25-8412_Exhibit_B_-_Fee_Schedule.xlsx

XLSX spreadsheet 45 KB Posted

Attached to
Disaster Debris Removal and Disposal Services - Grant Funded
Solicitation number
25-8412
Issued by
Collier County, Florida

About this file

This is a comprehensive Fee Schedule (Exhibit B) for a Disaster Debris Removal and Disposal Services contract issued by Collier County, Florida, targeting multiple experienced Disaster Debris Contractors (DDCs) to assist with debris management during disasters or emergency events. The document outlines detailed pricing schedules across four primary service areas: Land Debris Removal, Waterway Debris Removal, Labor and Equipment, and Generators/Pumps/Fuel, with extensive line-item pricing for various debris removal, transportation, processing, and specialty removal services.

The fee schedule includes estimated quantities for services such as vegetative and construction debris removal, hazardous materials disposal, white goods removal, tree and stump extraction, and specialized removal of items like concrete, vehicles, and vessels. Pricing is inclusive of labor, equipment, fuel, supplies, overhead, and incidental costs, with final disposal costs to be passed through to the county without markup. The document emphasizes that estimated quantities are for bid evaluation purposes only and may not reflect actual usage, and it places the responsibility on contractors to verify all pricing and calculations. The pricing structure allows for flexible emergency response, DMS (Debris Management Site) preparation, and miscellaneous services with competitive rates following FEMA guidelines.

View the file

Other files

File Type Posted
Grant_Funded_-_Request_for_Proposals_(RFP)_Instructions_2025_Rev.2.pdf PDF
Grant_Funded_-_Request_for_Proposals_(RFP)_Instructions_2025_Rev.2.pdf PDF
25-8412_Solicitation_Rev_2.pdf PDF
15-6365Ashbritt_Contract.pdf PDF
25-8412_Attachment_C_-_2025_DMS_FDEP_approval.pdf PDF
Multi-Contractor_Award_Agreement_[2025_ver.2].pdf PDF
25-8412_Exhibit_B_-_Fee_Schedule_Rev_1.xlsx XLSX spreadsheet
15-6365Ceres_Contract.pdf PDF
PO_Terms_and_Conditions_Rev.3.pdf PDF
PO_Terms_and_Conditions_Rev.3.pdf PDF
Multi-Contractor_Award_Agreement_[2025_ver.2].pdf PDF
15-6365CrowderGulf_Contract.pdf PDF
25-8412_Insurance_Requirements.pdf PDF
25-8412_Insurance_Requirements.pdf PDF
25-8412_FPP.pdf PDF
25-8412_Required_Forms_Grant_Funded_Revised_2025.docx DOCX document
25-8412_FPP.pdf PDF
25-8412_Required_Forms_Grant_Funded_Revised_2025.docx DOCX document
PO_Terms_and_Conditions_Rev.3.pdf PDF
Multi-Contractor_Award_Agreement_[2025_ver.2].pdf PDF
25-8412_Insurance_Requirements.pdf PDF
25-8412_FPP.pdf PDF
25-8412_Required_Forms_Grant_Funded_Revised_2025.docx DOCX document
25-8412_Exhibit_A_-_Collier_County_DDMP_2024.pdf PDF
25-8412_Attachment_B_-_PDAT_Compliance_Review_CollierCounty_043025.pdf PDF
25-8412_Attachment_A_-_Debris_Site_Buffers_Update_20250429_v01.pdf PDF
Grant_Funded_-_Request_for_Proposals_(RFP)_Instructions_2025_Rev.2.pdf PDF
25-8412_Solicitation_.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Land

LAND DEBRIS REMOVAL
Pricing shall be inclusive of all labor, equipment, fuel, supplies, overhead, profit, material, and any other incidental costs required to perform and complete all work as specified in the Contract Documents. Final disposal costs, such as tipping fees, shall be passed through to the County without mark-up on the monthly invoices.
Line Items are inclusive of debris removal from ROW, Public Road, Commercial, Private Property, Roads, and Gated Community Debris.
The Estimated Quantities and Total Cost listed below are for bid evaluation purposes only and may not reflect actual usage.
The Excel document contains formulas for convenience, however it is the Contractor’s/Vendor's responsibility to verify all pricing and calculations are CORRECT. Collier County is not responsible for errors in formulas or calculations contained within Excel document(s).
In the event there is a discrepancy between a subtotal or total amount and the unit prices and extended amounts, the unit prices will prevail and the corrected extension(s) and total(s) will be considered the price. The County will only accept proposals submitted on the forms provided by the County. Proposals submitted on other forms, other than those provided by the County, will be deemed non-responsive and ineligible for award. Proposers may not adjust or modify data provided within the Price Proposal Form. Proposals received with modified data may deem the Proposer as non-responsive and ineligible for award.
Schedule A - General Debris Removal Operations
Line ItemDescriptionUnit of MeasureEstimated QuantityRate ($)TOTAL
A.1Vegetative debris to Debris Management Site (DMS)CY350,000$ - 0
A.2Construction and Demolition (C&D)/mixed debris to Debris Management Site (DMS)CY600,000$ - 0
A.3Removal and disposal/recycling of white goods/appliancesEach2,800$ - 0
A.4Removal of freonEach1,680$ - 0
A.5Removal and disposal of hazardous materialslb38,000$ - 0
A.6Removal and disposal/recycling of electonicsEach100$ - 0
A.7Removal and disposal of dead animal carcasseslb10$ - 0
A.8Removal and disposal/recycling of tiresEach15$ - 0
Direct Hauling and Transportation to Final Disposal Site (FDS)
A.9Direct Haul of Unprocessed Vegetative debris from point of collection to Final Disposal Site (FDS)CY200$ - 0
A.10Direct Haul of Unprocessed Construction and Demolition (C&D)/mixed debris from point of collection to Final Disposal Site (FDS)CY200$ - 0
A.11Direct haul of sand, soil, debris from point of collection to Final Disposal Site (FDS)CY10,000$ - 0
Schedule B - Hazardous Trees, Limbs, Stumps
Line ItemDescriptionTrunk DiameterUnit of MeasureEstimated QuantityRate ($)TOTAL
Hazardous Limb(s) Removalmeasured 2' above ground
B.1Branches that pose an immediate threat (i.e. hanging over public use areas, or improved property). Work consists of removing eligible hazardous limbs to be collected for processing.Accessable w/o mechanical equipmentPer Tree200$ - 0
B.2Accessable only by mechanical equipmentPer Tree200$ - 0
Hazardous Tree Removal w/ <50% of rootball exposedmeasured 2' above ground
B.3(e.g., tree snapped in half).Physical damage to root system, trunk, stem, or limbs; or direction and lean is a safety risk. Work consists of removing eligible hazardous trees. Work consists of flush cut and disposal in accordance with FEMA guidance.< = 24Each200$ - 0
B.424.1-36Each200$ - 0
B.5>36.1Each200$ - 0
Hazardous Tree Removal w/ 50% or more of rootball exposedmeasured 2' above ground
B.6(e.g., uprooted tree). Physical damage to root system, trunk, stem, or limbs; or direction and lean is a safety risk. Work consists of removing eligible hazardous trees. Work consists of removal, grinding, and hole filling of rootball in accordance with FEMA guidance.< = 24Each150$ - 0
B.724.1-36Each150$ - 0
B.8>36.1Each150$ - 0
Stump Removalmeasured at ground level
B.9Stump Extraction, removal, hauling, and disposal< = 24Each50$ - 0
B.1024.1-36Each50$ - 0
B.11>36.1Each50$ - 0
B.12Grinding stump, backfilling, and grading stump holeEach50$ - 0
Schedule C - Specialty Removal
Line ItemDescriptionUnit of MeasureEstimated QuantityRate ($)TOTAL
C.1Removal and disposal/recycling of concreteCY13,000$ - 0
C.2Removal and disposal of asbestoslb200$ - 0
C.3Removal and disposal of VehicleEach2$ - 0
C.4Removal and disposal of Vessels< = 30'Each2$ - 0
C.5Removal and disposal of Vessels> 30'Each2$ - 0
C.6Removal of wooden light or utility polesEach2$ - 0
Schedule D - DMS Site Operation and Haulout
Line ItemDescriptionUnit of MeasureEstimated QuantityRate ($)TOTAL
D.1DMS ManagementCY1,000,000$ - 0
D.2C&D Processing- CompactionCY40,000$ - 0
D.3Vegetation Processing - GrindingCY15,000$ - 0
D.4Vegetation Processing - Air Curtain Incineration (ACI)CY15,000$ - 0
D.5Vegetation Processing - Open BurnCY15,000$ - 0
D.6Processed Vegetative debris from DMS to Final Disposal Site (FDS)CY/Mile40,000$ - 0
D.7Processed Construction and Demolition (C&D) debris from DMS to Final Disposal Site (FDS)CY/Mile200,000$ - 0
Land Debris Removal - TOTAL COST$ - 0
END LAND

WaterWay

WATERWAY DEBRIS REMOVAL
Pricing shall be inclusive of all labor, equipment, fuel, supplies, overhead, profit, material, and any other incidental costs required to perform and complete all work as specified in the Contract Documents. Final disposal costs, such as tipping fees, shall be passed through to the County without mark-up on the monthly invoices.
Line Items are inclusive of debris removed from storm conveyances, waterways, and beaches from ROW, Public Road, Commercial, Private Property, Roads, and Gated Community Debris.
The Estimated Quantities and Total Cost listed below are for bid evaluation purposes only and may not reflect actual usage.
The Excel document contains formulas for convenience, however it is the Contractor’s/Vendor's responsibility to verify all pricing and calculations are CORRECT. Collier County is not responsible for errors in formulas or calculations contained within Excel document(s).
In the event there is a discrepancy between a subtotal or total amount and the unit prices and extended amounts, the unit prices will prevail and the corrected extension(s) and total(s) will be considered the price. The County will only accept proposals submitted on the forms provided by the County. Proposals submitted on other forms, other than those provided by the County, will be deemed non-responsive and ineligible for award. Proposers may not adjust or modify data provided within th ePrice Proposal Form. Proposals received with modified data may deem the Proposer as non-responsive and ineligible for award.
Schedule E - General Debris Removal Operations
Line ItemDescriptionUnit of MeasureEstimated QuantityRate ($)TOTAL
E.1Vegetative debris to Debris Management Site (DMS)CY200,000$ - 0
E.2Construction and Demolition (C&D)/mixed debris to Debris Management Site (DMS)CY150,000$ - 0
E.3Removal and disposal/recycling of white goods/appliancesEach200$ - 0
E.4Removal of freonEach5$ - 0
E.5Removal and disposal of hazardous materialslb10,000$ - 0
E.6Removal and disposal/recycling of electonicsEach100$ - 0
E.7Removal and disposal of dead animal carcasseslb10$ - 0
E.8Removal and disposal/recycling of tiresEach15$ - 0
Direct Hauling and Transportation to Final Disposal Site (FDS)
E.9Direct Haul of Unprocessed Vegetative debris from point of collection to Final Disposal Site (FDS)CY200$ - 0
E.10Direct Haul of Unprocessed Construction and Demolition (C&D)/mixed debris from point of collection to Final Disposal Site (FDS)CY200$ - 0
E.11Direct haul of sand, soil, debris from point of collection to Final Disposal Site (FDS)CY10,000$ - 0
Schedule F - Hazardous Trees, Limbs, Stumps
Line ItemDescriptionTrunk DiameterUnit of MeasureEstimated QuantityRate ($)TOTAL
Hazardous Limb(s) Removalmeasured 2' above ground
F.1Branches that pose an immediate threat (i.e. hanging over public use areas, or improved property). Work consists of removing eligible hazardous limbs to be collected for processing.Accessable w/o mechanical equipmentPer Tree5$ - 0
F.2Accessable only by mechanical equipmentPer Tree5$ - 0
Hazardous Tree Removal w/ <50% of rootball exposedmeasured 2' above ground
F.3(e.g., tree snapped in half).Physical damage to root system, trunk, stem, or limbs; or direction and lean is a safety risk. Work consists of removing eligible hazardous trees. Work consists of flush cut and disposal in accordance with FEMA guidance.< = 24Each5$ - 0
F.424.1-36Each5$ - 0
F.5>36.1Each5$ - 0
Hazardous Tree Removal w/ 50% or more of rootball exposedmeasured 2' above ground
F.6(e.g., uprooted tree). Physical damage to root system, trunk, stem, or limbs; or direction and lean is a safety risk. Work consists of removing eligible hazardous trees. Work consists of removal, grinding, and hole filling of rootball in accordance with FEMA guidance.< = 24Each1$ - 0
F.724.1-36Each1$ - 0
F.8>36.1Each1$ - 0
Stump Removalmeasured at ground level
F.9Stump Extraction, removal, hauling, and disposal< = 24Each5$ - 0
F.1024.1-36Each5$ - 0
F.11>36.1Each5$ - 0
F.12Grinding stump, backfilling, and grading stump holeEach5$ - 0
Schedule G - Specialty Removal
Line ItemDescriptionUnit of MeasureEstimated QuantityRate ($)TOTAL
G.1Removal and disposal/recycling of concreteCY100$ - 0
G.2Removal and disposal of asbestoslb10$ - 0
G.3Removal and disposal of VehicleEach20$ - 0
G.4Removal and disposal of Vessels< = 30'Each20$ - 0
G.5Removal and disposal of Vessels> 30'Each25$ - 0
G.6Removal of wooden light or utility polesEach2$ - 0
Schedule H - Stormwater Conveyances, Waterways, and Beaches
Line ItemDescriptionUnit of MeasureEstimated QuantityRate ($)TOTAL
Stormwater Conveyances, Waterways, and Beaches
H.1Pipe systems, ditches, swales, canals (clear and removal of debris, and transport for disposal)Linear Foot500$ - 0
H.2Catch basins and storm inlets/outlets, culverts (clear and removal of debris, and transport for disposal)Each20$ - 0
H.3Stormwater ponds, creeks, mangroves, and bridges (clear and removal of debris)CY20$ - 0
H.4Beach Rake and ScreeningACRE25$ - 0
H.5Soil and/or Sand Debris Screening (includes collection, screening, and final disposal of material)CY5,000$ - 0
H.6Restoration - Berm/Beach ConstructionCY5,000$ - 0
H.7Canal Shoreline RestorationLinear Foot1,000$ - 0
Waterway Disposal Removal - TOTAL COST$ - 0
END WATERWAY

Labor_Equipment

LABOR AND EQUIPMENT
This schedule shall be utilized for Emergency Work, DMS Preparation, and other miscellaneous services as applicable.
Unit prices shall include all expenses for labor, fuel, insurance and all other incidental fees. Mobilize, operate and demobilize the equipment, transportation fees, equipment fees, maintenance and repair, and labors to be equipped with communication devices (i.e. cell phone) and travel equipment (i.e. vehicle)
Total Cost listed below is for bid evaluation purposes only.
Equipment rates shall include an operator, maintenance, and fuel, unless otherwise noted, be competitive and follow FEMA guidelines.
All labor related line items are to be fully burdened to include all taxes, benefits, handling charges, over head and profits; per diem and fuel is to be included in hourly labor rates.
Any Material Costs must provide reciepts. 10% Markup on materials.
Schedule I - Labor
Line ItemDescriptionUnit of MeasureEstimated QuantityRate ($)TOTAL
J.1Operations ManagerHour$ - 0
J.2Project ManagerHour$ - 0
J.3SuperintendentHour$ - 0
J.4ForemanHour$ - 0
J.5SupervisorHour$ - 0
J.6Crew ForemanHour$ - 0
J.7Project EngineerHour$ - 0
J.8Equipment OperatorHour$ - 0
J.9Truck DriverHour$ - 0
J.10MechanicHour$ - 0
J.11ElectricianHour$ - 0
J.12Tree Climber/Chainsaw and GearHour$ - 0
J.13Laborer w/gear (i.e. Chain Saw)Hour$ - 0
J.14Laborer w/Small Tools, Traffic Control, or Flag PersonHour$ - 0
J.15Bonded and Certified Security PersonnelHour$ - 0
J.16Administrative AssistantHour$ - 0
J.17ClericalHour$ - 0
J.18Other – Please ListHour$ - 0
Schedule J - Equipment
Line ItemDescriptionSize/TypeUnit of MeasureEstimated QuantityRate ($)TOTAL
Transportation Vehicles
K.1Pickup Truck1/2 TonDay$ - 0
K.2Pickup Truck3/4 TonDay$ - 0
K.3Pickup Truck1 Ton (4x4)Day$ - 0
K.4Flatbed Trailer40'Day$ - 0
K.5Service Truck HourDay$ - 0
K.6Lowboy Trailer12 - 50 TonDay$ - 0
K.7Lowboy Trailer> 50 TonDay$ - 0
K.8All Terrain VehicleDay$ - 0
K.9Swamp BuggyDay$ - 0
Skidsteers and Bobcats
K.10Skidsteer/Bobcat equivalent w/grapple1000 lb capacityHour$ - 0
K.11Skidsteer/Bobcat equivalent w/attachment (bucket, grapple, or sweeper)1000 lb capacityHour$ - 0
K.12Skidsteer/Bobcat equivalent w/grapple2000 lb capacityHour$ - 0
K.13Skidsteer/Bobcat equivalent w/attachment (bucket, grapple, or sweeper)2000 lb capacityHour$ - 0
Heavy Equipment
K.14Brush, CutterAt least 7' cut widthHour$ - 0
K.15Bucket TruckUp to 50' reachHour$ - 0
K.16Bucket Truck>50' reachHour$ - 0
K.17Bush HogHour$ - 0
K.18ChainsawHour$ - 0
K.19Crane0 - 15 TonHour$ - 0
K.20Crane16 - 30 TonHour$ - 0
K.21Crane30 - 50 TonHour$ - 0
K.22Crane> 50 TonHour$ - 0
K.23Dozer, TrackedD4 or equivalentHour$ - 0
K.24Dozer, TrackedD5 or equivalentHour$ - 0
K.25Dozer, TrackedD6 or equivalentHour$ - 0
K.26Dozer, TrackedD8 or equivalentHour$ - 0
K.27Dozer, TrackedD10 or equivalentHour$ - 0
K.28Excavator, tracked2.5 cy capacityHour$ - 0
K.29Excavator, tracked> 2.5 cy capacityHour$ - 0
K.30Excavator, rubber tire w/grapple2.5 cy capacityHour$ - 0
K.31Excavator, rubber tire w/grapple> 2.5 cy capacityHour$ - 0
K.32Forkliftup to 18,000 poundsHour$ - 0
K.33Forklift< 18,000 poundsHour$ - 0
K.34Forklift accessoryHour$ - 0
K.35GraderCAT125 or equivalentHour$ - 0
K.36Loader, Articulated, w/bucket2 - 2 1/2 cy capacityHour$ - 0
K.37Loader, Articulated, w/bucket> 2 1/2 cy capacityHour$ - 0
K.38Loader, Wheeled1 - 5 CY capacityHour$ - 0
K.39Loader, Wheeled> 5 cy capacityHour$ - 0
K.40Loader, w/backhoe attachment1-3 cy capacityHour$ - 0
K.41Loader, tracked knuckleboom1 - 25 cy capacityHour$ - 0
K.42Loader, tracked knuckleboom> 25 cy capacityHour$ - 0
K.43Loader, tracked knuckleboom and grapple1 - 25 cy capacityHour$ - 0
K.44Loader, tracked knuckleboom and grapple> 25 cy capacityHour$ - 0
K.45Log SkidderCat 525B or equivalentHour$ - 0
K.46Street Sweeper/Mechanical BroomBeach Sand Rake 600HDHour$ - 0
K.47RakeHour$ - 0
K.48Sandbag MachineHour$ - 0
K.49Tow TruckHour$ - 0
K.50Trackhoe w/bucket1-5 cyHour$ - 0
K.51Trackhoe w/grapple1-5 cyHour$ - 0
K.52Trackhoe w/rubber tires, w/bucket1-5 cyHour$ - 0
K.53Trackhoe w/rubber tires, w/grapple1-5 cyHour$ - 0
K.54Water Truck (Non-Potable, Dust Control and Pavement Maintenance)3500 gallonsHour$ - 0
K.55Waste Collection Rear Loader TruckHour$ - 0
Jet Vacs and Water Trucks
K.56Sewer Camera Inspection TruckHour$ - 0
K.57Combined Sewer Cleaning<500 gallonsHour$ - 0
K.58Combined Sewer Cleaning< 500 gallonsHour$ - 0
K.59Cleaner, Sewer/Catch BasinHour$ - 0
K.60Truck, Hydro Vac500-gal debris tank;Hour$ - 0
K.61Truck, VacuumHour$ - 0
K.62Vac Truck/Jetter3500 gallonsHour$ - 0
K.63Pumper Truckmin 3500 gallonsHour$ - 0
K.64Leaf VacHour$ - 0
Grinders/Chippers
K.65Tub Grinderup to 1300 HPHour$ - 0
K.66Tub Grinder> 1300 HPHour$ - 0
K.67Stump Grinderup to 30" diameterHour$ - 0
K.68Stump Grinder> 30" diameterHour$ - 0
K.69Chipper/MulcherHour$ - 0
K.70Mulcher, Trailer MountedHour$ - 0
K.71Air CurtainHour$ - 0
Hauling Vehicles
K.72Dump Truck5 - 15 CYHour$ - 0
K.73Dump Truck16 - 25 CYHour$ - 0
K.74Dump Truck26 - 35 CYHour$ - 0
K.75Dump Truck> 35 CYHour$ - 0
K.76DumpTrailer5 - 15 CYHour$ - 0
K.77DumpTrailer16 - 25 CYHour$ - 0
K.78DumpTrailer26 - 35 CYHour$ - 0
K.79DumpTrailer> 35 CYHour$ - 0
K.80Claw Truck< or = 20 CYCY$ - 0
K.81Claw Truck> 20 CY up to < 50 CYCY$ - 0
K.82Walking Floor Trailer w/ Tractor100 CYHour$ - 0
Marine Resources
K.83Barge w/ Mounted Excavator & Push boat, 40'Day$ - 0
K.84Barge with WinchDay$ - 0
K.85Baot, Debris Removal Skiff48'Day$ - 0
K.86Utility boat, motorized< 12'Day$ - 0
K.87Utility boat, motorized>12'Day$ - 0
K.88Utility boat, nonmotorized< 12'Day$ - 0
K.89Utility boat, nonmotorized>12'Day$ - 0
Hoses (Per 25 foot length Includes couplings)
K.90Hose, dischargeany inchHour$ - 0
K.91Hose, suctionany inchHour$ - 0
Air Compressors (hoses included)
K.92Air Compressor0-150 hpHour$ - 0
K.93Air Compressor> 150 hpHour$ - 0
Miscallaneous
K.94Light Tower (Portable light plant w/ Generator)< 2000 Watt RangeDay$ - 0
K.95Light Tower (Portable light plant w/ Generator)> 2000 Watt RangeDay$ - 0
K.96Message BoardDay$ - 0
Labor and Equipment - TOTAL COST$ - 0
Other - Please list

Gen_pump_fuel

GENERATORS, PUMPS, FUEL
Generators
Generators shall be delivered with a full tank of fuel (no propane generators).
Price includes all necessary cords and cables for connection.
County is responsible for refueling generators, unless County directs Contractor to refuel
County is responsible for care of generators until the generator is picked up by Contractor.
Contractor shall provide liability release once the generator is inspected.
County shall return generators with a full tank of fuel or will be required to pay a per gallon rate.
Transportation/Freight fees for rental generators is not included and will be quoted for mobilization and demobilization at time of event.
Total Cost listed below is for bid evaluation purposes only.
Schedule K - Generators, Pump, Fuel
Line ItemDescriptionSize/TypeUnit of MeasureEstimated QuantityRate ($)TOTAL
L.1Generator< 100 KWWeekly$ - 0
L.2Generator100 - 250 KWWeekly$ - 0
L.3Generator251 - 500 KWWeekly$ - 0
L.4Generator501 - 800 KWWeekly$ - 0
L.5Generator801 - 1000 KWWeekly$ - 0
L.6Generator1001 - 1500 KWWeekly$ - 0
L.7Generator> 1500 KWWeekly$ - 0
L.8Fuel tanker for refilling generators (rented and owned). Rate includes truck , drivers, lodging, per diem. Rate does not include cost of fuelWeekly$ - 0
Pumps
Rate shall include fuel and support personnel
Rates includes installation, service, routine maintenance, suction and discharge hoses.
L.9Trash Pump2"Day$ - 0
L.10Trash Pump4"Day$ - 0
L.11Trash Pump6"Day$ - 0
L.12Hydraulic Pump with Power6"Day$ - 0
L.13Hydraulic Pump with Power8"Day$ - 0
L.14Hydraulic Pump with Power10"Day$ - 0
L.15Centrifugal Pump12"Day$ - 0
L.16Centrifugal Pump18"Day$ - 0
L.17Pump40 - 140 hpDay$ - 0
L.18Pump141 - 350 hpDay$ - 0
L.19Pump> 350 hpDay$ - 0
L.20Pump Watch Services (person to watch pump)Day$ - 0
Fuel
Rates do not include cost of fuel. Costs of fuel to be negotiated at time of service request
L.20Portable Storage Tank550 gallonDay$ - 0
L.21Portable Storage Tank1,000 gallonDay$ - 0
L.22Portable Storage Tank6,000 gallon or greater tankDay$ - 0
L.23Fuel Pump 13 GPM, includes nozzle12 Volt Fill-Rite PumpDay$ - 0
L.24Portable Tank Delivery/PickupPer Service$ - 0
L.25Cleanout of portable tank (if required)Portable Tank Cleanout FeePer Service$ - 0
L.26Transport Truck w/trailer or Bobtail TruckTruck with driverDay$ - 0
L.27Mobile Fuel Station12,000 Gal capacity on trailerDay$ - 0
L.28Frac Tank20,000 gallonDay$ - 0
L.29Person to operate fuel station or fuel vehiclesLaborHour$ - 0
Generators, Pumps and Fuel - TOTAL COST$ - 0
Other - Please list

File details come from the government source that posted it. Updated .