25-2590 2025 Irrigation Main Replacement Year #2 - Bid Sheet.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
2025 Irrigation Main Replacement - Year 2
Solicitation number
25-2590
Issued by
Muskegon County, Michigan

About this file

The file is a bid sheet for IFB 25-2590, a 2025 Irrigation Main Replacement project for Muskegon County, Michigan, representing the second year of a multi-year infrastructure improvement initiative. The project involves comprehensive replacement of existing asbestos cement irrigation main piping at the Muskegon County Resource Recovery Center, with detailed line items covering various pipe dimensions and materials, including ductile iron (DI) mains ranging from 8" to 42", valve replacements, couplers, bends, reducers, sleeves, and associated infrastructure components. The bid sheet includes four primary sections: General, Field Work, Valve Replacements, and Alternate Connection Materials, with specific quantities for each item type, such as 380 feet of 42" restrained DI main, 1,050 feet of 42" DI main, and multiple valve and fitting installations.

The bid sheet includes a $100,000 allowance for unforeseen circumstances and provides a structured cost schedule that allows bidders to input unit costs for each line item. The total current bid value is $100,000, with additional line items for mobilization (capped at 10%), utility investigation (capped at 5%), and various restoration and removal activities. The project appears to be focused on improving system resiliency and reliability, with provisions for clearing, brushing, tree removal, bypass operations, and comprehensive site restoration. While specific funding sources are not detailed in the document, the multi-year approach suggests a strategic, phased infrastructure investment by Muskegon County to modernize and enhance its irrigation infrastructure.

View the file

Other files

File Type Posted
25-2590 2025 Irrigation Main Replacement - Year #2.pdf PDF
W9 BLANK.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cost Schedule

IFB 25-2590 2025 Irrigation Main Replacement - Year 2
Company Name
Instructions for using Bid Sheet

Fill in Company information.

Complete the Unit cost portion, the Extended Price will calculate.Street
City/State
Contact Name
Phone #
Email Address
Line #ProductQuantityUnit of MeasureUnit CostExtended Price
Section 1: General
1Mobilization, Max 10%1Lsum$ - 0
2Utility Investigation, Max 5%1Lsum$ - 0
3Allowance for Unforeseen Circumstances1Lsum$ 100,000.00$ 100,000.00
Section 2: Field 27
4Irrigation Main, 42" DI, Restrained380FT$ - 0
5Irrigation Main, 42" DI1,050FT$ - 0
6Irrigation Main, 36" DI, Restrained410FT$ - 0
7Irrigation Main, 36" DI1,100FT$ - 0
8Irrigation Main, 24" DI, Restrained110FT$ - 0
9Irrigation Main, 10" DI, Restrained50FT$ - 0
10Irrigation Main, 8" DI, Restrained40FT$ - 0
11Gate Valve & Box, 24"1EA$ - 0
1210" AC/DI Coupler1EA$ - 0
1336" Sleeve2EA$ - 0
1410" Sleeve1EA$ - 0
1542" x 42" x 42" Tee1EA$ - 0
1624" x 24" x 8" Tee1EA$ - 0
1710" x 10" x 10" Tee1EA$ - 0
1842" x 36" Reducer1EA$ - 0
1942" x 24" Reducer1EA$ - 0
2024" x 10" Reducer1EA$ - 0
2142" 11.25° Bend1EA$ - 0
2236" 45° Bend1EA$ - 0
2324" 45° Bend1EA$ - 0
2410" 90° Bend1EA$ - 0
2510" 45° Bend1EA$ - 0
268" 90° Bend2EA$ - 0
2742" Cap w/ 4" Standpipe1EA$ - 0
288" Irrigation Rig Connection1EA$ - 0
299 SFT Thrust Block1EA$ - 0
30Irrigation Main, Rem, Less than 14", AC50FT$ - 0
31Irrigation Main, Rem, Less than 14"25FT$ - 0
32Irrigation Main, Rem, Greater than 24"20FT$ - 0
3372" CL IV Conc. Storm Sewer100FT$ - 0
3472" Conc. Flared End Section2EA$ - 0
35Construction Bypass Operation1LS$ - 0
36Clearing, Brushing, and Tree Removal1LS$ - 0
37Underdrain Removal and Replacement100FT$ - 0
38Access Road1,800SYD$ - 0
39Restoration1Lsum$ - 0
Section 3: Valve Replacements
40Irrigation Main, 24" DI, Restrained30FT$ - 0
41Irrigation Main, 20" DI, Restrained45FT$ - 0
42Irrigation Main, 18" DI, Restrained15FT$ - 0
43Irrigation Main, 16" DI, Restrained40FT$ - 0
44Irrigation Main, 14" DI, Restrained15FT$ - 0
45Irrigation Main, 12" DI, Restrained30FT$ - 0
46Irrigation Main, 10" DI, Restrained25FT$ - 0
47Gate Valve & Box, 24"1EA$ - 0
48Gate Valve & Box, 20"2EA$ - 0
49Gate Valve & Box, 16"1EA$ - 0
50Gate Valve & Box, 12"1EA$ - 0
51Gate Valve & Box, 10"2EA$ - 0
5218" AC/DI Coupler2EA$ - 0
5316" AC/DI Coupler2EA$ - 0
5414" AC/DI Coupler1EA$ - 0
5512" AC/DI Coupler2EA$ - 0
5610" AC/DI Coupler2EA$ - 0
5720" Sleeve1EA$ - 0
5810" Sleeve1EA$ - 0
5920" x 20" x 20" Tee1EA$ - 0
6024" x 16" Reducer2EA$ - 0
6120" x 18" Reducer2EA$ - 0
6216" x 14" Reducer2EA$ - 0
6320 SFT Thrust Block1EA$ - 0
64Irrigation Main, Rem, Less than 14", AC35FT$ - 0
65Irrigation Main, Rem, 14" to 24", AC125FT$ - 0
66Irrigation Main, Rem, Less than 14"20FT$ - 0
67Irrigation Main, Rem, 14" to 24"25FT$ - 0
68Restoration1Lsum$ - 0
Total$ 100,000.00
Section 4: Alternate Connection Materials
69Gate Valve & Box, 10", Furnish1EA$ - 0
7010" Sleeve, Furnish1EA$ - 0