25_22 RFP Renovations of the Community Garden.pdf

PDF 644 KB Posted

Attached to
Renovations of the Community Garden at Parker Road
Solicitation number
PE-72200-NONST-2026-000000059
Issued by
Peach County, Columbus City, Georgia

About this file

This is a Request for Proposals (RFP No. 25-22) issued by Rockdale County, Georgia, for Renovations of the Community Garden at Parker Road. The project involves comprehensive renovation work including installing six 1 1/4-inch steel yard hydrants, constructing wellness structures such as raised bed planters, a wood gazebo, a yoga/wellness deck, and two pergolas, creating concrete and mulch trails, installing horse and chain link fencing, landscaping, and providing educational materials. The mandatory pre-proposal conference is scheduled for August 25, 2025, at 9:00 a.m., and proposals are due on September 11, 2025, by 2:00 p.m. The contract term is 120 days from the Notice to Proceed, with liquidated damages of $100 per calendar day for delays.

The project is funded through a federal grant, and the county will select which items to complete to stay within the funding limit. Proposers must submit a comprehensive bid with lump sum costs for each project component, including a 5% contingency. The evaluation will be a past performance/quality/price trade-off, with 25% weight on staffing, 35% on experience/performance, 10% on approach, and 30% on cost. Proposers must provide financial statements, demonstrate financial stability, and include a current business license. The county reserves the right to award the contract to the most advantageous proposer and may conduct interviews as part of the selection process.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RREEQQUUEESSTT FFOORR PPRROOPPOOSSAALLSS

NNoo.. 2255--2222

RROOCCKKDDAALLEE CCOOUUNNTTYY,, GGEEOORRGGIIAA

JJuullyy 3300,, 22002255

RREENNOOVVAATTIIOONNSS OOFF TTHHEE CCOOMMMMUUNNIITTYY GGAARRDDEENN

AATT PPAARRKKEERR RROOAADD

ROCKDALE COUNTY FINANCE DEPARTMENT

PROCUREMENT OFFICE

958 Milstead Avenue

CONYERS, GA 30012

770-278-7552

RFP No.25-22

INTRODUCTION:

Rockdale County is requesting Competitive Sealed Proposals for the Renovations of the Community Garden at Parker Road. Instructions for preparation and submission of a proposal are contained in this packet. Proposals must be typed or printed in ink.

The Contractor will furnish all products, tools, construction equipment, skill, and labor of every description necessary to carry out and to complete in a good, firm, substantial workmanlike manner for the Renovations of the Community Garden at Parker Road in accordance with the County’s Request for Proposal No. 25-22, incorporated herein by reference, (hereinafter called “Work”), and Contractor’s proposal dated (input date), attached hereto and made a part hereof, (hereinafter called “Proposal”). Contractor shall provide, at their expense, all vehicles and equipment necessary to provide this work.

Rockdale County provides equal opportunity for all businesses and does not discriminate against any person or business because of race, color, religion, sex, national origin, handicap, or veterans’ status. This policy ensures all segments of the business community have access to supplying the goods and services needed by Rockdale County.

PURCHASING CONTACT FOR THIS REQUEST:

All questions concerning this RFP and all questions arising subsequent to award are to be addressed to the Purchasing Division via email to Adrienne Brown, at Adrienne.m.brown@rockdalecountyga.gov.

Rockdale County Finance Department Purchasing Division

Attn: Adrienne Brown 958 Milstead Avenue Conyers, GA 30012

Phone: (770) 278-7557, Fax: (770) 278-8910 E-mail: Adrienne.m.brown@rockdalecountyga.gov

To maintain a “level playing field”, and to assure that all proposers receive the same information, proposers are requested NOT to contact anyone other than the contact above until after the award of the contract. Doing so could result in disqualification of the proposer.

PROPOSAL COPIES FOR EVALUATION:

Proposal:

One (1) USB Flash Drive in Adobe PDF format will be required for review purposes. Flash Drives that are blank or have incorrect information on them will not be acceptable and may be justification for disqualification. Check your Flash Drive(s) to ensure that they have the appropriate material on it before submitting.

CONTRACT TERM:

120 days from the Notice to Proceed

DUE DATE:

Sealed proposals will be received at the Rockdale County Finance Department, Procurement Division, 958 Milstead Avenue, Conyers, GA 30012 no later than 2:00 P.M., local time, Thursday, September 11, 2025.

Proposals received after this time will not be accepted.

mailto:Adrienne.m.brown@rockdalecountyga.gov mailto:Adrienne.m.brown@rockdalecountyga.gov

PRE-PROPOSAL CONFERENCE:

There will be a MANDATORY Pre-Proposal Conference held at 1400 Parker Rd., Conyers, GA 30094, at 9:00 a.m., local time, Monday, August 25, 2025. Prime bidders who arrive more than 5 minutes after the start of the meeting (as stated in the solicitation and by the Procurement representative’s watch) or after the discussion portion of the meeting (whichever comes first) may not be permitted to submit a bid on the project. Any questions and/or misunderstandings that may arise from this RFP may be asked and answered at the pre-proposal conference;

however, oral responses are not authoritative. Proposers are encouraged to review the RFP before attending the pre-proposal conference. Questions received after the pre-proposal conference must be submitted in writing to Adrienne.m.brown@rockdalecountyga.gov. Any contractor who intends to submit a proposal is required to attend this meeting.

QUESTIONS AND CLARIFICATIONS:

All questions and requests for clarifications concerning this RFP must be submitted to the Purchasing Division via email to Adrienne.m.brown@rockdalecountyga.gov no later than 2:00 p.m., local time, on Thursday, September 4, 2025. It shall be the proposer’s responsibility to seek clarification as early as possible prior to the due date and time. Written responses from the County to the questions it receives will be in an addendum and posted to the County’s website at www.rockdalecountyga.gov, under Bid Opportunities. Questions or requests for clarifications received after this deadline will not receive a response.

ADDENDA:

Answers to questions submitted that materially change the conditions and specifications of this RFP will be issued in an addendum and posted to the County’s website at www.rockdalecountyga.gov Bid Opportunities. Any discussions or documents will be considered non-binding unless incorporated and issued in an addendum.

It is the proposer’s responsibility to check the Rockdale County website at www.rockdalecountyga.gov, Bid Opportunities for any addenda that may be issued, prior to submitting a proposal for this RFP.

QUANTITIES

The quantities listed in the Proposers Response Schedule are provided as an estimate for proposal purposes.

The County will not be obligated to quantities beyond actual needs.

LIQUIDATED DAMAGES

Time is of the essence and is an essential element of this Contract, and the Contractor shall pay to the County, not as a penalty, but as liquidated damages, the sum of $100.00 for each calendar day that there is default of completing the Work within the time limit named herein. If the Contractor abandons the Contract before commencement of the Work or defaults in completion of all the Work after commencement thereof, the Contractor shall be liable for such liquidated damages. These fixed liquidated damages are not established as a penalty but are calculated and agreed upon in advance by the County and the Contractor due to the uncertainty and impossibility of making a determination as to the actual and consequential damages incurred by the County and the general public of Rockdale County, Georgia as a result of the failure on the part of the Contractor to complete the Work on time. Such liquidated damages referred to herein are intended to be and are cumulative and shall be in addition to every other remedy now or hereafter enforceable at law, in equity, by statute, or under the Contract.

QUALIFICATIONS OF OFFERORS:

Proposers must have a current business license from their home-based jurisdiction and provide a copy of that license with the submittal of their proposal response.

Proposals from any offeror that is in default on the payment of any taxes, license fees, or other monies due to Rockdale County will not be accepted.

Any contractor submitting a Proposal must complete the Contractor’s Qualification Statement and Questionnaire if provided in this package.

In evaluating Proposals, the County may seek additional information from any contractor concerning such mailto:Adrienne.m.brown@rockdalecountyga.gov mailto:Adrienne.m.brown@rockdalecountyga.gov http://www.rockdalecountyga.gov/ http://www.rockdalecountyga.gov/ http://www.rockdalecountyga.gov/ contractor’s proposal or its qualifications to construct the Project.

DEBRIEFINGS:

In lieu of Post-Award debriefings, Rockdale County will provide the final evaluation Score Sheet. The Score Sheet will include the scores for all firms who responded and will typically be provided with a PDF file and e-mailed.

FINANCIAL STABILITY

The Offeror will provide financial information that would allow proposal evaluators to ascertain the financial stability of the firm.

• If a public company, the Offeror will provide their most recent audited financial report.

• If a private company, the Offeror will provide a copy of their most recent internal financial statement, and/or a letter from their financial institution, on the financial institution’s letterhead, stating the Offeror is in good standing with that financial institution.

SELECTION PROCESS:

The Rockdale County Procurement Office and Evaluation Committee makes a recommendation for award. The Board of Commissioners will make the actual award of the contract and has the authority to award the contract to a company different than the company recommended by the Procurement Office and/or Evaluation Committee.

This is a past performance/quality/price trade-off source selection in which competing offeror’s past and present performance history and product quality will be evaluated on a basis approximately equal to price. Award will be made to the responsible offeror whose proposal represents the best value after evaluation in accordance with the factors listed below. Rockdale County Board of Commissioners may reject any or all proposals and to waive any technicalities or informalities if such action is in the county’s interest.

Rockdale County may evaluate proposals and award a contract without discussions with offerors. Therefore, the offeror’s initial proposal should contain the offeror’s best terms from a price and technical standpoint. The County reserves the right to conduct discussions if the County later determines them to be necessary.

Proposers will be evaluated based on the following criteria and may be called in for an interview.

The County intends to award the contract to the responsible and responsive contractor whose proposal is determined in writing to be the most advantageous to the County taking into consideration all of the evaluation criteria.

EVALUATION CRITERIA:

Offerors will be evaluated based on the following criteria and may be called in for an interview.

Respondents will have their submissions evaluated and scored. Submissions will be evaluated to assess the respondent's ability to provide anticipated services for Rockdale County. Rockdale County shall be the sole judge of the quality and the applicability of all statements of qualifications. Approach, scope, overall quality, local facilities, terms, and other pertinent considerations will be taken into account in determining acceptability.

Selection Committee shall evaluate and rank the statements of qualifications based on the following criteria:

• Staffing and Availability – Evaluation of the list of personnel specifically assigned to the RFP proposed project, including their qualifications, overall experience and recent experience on projects of similar nature and complexity to the proposed project. Organization and Staffing, evaluation of the workload of the proposing firm and the staffing to be assigned to the proposed project; time schedule of the Proposer in relation to that of the proposed project location of the offices or facilities from which the services are to be provided to the County. (25%)

• Experience/Performance – Review of personnel qualifications and experience. Management approach to projects, past performance on projects of similar nature and complexity as the proposed project. Evaluation of client references including but not limited to references submitted in qualification response; overall responsiveness to County’s needs. Provider financial capability, qualifications and experience. (35%)

• Approach – Evaluation of the overall understanding of the scope of the proposed project; completeness, adequacy and responsiveness to the required information of the request for proposals. (10%)

• Cost – (30%)

INTERVIEWS

Interviews may be scheduled. Interviews will be informal and will provide respondents with an opportunity to answer any questions the selection team may have on a submission.

INSURANCE:

Before starting any work, the successful contractor must furnish to Rockdale County certificate(s) of insurance from companies doing business in Georgia. The Company shall maintain in full force and effect the following insurance during the term of the Agreement:

Coverages: Limits of Liability:

Workers’ Compensation Statutory Employers’ Liability $1,000,000.00 Bodily Injury Liability $1,000,000.00 each occurrence except Automobile $1,000,000.00 aggregate Property Damage Liability $1,000,000.00 each occurrence except Automobile $1,000,000.00 aggregate Personal & Advertising Injury Limit $1,000,000.00 Products / Completed Ops. $2,000,000.00 aggregate Automobile Bodily Injury $1,000,000.00 each person Liability $1,000,000.00 each occurrence Automobile Property Damage $1,000,000.00 each occurrence Liability Property Coverage /Builders Risk Policy Equal to or greater than the existing building limit if performing renovations.

(If hazardous substances are involved) Contractor’s Pollution Liability (with 1-year extended reporting period) Each Occurrence $1,000,000.00 Aggregate $2,000,000.00

Environmental Impairment Liability (with 1-year extended reporting period) Each Occurrence $1,000,000.00 Aggregate $2,000,000.00

Professional Liability/General Liability $1,000,000.00

All insurance shall be provided by an insurer(s) acceptable to the County and shall provide for thirty (30) days prior notice of cancellation to the County. Upon contract award, Contractor shall deliver to the County a certificate or policy of insurance evidencing Contractor’s compliance with this paragraph. Contractor shall abide by all terms and conditions of the insurance and shall do nothing to impair or invalidate the coverage.

Rockdale, GA shall be named as Additional Insured under any General Liability, Business Auto and Umbrella Policies using ISO Additional Insured Endorsement forms CG 2010 or its equivalent. Coverage shall apply as Primary and non-contributory with Waiver of Subrogation in favor of Rockdale County, Georgia.

The insurance carrier must have a minimum rating of A or higher as determined by the rating firm A.M. Best.

Certificates must contain policy number, policy limits, and policy expiration date of all policies. The Request for Proposals (RFP) number and project name must be inserted in the Description of Operations section of the certificate.

Certificates are to be issued to:

Rockdale County, Georgia 958 Milstead Avenue Conyers, GA 30012

BONDS:

Rockdale County shall request the following for bids/proposals in excess of Fifty Thousand Dollars ($50,000.00).

BID BOND

Each bid shall include a bid bond in the amount of five percent (5%) of the total bid amount as guarantee that the bidder shall not withdraw the bid for 120 days after the scheduled bid opening. If awarded the contract, Bidders shall enter a written agreement with Rockdale County in accordance with the bid.

PERFORMANCE BOND

Upon execution and delivery of the contract, the bidder shall furnish Rockdale County a performance bond for the full amount of the contract. Maintenance provisions of the bond shall remain in effect for a period of twelve (12) months after acceptance of the work by the County. The surety shall be a reputable bonding company authorized to transact business in the State of Georgia.

PAYMENT BOND

Upon execution and delivery of the contract, the bidder shall furnish Rockdale County a payment bond for the full amount of the contract. Maintenance provisions of the bond shall remain in effect for a period of twelve (12) months after acceptance of the work by the County. The surety shall be a reputable bonding company authorized to transact business in the State of Georgia.

All sureties of bonds for Rockdale County must be licensed to do business in the State of Georgia and must be listed on the Department of Treasury Federal Register.

PERMITS:

The awarded contractor will be responsible for acquiring any permits that are required for this project/purchase.

Rockdale County will waive fees on all permits issued by Rockdale County.

AWARD OF CONTRACT

The Rockdale County Procurement Office and Evaluation Committee makes a recommendation for award. The Board of Commissioners will make the actual award of the contract and has the authority to award the contract to a company different than the company recommended by the Procurement Office and/or Evaluation Committee.

Rockdale County reserves the right to make no awards, multiple awards, one award for all items; or whatever the County deems to be in its best interest.

OPEN RECORDS

The contents of the proposals will not be made public until after an award and contract has been executed.

ILLEGAL IMMIGRATION REFORM AND ENFORCEMENT ACT OF 2011

Vendors submitting a Qualification package in response to this RFP must complete the Contractor Affidavit under O.C.G.A. §13-10-91(b)(1) which is provided with the RFP package to verify compliance with the Illegal Immigration Reform and Enforcement Act of 2011.

A. The form must be signed by an authorized officer of the contractor or their authorized agent.

B. The form must be notarized.

C. The contractor will be required to have all subcontractors and sub-subcontractors who are engaged to complete physical performance of services under the final contract executed between the County and the contractor complete the appropriate subcontractor and sub-subcontractor affidavits and return them to the County a minimum of five (5) days prior to any work being accomplished by said subcontractor or sub-subcontractor. Format for this affidavit can be provided to the contractor if necessary.

PIGGYBACKING

Rockdale County encourages and agrees to the successful bidder extending the pricing, terms and conditions of this solicitation or resultant contract to other governmental entities at the discretion of the successful bidder.

GENERAL INFORMATION

No proposals received after said time or at any place other than the time and place as stated in the notice shall be considered. No responsibility shall attach to Rockdale County for the premature opening of a proposal not properly addressed and identified.

WITHDRAWAL OF PROPOSAL:

A proposer may withdraw his proposal before the proposal due date, without prejudice to the proposer, by submitting a written request of withdrawal to the Rockdale County Procurement Office.

REJECTION OF PROPOSAL:

Rockdale County may reject any and all proposals and must reject a proposal of any party who has been delinquent or unfaithful in any formal contract with Rockdale County. Also, the right is reserved to waive any irregularities or informalities in any proposal in the proposing procedure. Rockdale County shall be the sole judge as to which proposal is best, and in ascertaining this, will take into consideration the business integrity, financial resources, facilities for performing the work, and experience in similar operations of the various proposers.

STATEMENT OF EXPERIENCE AND QUALIFICATIONS:

The proposer may be required, upon request, to prove to the satisfaction of Rockdale County that he/she has the skill, experience, necessary facilities and ample financial resources to perform the contract(s) in a satisfactory manner and within the required time. If the available evidence of competency of any proposer is not satisfactory, the proposal of such proposer may be rejected. The successful proposer is required to comply with and abide by all applicable federal and state laws in effect at the time the contract is awarded.

NON-COLLUSION AFFIDAVIT:

By submitting a proposal, the proposer represents and warrants that such proposal is genuine and not sham or collusive or made in the interest or in behalf of any person not therein named, that the proposer has not directly or indirectly induced or solicited any other proposer to put in a sham proposal, or any other person, firm or corporation to refrain from proposing and that the proposer has not in any manner sought by collusion to secure to that proposer any advantage over any other proposer.

INTEREST OF:

By submitting a proposal, the proposer represents and warrants that a Commissioner, Administrator, employee, nor any other person employed by Rockdale County has, in any manner, an interest, directly or indirectly, in the proposal or in the contract which may be made under it, or in any expected profits to arise there from.

DOCUMENTS DEEMED PART OF THE CONTRACT:

The notice, invitation to proposers, general conditions, and instructions for proposers, special conditions, specifications, proposal, and addenda, if any, will be deemed part of the contract.

STANDARD INSTRUCTIONS

1. The instructions contained herein shall be construed as a part of any proposal invitation and/or specifications issued by Rockdale County and must be followed by each proposer.

2. The written specifications contained in this proposal shall not be changed or superseded except by written addendum from Rockdale County. Failure to comply with the written specifications for this proposal may result in disqualification by Rockdale County.

3. All goods and materials shall be F.O.B. Destination Conyers, Georgia and no freight or postage charges will be paid by Rockdale County unless such charges are included in the proposal price.

4. The following number, RFP No. 25-22, must be written clearly on the outside of each proposal envelope in order to avoid prior opening in error.

5. All proposals must be received and in-hand at proposal due date and time. Each proposer assumes the responsibility for having his/her proposal received at the designated time and place of proposal due date.

Proposals received after the stated time and date may be subject to rejection without consideration, regardless of postmark. Rockdale County accepts no responsibility for mail delivery.

6. Unless otherwise stated, all proposals submitted shall be valid and may not be withdrawn for a period of 120 days from the due date.

7. Each proposal form submitted must include the name of the business, mailing address, the name, title and signature of the person submitting the proposal. When submitting a proposal to Rockdale County the Proposal Form must be submitted in a separate sealed envelope labeled “Proposal Form”.

8. Rockdale County reserves the right to accept a proposal that is not the lowest price if, in the County's judgment, such proposal is in the best interest of the County and the public. The County reserves the right to reject any and all proposals.

9. Telephone, Emailed or Facsimile proposals will not be accepted.

10. No sales tax will be charged on any orders except for contracts that include construction materials being purchased through a third party.

i. Federal I.D. #58-6000882

ii. Sales Tax Exempt #308750008

11. If applicable, completed questionnaires must be signed manually. Rockdale County reserves the right to accept or reject any proposal on the basis of incomplete or inaccurate answers to the questionnaire.

12. If applicable, warranty information shall be provided.

13. Proposers shall state delivery time after receiving order.

14. Proposers shall identify any subcontractors and include an explanation of the service or product that they may provide.

BID SPECIFICATIONS:

A. Overview:

Rockdale County is requesting proposals for renovations to the existing community garden per the attached construction plans and the instructions below. Funding is from a federal grant so bidders shall provide complete pricing for each item listed in the bid form so that the county can select which items to complete so as to not exceed the funding. Each line item should include all materials, labor, overhead, profit, direct and indirect cost associated with that item independent from the other items. The county reserves the right to contract for one or more of the items without picking others.

B. General:

1. The contractor’s personnel shall have the qualifications, knowledge, and experience to properly and reliably perform the Services described herein.

2. The contractor shall always provide sufficient qualified personnel to perform the Services required in a timely, accurate, and professional manner.

3. The contractor shall perform all work in coordination with the County’s schedule and/or other contractors engaged by the county.

4. The contractor shall take necessary precautions to protect any adjacent facilities and/or environment during the course of installation.

5. The contractor must clean up site after completion of the work and must dispose of all trash, materials, packaging, etc.

6. The contractor shall remove grass and topsoil and prepare and compact subgrade properly.

7. The contractor shall provide a one-year unconditional warranty for all material and labor performed with the exception of grassing and plantings where irrigation is not provided.

C. Items:

1. Irrigation supplies:

a. Provide (6) new 1 1/4-inch diameter, steel dry pipe yard hydrants with pump handle at locations shown on plan.

b. Provide all materials and labor required to trench and install new system.

c. Each yard hydrant location shall consist of pipe extending 2 ft above ground and minimum

1.5 ft below surface with frost proof valve with drain port.

d. Each location embedded in crushed stone or gravel.

2. Wellness structures:

a. Provide 3ft wide x 6ft long x 30” tall x 12” deep cedar wood raised bed planters as shown on plans.

b. Provide wood gazebo at location shown on plans.

c. Provide yoga/wellness deck at location shown on plans.

d. Provide pergolas at (2) locations as shown on plans.

i. Alternate #1: provide 10 ft wide by 6ft deep pergola with similar details as shown

e. All construction details as shown on plans.

3. Trails:

a. Provide concrete sidewalks as shown on plans.

b. Provide mulch trails as shown on plans.

4. Fencing:

a. Provide 4-rail horse fencing as shown on plans.

b. Provide 4ft tall black vinyl coated 9-gauge chain link fencing with top and bottom rails in locations as shown on plans.

i. Alternate #2: furnish and install 12ft wide by 4ft tall horizontal rolling gate including motor, all hardware, keypad with mounting post, and (6) wireless remotes.

i. No electrical work - power provided by the county.

c. Provide 6ft tall black vinyl coated 9-gauge chain link fencing with top rail and bottom tension wire to match existing fence in locations as shown on plans.

d. Provide gates in size and composition as indicated on plans.

e. Gates shall include strong arm latches and cane bolt for security.

f. All posts to be embedded in concrete.

5. Plants and landscaping:

a. Provide all plants and landscape beds as shown on plans.

b. Provide centipede sod as shown on plans.

c. All disturbed areas caused by construction shall be smoothed and replaced with grass seed and straw. No area shall be left as exposed dirt.

d. Machine and hand till dirt as needed to provide loose subgrade for seed or sod.

e. Fertilizer to be provided in proper mixture as needed per the growing season of installation.

f. Mulch to be installed a minimum of 4” to provide a depth of 3” compacted.

6. Educational materials:

a. For each landscape item installed, provide a minimum of 2 in-ground signage plaques as shown on plans.

b. This includes all plants, shrubs, and trees.

General:

Purchase Price shall include delivery, F.O.B. Rockdale County, Conyers, GA 30012.

PROPOSAL FORM

Instructions: Complete all THREE parts of this bid form.

PART I: Proposal Summary Complete the information below. If you wish to submit more than one brand, make a photocopy of this Proposal Form.

1 Irrigation system - lump sum cost $

2 Wellness structure A – Raised beds (Qty 12) lump sum cost $

3 Wellness structure B – Gazebo (Qty 1) lump sum cost $

4 Wellness structure C – Yoga deck (Qty 1) lump sum cost $

5 Wellness structure D – Pergolas (Qty 2) lump sum cost $

6 Trails (sidewalks and mulch) - lump sum cost $

7 Fencing (wood and chain link) - lump sum cost $

8 Plants and landscaping - lump sum cost $

9 Educational Materials - lump sum cost $

10 Subtotal (sum of lines 1 through 9) $

11 5% contingency (line 10 x 5%) $

12 Alternate #1 – 10ft x 6ft pergolas (Qty 2) lump sum cost $

13 Alternate #2 – 12ft x 4ft rolling gate lump sum cost $

14 Total bid (lines 1 through 13) $

PART II: Addenda Acknowledgements (if applicable) Each vendor is responsible for determining that all addenda issued by the Rockdale County Finance Department – Purchasing Division have been received before submitting a bid.

Addenda Date Vendor Received Initials “1” “2” “3” “4” “5” “6”

PART III: Vendor Information:

Company Name Address Telephone E-Mail Representative (print name) Signature of Representative Date Submitted

ROCKDALE COUNTY BOARD OF COMMISSIONERS

NON-COLLUSION AFFIDAVIT OF VENDOR

State of ____________________)

County of ____________________)

___________________________________________, being first duly sworn, deposes and says that:

(1) He is____________________________________ (owner, partner officer, representative, or agent) of ___________________________, the Vendor that has submitted the attached RFP;

(2) He is fully informed respecting the preparation and contents of the attached RFP and of all pertinent circumstances respecting such RFP;

(3) Such RFP is genuine and is not a collusive or sham RFP;

(4) Neither the said Vendor nor any of its officers, partners, owners, agents, representatives, employees or parties in interest, including this affidavit, has in any way colluded, conspired, connived or agreed, directly or indirectly with any other Vendor, firm or person to submit a collusive or sham RFP in connection with the Contract for which the attached RFP has been submitted or refrain from proposing in connection with such Contract, or has in any manner, directly or indirectly, sought by agreement or collusion or communication or conference with any other Vendor, firm or person to fix the price or prices in the attached RFP or of any other Vendor, or to fix any overhead, profit or cost element of the proposing price or the proposing price of any other Vendor, or to secure through any collusion, conspiracy, connivance or unlawful agreement any advantage against Rockdale County or any person interested in the proposed Contract; and

(5) The price or prices quoted in the attached RFP are fair and proper and are not tainted by any collusion, conspiracy, connivance or unlawful agreement on the part of the Vendor or any of its agents, representatives, owners, employees, or parties in interest, including this affidavit.

(Signed)

(Title)

Subscribed and Sworn to before me this ___________ day of _____________, 202__

Name__________________________________________________

Title__________________________________________________ My commission expires (Date)

ROCKDALE COUNTY BOARD OF COMMISSIONERS

NON-COLLUSION AFFIDAVIT OF SUB-CONTRACTOR

State of ____________________)

County of ____________________)

___________________________________________, being first duly sworn, deposes and says that:

(1) He/She is____________________________________ (owner, partner officer, representative, or agent) of ___________________________, the sub-contractor that has submitted the attached RFP;

(2) He is fully informed respecting the preparation and contents of the attached RFP and of all pertinent circumstances respecting such RFP;

(3) Such RFP is genuine and is not a collusive or sham RFP;

(4) Neither the said sub-contractor nor any of its officers, partners, owners, agents, representatives, employees or parties in interest, including this affidavit, has in any way colluded, conspired, connived or agreed, directly or indirectly with any other Vendor, firm or person to submit a collusive or sham RFP in connection with the Contract for which the attached RFP has been submitted or refrain from proposing in connection with such Contract, or has in any manner, directly or indirectly, sought by agreement or collusion or communication or conference with any other Vendor, firm or person to fix the price or prices in the attached RFP or of any other Vendor, or to fix any overhead, profit or cost element of the proposing price or the proposing price of any other Vendor, or to secure through any collusion, conspiracy, connivance or unlawful agreement any advantage against Rockdale County or any person interested in the proposed Contract; and

(5) The price or prices quoted in the attached RFP are fair and proper and are not tainted by any collusion, conspiracy, connivance or unlawful agreement on the part of the sub-contractor or any of its agents, representatives, owners, employees, or parties in interest, including this affidavit.

(Signed)

(Title)

Subscribed and Sworn to before me this ___________ day of _____________, 202__.

Name_________________________________________________

Title_________________________________________________ My commission expires (Date)

Contractor Affidavit under O.C.G.A. § 13-10-91(b)(l)

The undersigned contractor ("Contractor") executes this Affidavit to comply with O.C.G.A § 13-10-91 related to any contract to which Contractor is a party that is subject to O.C.G.A. § 13-10-91 and hereby verifies its compliance with O.C.G.A. § 13-10-91, attesting as follows:

a) The Contractor has registered with, is authorized to use and uses the federal work authorization program commonly known as E-Verify, or any subsequent replacement program;

b) The Contractor will continue to use the federal work authorization program throughout the contract period, including any renewal or extension thereof;

c) The Contractor will notify the public employer in the event the Contractor ceases to utilize the federal work authorization program during the contract period, including renewals or extensions thereof;

d) The Contractor understands that ceasing to utilize the federal work authorization program constitutes a material breach of Contract;

e) The Contractor will contract for the performance of services in satisfaction of such contract only with subcontractors who present an affidavit to the Contractor with the information required by O.C.G.A. § 13-10-91(a), (b), and (c);

f) The Contractor acknowledges and agrees that this Affidavit shall be incorporated into any contract(s) subject to the provisions of O.C.G.A. § 13-10- 91 for the project listed below to which Contractor is a party after the date hereof without further action or consent by Contractor; and

g) Contractor acknowledges its responsibility to submit copies of any affidavits, drivers' licenses, and identification cards required pursuant to O.C.G.A. § 13-10-91 to the public employer within five business days of receipt.

Federal Work Authorization User Identification Number Date of Authorization

Name of Contractor Name of Project

Name of Public Employer

I hereby declare under penalty of perjury that the foregoing is true and correct.

Executed on _________, _____, 20_____ in _______________ (city), __________ (state).

Signature of Authorized Officer or Agent

Printed Name and Title of Authorized Officer or Agent

SUBSCRIBED AND SWORN BEFORE ME

ON THIS THE _______ DAY OF _____________, 20______.

NOTARY PUBLIC

My Commission Expires: _____________________________

Subcontractor Affidavit under O.C.G.A. § 13-10-91(b)(3)

By executing this affidavit, the undersigned subcontractor verifies its compliance with O.C.G.A. § 13-10-91, stating affirmatively that the individual, firm or corporation which is engaged in the physical performance of services under a contract with (name of contractor) on behalf of (name of public employer) has registered with, is authorized to use and uses the federal work authorization program commonly known as E-Verify, or any subsequent replacement program, in accordance with the applicable provisions and deadlines established in O.C.G.A. § 13-10-91. Furthermore, the undersigned subcontractor will continue to use the federal work authorization program throughout the contract period and the undersigned subcontractor will contract for the physical performance of services in satisfaction of such contract only with sub-subcontractors who present an affidavit to the subcontractor with the information required by O.C.G.A. § 13-10-91(b). Additionally, the undersigned subcontractor will forward notice of the receipt of an affidavit from a sub-subcontractor to the contractor within five business days of receipt. If the undersigned subcontractor receives notice that a sub-subcontractor has received an affidavit from any other contracted sub-subcontractor, the undersigned subcontractor must forward, within five business days of receipt, a copy of the notice to the contractor.

Subcontractor hereby attests that its federal work authorization user identification number and date of authorization are as follows:

Federal Work Authorization User Identification Number Date of Authorization Name of Subcontractor Name of Project Name of Public Employer

I hereby declare under penalty of perjury that the foregoing is true and correct.

Executed on ______, ___, 202__ in _____(city), ______(state).

Signature of Authorized Officer or Agent Printed Name and Title of Authorized Officer or Agent

SUBSCRIBED AND SWORN BEFORE ME

ON THIS THE ______ DAY OF ______________,202__.

NOTARY PUBLIC

My Commission Expires:

Sub-subcontractor Affidavit under O.C.G.A. § 13-10-91(b)(4)

By executing this affidavit, the undersigned sub-subcontractor verifies its compliance with O.C.G.A. § 13-10-91, stating affirmatively that the individual, firm or corporation which is engaged in the physical performance of services under a contract for (name of subcontractor or sub-subcontractor with whom such sub-subcontractor has privity of contract) and (name of contractor) on behalf of (name of public employer) has registered with, is authorized to use and uses the federal work authorization program commonly known as E-Verify, or any subsequent replacement program, in accordance with the applicable provisions and deadlines established in O.C.G.A. § 13-10-91. Furthermore, the undersigned sub-subcontractor will continue to use the federal work authorization program throughout the contract period and the undersigned sub-subcontractor will contract for the physical performance of services in satisfaction of such contract only with sub-subcontractors who present an affidavit to the sub-subcontractor with the information required by O.C.G.A. § 13-10-91(b). The undersigned sub-subcontractor shall submit, at the time of such contract, this affidavit to (name of subcontractor or sub-subcontractor with whom such sub-subcontractor has privity of contract).

Additionally, the undersigned sub-subcontractor will forward notice of the receipt of any affidavit from a sub-subcontractor to (name of subcontractor or sub-subcontractor with whom such sub-subcontractor has privity of contract).

Sub-subcontractor hereby attests that its federal work authorization user identification number and date of authorization are as follows:

Federal Work Authorization User Identification Number Date of Authorization Name of Sub-subcontractor Name of Project Name of Public Employer

I hereby declare under penalty of perjury that the foregoing is true and correct.

Executed on ______, ___, 202__ in _____(city), ______(state).

Signature of Authorized Officer or Agent Printed Name and Title of Authorized Officer or Agent

SUBSCRIBED AND SWORN BEFORE ME

ON THIS THE ______ DAY OF ______________,202__.

NOTARY PUBLIC

Affidavit Verifying Status for County Public Benefit Application

By executing this affidavit under oath, as an applicant for the award of a contract with Rockdale, County Georgia, I __________________________. [Name of natural person applying on behalf of individual, business, corporation, partnership, or other private entity] am stating the following as required by O.C.G.A. Section 50-36-1:

1) ______ I am a United States citizen

OR

2) ______ I am a legal permanent resident 18 years of age or older or I am an otherwise qualified alien or non-immigrant under the Federal Immigration and Nationality Act 18 years of age or older and lawfully present in the United States.*

In making the above representation under oath, I understand that any person who knowingly and willfully makes a false, fictitious, or fraudulent statement or representation in an affidavit shall be guilty of a violation of Code Section 16-10-20 of the Official Code of Georgia.

Signature of Applicant: Date

Printed Name:

Alien Registration number for non-citizens

SUBSCRIBED AND SWORN

BEFORE ME ON THIS THE

DAY OF , 202 .

Notary Public My commission Expires:

*Note: O.C.G.A. § 50-36-1(e)(2) requires that aliens under the federal Immigration and Nationality Act, Title 8 U.S.C., as amended, provide their registration number. Because legal permanent residents are included in the federal definition of “alien”, legal permanent residents must also provide their alien registration number. Qualified aliens that do not have an alien registration number may supply another identifying number below.

BID BOND FORM

KNOW ALL MEN BY THESE PRESENTS, that we, __________________________________ (hereinafter called the Principal) and _____________________________________ (hereinafter called the Surety), a corporation chartered and existing under the laws of the State of ____________ with its principal offices in the City of ________________and listed in the Federal Register and licensed to write surety bonds in the State of Georgia, are held and firmly bound unto Rockdale County, Georgia, in the full and just sum of ____________________Dollars ($___________________ ) good and lawful money of the United States of America, to be paid upon demand of Rockdale County, Georgia, to which payment well and truly to be made we bind ourselves, our heirs, executors, administrators, and assigns, jointly and severally and firmly by these presents.

WHEREAS, the Principal is about to submit, or has submitted to Rockdale County, Georgia, a Bid for RFP No.

WHEREAS, the Principal desires to file this Bond in accordance with law to accompany this Bid.

NOW, THEREFORE, the conditions of this obligation are such that if the Bid be accepted within one hundred and twenty (120) days of the Bid opening, the Principal shall execute a Contract in accordance with the Bid and upon the terms, conditions, and prices set forth therein, and in the form and manner required by Rockdale County, Georgia, and within ten (10) days from the date of Notice of Award of the Contract, execute a sufficient and satisfactory Performance Bond equals to 100% of the Contract Price and Payment Bond equals to 100% of the Contract Price, payable to Rockdale County, Georgia, in form and with security satisfactory to Rockdale County and furnish satisfactory proof of the insurance required, then this obligation to be void;

otherwise, to be and remain in full force and virtue in law; and the Surety shall, upon failure of the Principal to comply with any or all of the foregoing requirements within the time specified above, immediately pay to the aforesaid Rockdale County, Georgia, upon demand, the amount hereof in good and lawful money of the United States of America, not as a penalty, but as liquidated damages.

IN TESTIMONY THEREOF, the Principal and Surety have caused these presents to be duly signed and sealed this _____day of_____________________ , 202__ .

PRINCIPAL

By:____________________________________(SEAL) Signature of Principal Print Name and Title of Authorized Signer Print Name of Principal Business

ATTEST:

Corporate Secretary

SURETY

By:________________________________(SEAL)

Signature of Surety (by Power of Attorney) Print Name and Title of Authorized Signer Print Name of Surety Business

WITNESS:

PERFORMANCE BOND

STATE OF GEORGIA BOND NO.______________

COUNTY OF ROCKDALE

KNOW ALL MEN BY THESE PRESENTS, that we, , as Principal, (hereinafter known as Contractor), and we, , as Surety, do hereby acknowledge ourselves indebted and firmly bound and held unto Rockdale County, Georgia for use and benefit of those entitled thereto, in the sum of Dollars ($ ) for the payment of which will and truly to be made, in lawful money of the United States of America, we do hereby bind ourselves, successors, assigns, heirs and personal representatives.

BUT THE CONDITION OF THE FOREGOING OBLIGATION OR BOND IS THIS:

WHEREAS, the Owner has engaged the said Contractor for the sum of ______________________________________________($_____________________________) for construction of Rockdale County, Georgia, RFP# : as more fully appears in a written Contract Agreement bearing the date of , 2025, a copy of which Contract Agreement is by reference hereby made a part hereof.

NOW, THEREFORE, if said Contractor shall fully and faithfully perform all the undertakings and obligations under the said Contract Agreement hereinbefore referred to and shall fully indemnify and save harmless the said Owner from all costs and damage whatsoever which it may suffer by reason of any failure on the part of said Contractor to do so, and shall fully reimburse and repay the said Owner any and all outlay and expense which it may incur in making good any such default, and shall correct all defects in products and workmanship appearing within one year of the completion of all Work, then this obligation shall be null and void, otherwise, it shall remain in full force and effect.

And for value received it is hereby stipulated and agreed that no change, extension of time, alteration or addition to the terms of the said Contract Agreement, or in the Work to be performed there under, or the Specifications accompanying the same shall in any wise affect the obligations under this Contract Agreement or Bond, and notice is hereby waived of any such damage, extension of time, alteration or addition to the terms of the Contract Agreement or to the Work or to the Contract Documents.

This bond is given pursuant to and in accordance with the provisions of O.C.G.A. Section 36-10-1 et. seq. and 36-82-100 et. seq. and all the provisions of the law referring to this character of Bond as set forth in said Sections or as may be hereinafter enacted, and these are hereby made a part hereof to the same extent as if set out herein in full.

IN WITNESS WHEREOF, the said Contractor has hereunder affixed its signature and seal, and said Surety has hereunto caused to be affixed its corporate signature and seal, by its duly authorized officers, on this day of , 2025, executed in two (2) counterparts.

CONTRACTOR - PRINCIPAL:

By:

Name:

(Please Print) Title:

Address:

Phone:

ATTEST:

Name:

(Please Print) Title: (SEAL)

Note: Attestation for a corporation must be by the corporate secretary; for a partnership by another partner;

for an individual by a notary.

SURETY:

By:

Name:

(Please Print) Title: (SEAL)

WITNESS:

Name:

(Please Print) Title: (SEAL)

Note: Surety companies executing bonds must appear on the Treasury Department's most current list (Circular 570 as amended) and be authorized to transact business in the state where the Project is located.

Resident agent in state in which Work is to be performed:

By:

Name:

(Please Print) Title:

PAYMENT BOND

STATE OF GEORGIA BOND NO. ___________

COUNTY OF ROCKDALE

KNOW ALL MEN BY THESE PRESENTS, that we, , as Principal, (hereinafter known as Contractor), and we, , as Surety, are held and firmly bound unto Rockdale County, Georgia (hereinafter called the Owner), in the penal sum of Dollars ($____________ ) lawful money of the United States of America, for the payment of which sum will and truly to be made, we bind ourselves, our heirs, personal representatives, successors and assigns, jointly and severally, firmly by these presents.

WHEREAS, said Contractor has entered into a certain Contract Agreement with said Owner, dated____________ , 2025, for construction of Rockdale County, Georgia RFP# :

(hereinafter called the Contract), which Contract Agreement and the Contract Documents for said Work shall be deemed a part hereof as fully as if set out herein.

NOW, THEREFORE, the condition of this obligation is such, that if said Contractor and all subcontractors to whom any portion of the Work provided for in said Contract Agreement is sublet and all assignees of said Contractor and of such subcontractors shall promptly make payments to all persons supplying them with labor, products, services, or supplies for or in the prosecution of the Work provided for in such Contract Agreement, or in any amendment or extension of or addition to said Contract Agreement, and for the payment of reasonable attorney's fees, incurred by the claimant in suits on this Bond, then the above obligation shall be void; otherwise, it shall remain in full force and effect.

HOWEVER, this Bond is subject to the following conditions and limitations:

(a) Any person, firm or corporation that has furnished labor, products, or supplies for or in the prosecution of the Work provided for in said Contract Agreement shall have a direct right of action against the Contractor and Surety on this Bond, which right of action shall be asserted in a proceeding, instituted in the county in which the Work provided for in said Contract Agreement is to be performed or in any county in which Contractor or Surety does business. Such right of action shall be asserted in proceedings instituted in the name of the claimant or claimants for its use and benefit against said Contractor and Surety or either party (but not later than one year after the final settlement of said Contract Agreement) in which action such claim or claims shall be adjudicated and judgment rendered thereon.

(b) In no event shall the Surety be liable for a greater sum than the penalty of this Bond, or subject to any suit, action or proceeding thereon that is instituted later than one year after the final settlement of said Contract Agreement.

(c) This Bond is given pursuant to and in accordance with provisions of O.C.G.A. Section 13-10-1 et. seq.

and 36-82-100 et. seq. hereinafter, and all the provisions of law referring to this character of Bond as set forth in said Sections or as may be hereinafter enacted, and these are hereby made a part hereof to the same extent as if set out herein in full.

IN WITNESS WHEREOF, the said Contractor has hereunder affixed its signature and seal, and said Surety has hereunto caused to be affixed its corporate signature and seal, by its duly authorized officers, on this __ day of _____ , 2025, executed in two (2) counterparts.

CONTRACTOR - PRINCIPAL:

By:

Name:

(Please Print) Title:

Address:

Phone:

ATTEST:

Name:

(Please Print) Title: (SEAL)

Note: Attestation for a corporation must be by the corporate secretary; for a partnership by another partner;

for an individual by a notary.

SURETY:

By:

Name:

(Please Print)…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .