This is a Request for Proposals (RFP No. 25-10) issued by Rockdale County, Georgia for small contract work including framing, drywall, and acoustical ceiling (ACT) work. The county is seeking an experienced contractor to provide labor and materials for various small commercial interior projects on a per-project basis, with most work orders expected to be less than $15,000 and no individual project exceeding $50,000. The contract term is one year with options to renew for two additional one-year periods. Proposals are due by 2:00 P.M. on Thursday, June 5, 2025, and will be evaluated based on staffing and availability (35%), experience/performance (35%), approach (10%), and cost (20%).
The solicitation requires contractors to provide unit pricing for material markup percentage and labor costs for foreman/supervisor, framer, and helper roles. Contractors must have a current business license, Georgia General Contractor's License, and provide proof of insurance with specified liability limits. The county has a Local Vendor Preference Policy that allows local vendors to receive an extra 5 points on evaluation scoring, and an Equal Business Opportunity (EBO) program that aims to maximize contracting opportunities with Historically Underutilized Businesses (HUBs) and Small Business Enterprises (SBEs). Contractors will be responsible for all project materials, cleanup, and providing a one-year warranty on labor, with material warranties per manufacturer specifications.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RREEQQUUEESSTT FFOORR PPRROOPPOOSSAALLSS
NNoo.. 2255--1100
RROOCCKKDDAALLEE CCOOUUNNTTYY,, GGEEOORRGGIIAA
AApprriill 3300,, 22002255
SSMMAALLLL CCOONNTTRRAACCTT WWOORRKK TTOO IINNCCLLUUDDEE
FFRRAAMMIINNGG,, DDRRYYWWAALLLL,, && AACCTT WWOORRKK
ROCKDALE COUNTY FINANCE DEPARTMENT
PROCUREMENT OFFICE
958 Milstead Avenue
CONYERS, GA 30012
770-278-7552
RFP No.25-10
INTRODUCTION:
Rockdale County is requesting Competitive Sealed Proposals for Small Contract Work to Include Framing, Drywall, and ACT Work. Instructions for preparation and submission of a proposal are contained in this packet.
Proposals must be typed or printed in ink.
The Contractor will furnish all products, tools, construction equipment, skill, and labor of every description necessary to carry out and to complete in a good, firm, substantial workmanlike manner for Small Contract Work to Include Framing, Drywall, and ACT Work in accordance with the County’s Request for Proposal No. 25-10, incorporated herein by reference, (hereinafter called “Work”), and Contractor’s proposal dated (input date), attached hereto and made a part hereof, (hereinafter called “Proposal”). Contractor shall provide, at their expense, all vehicles and equipment necessary to provide this work.
Rockdale County provides equal opportunity for all businesses and does not discriminate against any person or business because of race, color, religion, sex, national origin, handicap, or veterans’ status. This policy ensures all segments of the business community have access to supplying the goods and services needed by Rockdale County.
PURCHASING CONTACT FOR THIS REQUEST:
All questions concerning this RFP and all questions arising subsequent to award are to be addressed to the Purchasing Division via email to Adrienne Brown, at Adrienne.m.brown@rockdalecountyga.gov.
Rockdale County Finance Department Purchasing Division
Attn: Adrienne Brown 958 Milstead Avenue Conyers, GA 30012
Phone: (770) 278-7557 E-mail: Adrienne.m.brown@rockdalecountyga.gov
To maintain a “level playing field”, and to assure that all proposers receive the same information, proposers are requested NOT to contact anyone other than the contact above until after the award of the contract. Doing so could result in disqualification of the proposer.
PROPOSAL COPIES FOR EVALUATION:
Technical Proposal:
One (1) hard copy, one (1) original hard copy, and one (1) USB Flash Drive in Adobe PDF format will be required for review purposes. (Original must be clearly marked “Original” and the Copies clearly marked “Copies.”). Flash Drives that are blank or have incorrect information on them will not be acceptable and may be justification for disqualification. Check your Flash Drive(s) to ensure that they have the appropriate material on it before submitting.
Price Proposal:
One (1) hard copy of the price proposal form is required to be submitted in a separate sealed envelope labeled “Proposal Form”. A copy of the Proposal Form must also be included on the USB Flash Drive.
CONTRACT TERM:
The Contract Term will be (1) year with the option to renew two (2) additional one-year terms, unless cancelled in writing 30 days before the end of current term.
Because this contract contains two (2) renewal periods and the price of materials is subject to change from year to year, it is appropriate to allow the Contractor to offer price increases prior to the renewal of the contract for the following year. Therefore, 90 days prior to the end of the contract, the Contractor will advise the County mailto:Adrienne.m.brown@rockdalecountyga.gov in writing of their desire to renew the contract and will provide the County with an updated price list (this should be the same price list from the original bid with any necessary additions that became evident during the previous year's operations). The County will review the price increases and if necessary, negotiate with the Contractor to finalize pricing. Once both parties have agreed to the contract extension pricing, the County will prepare an Amendment to the original contract outlining the extension period, the new pricing that has been approved by both parties, and any other changes to the contract that become necessary to improve the operational effectiveness of the Agreement.
DUE DATE:
Sealed proposals will be received at the Rockdale County Finance Department, Procurement Division, 958 Milstead Avenue, Conyers, GA 30012 no later than 2:00 P.M., local time, Thursday, June 5, 2025.
Proposals received after this time will not be accepted.
QUESTIONS AND CLARIFICATIONS:
All questions and requests for clarifications concerning this RFP must be submitted to the Purchasing Division via email to Adrienne.m.brown@rockdalecountyga.gov no later than 2:00 p.m., local time, on Thursday, May 29, 2025. It shall be the proposer’s responsibility to seek clarification as early as possible prior to the due date and time. Written responses from the County to the questions it receives will be in an addendum and posted to the County’s website at www.rockdalecountyga.gov, under Bid Opportunities. Questions or requests for clarifications received after this deadline will not receive a response.
ADDENDA:
Answers to questions submitted that materially change the conditions and specifications of this RFP will be issued in an addendum and posted to the County’s website at www.rockdalecountyga.gov Bid Opportunities. Any discussions or documents will be considered non-binding unless incorporated and issued in an addendum.
It is the proposer’s responsibility to check the Rockdale County website at www.rockdalecountyga.gov, Bid Opportunities for any addenda that may be issued, prior to submitting a proposal for this RFP.
LOCAL VENDOR PREFERENCE POLICY
The Rockdale County Board of Commissioners adopted a Local Vendor Preference Policy on March 26, 2013.
The policy will apply to all qualified Invitations to Bids and Request for Proposals after May 1, 2013. The Local Vendor Preference Policy allows Rockdale County vendors to get an extra 5 points on the evaluation criteria scoring for Request for Proposal. The Policy will give the local bidder the opportunity to match the price of a non-local vendor’s bid price if they are low and within 5% of the low bidder’s price on Invitation to Bids. A copy of the Policy may be downloaded from the County website at www.rockdalecountyga.gov Bid Opportunities.
The Local Vendor Preference Policy will apply to this RFP.
EQUAL BUSINESS OPPORTUNITY POLICY:
This RFP qualifies for Rockdale County Government EBO program. For questions regarding the EBO program, please contact Adrienne Brown at Adrienne.m.brown@rockdalecountyga.gov or 770-278-7557.
ENERGY EFFICIENT, RECYCLING, AND WASTE REDUCTION PURCHASING POLICY
Policy #R-2015-08 includes the following language:
The Rockdale County Board of Commissioners only purchases energy star rated equipment and appliances that are economically responsible and reduce resource consumption and waste within federal, state, and local laws. The County will only purchase recycled copy, computer, and fax paper with at least 30 percent recycled content.
A copy of the policy may be viewed and downloaded by visiting the website at www.rockdalecountyga.gov Bid Opportunities and scrolling down to the bottom of the page.
mailto:Adrienne.m.brown@rockdalecountyga.gov http://www.rockdalecountyga.gov/ http://www.rockdalecountyga.gov/ http://www.rockdalecountyga.gov/ http://www.rockdalecountyga.gov/ http://www.rockdalecountyga.gov/
QUALIFICATIONS OF OFFERORS:
Proposers must have a current business license from their home-based jurisdiction and provide a copy of that license with the submittal of their proposal response.
Proposals from any offeror that is in default on the payment of any taxes, license fees, or other monies due to Rockdale County will not be accepted.
Any contractor submitting a Proposal must complete the Contractor’s Qualification Statement and Questionnaire provided in this package.
In evaluating Proposals, the County may seek additional information from any contractor concerning such contractor’s proposal or its qualifications to construct the Project.
GENERAL CONTRACTOR’S LICENSE
As required by O.C.G.A. § 43-41-6, et seq., a Bidder responding to this Request for Proposal must provide a copy of its Georgia General Contractor’s License. The Georgia General Contractor’s License must be issued in the name of the Bidder. All licenses must be current, valid, and issued in compliance with applicable law.
Failure to provide this license with the Bid may result in the proposed Bid being deemed non-responsive.
DEBRIEFINGS:
In lieu of Post-Award debriefings, Rockdale County will provide the final evaluation Score Sheet. The Score Sheet will include the scores for all firms who responded and will typically be provided with a PDF file and e-mailed.
FINANCIAL STABILITY
The Offeror will provide financial information that would allow proposal evaluators to ascertain the financial stability of the firm.
• If a public company, the Offeror will provide their most recent audited financial report.
• If a private company, the Offeror will provide a copy of their most recent internal financial statement, and/or a letter from their financial institution, on the financial institution’s letterhead, stating the Offeror is in good standing with that financial institution.
SELECTION PROCESS:
The Rockdale County Procurement Office and Evaluation Committee makes a recommendation for award. The Board of Commissioners will make the actual award of the contract and has the authority to award the contract to a company different than the company recommended by the Procurement Office and/or Evaluation Committee.
This is a past performance/quality/price trade-off source selection in which competing offeror’s past and present performance history and product quality will be evaluated on a basis approximately equal to price. Award will be made to the responsible offeror whose proposal represents the best value after evaluation in accordance with the factors listed below. Rockdale County Board of Commissioners may reject any or all proposals and to waive any technicalities or informalities if such action is in the county’s interest.
Rockdale County may evaluate proposals and award a contract without discussions with offerors. Therefore, the offeror’s initial proposal should contain the offeror’s best terms from a price and technical standpoint. The County reserves the right to conduct discussions if the County later determines them to be necessary.
Proposers will be evaluated based on the following criteria and may be called in for an interview.
The County intends to award the contract to the responsible and responsive contractor whose proposal is determined in writing to be the most advantageous to the County taking into consideration all of the evaluation criteria.
EVALUATION CRITERIA:
Offerors will be evaluated based on the following criteria and may be called in for an interview.
Respondents will have their submissions evaluated and scored. Submissions will be evaluated to assess the respondent's ability to provide anticipated services for Rockdale County. Rockdale County shall be the sole judge of the quality and the applicability of all statements of qualifications. Approach, scope, overall quality, local facilities, terms, and other pertinent considerations will be taken into account in determining acceptability.
Selection Committee shall evaluate and rank the statements of qualifications based on the following criteria:
• Staffing and Availability – Evaluation of the list of personnel specifically assigned to the RFP proposed project, including their qualifications, overall experience and recent experience on projects of similar nature and complexity to the proposed project. Organization and Staffing, evaluation of the workload of the proposing firm and the staffing to be assigned to the proposed project; time schedule of the Proposer in relation to that of the proposed project location of the offices or facilities from which the services are to be provided to the County. (35%)
• Experience/Performance – Review of personnel qualifications and experience. Management approach to projects, past performance on projects of similar nature and complexity as the proposed project. Evaluation of client references including but not limited to references submitted in qualification response; overall responsiveness to County’s needs. Provider financial capability, qualifications and experience. (35%)
• Approach – Evaluation of the overall understanding of the scope of the proposed project; completeness, adequacy and responsiveness to the required information of the request for proposals. (10%)
• Cost – (20%)
INTERVIEWS
Interviews may be scheduled. Interviews will be informal and will provide respondents with an opportunity to answer any questions the selection team may have on a submission.
INSURANCE:
Before starting any work, the successful contractor must furnish to Rockdale County certificate(s) of insurance from companies doing business in Georgia. The Company shall maintain in full force and effect the following insurance during the term of the Agreement:
Coverages: Limits of Liability:
Workers’ Compensation Statutory Employers’ Liability $1,000,000.00 Bodily Injury Liability $1,000,000.00 each occurrence except Automobile $1,000,000.00 aggregate Property Damage Liability $1,000,000.00 each occurrence except Automobile $1,000,000.00 aggregate Personal & Advertising Injury Limit $1,000,000.00 Products / Completed Ops. $2,000,000.00 aggregate Automobile Bodily Injury $1,000,000.00 each person Liability $1,000,000.00 each occurrence Automobile Property Damage $1,000,000.00 each occurrence Liability Property Coverage /Builders Risk Policy Equal to or greater than the existing building limit if performing renovations.
(If hazardous substances are involved) Contractor’s Pollution Liability (with 1-year extended reporting period) Each Occurrence $1,000,000.00 Aggregate $2,000,000.00 Environmental Impairment Liability (with 1-year extended reporting period) Each Occurrence $1,000,000.00 Aggregate $2,000,000.00 Professional Liability/General Liability $1,000,000.00
All insurance shall be provided by an insurer(s) acceptable to the County and shall provide for thirty (30) days prior notice of cancellation to the County. Upon contract award, Contractor shall deliver to the County a certificate or policy of insurance evidencing Contractor’s compliance with this paragraph. Contractor shall abide by all terms and conditions of the insurance and shall do nothing to impair or invalidate the coverage.
Rockdale, GA shall be named as Additional Insured under any General Liability, Business Auto and Umbrella Policies using ISO Additional Insured Endorsement forms CG 2010 or its equivalent. Coverage shall apply as Primary and non-contributory with Waiver of Subrogation in favor of Rockdale County, Georgia.
The insurance carrier must have a minimum rating of A or higher as determined by the rating firm A.M. Best.
Certificates must contain policy number, policy limits, and policy expiration date of all policies. The Request for Proposals (RFP) number and project name must be inserted in the Description of Operations section of the certificate.
Certificates are to be issued to:
Rockdale County, Georgia 958 Milstead Avenue Conyers, GA 30012
PERMITS:
The awarded contractor will be responsible for acquiring any permits that are required for this project/purchase.
Rockdale County will waive fees on all permits issued by Rockdale County.
AWARD OF CONTRACT
The Rockdale County Procurement Office and Evaluation Committee makes a recommendation for award. The Board of Commissioners will make the actual award of the contract and has the authority to award the contract to a company different than the company recommended by the Procurement Office and/or Evaluation Committee.
Rockdale County reserves the right to make no awards, multiple awards, one award for all items; or whatever the County deems to be in its best interest.
OPEN RECORDS
The contents of the proposals will not be made public until after an award and contract has been executed.
ILLEGAL IMMIGRATION REFORM AND ENFORCEMENT ACT OF 2011
Vendors submitting a Qualification package in response to this RFP must complete the Contractor Affidavit under O.C.G.A. §13-10-91(b)(1) which is provided with the RFP package to verify compliance with the Illegal Immigration Reform and Enforcement Act of 2011.
A. The form must be signed by an authorized officer of the contractor or their authorized agent.
B. The form must be notarized.
C. The contractor will be required to have all subcontractors and sub-subcontractors who are engaged to complete physical performance of services under the final contract executed between the County and the contractor complete the appropriate subcontractor and sub-subcontractor affidavits and return them to the County a minimum of five (5) days prior to any work being accomplished by said subcontractor or sub-subcontractor. Format for this affidavit can be provided to the contractor if necessary.
GENERAL INFORMATION
No proposals received after said time or at any place other than the time and place as stated in the notice shall be considered. No responsibility shall attach to Rockdale County for the premature opening of a proposal not properly addressed and identified.
WITHDRAWAL OF PROPOSAL:
A proposer may withdraw his proposal before the proposal due date, without prejudice to the proposer, by submitting a written request of withdrawal to the Rockdale County Procurement Office.
REJECTION OF PROPOSAL:
Rockdale County may reject any and all proposals and must reject a proposal of any party who has been delinquent or unfaithful in any formal contract with Rockdale County. Also, the right is reserved to waive any irregularities or informalities in any proposal in the proposing procedure. Rockdale County shall be the sole judge as to which proposal is best, and in ascertaining this, will take into consideration the business integrity, financial resources, facilities for performing the work, and experience in similar operations of the various proposers.
STATEMENT OF EXPERIENCE AND QUALIFICATIONS:
The proposer may be required, upon request, to prove to the satisfaction of Rockdale County that he/she has the skill, experience, necessary facilities and ample financial resources to perform the contract(s) in a satisfactory manner and within the required time. If the available evidence of competency of any proposer is not satisfactory, the proposal of such proposer may be rejected. The successful proposer is required to comply with and abide by all applicable federal and state laws in effect at the time the contract is awarded.
NON-COLLUSION AFFIDAVIT:
By submitting a proposal, the proposer represents and warrants that such proposal is genuine and not sham or collusive or made in the interest or in behalf of any person not therein named, that the proposer has not directly or indirectly induced or solicited any other proposer to put in a sham proposal, or any other person, firm or corporation to refrain from proposing and that the proposer has not in any manner sought by collusion to secure to that proposer any advantage over any other proposer.
INTEREST OF:
By submitting a proposal, the proposer represents and warrants that a Commissioner, Administrator, employee, nor any other person employed by Rockdale County has, in any manner, an interest, directly or indirectly, in the proposal or in the contract which may be made under it, or in any expected profits to arise there from.
DOCUMENTS DEEMED PART OF THE CONTRACT:
The notice, invitation to proposers, general conditions, and instructions for proposers, special conditions, specifications, proposal, and addenda, if any, will be deemed part of the contract.
STANDARD INSTRUCTIONS
1. The instructions contained herein shall be construed as a part of any proposal invitation and/or specifications issued by Rockdale County and must be followed by each proposer.
2. The written specifications contained in this proposal shall not be changed or superseded except by written addendum from Rockdale County. Failure to comply with the written specifications for this proposal may result in disqualification by Rockdale County.
3. All goods and materials shall be F.O.B. Destination Conyers, Georgia and no freight or postage charges will be paid by Rockdale County unless such charges are included in the proposal price.
4. The following number, RFP No. 25-10 must be written clearly on the outside of each proposal envelope in order to avoid prior opening in error.
5. All proposals must be received and in-hand at proposal due date and time. Each proposer assumes the responsibility for having his/her proposal received at the designated time and place of proposal due date.
Proposals received after the stated time and date may be subject to rejection without consideration, regardless of postmark. Rockdale County accepts no responsibility for mail delivery.
6. Unless otherwise stated, all proposals submitted shall be valid and may not be withdrawn for a period of 120 days from the due date.
7. Each proposal form submitted must include the name of the business, mailing address, the name, title and signature of the person submitting the proposal. When submitting a proposal to Rockdale County the Proposal Form must be submitted in a separate sealed envelope labeled “Proposal Form”.
8. Rockdale County reserves the right to accept a proposal that is not the lowest price if, in the County's judgment, such proposal is in the best interest of the County and the public. The County reserves the right to reject any and all proposals.
9. Telephone, Emailed or Facsimile proposals will not be accepted.
10. No sales tax will be charged on any orders except for contracts that include construction materials being purchased through a third party.
i. Federal I.D. #58-6000882
ii. Sales Tax Exempt #308750008
11. If applicable, completed questionnaires must be signed manually. Rockdale County reserves the right to accept or reject any proposal on the basis of incomplete or inaccurate answers to the questionnaire.
12. If applicable, warranty information shall be provided.
13. Proposers shall state delivery time after receiving order.
14. Proposers shall identify any subcontractors and include an explanation of the service or product that they may provide.
Framing/Drywall/ACT work for Various County Projects
SCOPE OF WORK
General Requirements:
The General Requirements are as follows and on the attached pages:
Technical:
1) Overview:
Rockdale County is seeking experienced labor for construction of small commercial interior projects. The successful bidder will provide labor and material on a per project basis. The highest ranked, qualified contractor will receive a negotiated unit rate contract and will be employed on an as needed basis on various projects. For each project a scope of services and not to exceed fee will be agreed upon between the contractor and the County and executed through a Purchase Order type agreement. Most work orders will be for less than $15,000.
2) Scope of Work:
a) The scope of work generally involves wood and metal framing including walls, headers, sills, joists, rafters, new framing, rough in of utilities, drywall installation and finishing; acoustical ceilings; roofing; demolition of interiors; minor concrete work; installation of prefabricated cabinets and laminate countertops; painting; and other small contract work as needed.
b) Contractor will be responsible for protection of all existing surfaces during performance of work and shall cleanup site and remove all extra materials.
c) The cost per Purchase Order will not typically exceed $50,000 for any individual project. Any project over $50,000 will require bonding. No project will exceed $100,000 in cost.
3) Qualifications:
a) The contractor’s personnel shall have the qualifications, knowledge, and experience to properly and reliably perform the Services described herein.
b) The contractor shall always provide sufficient qualified personnel to perform the Services required in a timely, accurate, and professional manner.
c) The contractor shall provide all equipment and normal small tools needed to perform the work of the project at no cost to the county. If specialty tools or equipment are required, they shall be itemized after reviewing the scope of the project and provided in the work order proposal.
d) The contractor shall perform all work in coordination with the County’s schedule and/or other contractors engaged by the county.
e) Bidders shall complete the Contractor’s Qualification Statement and Questionnaire provided in this package with at least (3) three references to include the following:
i) All three references shall be within the Metro Atlanta area and shall have been completed within the last 5 years
ii) References shall include at minimum each of these trades: framing, drywall, and acoustical ceiling work.
iii) At least one reference shall include a project cost greater than $10,000.
4) Bid selection:
a) Bidders shall be ranked based upon a pass/fail regarding qualifications and references.
b) Qualified bidders shall submit a bid proposal to include the attached bid form.
5) Preparation:
a) Contractor shall prepare all existing surfaces as needed according to manufacturer’s instructions or industry best management practices.
b) Reasonable investigation of the condition of the area shall be conducted at the time of the work order proposal.
c) Any unforeseen conditions shall be discussed and an agreed upon compensation shall be approved per the unit prices in this bid by both parties prior to commencement of additional work.
d) All preparation and installation shall be per manufacturer’s recommendations. Where manufacturer recommended materials are not indicated, contractor shall utilize industry best management practices.
e) Minor moving of furniture shall be included within the unit prices at no extra cost. Moving of large items of furniture, filing cabinets, computers, and personnel effects shall be by the county.
f) Removal and disposal shall be included in the unit prices where such removal is reasonably done by hand without the use of additional machinery. Where investigation of the existing conditions warrants the rental of additional equipment pricing shall be included and mutually agreed upon by contractor and county representative.
g) County shall supply dumpsters at project sites unless agreed upon at time of work order proposal.
h) Whenever and wherever during the course of performing any work under this contract, the Contractor discovers the presence of asbestos or suspects that asbestos is present the contractor shall stop work immediately, notify the county representative, and await identification and/or removal of the suspect material. In the event that Contractor is delayed due to the discovery of asbestos, then a mutually agreed upon extension of time shall be allowed but without additional compensation due to the time extension.
6) Materials:
a) All materials shall be supplied by the contractor unless otherwise agreed upon in the work order proposal.
b) Invoices for all materials shall be submitted along with contractor’s invoice. Reimbursement for materials shall be the exact cost of the materials plus the percentage of markup indicated in bid documents. Failure to provide invoices is subject to rejection of payment for materials.
7) Labor:
a) Labor hourly cost shall be separate from the materials cost and shall be inclusive of overhead, profit, taxes, labor burden, and any other costs.
b) Labor shall be quoted on work order as a not to exceed cost. Additional hours shall not be compensated unless contractor encounters a reasonably unforeseen condition and receives written pre-approval by designated county representative.
c) Labor cost shall be divided into the following groups:
i) Foreman/Supervisor – this role shall be the person in charge on site who will have authority over individual workers and who will be the point of contact for county staff during the course of the project. This person can also act as the experienced professional on site in the event there is no division of roles.
ii) Framer – this person shall be the experienced professional on site performing the work
iii) Helper – this person shall be the worker on site who is under the authority of the framer or foreman and performs non-experienced roles assisting, cleaning, etc.
d) Labor costs on the work order proposal shall be divided into proposed hours of work times the labor cost per hour (see example of work order proposal cost format)
e) Labor hours shall be verified by County representative.
8) Work Order Proposal cost format:
a) Contractor shall review the scope of the work from the county representative and visit the site as needed to ensure proper investigation of the full amount of work to be done to complete the project
b) Contractor shall submit a work order proposal with verbiage to explain proper understanding of the work along with cost items in the following format:
Item 1 - materials cost $_______ Item 2 – percent markup X materials cost $_______ Item 3 – Foreman labor hours X cost per hour $_______ Item 4 – Framer labor hours X cost per hour $_______ Item 5 – Helper labor hours X cost per hour $_______ Total (sum of 1 through 5) $_______
c) Contractor shall have no other costs itemized in work order proposal unless otherwise authorized by county representative.
9) Other:
a) Contractor must clean up site after completion of the work and must dispose of all trash, materials, packaging, etc.
b) Contractor shall warrant all labor for a period of one year.
c) Material warranty shall be per the manufacturer.
PROPOSAL FORM – RFP #25-10
Instructions: Complete all THREE parts of this bid form.
PART I: Proposal Summary Complete the information below. If you wish to submit more than one brand, make a photocopy of this Proposal Form.
1. Material Mark-Up Percentage %
2. Labor Cost – Foreman/Supervisor $ /HR
3. Labor Cost - Framer $ /HR
4. Labor Cost - Helper $ /HR
PART II: Addenda Acknowledgements (if applicable) Each vendor is responsible for determining that all addenda issued by the Rockdale County Finance Department – Purchasing Division have been received before submitting a bid.
PART III: Vendor Information:
Company Name Address Telephone E-Mail Representative (print name) Signature of Representative Date Submitted
Addenda Date Vendor Received Initials “1” “2” “3” “4” “5” “6”
ROCKDALE COUNTY BOARD OF COMMISSIONERS
NON-COLLUSION AFFIDAVIT OF VENDOR
State of ____________________)
County of ____________________)
___________________________________________, being first duly sworn, deposes and says that:
(1) He is____________________________________ (owner, partner officer, representative, or agent) of ___________________________, the Vendor that has submitted the attached RFP;
(2) He is fully informed respecting the preparation and contents of the attached RFP and of all pertinent circumstances respecting such RFP;
(3) Such RFP is genuine and is not a collusive or sham RFP;
(4) Neither the said Vendor nor any of its officers, partners, owners, agents, representatives, employees or parties in interest, including this affidavit, has in any way colluded, conspired, connived or agreed, directly or indirectly with any other Vendor, firm or person to submit a collusive or sham RFP in connection with the Contract for which the attached RFP has been submitted or refrain from proposing in connection with such Contract, or has in any manner, directly or indirectly, sought by agreement or collusion or communication or conference with any other Vendor, firm or person to fix the price or prices in the attached RFP or of any other Vendor, or to fix any overhead, profit or cost element of the proposing price or the proposing price of any other Vendor, or to secure through any collusion, conspiracy, connivance or unlawful agreement any advantage against Rockdale County or any person interested in the proposed Contract; and
(5) The price or prices quoted in the attached RFP are fair and proper and are not tainted by any collusion, conspiracy, connivance or unlawful agreement on the part of the Vendor or any of its agents, representatives, owners, employees, or parties in interest, including this affidavit.
(Signed)
(Title)
Subscribed and Sworn to before me this ___________ day of _____________, 202__
Name__________________________________________________
Title__________________________________________________ My commission expires (Date)
ROCKDALE COUNTY BOARD OF COMMISSIONERS
NON-COLLUSION AFFIDAVIT OF SUB-CONTRACTOR
State of ____________________)
County of ____________________)
___________________________________________, being first duly sworn, deposes and says that:
(1) He/She is____________________________________ (owner, partner officer, representative, or agent) of ___________________________, the sub-contractor that has submitted the attached RFP;
(2) He is fully informed respecting the preparation and contents of the attached RFP and of all pertinent circumstances respecting such RFP;
(3) Such RFP is genuine and is not a collusive or sham RFP;
(4) Neither the said sub-contractor nor any of its officers, partners, owners, agents, representatives, employees or parties in interest, including this affidavit, has in any way colluded, conspired, connived or agreed, directly or indirectly with any other Vendor, firm or person to submit a collusive or sham RFP in connection with the Contract for which the attached RFP has been submitted or refrain from proposing in connection with such Contract, or has in any manner, directly or indirectly, sought by agreement or collusion or communication or conference with any other Vendor, firm or person to fix the price or prices in the attached RFP or of any other Vendor, or to fix any overhead, profit or cost element of the proposing price or the proposing price of any other Vendor, or to secure through any collusion, conspiracy, connivance or unlawful agreement any advantage against Rockdale County or any person interested in the proposed Contract; and
(5) The price or prices quoted in the attached RFP are fair and proper and are not tainted by any collusion, conspiracy, connivance or unlawful agreement on the part of the sub-contractor or any of its agents, representatives, owners, employees, or parties in interest, including this affidavit.
(Signed)
(Title)
Subscribed and Sworn to before me this ___________ day of _____________, 202__.
Name_________________________________________________
Title_________________________________________________ My commission expires (Date)
Contractor Affidavit under O.C.G.A. § 13-10-91(b)(l)
The undersigned contractor ("Contractor") executes this Affidavit to comply with O.C.G.A § 13-10-91 related to any contract to which Contractor is a party that is subject to O.C.G.A. § 13-10-91 and hereby verifies its compliance with O.C.G.A. § 13-10-91, attesting as follows:
a) The Contractor has registered with, is authorized to use and uses the federal work authorization program commonly known as E-Verify, or any subsequent replacement program;
b) The Contractor will continue to use the federal work authorization program throughout the contract period, including any renewal or extension thereof;
c) The Contractor will notify the public employer in the event the Contractor ceases to utilize the federal work authorization program during the contract period, including renewals or extensions thereof;
d) The Contractor understands that ceasing to utilize the federal work authorization program constitutes a material breach of Contract;
e) The Contractor will contract for the performance of services in satisfaction of such contract only with subcontractors who present an affidavit to the Contractor with the information required by O.C.G.A. § 13-10-91(a), (b), and (c);
f) The Contractor acknowledges and agrees that this Affidavit shall be incorporated into any contract(s) subject to the provisions of O.C.G.A. § 13-10- 91 for the project listed below to which Contractor is a party after the date hereof without further action or consent by Contractor; and
g) Contractor acknowledges its responsibility to submit copies of any affidavits, drivers' licenses, and identification cards required pursuant to O.C.G.A. § 13-10-91 to the public employer within five business days of receipt.
Federal Work Authorization User Identification Number Date of Authorization
Name of Contractor Name of Project
Name of Public Employer
I hereby declare under penalty of perjury that the foregoing is true and correct.
Executed on _________, _____, 20_____ in _______________ (city), __________ (state).
Signature of Authorized Officer or Agent
Printed Name and Title of Authorized Officer or Agent
SUBSCRIBED AND SWORN BEFORE ME
ON THIS THE _______ DAY OF _____________, 20______.
NOTARY PUBLIC
My Commission Expires: _____________________________
Subcontractor Affidavit under O.C.G.A. § 13-10-91(b)(3)
By executing this affidavit, the undersigned subcontractor verifies its compliance with O.C.G.A. § 13-10-91, stating affirmatively that the individual, firm or corporation which is engaged in the physical performance of services under a contract with (name of contractor) on behalf of (name of public employer) has registered with, is authorized to use and uses the federal work authorization program commonly known as E-Verify, or any subsequent replacement program, in accordance with the applicable provisions and deadlines established in O.C.G.A. § 13-10-91. Furthermore, the undersigned subcontractor will continue to use the federal work authorization program throughout the contract period and the undersigned subcontractor will contract for the physical performance of services in satisfaction of such contract only with sub-subcontractors who present an affidavit to the subcontractor with the information required by O.C.G.A. § 13-10-91(b). Additionally, the undersigned subcontractor will forward notice of the receipt of an affidavit from a sub-subcontractor to the contractor within five business days of receipt. If the undersigned subcontractor receives notice that a sub-subcontractor has received an affidavit from any other contracted sub-subcontractor, the undersigned subcontractor must forward, within five business days of receipt, a copy of the notice to the contractor.
Subcontractor hereby attests that its federal work authorization user identification number and date of authorization are as follows:
Federal Work Authorization User Identification Number Date of Authorization Name of Subcontractor Name of Project Name of Public Employer
I hereby declare under penalty of perjury that the foregoing is true and correct.
Executed on ______, ___, 202__ in _____(city), ______(state).
Signature of Authorized Officer or Agent Printed Name and Title of Authorized Officer or Agent
SUBSCRIBED AND SWORN BEFORE ME
ON THIS THE ______ DAY OF ______________,202__.
NOTARY PUBLIC
My Commission Expires:
Sub-subcontractor Affidavit under O.C.G.A. § 13-10-91(b)(4)
By executing this affidavit, the undersigned sub-subcontractor verifies its compliance with O.C.G.A. § 13-10-91, stating affirmatively that the individual, firm or corporation which is engaged in the physical performance of services under a contract for (name of subcontractor or sub-subcontractor with whom such sub-subcontractor has privity of contract) and (name of contractor) on behalf of (name of public employer) has registered with, is authorized to use and uses the federal work authorization program commonly known as E-Verify, or any subsequent replacement program, in accordance with the applicable provisions and deadlines established in O.C.G.A. § 13-10-91. Furthermore, the undersigned sub-subcontractor will continue to use the federal work authorization program throughout the contract period and the undersigned sub-subcontractor will contract for the physical performance of services in satisfaction of such contract only with sub-subcontractors who present an affidavit to the sub-subcontractor with the information required by O.C.G.A. § 13-10-91(b). The undersigned sub-subcontractor shall submit, at the time of such contract, this affidavit to (name of subcontractor or sub-subcontractor with whom such sub-subcontractor has privity of contract).
Additionally, the undersigned sub-subcontractor will forward notice of the receipt of any affidavit from a sub-subcontractor to (name of subcontractor or sub-subcontractor with whom such sub-subcontractor has privity of contract).
Sub-subcontractor hereby attests that its federal work authorization user identification number and date of authorization are as follows:
Federal Work Authorization User Identification Number Date of Authorization Name of Sub-subcontractor Name of Project Name of Public Employer
I hereby declare under penalty of perjury that the foregoing is true and correct.
Executed on ______, ___, 202__ in _____(city), ______(state).
Signature of Authorized Officer or Agent Printed Name and Title of Authorized Officer or Agent
SUBSCRIBED AND SWORN BEFORE ME
ON THIS THE ______ DAY OF ______________,202__.
NOTARY PUBLIC
Affidavit Verifying Status for County Public Benefit Application
By executing this affidavit under oath, as an applicant for the award of a contract with Rockdale, County Georgia, I __________________________. [Name of natural person applying on behalf of individual, business, corporation, partnership, or other private entity] am stating the following as required by O.C.G.A. Section 50-36-1:
1) ______ I am a United States citizen
OR
2) ______ I am a legal permanent resident 18 years of age or older or I am an otherwise qualified alien or non-immigrant under the Federal Immigration and Nationality Act 18 years of age or older and lawfully present in the United States.*
In making the above representation under oath, I understand that any person who knowingly and willfully makes a false, fictitious, or fraudulent statement or representation in an affidavit shall be guilty of a violation of Code Section 16-10-20 of the Official Code of Georgia.
Signature of Applicant: Date
Printed Name:
Alien Registration number for non-citizens
SUBSCRIBED AND SWORN
BEFORE ME ON THIS THE
DAY OF , 202 .
Notary Public My commission Expires:
*Note: O.C.G.A. § 50-36-1(e)(2) requires that aliens under the federal Immigration and Nationality Act, Title 8 U.S.C., as amended, provide their registration number. Because legal permanent residents are included in the federal definition of “alien”, legal permanent residents must also provide their alien registration number. Qualified aliens that do not have an alien registration number may supply another identifying number below.
Certification of Absence of Conflict of Interest For Development of Specifications or Scope of Work
Required for each contract or arrangement to prepare or develop specifications or requirements
(O.C.G.A. § 36-80-28)
The undersigned Consultant, who is entering into a contract or arrangement with Rockdale County to prepare or develop specifications or requirements for an invitation for bids, request for proposals, purchase order, or any other type of solicitation for said Rockdale County certifies that:
1. Consultant shall avoid any appearance of impropriety and shall follow all policies and procedures of Rockdale County, as may be related to the project.
2. Consultant discloses below any material transaction or relationship currently known to Consultant that reasonably could be expected to give rise to a conflict of interest, including, but not limited to, that of the Consultant, or the Consultant’s employees, agents or subsidiaries (Include past, present, or known prospective engagements, involvement in litigation or other dispute, client relationships, or other business or financial interest):
3. Consultant shall immediately disclose any material transaction or relationship subsequently discovered during the pendency of the contract or arrangement.
4. Consultant acknowledges that any violation or threatened violation of the agreement may cause irreparable injury to the Rockdale County, entitling Rockdale County to seek injunctive relief in addition to all other legal remedies.
Signature of Contractor’s Authorized Official
Printed Name & Title of Authorized Official
Date
CONTRACTOR’S QUALIFICATION STATEMENT AND QUESTIONNAIRE
NAME OF PROPOSED CONTRACTOR: _______________________________________
I. INSTRUCTIONS
A. All questions are to be answered in full. If copies of other documents will answer the question completely, they may be attached and clearly labeled. If additional space is needed, additional pages may be attached and clearly labeled.
B. The owner, Rockdale County, Georgia, its agents and representatives, shall be entitled to contact each and every reference listed in response to this questionnaire, and each entity referenced in any response to any question in this questionnaire. By completing this questionnaire, the contractor expressly agrees that any information concerning the contractor in possession of said entities and references may be made available to the owner.
C. Only complete and accurate information shall be provided by the contractor. The contractor hereby warrants that, to the best of its knowledge and belief, the responses contained herein are true, accurate, and complete. The contractor also acknowledges that the owner is relying on the truth and accuracy of the responses contained herein. If it is later discovered that any material information given in response to a question was provided by the contractor, knowing it was false, it shall constitute grounds for immediate termination or rescission by the owner of any subsequent agreement between the owner and the contractor. The owner shall also have and retain any other remedies provided by law.
D. The completed form shall be submitted with contractor’s proposals.
E. This form, its completion by the contractor, and its use by the contractor, and its use by the owner, shall not give rise to any liability on the part of the owner to the contractor or any third party or person.
II. GENERAL BACKGROUND
A. Current address of contractor: _____________________________________
B. Previous Name or address of contractor: _____________________________________
C. Current president or CEO and years in position: _____________________________________
D. Number of permanent employees: _____________________________________
E. Name and address of affiliated companies: _____________________________________
III. FINANCIAL STATUS
A. Please attach financial statements for the past three years for which they are complete. If such statements are not available, please furnish the following information:
1. LAST COMPLETE FISCAL YEAR:
A. Revenues (Gross)
B. Expenditures (Gross) C. Overhead & Admin (Gross) D. Profit (Gross)
2. YEAR PRIOR TO “1” ABOVE:
3. YEAR PRIOR TO “2” ABOVE:
B. BANKRUPTCIES
1. Has the Contractor, or any of its parents or subsidiaries, ever had a Bankruptcy Petition filed in its name, voluntarily or involuntarily? (If yes, specify date, circumstances, and resolution).
2. Has any Majority Shareholder ever had a Bankruptcy Petition filed in his/her name, voluntarily or involuntarily? (If yes, specify date, circumstances, and resolution).
C. BONDING
1. What is the Contractor’s current bonding capacity? ____________
2. What is the value of the Contractor’s work currently under contract? ____________
IV. COMPANY EXPERIENCE – SIMILAR PROJECTS
A. List three projects of reasonably similar nature, scope, and duration performed by your company in the last five years, specifying, where possible, the name and last known address of each owner of those projects:
Project #1:
Name and Address: ________________________________
Date of Project: ________________________________
Type of Project: ________________________________
Contract Price: ________________________________
Owner contact info: ________________________________
Architect/Engineer contact info: ________________________________ (if applicable) ________________________________
Project #2:
Name and Address: ________________________________
Date of Project: ________________________________
Type of Project: ________________________________
Contract Price: ________________________________
Owner contact info: ________________________________
Architect/Engineer contact info: ________________________________ (if applicable) ________________________________
Project #3:
Name and Address: ________________________________
Date of Project: ________________________________
Type of Project: ________________________________
Contract Price: ________________________________
Owner contact info: ________________________________
Architect/Engineer contact info: ________________________________ (if applicable) ________________________________
V ARBITRATIONS, LITIGATIONS, AND OTHER PROCEEDINGS
Has your company been involved in any construction _____________ arbitration demands filed by, or against, you in the last five years?
Has your company been involved in any construction-related _____________ lawsuits (other than labor or personal injury litigation) filed by, or against, you in the last five years?
Has your company been involved in any lawsuits, _____________ proceedings, or hearings initiated by the National Labor Relations Board or similar state agency in the past seven years?
Has your company been involved in any lawsuits, proceedings, _____________ or hearings initiated by the Occupational Safety and Health Administration concerning the project safety practices of the Contractor in the last seven years?
Has your company be involved in any lawsuits, proceedings, _____________ or hearings initiated by the Internal Revenue Service, or any state revenue department, concerning the tax liability of the Contractor (other than audits) in the last seven years?
Have any criminal proceedings or investigations been brought _____________ against the Contractor in the last ten years?
If you answered yes to any of…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .