This is a scope of work document for the City of Greenville, North Carolina, detailing construction requirements for the Kiln Room Enclosure project at the Jaycee Park Administration Building. The project involves constructing an enclosure around an existing kiln room, including the installation of framing, drywall, insulation, flooring, doors, and associated finishes. A mandatory pre-bid meeting is scheduled for Tuesday, June 23, 2026, at 9:00 am at the site location. Prospective bidders should direct inquiries to Mike Watson, Project Coordinator, at mwatson@greenvillenc.gov. The scope of work specifies detailed construction standards, material specifications, and workmanship requirements that align with local building codes and industry standards.
The document establishes technical specifications for all materials and construction methods, including requirements for framing materials, drywall installation, insulation R-values, flooring specifications, door hardware, and finish work. Bidders must comply with all applicable building codes and are responsible for site preparation, material delivery, and final cleanup. The document references standard construction practices and industry specifications to ensure quality and durability of the enclosure. All work must be completed in accordance with the detailed specifications outlined in the scope of work, with proper coordination between trades and adherence to safety requirements throughout the construction process.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COG 1213230 v2 Page 1
Informal Bid Request
25-26-52
Project:
Kiln Room Enclosure
Jaycee Park Administration Building Greenville, NC
Scope of Work:
Provide material, equipment, and labor to convert existing covered patio into a fully enclosed, conditioned workspace with plumbing fixtures, insulation, and new roof structure at the Jaycee Park Administration Building.
Special Conditions:
Work must comply with all OSHA safety guidelines.
Contractor is responsible for all needed paperwork to obtain required permits. All permits must be posted prior to the commencement of work.
A mandatory pre-bid meeting will be held on Tuesday, June 23, 2026, at 9:00 AM at the site.
Site Location:
2000 Cedar Lane Greenville, NC
Bid Submittal Deadline: Tuesday, July 7, 2026 @ 2:00 PM Via email to: mwatson@greenvillenc.gov
COG 1213230 v2 Page 2
INVITATION FOR INFORMAL BID ON
KILN ROOM ENCLOSURE – JAYCEE PARK ADMIN. BLDG.
INSTRUCTIONS FOR BIDDERS
The person, firm or corporation making a proposal shall submit a bid to Mike Watson, Project Coordinator, on or before the hour and day stated on the attached bid request form. The preferred method of delivery of the bid is by email to mwatson@greenvillenc.gov The bid may also be mailed or hand delivered to the Jaycee Park Administrative office located at 2000 Cedar Lane, Greenville, N.C., 27858 and must be received prior to the submittal deadline time and date stated and shall have the words Bid Enclosed, KILN RM - JCP Attn: Mike Watson along with the company name on the outside of the envelope.
All mailed or hand delivered bids received in the office will be marked with the date and time they are received by reception staff. Bids will not be opened and read aloud. The bids will be opened and evaluated, and a tabulation sheet will be available upon request once the contract is awarded to the successful bidder.
The bidder shall include the required responses and supply all the information as indicated on the Bid Form, Attachment B. The prices inserted shall be net and shall be the full cost including all factors whatsoever. Any bids not submitted on such forms provided will be considered unresponsive.
No bid may be changed or withdrawn after the time of the opening. Any modifications or withdrawals requested before this time shall be acceptable only when such request in writing is made to Mike Watson, Project Coordinator.
The City of Greenville reserves the right to reject any and all bids, to waive any formalities, and to accept the bid or any portion thereof that is deemed most advantageous to the City. Any bid submitted will be binding for 60 days after the opening.
The scope of work attached represents the minimum specification or description of work to be purchased or contracted. These requirements are not intended to prevent fair responses or to eliminate competition, but they are intended for the protection of each and every proposer to insure, if possible, that all bids submitted shall be upon a fair and comparable basis.
It is expressly understood by the bidders that written notice of award and/or receipt of purchase order will constitute agreement by the City to consummate the transaction and will serve together with the proposal, scope of work, and these instructions as the entire form of contract between the parties except in cases where formal contracts are warranted.
COG 1213230 v2 Page 3
All work shall be FOB, Greenville, N.C.
Each bidder shall affirm that no official or employee of the City of Greenville is directly or indirectly interested in this proposal for any reason of personal gain.
Sales taxes may be listed on the proposal, but as a separate item. No charge will be allowed for Federal Excise and Transportation tax from which the City is exempt.
New vendors must register with the City of Greenville’s online portal at the following web address: https://cityofgreenvillenc.munisselfservice.com/vss
Minority and/or Women Business Enterprise (MWBE) Program:
It is the policy of the City of Greenville to provide minorities and women equal opportunity for participating in all aspects of the City’s contracting and procurement programs, including but not limited to, construction projects, supplies and materials purchases, and professional and personal service contracts. In accordance with this policy, the City has adopted a Minority and Women Business Enterprise (M/WBE) Plan and subsequent program, outlining verifiable goals.
The City has established a 10% Minority Business Enterprise (MBE) and 6% Women Business Enterprise (WBE) goal for the participation of MWBE firms in supplying goods and services for the completion of this project. All firms submitting bids agree to utilize minority and women-owned firms whenever possible.
Questions regarding the City’s MWBE Program should be directed to Wanda House, Financial Services Manager, at (252) 329-4862.
Equal Employment Opportunity Clause:
The City of Greenville, NC is an equal opportunity employer and strictly prohibits discrimination against any employee or applicant for employment because of the individual’s race, color, religion, age, gender, disability, national origin, genetic information, sexual orientation, gender identity/reassignment or expression, military or veteran status, marital status, or any characteristic protected by applicable law.
TITLE VI NONDISCRIMINATION NOTIFICATION:
The City of Greenville, NC in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 US.C. §§ 2000d to 2000d-4) and the Regulations, hereby 1178814- v4 7 notifies all respondents that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this advertisement and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. See Attachment A for more information.
COG 1213230 v2 Page 4
Insurance Requirements:
The following insurance coverages and limits are standard insurance requirements for City contracts. At times the scope of the contracted work may require additional or unique coverages and increased limits.
The name of the contracting party must agree to purchase at its own expense insurance coverages to satisfy the following minimum requirements. A certificate reflecting the following minimum coverages shall be required and accompany the Contract:
1. Workers’ Compensation Insurance:
Limits:
Workers Compensation: Statutory for the State of North Carolina
Employers Liability: Bodily Injury by Accident $1,000,000 each accident
Bodily Injury by Disease $1,000,000 policy limit Bodily Injury by Disease $1,000,000 each employee.
No sub-contractor may exclude executive officers. Workers Compensation must include all employees.
2. Commercial General Liability:
Each Occurrence: $1,000,000 Personal and Advertising Injury $1,000,000 General Aggregate Limit $2,000,000 Products and Completed Operations Aggregate $2,000,000
The aggregate limit must apply per project. The form of coverage must be the ISO CG 00 01 policy as approved by the State of North Carolina Department of Insurance. If a form of coverage other than the CG 00 01 is used it must be approved.
Any endorsed exclusions or limitations from the standard policy must be clearly stated in writing and attached to the Certificate of Insurance. Completed Operations coverage must be maintained for the period of the applicable statute of limitations
The City of Greenville must be added as an Additional Insured to the Commercial General Liability policy.
3. Commercial Automobile Liability: (If Applicable)
Combined single limit $1,000.000
COG 1213230 v2 Page 5
The City of Greenville must be added as an Additional Insured on the Commercial Auto Liability policy.
4. Professional Liability: (If Applicable)
Each Claim Made: $1,000,000 Aggregate: $2,000,000
5. Builders Risk Coverage: (If Applicable)
Limit:
Minimum limit in the amount of total bid price.
The Builder Risk policy must be endorsed to increase the limit of insurance for all change orders.
Policy Form:
Builder Risk coverage must be on a direct physical loss basis and contain no exclusion for theft, collapse or damage to foundations or underground structures, pipes or conduits.
6. Named Insured:
The named Insured shall be The City of Greenville, P.O. Box 7207, Greenville NC 27835, the Contractor and all sub-contractors with a contractual assumption of responsibility for damage to the project.
All insurance companies must be admitted doing business in North Carolina and be acceptable to the City of Greenville’s Safety Risk Manager. If the insurance company(s) is a permitted surplus lines insurer, the insurance company name, and NAIC number must be submitted to the Safety Risk Manager for approval before commencing work. Contractor shall be required to provide the City no less than thirty (30) days’ notice of cancellation, or any material change, to any insurance coverage required by this Contract.
A Certificate of Insurance (COI) must be issued by an authorized representative of the insurance carrier(s). Certificates of Insurance must have the Insurance Company name and NAIC number clearly identified. The Certificate of Insurance must identify the Contract and contract work, including location, to be completed in the description section.
The City of Greenville’s review or acceptance of Certificates of Insurance shall not relieve contractor of any requirement to provide the specific insurance
COG 1213230 v2 Page 6 coverages set forth in the Contract. Nor shall the City of Greenville’s review or acceptance of Certificates of Insurance constitute a waiver of the specific insurance coverage requirements set forth in the Contract or acknowledgement that all insurance coverage requirements set forth in the Contract have been met.
Hold Harmless and Indemnity Agreement:
To the fullest extent permitted by law, the Contractor shall indemnify and hold harmless the City of Greenville, its employees, agents and consultants against any liability arising out of or in connection with any of the operations or obligations of the Contractor, including but not limited to any said operations or obligations subcontracted or assigned to a different person or entity from claims, damages, losses, and expenses, including but not limited to attorneys' fees, which is attributable to bodily injury, sickness, disease or death, or to injury to or destruction of tangible property, caused by acts or omissions of the Contractor or anyone directly or indirectly employed by them or anyone for whose acts the Contractor may be liable, regardless of whether or not such claim, damage, loss or expense is caused in part by a party indemnified hereunder. Such obligation shall not be construed to negate, abridge, or reduce other rights or obligation of indemnity which would otherwise exists as to a party or person described in this paragraph.
E-VERIFY COMPLIANCE: The Contractor shall comply with the requirements of Article 2 of Chapter 64 of the North Carolina General Statutes. Further, if the Contractor utilizes a Subcontractor, the Contractor shall require the Subcontractor to comply with the requirements of Article 2 of Chapter 64 of the North Carolina General Statutes. By submitting a proposal, The Proposer represents that their firm and its Subcontractors are in compliance with the requirements of Article 2 Chapter 64 of the North Carolina General Statutes.
IRAN DIVESTMENT ACT: Vendor certifies that: (i) it is not on the Iran Final Divestment List created by the NC State treasurer pursuant to N.C.G.S. 147-86.58; (ii) it will not take any actions causing it to appear on said list during the term of any contract with the City, and (iii) it will not utilize any subcontractor to provide goods and services hereunder that is identified on said list.
LIQUIDATED DAMAGES: If the Contractor fails to complete the work within the time specified in the bid package, the Contractor shall pay liquidated damages to the City of Greenville in the amount of $250.00 for each calendar day of delay until the work is completed or accepted.
The City of Greenville has adopted a Local Preference Policy, Resolution No. 056-13, and a Professional and other Services Policy, Resolution No. 057-13 that may pertain to this project. For more information, please see the City of Greenville’s webpage at Purchasing | Greenville, NC.
COG 1213230 v2 Page 7
Any questions regarding any part of this proposal shall be directed via email to Mike Watson, Project Coordinator, at mwatson@greenvillenc.gov
Bids must be submitted using the provided Bid Submittal Form, Attachment B, accompanied by the completed Reference Information Sheet.
COG 1213230 v2 Page 8
EXHIBIT B
Kiln Room Enclosure
Scope of Work
Scope The Contractor shall furnish all labor, materials, and equipment required to convert the existing covered patio into a fully enclosed, conditioned workspace with kiln zone, plumbing fixtures, insulation, and new roof structure. All work shall be to industry standards for construction. All OSHA requirements and other safety guidelines associated with the work shall be followed.
Debris All debris associated with this project shall be removed and properly disposed of offsite.
General Requirements
1. Contractor is responsible for all measurements.
2. All work shall comply with all applicable building codes and regulations.
3. Refer to Attachment C for detailed information and requirements related to the split system, kiln vents, intake louver, lighting, and plumbing fixtures.
4. Protect existing slab and adjacent structures during demolition and construction.
5. Remove and dispose of the existing shingled roof—including roof framing, underlayment, and flashing. Remove and dispose of all dog-eared fencing and posts surrounding the patio perimeter in full. Maintain the existing concrete slab, clean and prep for new wall construction.
6. Construct new exterior walls around the full perimeter using pressure-treated bottom plates anchored to the slab, 2×4 framing, 7/16" OSB or plywood sheathing, a continuous weather-resistive house wrap barrier, and a complete vinyl siding system with all associated components and vented soffit. Provide all required headers, lintels, and structural bracing as part of the wall assembly.
7. Construct a 4-foot wall (4’ H x 4’ L) to the left of the exterior door jamb.
Finish the kiln side with cement paneling (Hardie board paneling) and the opposite side with FRP paneling. Cap with 1-by material and paint.
8. Reuse the existing hollow metal door, frame, and hardware. Install new stainless-steel hinges with non-removable pins. Provide and install a new flat threshold, door sweep and weather-strippng. Prep and paint the door and frame.
9. Insulate all exterior walls with R-13 batt insulation and insulate the roof/ceiling assembly with a minimum of R-38 batt insulation installed between rafters at the underside of the roof deck. Seal all penetrations, joints, COG 1213230 v2 Page 9 and seams with foam or caulk to provide a continuous air barrier throughout the building envelope.
10. Remove the existing roof structure as required and install a complete new roof system, including new rafters or trusses sized per structural load requirements, new roof decking, underlayment, flashing, 30-year architectural shingles, and new drip edge with gutters and downspouts. Ensure the roof tie-in to the existing building is fully flashed and sealed to provide a watertight connection.
11. Install ½" gypsum board on the ceiling and tape, mud and sand for finishing and install a 22” x 30” ceiling access panel.
12. Install 4'×8' FRP wall panels at designated areas, adhered and fastened per manufacturer requirements, with panels set plumb, level, and tight to adjacent sheets, and install FRP panels over a smooth, solid substrate such as drywall, plywood, or OSB prepared per manufacturer requirements. Provide and install all required FRP trim components to create a complete, finished system
13. Install 4 x 8 cement board panels (Hardie Board paneling or equal) from floor to ceiling on all walls adjacent to or behind kilns as directed, maintaining all manufacturers specified clearances to combustibles. Provide non-combustible trim and fire-rated sealants as required to complete a fully compliant, protected wall assembly.
14. Remove the existing hardwiring to each kiln. Install 15-50 plugs for each kiln and connect them to new 15-50R outlets installed in the wall adjacent to each kiln. Attached is the information for each kiln model, including the electrical requirements.
15. Provide electrical hookup for the split system using a dedicated circuit breaker, including all required conduit, wiring, disconnects, and terminations installed in full compliance with NC Electrical Code and the manufacturer’s installation requirements.
16. Install eight new 8" LED ceiling lights using the existing switch leg and lighting control, ensuring all fixtures are mounted, wired, and supported per code. Provide and install two new electrical outlets on a dedicated circuit breaker, including all required conduit, wiring, and terminations in full compliance with NC Electrical Code.
17. Install a new emergency exit light over the rear exterior door, including all mounting hardware and electrical hookups.
18. Furnish and install a ductless mini-split heat pump with remote, sized appropriately for the insulated space, including a wall-mounted indoor head, an outdoor condenser on a pad or wall bracket, and all required refrigerant lines, condensate drain, and electrical disconnect. Test the system for proper operation and charge to ensure full compliance with the manufacturer’s installation requirements.
19. Provide complete plumbing rough-in for a utility sink with hot and cold-water supply. Install new water supply lines, new drain and vent lines—including a Studor Vent—tied into the existing sewer line in accordance with NC Plumbing Code. Provide all required shutoff valves, escutcheons, and fittings, and test all plumbing for leaks and proper drainage to ensure full, code-compliant operation.
COG 1213230 v2 Page 10
20. Hook the kilns to the existing electrical system, providing all required connections and terminations in accordance with manufacturer requirements and NC Electrical Code. Provide mechanical ventilation systems with a new outlet as indicated in Attachment C and maintain all required clearances to combustibles throughout the installation.
21. Paint the drywall ceiling, cement board panels, and all trim with one coat of primer and two coats of interior latex paint, applied to achieve a uniform finish. Provide and install a complete flat-stock trim package using 1-by material with caulking throughout to create a fully finished appearance.
22. Timely completion is essential due to the required shutdown of all pottery programs during construction. The Contractor shall commence work in mid-August and shall achieve full completion, weather permitting, within 30 calendar days of the start date. Liquidated damages will be assessed for failure to complete the work within the allotted contract time.
Warranty
Provide a standard manufacturer’s warranty on all materials and a 1-year warranty from the contractor on all labor.
Notes Contractor will be able to use the facility’s electricity, water, and restrooms to complete the work.
The facility will remain open to the public so the Contractor shall make allowances for this and be responsible for providing a safe work site at all times.
All egress doors shall not be blocked or restricted under any circumstances.
The laydown area, parking, time of work, access to the building, etc. will be discussed at a pre-construction meeting with the awarded contractor.
COG 1213230 v2 Page 11
Title VI of the Civil Rights Act of 1964 Nondiscrimination Provisions, Appendices A & E.
During the performance of this contract, the contractor, for itself, its assignees, and successors in interest (hereinafter referred to as the "contractor") agrees as follows:
1) Compliance with Regulations: The contractor (hereinafter includes consultants) will comply with the Acts and the Regulations relative to Nondiscrimination in Federally-assisted programs of the U.S. Department of Transportation (USDOT), as they may be amended from time to time, which are herein incorporated by reference and made a part of this contract.
(2) Nondiscrimination: The contractor, with regard to the work performed by it during the contract, will not discriminate on the grounds of race, color, national origin, sex, age, creed (religion), low-income, limited English proficiency, or disability in the selection and retention of subcontractors, including procurements of materials and leases of equipment. The contractor will not participate directly or indirectly in the discrimination prohibited by the Acts and the Regulations, including employment practices when the contract covers any activity, project, or program set forth in Appendix B of 49 CFR Part 21.
(3) Solicitations for Subcontractors, Including Procurements of Materials and Equipment: In all solicitations, either by competitive bidding, or negotiation made by the contractor for work to be performed under a subcontract, including procurements of materials, or leases of equipment, each potential subcontractor or supplier will be notified by the contractor of the contractor's obligations under this contract and the Acts and the Regulations relative to Nondiscrimination on the grounds of race, color, or national origin.
(4) Information and Reports: The contractor will provide all information and reports required by the Acts, the Regulations, and directives issued pursuant thereto and will permit access to its books, records, accounts, other sources of information, and its facilities as may be determined by the Recipient or the USDOT to be pertinent to ascertain compliance with such Acts, Regulations, and instructions. Where any information required of a contractor is in the exclusive possession of another who fails or refuses to furnish the information, the contractor will so certify to the Recipient or the USDOT, as appropriate, and will set forth what efforts it has made to obtain the information.
(5) Sanctions for Noncompliance: In the event of a contractor's noncompliance with the Non-discrimination provisions of this contract, the Recipient will impose such contract sanctions as it or the USDOT may determine to be appropriate, including, but not limited to:
(a) withholding payments to the contractor under the contract until the contractor complies;
and/or
(b) cancelling, terminating, or suspending a contract, in whole or in part.
(6) Incorporation of Provisions: The contractor will include the provisions of paragraphs one through six in every subcontract, including procurements of materials and leases of equipment, unless exempt by the Acts, the Regulations and directives issued pursuant thereto. The contractor will take action with respect to any subcontract or procurement as the Recipient or the USDOT may direct as a means of enforcing such provisions including sanctions for noncompliance. Provided, that if the contractor becomes involved in, or is threatened with litigation by a subcontractor, or supplier because of such direction, the contractor may request the Recipient to enter into any litigation to protect the interests of the Recipient. In addition, the contractor may request the United States to enter into the litigation to protect the interests of the United States.
I. During the performance of this contract, the contractor, for itself, its assignees, and successors in interest (hereinafter referred to as the "contractor") agrees to comply with the following nondiscrimination statutes and authorities; including but not limited to:
ATTACHMENT A
COG 1213230 v2 Page 12
Pertinent Nondiscrimination Authorities
• Title VI of the Civil Rights Act of 1964 (42 U.S.C. § 2000d et seq., 78 stat. 252), (prohibits discrimination on the basis of race, color, national origin); and 49 CFR Part 21.
• The Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, (42 U.S.C. § 4601), (prohibits unfair treatment of persons displaced or whose property has been acquired because of Federal or Federal-aid programs and projects);
• Federal-Aid Highway Act of 1973, (23 U.S.C. § 324 et seq.), (prohibits discrimination on the basis of sex);
• Section 504 of the Rehabilitation Act of 1973, (29 U.S.C. § 794 et seq.), as amended, (prohibits discrimination on the basis of disability); and 49 CFR Part 27;
• The Age Discrimination Act of 1975, as amended, (42 U.S.C. § 6101 et seq.), (prohibits discrimination on the basis of age);
• Airport and Airway Improvement Act of 1982, (49 USC § 471, Section 47123), as amended, (prohibits discrimination based on race, creed, color, national origin, or sex);
• The Civil Rights Restoration Act of 1987, (PL 100- 209), (Broadened the scope, coverage and applicability of Title VI of the Civil Rights Act of 1964, The Age Discrimination Act of 1975 and Section 504 of the Rehabilitation Act of 1973, by expanding the definition of the terms "programs or activities" to include all of the programs or activities of the Federal-aid recipients, sub-recipients and contractors, whether such programs or activities are Federally funded or not);
• Titles II and III of the Americans with Disabilities Act, which prohibit discrimination on the basis of disability in the operation of public entities, public and private transportation systems, places of public accommodation, and certain testing entities (42 U.S.C. §§ 12131-12189) as implemented by Department of Transportation regulations at 49 C.F.R. parts 37 and 38;
• The Federal Aviation Administration's Nondiscrimination statute (49 U.S.C. § 47123) (prohibits discrimination on the basis of race, color, national origin, and sex);
• Executive Order 12898, Federal Actions to Address Environmental Justice in Minority Populations and Low-Income Populations, which ensures Nondiscrimination against minority populations by discouraging programs, policies, and activities with disproportionately high and adverse human health or environmental effects on minority and low-income populations;
• Executive Order 13166, Improving Access to Services for Persons with Limited English Proficiency, and resulting agency guidance, national origin discrimination includes discrimination because of Limited English proficiency (LEP). To ensure compliance with Title VI, you must take reasonable steps to ensure that LEP persons have meaningful access to your programs (70 Fed. Reg. at 74087 to 74100);
• Title IX of the Education Amendments of 1972, as amended, which prohibits you from discriminating because of sex in education programs or activities (20 U.S.C. 1681 et seq);
• Federal transit laws, specifically 49 U.S.C. § 5332 (prohibiting discrimination based on race, color, religion, national origin, sex (including gender identity), disability, age, employment, or business opportunity).
COG 1213230 v2 Page 13
ATTACHMENT B
Bid Submittal Form
Kiln Room Enclosure – Jaycee Park Administration Building
Bids Due: Tuesday, July 7, 2026, by 2:00pm
Contractor’s Business Name: _____________________________________ License #: ________________
Address: _____________________________________________________ Zip Code: ________________
Contact Person: ___________________________________ Title: ________________________________
Phone:_______________________________ Email:___________________________________________
Business Type (sole proprietor, partnership, LLC, Inc., Other): ___________________________________
We hereby submit our bid to supply all materials and labor required to complete the scope of work.
Bid Amount: ($__________________________) _______________________________
_________________________________________________ and ________ / 100 Dollars
Addenda Received (if applicable): ______________
Submitted by: _______________________________ (print)
Signature: __________________________________ Date: _____________________
COG 1213230 v2 Page 14
COG 1213230 v2 Page 15
ATTACHMENT C
Drawing Information
COG 1213230 v2 Page 16
COG 1213230 v2 Page 17
Equipment Specification Information
Equipment Manufacture Model Number Qty.
Notes
Split System
Mitsubishi 18,000 BTU
R454B 19 Seer 1 Mini split heat pump station with all accessories to operate and mount
Kiln Vents
L&L Kilns C-250-Vent 2 for 2 ea. JD2927-3 kilns &
1 ea. e23T-208-3P kiln
Kiln Vent
L&L Kilns C-250-Vent/DB 1 Vent-Sure doubler (to vent two kilns)
Intake Louver
J&D Manufacturing VRSG12A-PS 1 With accessories and mounting and operation
Lighting
Juno WF8 SWW5
90CRI MW 8 8” round LED lights
Utility Sink
Proflo PFLT2123 1
Utility Sink
Faucet
Kingston Brass GS1241AL 1
Note:
1. It is the Contractor’s responsibility to ensure all specified materials include all required installation accessories, hardware, and components necessary for a complete and functional installation.
2. The above listed equipment may be replaced with products of equal or better quality, performance, and rating, subject to prior approval.
COG 1213230 v2 Page 18
COG 1213230 v2 Page 19
COG 1213230 v2 Page 20
COG 1213230 v2 Page 21
COG 1213230 v2 Page 22
COG 1213230 v2 Page 23
COG 1213230 v2 Page 24
COG 1213230 v2 Page 25
COG 1213230 v2 Page 26
COG 1213230 v2 Page 27
COG 1213230 v2 Page 28
COG 1213230 v2 Page 29
COG 1213230 v2 Page 30
COG 1213230 v2 Page 31
COG 1213230 v2 Page 32
| Informal Bid Request |
| INVITATION FOR INFORMAL BID ON |
| INSTRUCTIONS FOR BIDDERS |
File details come from the government source that posted it. Updated .