This Invitation for Bid (IFB) is issued by the California State Transportation Agency, Department of Motor Vehicles (DMV), Administrative Services Division, for the provision and installation of one fan coil unit at DMV Headquarters Building East located at 2415 First Avenue, Sacramento, California. The project requires contractors to provide all labor, tools, materials, equipment, and travel necessary to provide, replace, and start-up one ENVIRO-TEC HPE14 fan coil unit (55,449 BTU Total Cooling) with front and rear grilles, accessories, and factory piping package in the electrical room on the fourth floor. The unit must include a two-way pressure-independent control valve with modulating actuator, isolation ball valves, manual air vent, and Y-strainer with blowdown. Work shall be performed during regular DMV business hours (Monday through Friday, 8:00 a.m. to 5:00 p.m.) and completed within 120 calendar days from the specified start date. A mandatory pre-bid conference is scheduled for March 17, 2026, at 10:00 a.m. at DMV Headquarters. Written questions must be submitted by March 24, 2026, at 11:00 a.m., with responses released by March 30, 2026, at 4:30 p.m. Bids are due by email by April 6, 2026, at 11:59 p.m., with bid opening on April 7, 2026, at 1:00 p.m. The proposed contract start date is May 1, 2026, or upon contract approval. The contract term is 120 calendar days within a 14-month period, with a minimum 12-month labor and material warranty from DMV acceptance.
Bidders must possess a valid C-20 contractor license from the California Department of Consumer Affairs, Contractors State License Board and must not be targets of Economic Sanctions as defined in Executive Order N-6-22. Prevailing wage requirements apply if the bid exceeds $1,000, and public works contractor registration with the California Department of Industrial Relations is required if the bid exceeds $25,000. A payment bond equal to 100 percent of the total contract amount is required for bids exceeding $25,000. Commercial General Liability insurance with limits of not less than $1,000,000 per occurrence and Workers' Compensation insurance with employer liability limits of not less than $1,000,000 are mandatory. A 3 percent Disabled Veteran Business Enterprise (DVBE) participation requirement applies if the total bid is $10,000 or more, with bid incentives ranging from 3 to 5 percent based on DVBE participation levels. Small Business Enterprise and Non-Small Business preferences are available. All bids will be evaluated on a lowest responsive responsible bid basis, with award to be made following final inspection and quality verification. The DMV reserves the right to reject any or all bids and to request substantiation data to verify that proposed materials and equipment meet or exceed specified quality standards.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CALIFORNIA STATE TRANSPORTATION AGENCY GAVIN NEWSOM, Governor
DEPARTMENT OF MOTOR VEHICLES
ADMINISTRATIVE SERVICES DIVISION
P.O. BOX 932382
SACRAMENTO, CA 94232-3820
California Relay Telephone Service for the deaf or hard of hearing from TDD Phones: 1-800-735-2929; from Voice Phones: 1-800-735-2922
ADM 668 (REV. 1/2019) DMVWeb A Public Service Agency
25-346
INVITATION FOR BID
Notice to Prospective Bidders
March 3, 2025
You are invited to review and respond to this Invitation for Bid (IFB) entitled 25-346 – Provide and Install One
(1) Fan Coil Unit for DMV Headquarters Building East. This IFB is advertised in the California State Contracts Register through Cal eProcure at:
http://www.caleprocure.ca.gov or http://www.dgs.ca.gov
Please note that you must register with Cal eProcure in order to download IFB packages and any other provided documents from the Cal eProcure website.
Bidders are advised to check the Cal eProcure website for addendums, modifications, and updates to the bid documents. The Department of Motor Vehicles (DMV) is not responsible for failure of the prospective bidder to check for any bid document updates, changes, or answers to questions posted on Cal eProcure. Failure to periodically check the website will be at the bidder's sole risk.
In submitting your bid, you must comply with the instructions found herein. Your bid must be submitted via email (the DMV will not accept a mailed or hand-delivered bid).
Note that all agreements entered into with the State of California will include by reference General Terms and Conditions and Contractor Certification Clauses that may be viewed and downloaded at Internet site:
http://www.dgs.ca.gov
In the opinion of the DMV, this IFB package is complete and without need of explanation. The contact person for this IFB is:
Cindy Huynh Department of Motor Vehicles
Phone: (916) 818-2850 Email: Cindy.Huynh@dmv.ca.gov
Please note that no verbal information given will be binding upon the state unless such information is issued in writing as an official addendum.
CINDY HUYNH
Contract Administrator http://www.dgs.ca.gov/
TABLE OF CONTENTS
SECTION
➢ BIDDER REQUIREMENTS AND INFORMATION
1. Purpose and Description of Services
2. Bidder Qualifications
3. Prevailing Wage
4. Pre-Approved Equal Manufacturers/Brands
5. Schedule of Events
6. Mandatory Pre-Bid Conference
7. Written Questions
8. Submission of Bid
9. Bid Opening
10. Disposition of Bids
11. Evaluation and Selection
12. Notice of Contract Award
13. Standard Conditions of Service
14. Required Documents (Awarded Contractor)
15. Bid Preference(s)
16. Bid Incentive(s)
17. Generative Artificial Intelligence (GenAI)
➢ STANDARD AGREEMENT FORM (SAMPLE)
➢ EXHIBIT A – Scope of Work
➢ EXHIBIT B – Budget Detail and Payment Provisions
➢ EXHIBIT C – General Terms and Conditions
➢ EXHIBIT D – Special Terms and Conditions
➢ EXHIBIT E – Additional Provisions
➢ EXHIBIT F – Noncollusion Declaration
➢ EXHIBIT G – Standard California Nondiscrimination Construction Contract
➢ EXHIBIT H – Drawings
➢ APPENDIX A The United States Department of Transportation Standard Title VI/Non-Discrimination Assurances DOT Order No. 1050.2A
➢ APPENDIX E The United States Department of Transportation Standard Title VI/Non-Discrimination Assurances DOT Order No. 1050.2A
➢ REQUIRED BID DOCUMENTS CHECKLIST
➢ ATTACHMENT 1 – Bid/Bidder Certification Sheet
➢ ATTACHMENT 2 – Cost Sheet
➢ ATTACHMENT 3 – Payee Data Record
➢ ATTACHMENT 4 – Bidder Declaration & Subcontractor/Supplier List
➢ ATTACHMENT 5 – Darfur Contracting Act
➢ ATTACHMENT 6 – California Disabled Veteran Business Enterprise Participation Requirement and Incentive
➢ ATTACHMENT 7 – California Civil Rights Laws Certification
BIDDER REQUIREMENTS AND INFORMATION
1. Purpose and Description of Services
A. Provide and install one (1) fan coil unit for DMV Headquarters Building East.
Term: One hundred twenty (120) calendar days within a term of fourteen (14) months (see Schedule of Events for proposed start date of contract). See Exhibit A, Scope of Work, for a complete description of services.
2. Bidder Qualifications
A. The bidder shall possess a valid C-20 contractor license issued by the California Department of Consumer Affairs, Contractors State License Board (CSLB). All subcontractors that the bidder intends to utilize to perform work under the contract shall possess all applicable contractor licenses for the work they shall perform under the contract. The bidder’s contractor license number shall be indicated on the Bid/Bidder Certification Sheet (Attachment 1). The names of all subcontractors that the bidder intends to utilize and their contractor license number (if applicable) shall be indicated on the Bidder Declaration & Subcontractor/Supplier List (Attachment 4). All bidder and subcontractor contractor licenses shall be in good standing from the time of the bid opening through the term of the contract.
B. On March 4, 2022, Governor Gavin Newsom issued Executive Order N-6-22 regarding Economic Sanctions against Russia and Russian entities and individuals. “Economic Sanctions” refers to sanctions imposed by the U.S. government in response to Russia’s actions in Ukraine, as well as any sanctions imposed under state law. By submitting a bid, the bidder represents that it is not a target of Economic Sanctions. Should the State determine, at any time prior to the execution of a contract, that the bidder is a target of Economic Sanctions or is conducting prohibited transactions with sanctioned individuals or entities, that shall be grounds for rejection of the bidder’s bid by the DMV.
3. Prevailing Wage
A. In accordance with the provisions of Labor Code Sections 1770 - 1776, the bidder and their proposed subcontractor(s) shall adhere to the payment of prevailing wages as determined by the California Department of Industrial Relations (DIR) if the bidder’s total bid amount exceeds $1,000.00. The prevailing wage rate determinations can be downloaded from the DIR’s internet website at: http://www.dir.ca.gov. Copies of the DIR’s downloadable prevailing wage rate determinations are also on file at DMV Headquarters, and are available to any interested party on request. Additional questions regarding prevailing wage determinations shall be referred to the DIR’s Division of Labor Statistics and Research, Prevailing Wage Unit, at:
http://www.dir.ca.gov.
B. In the event the bidder’s total bid amount exceeds $25,000.00, the bidder and all subcontractors that the bidder intends to utilize to perform work under the contract, shall be a registered public works contractor with the DIR. The bidder shall provide proof of DIR registration for the bidder and all subcontractors that the bidder intends to utilize to perform wofrk under the contract with their bid. All bidder and subcontractor public works contractor registrations with the DIR shall be active from the time of the bid opening through the term of the contract, and shall remain active following the term of the contract until all certified payroll records in connection with the contract have been submitted to the DIR Labor Commissioner.
4. Pre-Approved Equal Manufacturers/Brands
A. For all materials, products, and/or items identified in Exhibit A, Scope of Work, that allow for a pre-approved equal manufacturer/brand, a bidder may submit a maximum of one (1) alternative manufacturer/brand per material/product/item identified for the DMV’s consideration. The bidder shall email alternative manufacturer/brand requests to the contact person identified on the cover page of this IFB no later than the date and time specified in the Schedule of Events for http://www.dir.ca.gov/ submitting written questions regarding this IFB. The DMV’s consideration of any alternative manufacturer/brand shall not be deemed as advance acceptance by the DMV. The DMV shall be the sole judge whether or not an alternative manufacturer/brand is considered equal, and may reject any submittal it deems inappropriate. The DMV’s decision shall be final.
5. Schedule of Events
Event Date Time
(1). IFB available to prospective bidders: 3/3/2026 N/A
(2). Mandatory pre-bid conference:
(Note: See additional info in Section 6.
3/17/2026 10:00 a.m.
(3). Written questions regarding IFB are due by:
(Note: See additional info in Section 7.)
3/24/2026 11:00 a.m.
(4). Written responses to questions released by: 3/30/2026 4:30 p.m.
(5). Final date for bid submission:
(Note: See additional info in Section 8.)
4/6/2026 11:59 p.m.
(6). Date of bid opening:
(Note: See additional info in Section 9.)
4/7/2026 1:00 p.m.
(7). Proposed start date of contract: 05/01/2026 or upon contract approval
N/A
6. Mandatory Pre-Bid Conference
A. A mandatory pre-bid conference is scheduled at DMV Headquarters (meet at the main lobby, security desk), 2415 First Avenue, Sacramento, CA 95818, for the purpose of discussing concerns regarding this IFB.
B. Potential bidders must be present at the designated meeting location notated above, at the time specified in the Schedule of Events. Potential bidders who are not at the designated meeting location at the specified time shall not be allowed to participate in the pre-bid conference.
C. Potential bidders must be present at the meeting location notated above, at the time specified in the Schedule Events, to sign in on the pre-bid conference sign in sheet at the mandatory pre-bid conference in order to be eligible to submit a bid. Signing in on the pre-bid conference sign in sheet shall be the only acceptable proof that a potential bidder attended the pre-bid conference.
Signing in on a building security/visitor log, providing a business card, or providing any other type of proof shall not be considered as acceptable proof of attending the pre-bid conference. If a bid is submitted by a potential bidder who failed to sign in on the pre-bid conference sign in sheet, the bid shall remain unopened and be returned to the bidder.
D. In the event a potential bidder is unable to attend the mandatory pre-bid conference, an authorized representative may attend on their behalf. The representative may only sign in for one (1) company. Subcontractors may not represent a potential bidder at a mandatory pre-bid conference. No bid shall be accepted unless the potential bidder or their authorized representative signed in on the pre-bid conference sign in sheet at the mandatory pre-bid conference.
E. Potential bidders who need assistance to attend the pre-bid conference due to a physical impairment, a reasonable accommodation shall be provided by the DMV upon request. The potential bidder must contact the contact person indicated on the cover page of this IFB package no less than five (5) DMV business days prior to the scheduled date and time of the pre-bid conference to arrange for a reasonable accommodation.
7. Written Questions
A. Submit all written questions via email to the contact person indicated on the cover page of this IFB package no later than the date and time specified in the Schedule of Events. Written responses to IFB questions will be released by the date and time specified in the Schedule of Events and viewable in the online project advertisement in Cal eProcure at:
http:/www.caleprocure.ca.gov.
8. Submission of Bid
A. Bids must be received via email no later than the date specified in the Schedule of Events. The DMV will not accept any bids that are mailed or hand-delivered.
(1). Bids shall be emailed in non-fillable PDF format (one [1] file that includes all required bid documents) to DMVBIDS@dmv.ca.gov. Only bids sent to this email will be considered.
Bids that contain any bid information in the body of the email may be rejected. Bids shall be sent to the email address listed above and contain the following information in the Subject Line only:
a. Bid # 25-346 for CINDY HUYNH for DMV Headquarters Fan Coil Unit Installation Due: 4/6/2026 at 11:59 p.m.
1. Bids may be deemed non-responsive if the subject line does not contain the above information.
(2). Emails shall not exceed one hundred (100) megabytes (MB) in size.
(3). Emailed bids will not be opened until after the date specified in the Schedule of Events.
(4). Bidders that send bid submission emails that are successfully received by the DMV at the above email address will receive an automated confirmation of bid received email response (the response will only acknowledge the receipt of an email and not identify the bid number or service/project description). In the event a bidder does not receive an automated confirmation of bid received email response after sending a bid submission email to the above email address, the bidder shall be responsible for confirming the DMV’s receipt of their bid with the contact person indicated on the cover page of this IFB package.
B. Bids must be received by the DMV no later than the specified in the Schedule of Events. Any bid received after the specified due date shall be rejected.
C. Bids shall include all required bid documents identified in the Required Bid Documents Checklist. Only submit the required bid documents with your bid, not the entire IFB package. Bids not including the required bid documents shall be deemed non-responsive. A non-responsive bid is one that does not meet the basic bid requirements.
D. Bidders are responsible for ensuring the accessibility and legibility of the submitted documents.
Bids that are not accessible or legible may be rejected.
E. All documents requiring a signature must bear an original signature of a person authorized to bind the bidding firm.
mailto:DMVBIDS@dmv.ca.gov
F. Bids must be submitted for the performance of all the services described herein. Any deviation from the work specifications shall not be considered and shall cause a bid to be rejected.
G. Costs for developing bids in anticipation of award of the contract are entirely the responsibility of the bidder and shall not be charged to the DMV.
H. An individual who is authorized to bind the bidding firm contractually shall sign the Bid/Bidder Certification Sheet (Attachment 1). The signature must indicate the title or position that the individual holds in the firm. An unsigned bid may be rejected.
I. A bidder may modify a bid after its submission by withdrawing its original bid and resubmitting a new bid prior to the bid submission deadline. Bidder modifications offered in any other manner, oral or written, shall not be considered.
J. A bidder may withdraw their bid by submitting a written withdrawal request to the DMV, signed by the bidder or an authorized agent. A bidder may thereafter submit a new bid prior to the bid submission deadline. Bids may not be withdrawn without cause subsequent to bid submission deadline.
K. The DMV may modify this IFB prior to the date fixed for submission of bids by the issuance of an addendum to all parties who received a bid package.
L. Bidders are cautioned to not rely on the DMV during the evaluation to discover and report to the bidder any defects and errors in the submitted documents. Bidders, before submitting their documents, should carefully proof them for errors and adherence to the IFB requirements.
M. Where applicable, bidders should carefully examine work sites and specifications. Bidders shall investigate conditions, character, and quality of surface or subsurface materials or obstacles that might be encountered. No additions or increases to the contract amount shall be made due to a lack of careful examination of work sites and specifications.
N. All documents submitted in response to this solicitation will become the property of the State of California and may be subject to the California Public Records Act (Government Code section 6250 et seq.). This includes any contact information within the documents, including that of references. Additionally, to the extent that a bidder believes its bid contains trade secret or proprietary information intended to be confidential, it is the bidder’s responsibility to identify and redact such information. A separate redacted copy of the bid must be submitted along with the original unredacted bid, and it will be the bidder’s responsibility to defend any redactions should a requester dispute them under the Public Records Act. In the absence of a pre-redacted bid, the DMV will treat the entire bid as a public record, except any information the DMV is required to redact under California law.
9. Bid Opening
A. If you plan to attend the public bid opening, you must email the contact person indicated on the cover page of this IFB no less than 24 hours prior to the bid opening date and time. The contact person will email the bid opening information, held virtually through Microsoft Teams.
10. Disposition of Bids
A. All documents submitted in response to this IFB shall become the property of the State of California, and shall be regarded as public records under the California Public Records Act (Government Code Section 6250 et seq.). However, the contents of all proposals, draft bids, correspondence, agenda, memoranda, working papers, or any other medium which discloses any aspect of a bidder's bid, shall be held in the strictest confidence until notice of award is released. The content of all working papers and discussions relating to a bid shall be held in confidence indefinitely, unless the public's interest is best served by an item’s disclosure because of its direct pertinence to a decision, agreement, or evaluation of a bid.
11. Evaluation and Selection
A. Each bid shall be checked for the presence or absence of required information in conformance with the submission requirements of this IFB.
B. The DMV shall put each bid through a process of evaluation to determine its responsiveness to the DMV's needs.
C. A bidder may be deemed not responsible and their bid may be rejected if they have previously been terminated for cause/breach for the same or similar services at the location designated in this IFB.
D. All bids may be rejected whenever the DMV determines that the cost is not reasonable or otherwise in the best interest of the DMV. There is no requirement to award a contract if, in the opinion of the DMV, no bids were received containing a reasonable contract price or if there is another business-based reason not to make an award.
E. Following the time of the bid opening, and prior to award of the contract, the DMV reserves the right to request that any bidder submit substantiation data to verify that the materials, products, items, and equipment to be incorporated into the work by the bidder shall equal or exceed the class or quality of the materials, products, items, and equipment that are designated within Exhibit A. When requested by the DMV, a bidder shall provide the DMV with all requested substantiation data within two (2) calendar days following DMV’s request. The DMV reserves the right to reject any bidder proposed materials, products, items, and equipment that the DMV has determined does not equal or exceed the class or quality of the materials, products, items, and equipment that are designated in Exhibit A.
F. Bids that contain false or misleading statements, or which provide references that do not support an attribute or condition claimed by the bidder, may be rejected. If, in the opinion of the DMV, such information was intended to mislead the DMV in its evaluation of the bid, and the attribute, condition, or capability is a requirement of this IFB, it shall be the basis for rejection of the bid.
G. A bid may be rejected if it is conditional or incomplete. The DMV may reject any or all bids and may waive any immaterial deviation in a bid. The DMV's waiver of immaterial defect shall in no way modify the IFB document or excuse the bidder from full compliance with all requirements if awarded the contract.
H. A bid may be rejected if it contains any alterations of form or other irregularities of any kind. The DMV does not accept alternate contract language from prospective contractors. Bids with such language shall be considered a counter proposal and shall be rejected. The State’s General Terms and Conditions (GTC) are not negotiable. The GTC may be viewed on the internet at:
http://www.dgs.ca.gov.
I. The final selection shall be made on the basis of the lowest responsible responsive bid. In the event there is tie, each of the tied bidders shall be contacted by the contact person indicated on the cover page of this IFB regarding a date and time for a flip of a coin. The bidder whose bid was received first shall make the call. Bidders or their authorized representative(s) are allowed to be present for the flip of the coin.
12. Notice of Contract Award
A. The DMV shall email or mail bidding contractors a written notice of contract award.
13. Standard Conditions of Service
A. Following the release of the written notice of contract award, the DMV shall email or mail the awarded contractor a prepared contract for signature that includes a cover letter instructing the awarded contractor on how to proceed. The cover letter may request that additional information and/or required documents be provided by the awarded contractor before the contract can be fully executed.
B. Services shall be available on the expressed date set by the DMV and the awarded contractor after all approvals have been obtained and the contract is fully executed.
C. All performance under the contract shall be completed on or before the termination date of the contract.
D. No oral understanding or agreement shall be binding on either party.
14. Required Documents (Awarded Contractor)
A. Prior to approval of the contract, unless otherwise specified below, the awarded contractor shall provide the DMV with all of the following required documents within ten (10) calendar days after the contract has been forwarded to the awarded contractor for signature. If the awarded contractor fails to provide the DMV with all of the following required documents within the above specified number of calendar days after the contract has been forwarded to the awarded contractor for signature, the DMV may deem the awarded contractor as non-responsive and may rescind the contract award:
(1). Contractor Certification Clauses
a. The awarded contractor shall sign and submit to the DMV, page one (1) of the Contractor Certification Clauses (CCC) which can be found on the Internet at:
http://www.dgs.ca.gov.
(2). Insurance Requirements
a. When requested by the DMV, the awarded contractor shall provide the DMV with all of the following certificate(s) of insurance (Note: The DMV shall not be responsible for any premiums or assessments on insurance policies):
1. Commercial General Liability
A. Coverage shall provide limits of not less than $1,000,000.00 per occurrence for bodily injury and property damage liability combined. The policy shall include coverage for liabilities arising out of premises operations, independent contractors, products/completed operations, personal and advertising injury and liability assumed under an insured contract. This insurance shall apply separately to each insured against whom claim is made or suit is brought subject to the Contractor’s limit of liability.
B. The insurance policy shall include the following additional insured endorsement that shall be under form acceptable to DGS, Office of Risk and Insurance Management (ORIM):
(1). The State of California, its officers, agents and employees are included as additional insured, but only with respect to work performed for the State of California.
2. Worker’s Compensation
A. Employer liability limits of not less than $1,000,000.00 are required if the awarded contractor employs any person, in any manner, that is subject to the Workers Compensation Laws of California. The awarded contractor shall maintain statutory workers compensation and employer’s liability coverage for all of its employees who will be engaged in the performance of the contract. If the awarded contractor does not employ any person, in any manner, so as to not become subject to the Workers’ Compensation laws of California, the awarded contractor shall contact the DMV Contract Administrator to request a Workers’ Compensation Exemption Certification form. This form shall be completed by the awarded contractor and submitted to the DMV prior to approval of the contract.
B. The awarded contractor’s workers compensation insurance policy shall be endorsed with a waiver of subrogation in favor of the State of California in the event the awarded contractor employs any person, in any manner, that is subject to the Workers Compensation Laws of California.
(3). Payment Bond
a. Per Public Contract Code Section 7103, the awarded contractor shall provide a payment bond equal to one-hundred-percent (100%) of the total amount payable under the contract if the awarded contractor’s total bid amount exceeds $25,000.00. The payment bond must be printed on Standard Form 807 (STD 807), and must include the contract number and the description of work to be performed under the contract. The payment bond must be executed by the Contractor and a corporate surety authorized to transact a general surety business in the State of California.
15. Bid Preference(s)
A. The following preferences are applicable to this IFB:
(1). Small Business Enterprise (SBE) Preference
a. SBE Program info can be found at the following internet web site:
http://www.dgs.ca.gov.
(2). Non-Small Business (Non-SB) Preference
a. Non-SB preference info can be found at the following internet web site:
http://www.dgs.ca.gov (Note: Non-SB Preference cannot displace a direct award to a California certified Small Business or a California certified Micro Business).
16. Bid Incentive(s)
A. The following incentive is applicable to this IFB:
(1). Disabled Veteran Business Enterprise (DVBE) Participation Incentive
a. See Attachment 6 for DVBE Participation Incentive information (Note: DVBE Participation Incentive cannot displace a direct award to a California certified Small Business or a California certified Micro Business).
17. Generative Artificial Intelligence (GenAI)
A. The State of California seeks to realize the potential benefits of GenAI, through the development and deployment of GenAI tools, while balancing the risks of these new technologies.
B. Bidder must notify the State in writing if it: (1) intends to provide GenAI as a deliverable to the State; or (2), intends to utilize GenAI, including GenAI from third parties, to complete all or a portion of any deliverable that materially impacts: (i) functionality of a State system, (ii) risk to the State, or (iii) Contract performance. For avoidance of doubt, the term “materially impacts” shall have the meaning set forth in State Administrative Manual (SAM) § 4986.2 Definitions for GenAI.
C. Failure to report GenAI to the State may result in disqualification. The State reserves the right to seek any and all relief to which it may be entitled to as a result of such nondisclosure.
D. Upon notification by a Bidder of GenAI as required, the State reserves the right to incorporate GenAI Special Provisions into the final contract or reject bids that present an unacceptable level of risk to the State.
E. Government Code 11549.64 defines “Generative Artificial Intelligence (GenAI)” as an artificial intelligence system that can generate derived synthetic content, including text, images, video, and audio that emulates the structure and characteristics of the system’s training data.
The remainder of this page is intentionally left blank.
DO NOT COMPLETE OR SUBMIT WITH YOUR BID!
SCOPE OF WORK
1. Contractor’s Full Business Name (to be completed by the DMV), hereinafter referred to as the Contractor, agrees to provide the Department of Motor Vehicles (DMV) all labor, tools, materials, equipment, and travel necessary to provide, replace and start-up one (1) fan coil unit in the electrical room on the 4th floor at DMV Headquarters, Building East for the term of this Agreement. The Contractor is responsible for field verifying all dimensions and existing site conditions pertinent to this Agreement.
2. The services shall be performed at: 2415 First Avenue. Sacramento, CA 95818.
3. Commencement and Completion of Work
A. The Contractor shall commence work under this Agreement on the specified start date provided by the DMV Project Manager following the execution of this Agreement by the state.
The DMV Project Manager shall provide the Contractor with written notification of the start date prior to the Contractor commencing work under this Agreement.
B. The Contractor shall complete all work under this Agreement within 120 calendar day(s) from the specified start date provided by the DMV Project Manager, no later than the expiration date of this Agreement.
4. The services shall be performed during regular DMV business hours, Monday through Friday between 8:00 a.m. and 5:00 p.m., unless prior approval is obtained from the DMV Project Manager. All work dates and times must be approved by the DMV Project Manager before work is performed.
5. The Project Managers during the term of this Agreement shall be:
Department of Motor Vehicles Contractor Name (TBD)
Name: TBD Name: TBD
Phone: TBD Phone: TBD
Email: TBD Email: TBD
6. Any questions or issues regarding the management of this Agreement shall be directed to the following Contract Coordinators:
Department of Motor Vehicles Contractor Name (TBD)
Name: TBD Name: TBD
Address:
TBD Address:
TBD
Phone: TBD Phone: TBD
Email: TBD Email: TBD
7. In the event of any changes to the name, address, and/or contact information for the Project Managers and/or Contract Coordinators identified in this Exhibit, the party making the changes shall notify the other party in writing.
The remainder of this page is intentionally left blank
EXHIBIT A
8. Detailed description of work to be performed and duties of all parties:
A. SUMMARY OF WORK
(1). Provide, install and start-up one (1) fan coil unit
a. The Contractor shall provide and install one (1) ENVIRO-TEC HPE14, 55,449 BTU Total Cooling Fan Coil Unit, Front Supply Grille, Rear Return Grille and accessories or pre-approved equal. Remove the existing fan coil unit and accessories and recycle them through a recycling center or equivalent recycling method.
b. Fan Coil Specifications:
1. Voltage: 120 VAC.
2. Phase: 1.
3. Enclosure: UL Type NEMA 1 (indoor).
4. FLA 9.6.
5. AIRFLOW 1,337 CFM.
6. CHW Flow Rate 11.3 GPM.
7. LAR: 54.5*F DB/53.7* WB.
8. EAT: 80*F DB/67* WB.
9. EWT/LWT: 45*F DB/55.1*F.
10. FPD: 7.4 (FT.WG).
11. ESP: 0.05 (IN.WG).
12. ROW: 6.
13. Coil Connection Size: 1-1/8” inch.
14. Filter: 2” inch, 30% Pleated (Merv 8).
c. Accessories
1. Factory Piping Package for 1” Chilled Water Supply and Return
2. Two (2) Way Pressure Independent Control Valve with Modulating Actuator. Fail in-place (JCI VA9104-1GA-3S Actuator and JCI VG1275AE Valve).
3. Isolation Ball Valves.
4. Manual Air Vent.
5. Pressure/Temperature Ports.
6. Unions.
7. Y-Strainer with blow down.
(2). Installation
a. The Contractor shall provide factory trained start-up and commissioning, following the installation.
b. Controls (Alerton) installation by others.
c. Start-up shall include all necessary settings and parameters to be fully functional with DMV’s existing Alerton Energy Management system and to be fully functional upon completion of start-up.
(3). Warranty
a. Labor and material warranty shall be a minimum of twelve (12) months from the time of DMV’s acceptance.
(4). Final Inspection Notice
a. Upon completion, the DMV shall perform a final inspection and issue a report to the Contractor. Final inspection date shall be established by the DMV Project Manager and not before all variable air volume controllers are installed and fully functioning.
(5). Work Environment
a. The Contractor shall always maintain a safe and clean work environment and remove all debris no later than at the end of each work shift. Debris shall be removed from premises in a legal and acceptable manner as approved by the DMV Project Manager.
The remainder of this page is intentionally left blank.
SECTION 23 05 00
COMMON WORK RESULTS FOR HVAC
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Thermometers, liquid in glass.
2. Test-plug kits.
1.2 DEFINITIONS
A. Existing piping to remain: Existing piping that is not to be removed and that is not otherwise indicated to be removed, removed and salvaged, or removed and reinstalled.
1.3 ACTION SUBMITTALS
A. Product Data:
1. For each type of product, excluding motors which are included in Part 1 of HVAC equipment Sections.
a. Include construction details, material descriptions, and dimensions of individual components, and finishes.
b. Include operating characteristics and furnished accessories.
1.4 INFORMATIONAL SUBMITTALS
A. Product Certificates: For each type of meter.
B. Field quality-control reports.
1.5 CLOSEOUT SUBMITTALS
A. Operation and Maintenance Data: For each type of meter and gauge to include in operation and maintenance manuals.
1.6 QUALITY ASSURANCE
A. Welding Qualifications: Qualify procedures and personnel in accordance with AWS D1.1/D1.1M.
B. Pipe and Pressure-Vessel Welding Qualifications: Qualify procedures and operators in accordance with 2021 ASME Boiler and Pressure Vessel Code, Section IX.
PART 2 - PRODUCTS
2.1 METERS AND GAUGES FOR HVAC PIPING
A. Thermometers, Liquid in Glass - Metal Case, Industrial Style:
1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:
a. Miljoco Corporation.
b. Trerice, H. O. Co.
c. Or equal.
2. Source Limitations: Provide liquid-in-glass, metal-case, industrial-style thermometers from single manufacturer.
3. Standard: ASME B40.200.
4. Tube: Glass with magnifying lens and blue or red organic liquid.
5. Tube Background: Nonreflective aluminum with permanently etched scale markings graduated in deg F and deg C.
6. Window: Glass.
7. Connector: 1-1/4 inches, with ASME B1.1 screw threads.
8. Accuracy: Plus or minus 1 percent of scale range or one scale division, to a maximum of
1.5 percent of scale range.
B. Test-Plug Kits:
1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:
a. Blue Ribbon Corp.
b. Peterson Equipment Co., Inc.
c. Or equal.
2. Source Limitations: Provide test-plug kits from single manufacturer.
3. Furnish one test-plug kit(s) containing one thermometer(s) and adapter. Thermometer sensing elements and adapter probes are to be of diameter to fit test plugs and of length to project into piping.
4. Low-Range Thermometer: Small, bimetallic insertion type with 1- to 2-inch diameter dial and tapered-end sensing element. Dial range is to be at least 25 to 125 deg F.
5. Carrying Case: Metal, with formed instrument padding.
PART 3 - EXECUTION
3.1 INSTALLATION OF METERS AND GAUGES
A. Install direct-mounted thermometers in thermowells and adjust vertical and tilted positions.
B. Install test plugs in piping tees
C. Assemble and install connections, tubing, and accessories between flow-measuring elements and flowmeters according to manufacturer's written instructions.
D. Install connection fittings in accessible locations for attachment to portable indicators.
E. Install thermometers in the following locations:
1. Inlet and outlet of each hydronic coil in fan coil unit.
3.2 CONNECTIONS
A. Install meters and gauges adjacent to machines and equipment to allow space for service and maintenance of meters, gauges, machines, and equipment.
3.3 ADJUSTING
A. After installation, calibrate meters according to manufacturer's written instructions.
B. Adjust faces of meters and gauges to proper angle for best visibility.
3.4 THERMOMETER APPLICATION
A. Thermometers at inlet and outlet of each hydronic coil in fan coil unit and built-up central systems are to be the following:
1. Industrial -style, liquid-in-glass type.
2. Test plug with chlorosulfonated polyethylene synthetic self-sealing rubber inserts.
3.5 THERMOMETER SCALE-RANGE APPLICATION
A. Scale Range for Chilled-Water Piping:
1. 0 to 150 deg F.
B. Scale Range for Condenser-Water Piping:
1. 0 to 150 deg F.
END OF SECTION 23 005 00
SECTION 23 05 29
HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Metal pipe hangers and supports.
2. Thermal-hanger shield inserts.
3. Fastener systems.
4. Equipment supports.
1.2 ACTION SUBMITTALS
A. Product Data: For each type of product.
1.3 QUALITY ASSURANCE
A. Structural-Steel Welding Qualifications: Qualify procedures and personnel according to AWS D1.1/D1.1M, "Structural Welding Code - Steel."
PART 2 - PRODUCTS
2.1 METAL PIPE HANGERS AND SUPPORTS
A. Stainless Steel Pipe Hangers and Supports:
1. Description: MSS SP-58, Types 1 through 58, factory-fabricated components.
2. Padded Hangers: Hanger with fiberglass or other pipe insulation pad or cushion to support bearing surface of piping.
3. Hanger Rods: Continuous-thread rod, nuts, and washer made of stainless steel.
2.2 THERMAL-HANGER SHIELD INSERTS
A. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:
1. Buckaroos, Inc.
2. CADDY; a brand of nVent.
3. Carpenter & Paterson, Inc.
4. KB Enterprise.
5. Or equal.
B. Insulation-Insert Material for Cold Piping: ASTM C552, Type II cellular glass with 100-psi minimum compressive strength and vapor barrier.
C. For Clevis or Band Hangers: Insert and shield shall cover lower 180 degrees of pipe.
D. Insert Length: Extend 2 inches beyond sheet metal shield for piping operating below ambient air temperature.
2.3 FASTENER SYSTEMS
A. Mechanical-Expansion Anchors: Insert-wedge-type anchors for use in hardened portland cement concrete; with pull-out, tension, and shear capacities appropriate for supported loads and building materials where used.
1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:
a. B-line, an Eaton business.
b. Empire Tool and Manufacturing Co., Inc.
c. Hilti, Inc.
d. Or equal.
2. Indoor Applications: stainless steel.
2.4 EQUIPMENT SUPPORTS
A. Description: Welded, shop- or field-fabricated equipment support made from structural carbon-steel shapes.
PART 3 - EXECUTION
3.1 APPLICATION
A. Strength of Support Assemblies: Where not indicated, select sizes of components so strength will be adequate to carry present and future static loads within specified loading limits.
Minimum static design load used for strength determination shall be weight of supported components plus 200 lb.
3.2 HANGER AND SUPPORT INSTALLATION
A. Metal Pipe-Hanger Installation: Comply with MSS SP-58. Install hangers, supports, clamps, and attachments as required to properly support piping from the building structure.
B. Thermal-Hanger Shield Installation: Install in pipe hanger or shield for insulated piping.
C. Fastener System Installation:
1. Install mechanical-expansion anchors in concrete after concrete is placed and completely cured. Install fasteners according to manufacturer's written instructions.
D. Install hangers and supports complete with necessary attachments, inserts, bolts, rods, nuts, washers, and other accessories.
E. Equipment Support Installation: Fabricate from welded-structural-steel shapes.
F. Install hangers and supports to allow controlled thermal and seismic movement of piping systems, to permit freedom of movement between pipe anchors, and to facilitate action of expansion joints, expansion loops, expansion bends, and similar units.
G. Install lateral bracing with pipe hangers and supports to prevent swaying.
H. Load Distribution: Install hangers and supports so that piping live and dead loads and stresses from movement will not be transmitted to connected equipment.
I. Pipe Slopes: Install hangers and supports to provide indicated pipe slopes and to not exceed maximum pipe deflections allowed by ASME B31.9 for building services piping.
J. Insulated Piping:
1. Attach clamps and spacers to piping.
a. Use thermal-hanger shield insert with clamp sized to match OD of insert.
b. Do not exceed pipe stress limits allowed by ASME B31.9 for building services piping.
2. Install MSS SP-58, Type 40, protective shields on cold piping with vapor barrier. Shields shall span an arc of 180 degrees.
3. Shield Dimensions for Pipe: Not less than the following:
a. NPS 1/4 to NPS 3-1/2: 12 inches long and 0.048 inch thick.
4. Thermal-Hanger Shields: Install with insulation same thickness as piping insulation.
3.3 EQUIPMENT SUPPORTS
A. Fabricate structural-steel stands to suspend equipment from structure overhead or to support equipment above floor.
B. Grouting: Place grout under supports for equipment and make bearing surface smooth.
C. Provide lateral bracing, to prevent swaying, for equipment supports.
3.4 ADJUSTING
A. Hanger Adjustments: Adjust hangers to distribute loads equally on attachments and to achieve indicated slope of pipe.
B. Trim excess length of continuous-thread hanger and support rods to 1-1/2 inches.
3.5 PAINTING
A. Galvanized Surfaces: Clean welds, bolted connections, and abraded areas and apply galvanizing-repair paint to comply with ASTM A780/A780M.
3.6 HANGER AND SUPPORT SCHEDULE
A. Specific hanger and support requirements are in Sections specifying piping systems and equipment.
B. Comply with MSS SP-58 for pipe-hanger selections and applications that are not specified in piping system Sections.
C. Use hangers and supports with galvanized metallic coatings for piping and equipment that will not have field-applied finish.
D. Use nonmetallic coatings on attachments for electrolytic protection where attachments are in direct contact with copper tubing.
E. Use copper-plated pipe hangers and copper or stainless steel attachments for copper piping and tubing.
F. Use padded hangers for piping that is subject to scratching.
G. Use thermal-hanger shield inserts for insulated piping and tubing.
H. Horizontal-Piping Hangers and Supports: Unless otherwise indicated and except as specified in piping system Sections, install the following types:
1. Adjustable, Steel Clevis Hangers (MSS Type 1): For suspension of noninsulated or insulated, stationary pipes NPS 1/2 to NPS 30.
2. Pipe Hangers (MSS Type 5): For suspension of pipes NPS 1/2 to NPS 4, to allow off-center closure for hanger installation before pipe erection.
3. U-Bolts (MSS Type 24): For support of heavy pipes NPS 1/2 to NPS.
4. Clips (MSS Type 26): For support of insulated pipes not subject to expansion or contraction.
5. Single-Pipe Rolls (MSS Type 41): For suspension of pipes NPS 1 to NPS 30, from two rods if longitudinal movement caused by expansion and contraction might occur.
I. Hanger-Rod Attachments: Unless otherwise indicated and except as specified in piping system Sections, install the following types:
1. Steel Clevises (MSS Type 14): For 0 to 150 deg F piping installations.
J. Building Attachments: Unless otherwise indicated and except as specified in piping system Sections, install the following types:
1. Steel or Malleable Concrete Inserts (MSS Type 18): For upper attachment to suspend pipe hangers from concrete ceiling.
2. C-Clamps (MSS Type 23): For structural shapes.
3. Linked-Steel Clamps with Eye Nuts (MSS Type 29): For attaching to bottom of steel I-beams for heavy loads, with link extensions.
K. Saddles and Shields: Unless otherwise indicated and except as specified in piping system Sections, install the following types:
1. Steel-Pipe-Covering Protection Saddles (MSS Type 39): To fill interior voids with insulation that matches adjoining insulation.
2. Protection Shields (MSS Type 40): Of length recommended in writing by manufacturer to prevent crushing insulation.
3. Thermal-Hanger Shield Inserts: For supporting insulated pipe.
L. Spring Hangers and Supports: Unless otherwise indicated and except as specified in piping system Sections, install the following types:
1. Spring Cushions (MSS Type 48): For light loads if vertical movement does not exceed 1- 1/4 inches.
2. Constant Supports: For critical piping stress and if necessary to avoid transfer of stress from one support to another support, critical terminal, or connected equipment. Include auxiliary stops for erection, hydrostatic test, and load-adjustment capability. These supports include the following types:
a. Horizontal (MSS Type 54): Mounted horizontally.
b. Vertical (MSS Type 55): Mounted vertically.
M. Use mechanical-expansion anchors instead of building attachments where required in concrete construction.
END OF SECTION 23 05 29
SECTION 23 05 53
IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT
1.1 SUMMARY
A. Section Includes:
1. Equipment labels.
2. Pipe labels.
3. Valve tags.
1.2 ACTION SUBMITTALS
A. Product Data: For each type of product.
B. Samples: For color, letter style, and graphic representation required for each identification material and device.
C. Equipment-Label Schedule: Include a listing of all equipment to be labeled with the proposed content for each label.
D. Valve-numbering scheme.
E. Valve Schedules: Provide for each piping system. Include in operation and maintenance manuals.
PART 2 - PRODUCTS
2.1 EQUIPMENT LABELS
A. Metal Labels for Equipment:
1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:
a. Brady Corporation.
b. Brimar Industries, Inc.
c. Carlton Industries, LP.
d. Or equal.
2. Material and Thickness: stainless steel, 0.025-inch minimum thickness, with predrilled or stamped holes for attachment hardware.
3. Letter and Background Color: As indicated for specific application under Part 3.
4. Minimum Label Size: Length and width vary for required label content, but not less than 2-1/2 by 3/4 inch.
5. Minimum Letter Size: 1/4 inch for name of units if viewing distance is less than 24 inches, 1/2 inch for viewing distances of up to 72 inches, and proportionately larger lettering for greater viewing distances. Include secondary lettering two-thirds to three-fourths the size of principal lettering.
6. Fasteners: Stainless steel rivets or self-tapping screws.
7. Adhesive: Contact-type permanent adhesive, compatible with label and with substrate.
B. Label Content: Include equipment's Drawing designation or unique equipment number, Drawing numbers where equipment is indicated.
2.2 PIPE LABELS
A. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:
1. Brady Corporation.
2. Brimar Industries, Inc.
3. Carlton Industries, LP.
4. Or equal.
B. General Requirements for Manufactured Pipe Labels: Preprinted, color coded, with lettering indicating service and showing flow direction in accordance with ASME A13.1.
C. Letter and Background Color: As indicated for specific application under Part 3.
D. Pretensioned Pipe Labels: Precoiled, semirigid plastic formed to partially cover circumference of pipe and to attach to pipe without fasteners or adhesive.
E. Self-Adhesive Pipe Labels: Printed plastic with contact-type, permanent-adhesive backing.
F. Pipe Label Contents: Include identification of piping service using same designations or abbreviations as used on Drawings. Also include:
1. Pipe size.
2. Flow-Direction Arrows: Include flow-direction arrows on main distribution piping.
Arrows may be either integral with label or applied separately.
3. Lettering Size: At least 1/2 inch for viewing distances of up to 72 inches and proportionately larger lettering for greater viewing distances.
2.3 VALVE TAGS
A. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:
1. Brady Corporation.
2. Brimar Industries, Inc.
3. Carlton Industries, LP.
4. Or equal.
B. Description: Stamped or engraved with 1/4-inch letters for piping system abbreviation and 1/2-inch numbers.
1. Tag Material: stainless steel, 0.024-inch minimum thickness, with predrilled or stamped holes for attachment hardware.
2. Fasteners: Brass wire.
C. Letter and Background Color: As indicated for specific application under Part 3.
D. Valve Schedules: see drawings.
1. Include valve-tag schedule in operation and maintenance data.
PART 3 - EXECUTION
3.1 PREPARATION
A. Clean piping and equipment surface of incompatible primers, paints, and encapsulants, as well as dirt, oil, grease, release agents, and other substances that could impair bond of identification devices.
3.2 INSTALLATION, GENERAL REQUIREMENTS
A. Coordinate installation of identifying devices with completion of covering and painting of surfaces where devices are to be applied.
B. Coordinate installation of identifying devices with locations of access panels and doors.
C. Install identifying devices before installing acoustical ceilings and similar concealment.
D. Locate identifying devices so that they are readily visible from the point of normal approach.
3.3 INSTALLATION OF EQUIPMENT LABELS, WARNING SIGNS, AND LABELS
A. Permanently fasten labels on each item of mechanical equipment.
B. Sign and Label Colors:
1. White letters on an ANSI Z535.1 safety-blue background.
C. Locate equipment labels where accessible and visible.
3.4 INSTALLATION OF PIPE LABELS
A. Install pipe labels showing service and flow direction with permanent adhesive on pipes.
B. Pipe-Label Locations: Locate pipe labels where piping is exposed or above accessible ceilings in finished spaces; machine rooms; accessible maintenance spaces such as shafts, tunnels, and plenums; and exterior exposed locations as follows:
1. Within 3 ft. of each valve and control device.
2. At access doors, manholes, and similar access points that permit view of concealed piping.
3. Within 3 ft. of equipment items and other points of origination and termination.
4. Spaced at maximum intervals of 25 ft. along each run. Reduce intervals to 10 ft. in areas of congested piping, ductwork, and equipment.
C. Flow-Direction Arrows: Use arrows to indicate direction of flow in pipes, including pipes where flow is allowed in both…