25-2588 Whitehall Purge Well Rehab Bid Sheet.xlsx
XLSX spreadsheet 13 KB Posted
- Attached to
- Whitehall Purge Well Rehabilitation - 20 HP
- Solicitation number
- 25-2588
- Issued by
- Mackinac County, Michigan
About this file
This document is a Bid Sheet (IFB 25-2588) for the Whitehall Purge Well Replacement project, involving the Muskegon County Resource Recovery Center in Whitehall Township, Michigan. The project scope includes comprehensive rehabilitation of a 38-year-old purge well system, with nine wells requiring complete pump and motor replacements, including removal of existing equipment, installation of new 20 HP pumps and motors, well pump control panels, precast manholes, ductile iron piping, valves, and system connections. The bid sheet outlines detailed line items for each replacement component, with a total bid allowance of $30,000, including a $30,000 contingency for unforeseen circumstances.
The bid sheet provides a structured format for potential contractors to submit pricing, with instructions to complete company information, indicate project commencement timeline, and enter unit pricing. The project is mandated by a State of Michigan order to maintain the operational status of the purge well system, which prevents groundwater migration from the former Whitehall Wastewater Treatment Plant site. The bid sheet allows for unit pricing across multiple critical infrastructure replacement components, with flexibility for additional documentation if needed. The comprehensive rehabilitation appears designed to ensure continued compliance with state environmental regulations and maintain critical groundwater management infrastructure.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 25-2588 Whitehall Purge Well Rehab - 20hp.pdf | ||
| W9 BLANK.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Sheet
| IFB 25-2588 Whitehall Purge Well Replacement - 20hp | |
| Company Name | |
| Street | |
| City/State | |
| Contact Name | |
| Phone # | |
| Email Address |
Anticipate to Start W/In How Many Days after Award:
| Description | Quantity | Unit | Unit Price | Total Amount |
| Mobilization, Max 10% of Bid | 1 | LS | $ - 0 | |
| Remove Existing 20 HP Pump and Motor | 9 | EA | $ - 0 | |
| Remove Existing Well Pump Controls | 9 | EA | $ - 0 | |
| Clean Existing 16" Well Screens | 1 | LS | $ - 0 | |
| Install New 20 HP Pump and Motors | 9 | EA | $ - 0 | |
| Install New 20 HP Well Pump Control Panel & Components | 9 | EA | $ - 0 | |
| Install 60" Precast Manhole | 9 | EA | $ - 0 | |
| Install 8" Ductile Iron Pipe | 150 | LF | $ - 0 | |
| Install 8" Check Valve | 9 | EA | $ - 0 | |
| Install 8" Butterfly Valve | 9 | EA | $ - 0 | |
| Install Air Release | 9 | EA | $ - 0 | |
| Connect to Existing Purge Well System | 9 | EA | $ - 0 | |
| Allowance for Unforeseen Circumstances | 1 | LS | $ 30,000.00 | $ 30,000.00 |
| TOTAL | $ 30,000.00 |
Instructions for using Bid Sheet *Fill in Company information *Enter the anticipated number of days that work could commence after being awarded contract.
*Enter Unit Price only - Total Amount will calculate autmatically *If additional space is needed - please attach additional pages
File details come from the government source that posted it. Updated .