 0 | ||
| Schedule H - Stormwater Conveyances, Waterways, and Beaches | ||||||
| Line Item | Description | Unit of Measure | Estimated Quantity | Rate ($) | TOTAL | |
| Stormwater Conveyances, Waterways, and Beaches | ||||||
| H.1 | Pipe systems, ditches, swales, canals (clear and removal of debris, and transport for disposal) | Linear Foot | 500 | $ - 0 | ||
| H.2 | Catch basins and storm inlets/outlets, culverts (clear and removal of debris, and transport for disposal) | Each | 20 | $ - 0 | ||
| H.3 | Stormwater ponds, creeks, mangroves, and bridges (clear and removal of debris) | CY | 20 | $ - 0 | ||
| H.4 | Beach Rake and Screening | ACRE | 25 | $ - 0 | ||
| H.5 | Soil and/or Sand Debris Screening (includes collection, screening, and final disposal of material) | CY | 5,000 | $ - 0 | ||
| H.6 | Restoration - Berm/Beach Construction | CY | 5,000 | $ - 0 | ||
| H.7 | Canal Shoreline Restoration | Linear Foot | 1,000 | $ - 0 | ||
| Waterway Disposal Removal - TOTAL COST | $ - 0 | |||||
| END WATERWAY |
Labor_Equipment
| LABOR AND EQUIPMENT | ||||||
| This schedule shall be utilized for Emergency Work, DMS Preparation, and other miscellaneous services as applicable. | ||||||
| Unit prices shall include all expenses for labor, fuel, insurance and all other incidental fees. Mobilize, operate and demobilize the equipment, transportation fees, equipment fees, maintenance and repair, and labors to be equipped with communication devices (i.e. cell phone) and travel equipment (i.e. vehicle) | ||||||
| Total Cost listed below is for bid evaluation purposes only. | ||||||
| Equipment rates shall include an operator, maintenance, and fuel, unless otherwise noted, be competitive and follow FEMA guidelines. | ||||||
| All labor related line items are to be fully burdened to include all taxes, benefits, handling charges, over head and profits; per diem and fuel is to be included in hourly labor rates. | ||||||
| Any Material Costs must provide reciepts. 10% Markup on materials. | ||||||
| Schedule I - Labor | ||||||
| Line Item | Description | Unit of Measure | Estimated Quantity | Rate ($) | TOTAL | |
| J.1 | Operations Manager | Hour | $ - 0 | |||
| J.2 | Project Manager | Hour | $ - 0 | |||
| J.3 | Superintendent | Hour | $ - 0 | |||
| J.4 | Foreman | Hour | $ - 0 | |||
| J.5 | Supervisor | Hour | $ - 0 | |||
| J.6 | Crew Foreman | Hour | $ - 0 | |||
| J.7 | Project Engineer | Hour | $ - 0 | |||
| J.8 | Equipment Operator | Hour | $ - 0 | |||
| J.9 | Truck Driver | Hour | $ - 0 | |||
| J.10 | Mechanic | Hour | $ - 0 | |||
| J.11 | Electrician | Hour | $ - 0 | |||
| J.12 | Tree Climber/Chainsaw and Gear | Hour | $ - 0 | |||
| J.13 | Laborer w/gear (i.e. Chain Saw) | Hour | $ - 0 | |||
| J.14 | Laborer w/Small Tools, Traffic Control, or Flag Person | Hour | $ - 0 | |||
| J.15 | Bonded and Certified Security Personnel | Hour | $ - 0 | |||
| J.16 | Administrative Assistant | Hour | $ - 0 | |||
| J.17 | Clerical | Hour | $ - 0 | |||
| J.18 | Other – Please List | Hour | $ - 0 | |||
| Schedule J - Equipment | ||||||
| Line Item | Description | Size/Type | Unit of Measure | Estimated Quantity | Rate ($) | TOTAL |
| Transportation Vehicles | ||||||
| K.1 | Pickup Truck | 1/2 Ton | Day | $ - 0 | ||
| K.2 | Pickup Truck | 3/4 Ton | Day | $ - 0 | ||
| K.3 | Pickup Truck | 1 Ton (4x4) | Day | $ - 0 | ||
| K.4 | Flatbed Trailer | 40' | Day | $ - 0 | ||
| K.5 | Service Truck Hour | Day | $ - 0 | |||
| K.6 | Lowboy Trailer | 12 - 50 Ton | Day | $ - 0 | ||
| K.7 | Lowboy Trailer | > 50 Ton | Day | $ - 0 | ||
| K.8 | All Terrain Vehicle | Day | $ - 0 | |||
| K.9 | Swamp Buggy | Day | $ - 0 | |||
| Skidsteers and Bobcats | ||||||
| K.10 | Skidsteer/Bobcat equivalent w/grapple | 1000 lb capacity | Hour | $ - 0 | ||
| K.11 | Skidsteer/Bobcat equivalent w/attachment (bucket, grapple, or sweeper) | 1000 lb capacity | Hour | $ - 0 | ||
| K.12 | Skidsteer/Bobcat equivalent w/grapple | 2000 lb capacity | Hour | $ - 0 | ||
| K.13 | Skidsteer/Bobcat equivalent w/attachment (bucket, grapple, or sweeper) | 2000 lb capacity | Hour | $ - 0 | ||
| Heavy Equipment | ||||||
| K.14 | Brush, Cutter | At least 7' cut width | Hour | $ - 0 | ||
| K.15 | Bucket Truck | Up to 50' reach | Hour | $ - 0 | ||
| K.16 | Bucket Truck | >50' reach | Hour | $ - 0 | ||
| K.17 | Bush Hog | Hour | $ - 0 | |||
| K.18 | Chainsaw | Hour | $ - 0 | |||
| K.19 | Crane | 0 - 15 Ton | Hour | $ - 0 | ||
| K.20 | Crane | 16 - 30 Ton | Hour | $ - 0 | ||
| K.21 | Crane | 30 - 50 Ton | Hour | $ - 0 | ||
| K.22 | Crane | > 50 Ton | Hour | $ - 0 | ||
| K.23 | Dozer, Tracked | D4 or equivalent | Hour | $ - 0 | ||
| K.24 | Dozer, Tracked | D5 or equivalent | Hour | $ - 0 | ||
| K.25 | Dozer, Tracked | D6 or equivalent | Hour | $ - 0 | ||
| K.26 | Dozer, Tracked | D8 or equivalent | Hour | $ - 0 | ||
| K.27 | Dozer, Tracked | D10 or equivalent | Hour | $ - 0 | ||
| K.28 | Excavator, tracked | 2.5 cy capacity | Hour | $ - 0 | ||
| K.29 | Excavator, tracked | > 2.5 cy capacity | Hour | $ - 0 | ||
| K.30 | Excavator, rubber tire w/grapple | 2.5 cy capacity | Hour | $ - 0 | ||
| K.31 | Excavator, rubber tire w/grapple | > 2.5 cy capacity | Hour | $ - 0 | ||
| K.32 | Forklift | up to 18,000 pounds | Hour | $ - 0 | ||
| K.33 | Forklift | < 18,000 pounds | Hour | $ - 0 | ||
| K.34 | Forklift accessory | Hour | $ - 0 | |||
| K.35 | Grader | CAT125 or equivalent | Hour | $ - 0 | ||
| K.36 | Loader, Articulated, w/bucket | 2 - 2 1/2 cy capacity | Hour | $ - 0 | ||
| K.37 | Loader, Articulated, w/bucket | > 2 1/2 cy capacity | Hour | $ - 0 | ||
| K.38 | Loader, Wheeled | 1 - 5 CY capacity | Hour | $ - 0 | ||
| K.39 | Loader, Wheeled | > 5 cy capacity | Hour | $ - 0 | ||
| K.40 | Loader, w/backhoe attachment | 1-3 cy capacity | Hour | $ - 0 | ||
| K.41 | Loader, tracked knuckleboom | 1 - 25 cy capacity | Hour | $ - 0 | ||
| K.42 | Loader, tracked knuckleboom | > 25 cy capacity | Hour | $ - 0 | ||
| K.43 | Loader, tracked knuckleboom and grapple | 1 - 25 cy capacity | Hour | $ - 0 | ||
| K.44 | Loader, tracked knuckleboom and grapple | > 25 cy capacity | Hour | $ - 0 | ||
| K.45 | Log Skidder | Cat 525B or equivalent | Hour | $ - 0 | ||
| K.46 | Street Sweeper/Mechanical Broom | Beach Sand Rake 600HD | Hour | $ - 0 | ||
| K.47 | Rake | Hour | $ - 0 | |||
| K.48 | Sandbag Machine | Hour | $ - 0 | |||
| K.49 | Tow Truck | Hour | $ - 0 | |||
| K.50 | Trackhoe w/bucket | 1-5 cy | Hour | $ - 0 | ||
| K.51 | Trackhoe w/grapple | 1-5 cy | Hour | $ - 0 | ||
| K.52 | Trackhoe w/rubber tires, w/bucket | 1-5 cy | Hour | $ - 0 | ||
| K.53 | Trackhoe w/rubber tires, w/grapple | 1-5 cy | Hour | $ - 0 | ||
| K.54 | Water Truck (Non-Potable, Dust Control and Pavement Maintenance) | 3500 gallons | Hour | $ - 0 | ||
| K.55 | Waste Collection Rear Loader Truck | Hour | $ - 0 | |||
| Jet Vacs and Water Trucks | ||||||
| K.56 | Sewer Camera Inspection Truck | Hour | $ - 0 | |||
| K.57 | Combined Sewer Cleaning | <500 gallons | Hour | $ - 0 | ||
| K.58 | Combined Sewer Cleaning | < 500 gallons | Hour | $ - 0 | ||
| K.59 | Cleaner, Sewer/Catch Basin | Hour | $ - 0 | |||
| K.60 | Truck, Hydro Vac | 500-gal debris tank; | Hour | $ - 0 | ||
| K.61 | Truck, Vacuum | Hour | $ - 0 | |||
| K.62 | Vac Truck/Jetter | 3500 gallons | Hour | $ - 0 | ||
| K.63 | Pumper Truck | min 3500 gallons | Hour | $ - 0 | ||
| K.64 | Leaf Vac | Hour | $ - 0 | |||
| Grinders/Chippers | ||||||
| K.65 | Tub Grinder | up to 1300 HP | Hour | $ - 0 | ||
| K.66 | Tub Grinder | > 1300 HP | Hour | $ - 0 | ||
| K.67 | Stump Grinder | up to 30" diameter | Hour | $ - 0 | ||
| K.68 | Stump Grinder | > 30" diameter | Hour | $ - 0 | ||
| K.69 | Chipper/Mulcher | Hour | $ - 0 | |||
| K.70 | Mulcher, Trailer Mounted | Hour | $ - 0 | |||
| K.71 | Air Curtain | Hour | $ - 0 | |||
| Hauling Vehicles | ||||||
| K.72 | Dump Truck | 5 - 15 CY | Hour | $ - 0 | ||
| K.73 | Dump Truck | 16 - 25 CY | Hour | $ - 0 | ||
| K.74 | Dump Truck | 26 - 35 CY | Hour | $ - 0 | ||
| K.75 | Dump Truck | > 35 CY | Hour | $ - 0 | ||
| K.76 | DumpTrailer | 5 - 15 CY | Hour | $ - 0 | ||
| K.77 | DumpTrailer | 16 - 25 CY | Hour | $ - 0 | ||
| K.78 | DumpTrailer | 26 - 35 CY | Hour | $ - 0 | ||
| K.79 | DumpTrailer | > 35 CY | Hour | $ - 0 | ||
| K.80 | Claw Truck | < or = 20 CY | CY | $ - 0 | ||
| K.81 | Claw Truck | > 20 CY up to < 50 CY | CY | $ - 0 | ||
| K.82 | Walking Floor Trailer w/ Tractor | 100 CY | Hour | $ - 0 | ||
| Marine Resources | ||||||
| K.83 | Barge w/ Mounted Excavator & Push boat, 40' | Day | $ - 0 | |||
| K.84 | Barge with Winch | Day | $ - 0 | |||
| K.85 | Baot, Debris Removal Skiff | 48' | Day | $ - 0 | ||
| K.86 | Utility boat, motorized | < 12' | Day | $ - 0 | ||
| K.87 | Utility boat, motorized | >12' | Day | $ - 0 | ||
| K.88 | Utility boat, nonmotorized | < 12' | Day | $ - 0 | ||
| K.89 | Utility boat, nonmotorized | >12' | Day | $ - 0 | ||
| Hoses (Per 25 foot length Includes couplings) | ||||||
| K.90 | Hose, discharge | any inch | Hour | $ - 0 | ||
| K.91 | Hose, suction | any inch | Hour | $ - 0 | ||
| Air Compressors (hoses included) | ||||||
| K.92 | Air Compressor | 0-150 hp | Hour | $ - 0 | ||
| K.93 | Air Compressor | > 150 hp | Hour | $ - 0 | ||
| Miscallaneous | ||||||
| K.94 | Light Tower (Portable light plant w/ Generator) | < 2000 Watt Range | Day | $ - 0 | ||
| K.95 | Light Tower (Portable light plant w/ Generator) | > 2000 Watt Range | Day | $ - 0 | ||
| K.96 | Message Board | Day | $ - 0 | |||
| Labor and Equipment - TOTAL COST | $ - 0 | |||||
| Other - Please list |
Gen_pump_fuel
| GENERATORS, PUMPS, FUEL | ||||||
| Generators | ||||||
| Generators shall be delivered with a full tank of fuel (no propane generators). | ||||||
| Price includes all necessary cords and cables for connection. | ||||||
| County is responsible for refueling generators, unless County directs Contractor to refuel | ||||||
| County is responsible for care of generators until the generator is picked up by Contractor. | ||||||
| Contractor shall provide liability release once the generator is inspected. | ||||||
| County shall return generators with a full tank of fuel or will be required to pay a per gallon rate. | ||||||
| Transportation/Freight fees for rental generators is not included and will be quoted for mobilization and demobilization at time of event. | ||||||
| Total Cost listed below is for bid evaluation purposes only. | ||||||
| Schedule K - Generators, Pump, Fuel | ||||||
| Line Item | Description | Size/Type | Unit of Measure | Estimated Quantity | Rate ($) | TOTAL |
| L.1 | Generator | < 100 KW | Weekly | $ - 0 | ||
| L.2 | Generator | 100 - 250 KW | Weekly | $ - 0 | ||
| L.3 | Generator | 251 - 500 KW | Weekly | $ - 0 | ||
| L.4 | Generator | 501 - 800 KW | Weekly | $ - 0 | ||
| L.5 | Generator | 801 - 1000 KW | Weekly | $ - 0 | ||
| L.6 | Generator | 1001 - 1500 KW | Weekly | $ - 0 | ||
| L.7 | Generator | > 1500 KW | Weekly | $ - 0 | ||
| L.8 | Fuel tanker for refilling generators (rented and owned). Rate includes truck , drivers, lodging, per diem. Rate does not include cost of fuel | Weekly | $ - 0 | |||
| Pumps | ||||||
| Rate shall include fuel and support personnel | ||||||
| Rates includes installation, service, routine maintenance, suction and discharge hoses. | ||||||
| L.9 | Trash Pump | 2" | Day | $ - 0 | ||
| L.10 | Trash Pump | 4" | Day | $ - 0 | ||
| L.11 | Trash Pump | 6" | Day | $ - 0 | ||
| L.12 | Hydraulic Pump with Power | 6" | Day | $ - 0 | ||
| L.13 | Hydraulic Pump with Power | 8" | Day | $ - 0 | ||
| L.14 | Hydraulic Pump with Power | 10" | Day | $ - 0 | ||
| L.15 | Centrifugal Pump | 12" | Day | $ - 0 | ||
| L.16 | Centrifugal Pump | 18" | Day | $ - 0 | ||
| L.17 | Pump | 40 - 140 hp | Day | $ - 0 | ||
| L.18 | Pump | 141 - 350 hp | Day | $ - 0 | ||
| L.19 | Pump | > 350 hp | Day | $ - 0 | ||
| L.20 | Pump Watch Services (person to watch pump) | Day | $ - 0 | |||
| Fuel | ||||||
| Rates do not include cost of fuel. Costs of fuel to be negotiated at time of service request | ||||||
| L.20 | Portable Storage Tank | 550 gallon | Day | $ - 0 | ||
| L.21 | Portable Storage Tank | 1,000 gallon | Day | $ - 0 | ||
| L.22 | Portable Storage Tank | 6,000 gallon or greater tank | Day | $ - 0 | ||
| L.23 | Fuel Pump 13 GPM, includes nozzle | 12 Volt Fill-Rite Pump | Day | $ - 0 | ||
| L.24 | Portable Tank Delivery/Pickup | Per Service | $ - 0 | |||
| L.25 | Cleanout of portable tank (if required) | Portable Tank Cleanout Fee | Per Service | $ - 0 | ||
| L.26 | Transport Truck w/trailer or Bobtail Truck | Truck with driver | Day | $ - 0 | ||
| L.27 | Mobile Fuel Station | 12,000 Gal capacity on trailer | Day | $ - 0 | ||
| L.28 | Frac Tank | 20,000 gallon | Day | $ - 0 | ||
| L.29 | Person to operate fuel station or fuel vehicles | Labor | Hour | $ - 0 | ||
| Generators, Pumps and Fuel - TOTAL COST | $ - 0 | |||||
| Other - Please list |