The document is Exhibit C - Schedule of Charges for the South Washington Street Improvements Project (No. 25-810) by the City of Thornton, Colorado, detailing billable hourly rates and estimated costs across multiple project phases. The project involves engineering design services for constructing detached sidewalks along Washington Street between 85th Avenue and Eppinger Boulevard, with the scope divided into five distinct phases: Pre-Design/Design, Final Design, Bid, Construction, and Closeout/Warranty.

The schedule outlines a comprehensive pricing structure with estimated hours and costs for each project phase, allowing for flexible billing based on professional service categories. While specific dollar amounts are redacted in the document, the schedule provides a structured framework for tracking and billing professional engineering services throughout the project's lifecycle. The document appears to be part of a competitive bidding process, with detailed cost tracking mechanisms to ensure transparent and accountable project management for the municipal infrastructure improvement initiative.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT C

SCHEDULE OF CHARGES

SOUTH WASHINGTON STREET IMPROVEMENTS

PROJECT NO. 25-810

BILLABLE HOURLY RATES AND ESTIMATED TOTAL COST:

Category
Billable Hourly Rate

Estimated Total Hours

Estimated Total Cost

PRE-DESIGN / DESIGN PHASE

X

=
$

X

=
$

X

=
$

X

=
$

X

=
$

X

=
$
Pre-Design / Design Phase Subtotal
=
$

FINAL DESIGN PHASE

X

=
$

X

=
$

X

=
$

X

=
$

X

=
$

X

=
$
Final Design Phase Subtotal
=
$

BID PHASE

X

=
$

X

=
$

X

=
$

X

=
$

X

=
$

X

=
$
Bid Phase Subtotal
=
$

CONSTRUCTION PHASE

X

=
$

X

=
$

X

=
$

X

=
$
Category
Billable Hourly Rate

Estimated Total Hours

Estimated Total Cost

X

=
$

X

=
$
Construction Phase Subtotal
=
$

CLOSEOUT/WARRANTY PHASE

X

=
$

X

=
$

X

=
$

X

=
$

X

=
$

X

=
$
Closeout/Warranty Phase Subtotal
=
$
TOTAL PROPOSE COST
$

(Use additional page if necessary.)

S:\SS\C-P\2025\25-810 South Washington Street Improvements\1DD - Design Documents\Bid Docs\Final Docs Rev. 9/2022

File details come from the government source that posted it. Updated .