This document is an Invitation for Bids (IFB) issued by the City of Centennial, Colorado for the NDST Traffic Signal Rebuild Designs project. The project involves reconstructing existing pole and mastarm type traffic signals at four intersections: Dry Creek & Monaco, Dry Creek & Quebec, Dry Creek & Willow Way, and Easter & Peoria. The contract will require furnishing all labor, equipment, and materials to complete the traffic signal upgrades. The bid is due on October 1, 2025, with bids to be submitted electronically through the Rocky Mountain E-Purchasing System. The contract duration is 365 calendar days from the Notice to Proceed, with an estimated start date soon after contract award. Bidders must provide a 10% bid bond and comply with Colorado labor requirements, including employing at least 80% Colorado labor.
The total project budget and specific funding sources are not explicitly detailed in the document. The bid will be awarded based on a comprehensive evaluation considering the bidder's qualifications, ability to perform the work, compliance with specifications, and overall value to the City. Contractors must provide evidence of financial stability, past performance, and technical capabilities. The project includes various bid items such as traffic signal equipment, electrical conduit, wiring, poles, pedestrian signals, and associated infrastructure components. The City reserves the right to reject any or all bids and to modify the project scope as needed. Additional requirements include providing performance and payment bonds, maintaining specific insurance coverages, and adhering to local and state regulations for construction projects.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INVITATION FOR BIDS
City of Centennial Project No. 25-09-03
CONSTRUCTION CONTRACT
FOR THE FOLLOWING PROJECT:
NDST Traffic Signal Rebuild Designs
Date:
September 12, 2025
Prepared by City of Centennial 13133 East Arapahoe Road.
Centennial, CO 80112 303-325-8000
TABLE OF CONTENTS
I. BID NOTICE / INVITATION FOR BIDS
II. INSTRUCTIONS TO BIDDERS
III. BID FORM
(Note: items III through VII below are to be completed and returned as part of the bid submittal)
IV. NONCOLLUSION AFFIDAVIT OF PRIME BIDDER
V. BIDDER’S CERTIFICATION
VI. QUESTIONNAIRE
VII. BID BOND
EXHIBITS
Exhibit A: Standard Form of Construction Contract
Exhibit B: General Conditions to the Construction Contract
Exhibit C: Special Conditions to the Construction Contract
Exhibit D: Form of Performance, Payment, Maintenance and Warranty Bond (to be completed upon award)
Exhibit E: Contract Documents
A. NOTICE OF AWARD
B. NOTICE TO PROCEED
C. SHOP DRAWING TRANSMITTAL FORM
D. FORM OF CHANGE ORDER
E. APPLICATION FOR PAYMENT
F. FORM OF PARTIAL WAIVER OF LIEN
G. FORM OF FINAL WAIVER OF LIEN
H. CERTIFICATE OF SUBSTANTIAL COMPLETION
I. CERTIFICATE OF FINAL COMPLETION
J. CERTIFICATE OF PARTIAL ACCEPTANCE
Exhibit F: Project Specifications Construction plans for NDST Traffic Signal Rebuild Designs by Ulteig dated
September 9, 2025 Bid Documents containing:
Project Specifications and Special Provisions by Ulteig dated September 4, 2025 ii
I. BID NOTICE / INVITATION FOR BIDS
CITY OF CENTENNIAL, COLORADO
BID NOTICE
INVITATION FOR BIDS
City of Centennial Project No. 25-09-03
Project Description: This project shall include all labor, equipment, and materials necessary to partially or fully reconstruct existing pole and mastarm type traffic signals as per plans at the intersections of Dry Creek & Monaco; Dry Creek & Quebec; Dry Creek & Willow Way; and Easter & Peoria.
Project Manager: Anna L. Bunce, PE, PTOE Project Engineer: Anna L. Bunce, PE, PTOE
PUBLIC NOTICE IS HEREBY GIVEN that there is on file with the City of Centennial Contract Documents for City of Centennial Project No. referenced above.
Bids will be received at Rocky Mountain E-Purchasing System www.bidnetdirect.com/colorado if actually received by 2:00 p.m. local time (City clock) on Wednesday the 1st day of October, 2025, for construction of the project referenced above. Additional information regarding this Project may be accessed at www.bidnetdirect.com/colorado.
Such Bids as are received will be opened and read aloud through an on-line conference or meeting platform at a date and time to be identified by Addendum.
Each Bid shall be made on the Bid Form provided in the bid packet and no Bidder may withdraw their Bid for a period of ninety (90) days from and after the date set for opening of bids. Each Bid must be accompanied by a Bid Bond on an approved form in an amount equal to ten percent (10%) of the Bid price, made payable to the City of Centennial, which shall be considered as liquidated damages and shall be forfeited to the City if said Bid is accepted and the Bidder fails to execute the Contract within ten (10) calendar days after the Award by the City. The Bid Bond will be submitted in a separate electronic file. Each Bid must also be accompanied by a completed Questionnaire.
The work herein provided for shall be done under written Contract with the contractor chosen by the City as deemed to be in the best interests of the City. Upon review of Bid prices and the Questionnaires, the City may be required to add or delete portions of Work from this Project. The contractor chosen by the City must perform at least 70% of the Work.
The successful Bidder will be required to furnish, as part of the Contract, insurance certificates in the amount specified in the General Conditions, a Performance, Payment, Maintenance and Warranty Bond in an amount equal to one-hundred percent (100%) of the Contract Sum, said bond to be issued by a responsible corporate surety approved by the City, and which shall guarantee the faithful performance of the Construction Contract and the terms and conditions therein contained and shall guarantee the prompt payment of all materials and labor, and protect and save harmless the City from claims and damages of any kind caused by the operations of the Contractor.
Preference is hereby given to materials, supplies, and provisions produced or manufactured in Colorado, quality being equal to articles offered by competitors outside of the State. In accordance with C.R.S. § 8-17-101 and the General Conditions applicable to the work, Colorado labor shall be employed to perform at least eighty percent (80%) of the work. The City also expects each Contractor to self-perform no less than seventy percent (70%) of the work.
www.bidnetdirect.com/colorado
In accordance with Article 19 of Title 8, C.R.S., the City shall apply a comparable percentage disadvantage to each bid received from a Bidder who is not a resident bidder of the State of Colorado (non-resident Bidder) and who is from a state that provides a percentage bidding preference to resident bidders of the non-resident Bidder’s state. Any Bidder may obtain additional information regarding the bid preference from the City’s Contract Administrator or from the web site maintained by the Colorado Department of Personnel. The bid preference shall not be applied to any work that receives federal money.
The bid preference required by Article 19 of Title 8, C.R.S. shall be suspended if such requirement would contravene any treaty, law, agreement or regulation of the United States, or would cause denial of federal moneys or preclude the ability of the City to access federal moneys that would otherwise be available.
Centennial uses the Rocky Mountain E-Purchasing System (RMEPS) at www.bidnetdirect.com/colorado to distribute official copies of the Bid Documents for use in preparing Bids. Bidders will be required to register with the website to download the Bid documents and Addenda.
If you experience problems with the RMEPS website, please call 1-800-835-4603, extension 214 or 221, for assistance. There is no charge by RMEPS for this service. Bidders are required to acknowledge all Addenda with their Bid and are encouraged to view the Addenda posted on RMEPS prior to submitting a Bid.
The City reserves the right to waive informalities or irregularities and to reject any or all Bids.
Capitalized terms not defined in the Instruction to Bidders have the meaning assigned in the General Conditions.
II. INSTRUCTIONS TO BIDDERS
PART 1 - DEFINED TERMS
1.01 Terms defined in the General Conditions to the Construction Contract shall carry their defined meaning throughout this Invitation for Bids.
1.02 “Addenda” or “Addendum” means an addition or modification to this Invitation for Bids issued by the City pursuant to Part 5 of these Instructions to Bidders.
1.03 “Bidder” means a person or entity responding to this Request for Bids.
1.04 “Bid Security” means an amount of security filed with a bid in the form and amount required by Paragraph 7.01 of these Instructions to Bidders.
1.05 “Construction Contract” means the City’s standard form of construction contract, which is included as Exhibit A to this Bid Packet.
1.06 “General Conditions” means the standard conditions to the City’s Construction Contract, which are included as Exhibit B to this Bid Packet.
1.07 “Invitation for Bids” or “IFB” means these 112 pages compiled for bidding on City of Centennial Project No. 25-09-03 dated September 12, 2025, together with Exhibit C (Special Conditions to Construction Contract) and Exhibit F (Specifications), both of which are attachments to this IFB and are incorporated herein by reference.
1.08 “Questionnaire” means the document prepared by Bidder in Section VI of this IFB.
1.09 “Successful Bidder" means the Bidder to whom the City (on the basis of the City's evaluations as hereinafter provided) makes an award.
PART 2 - COPIES OF CONTRACT DOCUMENTS
2.01 Complete copies of the Contract Documents for use in preparing bids may be obtained from the Rocky Mountain E-Purchasing System (RMEPS) at www.bidnetdirect.com/colorado, as set forth in this IFB.
Should you experience any problems in downloading the Contract Documents, please contact the City’s Purchasing Manager at 303-754-3402.
2.02 The City, in making copies of Contract Documents available on the above terms, does so only for the purpose of obtaining bids on the work and does not confer a license or grant for any other use.
2.03 Contract Documents not obtained from the City through RMEPS may be incomplete or inaccurate.
PART 3 - QUALIFICATIONS OF BIDDERS
3.01 In addition to the Bid Form (Section III of this IFB), all Bidders must submit a signed Non-Collusion Affidavit of Prime Bidder (Section IV of this IFB), a signed Bidder’s Certification (Section V of this IFB), a completed Questionnaire (Section VI of this IFB) and a Bid Bond (Section VII of this IFB).
3.02 In determining the Bidder's qualifications, the City will use the criteria described in Part 6.
3.03 Each Bidder may also be required to show that it has handled former work so that no just claims are pending against such work. No bid will be accepted from a Bidder who is engaged on any work that would impair their ability to perform or finance this Work.
3.04 Evidence of a Bidder's qualification to do business in the State of Colorado may be required.
3.05 The Bidder will be required to establish to the satisfaction of the City the reliability and responsibility of all proposed subcontractors and suppliers pursuant to the criteria set forth in these Instructions. Prior to the award of the Construction Contract, the City will notify the Bidder in writing if the City has reasonable objection to any such proposed subcontractor. In this event, the Bidder may, at their option, (1) withdraw their bid, or (2) submit a substitute acceptable to the City with an adjustment in the bid to cover any difference in cost. The City may, at its discretion, accept the adjusted bid or may disqualify the Bidder. In the event of either withdrawal or disqualification, the Bid Security shall be returned to the Bidder.
PART 4 - EXAMINATION OF CONTRACT DOCUMENTS AND SITE
4.01 Before submitting a bid, each Bidder should (a) examine the Contract Documents thoroughly; (b) visit the site or sites to familiarize themselves with local conditions that may, in any manner, affect cost, progress or performance of the Work; (c) familiarize themselves with federal, state, and local laws, ordinances, rules and regulations that may in any manner affect cost, progress or performance of the Work; and (d) study and carefully correlate Bidder's observations with the Contract Documents.
4.02 Upon request, the City will provide each Bidder access to the site or sites to conduct such investigations and tests as each Bidder deems necessary for submission of its bid.
4.03 Site access will be limited to normal working hours unless otherwise provided by the Project Manager.
4.04 If a meeting with City Staff or consultant is desired, prospective Bidders must contact the Project Manager at least forty-eight (48) hours prior to the time they would like an appointment to review the project, Monday through Thursday. City Staff will comply with such requests on a time-available basis only.
PART 5 - INTERPRETATIONS
All questions regarding the meaning or intent of the Contract Documents shall be submitted in writing to Elizabeth Dunaway, Purchasing Manager, City of Centennial, 13133 E. Arapahoe Road, Centennial, CO 80112. Any inquiry received seven (7) or more days prior to the date fixed for the opening of bids will be given consideration. Only questions answered by formal written Addenda will be binding. Oral and other interpretations or clarifications shall be without legal effect. Any and all such interpretations and any supplemental instructions will be in the form of written Addenda which, if issued, will be posted at www.bidnetdirect.com/colorado. Prior to the date fixed for the opening of Bids, however, it will be the Bidder's responsibility to verify that all Addenda have been received. All Addenda so issued shall become part of the Contract Documents, and all Bidders shall be bound by such Addenda, whether or not received by the Bidder.
PART 6 - BASIS FOR EVALUATION OF BIDS
In addition to the requirements discussed in Part 3 above, the following criteria will be considered in the evaluation and award of the Bid. If the Construction Contract is to be awarded, it will be awarded to the Bidder whose evaluation by the City indicates to the City that the award will provide the best value and be in the best interests of the City. In making this determination, the following factors may be considered:
1. The Bidder's skill, ability, and capacity to perform the personal services or to furnish the materials, equipment or supplies required;
2. How much of the Work will be completed by Bidder and not a subcontractor;
3. Whether the Bidder can perform the Work within the time period specified, without delay or interference;
4. The Bidder's character, integrity, reputation, judgment, experience and efficiency;
5. The quality of the Bidder's performance of previous contracts with the City and/or with other local governmental entities within the State of Colorado;
6. The Bidder's previous and current compliance with statutes, ordinances and rules relating to the
Work;
7. The sufficiency of the Bidder's financial resources necessary for the performance of the Work;
and
8. The number and nature of any conditions attached to the bid.
The City reserves the right to reject all bids when it determines that such action is in the public interest.
PART 7 - BID SECURITY
7.01 Each bid must be accompanied by security in the amount of ten percent (10%) of the maximum price bid in the form of the bid bond included with the Contract Documents.
7.02 If the Successful Bidder fails to execute and deliver the Construction Contract, furnish the required Performance, Payment, Maintenance and Warranty Bond, furnish the required evidence of insurance, or satisfy all conditions precedent to execution of the Construction Contract within ten (10) business days of the date of Notice of Award, Owner may cancel or terminate the Notice of Award and the Bid Security of that Bidder shall be forfeited to the City, not as a penalty, but as liquidated damages to compensate the City for the cost of delay and also as an estimate of the difference between the Successful Bidder's bid and that of the next acceptable bid as ranked by the City. The Bid Security of any Bidder whom the City believes to have a reasonable chance of receiving the award may be retained by the City (a) until seven (7) days after the effective date of the Construction Contract or (b) until the bids expire, whichever is earlier.
PART 8 - CONTRACT TIME
The number of days within which the project is to be completed (the Contract Time) will be finally set forth in Part 1 of the Construction Contract. At this time, it is estimated the Contract Time will be Three Hundred and Sixty-Five (365) calendar days from the Notice to Proceed.
PART 9 - LIQUIDATED DAMAGES
Provisions for liquidated damages are set forth in the Construction Contract and other Contract Documents.
PART 10 - SUBSTITUTE MATERIAL AND EQUIPMENT
The Construction Contract, if awarded, will be on the basis of material and equipment described in the Specifications, without consideration of possible substitute or “or equal” items. Whenever it is indicated in the Specifications that a substitute or “or equal” item of material or equipment may be furnished or used by the Contractor if acceptable to the Project Manager, the procedure for submittal of any such application by the Contractor and consideration by the Project Manager is set forth in the General Conditions.
PART 11 – BID FORM
11.01 This Bid Packet contains a complete set of forms and a sample contract for the convenience and reference of Bidders. The contract and forms are not to be detached, filled out, executed or returned with the Bid. The Bidder shall complete and return only those documents described in paragraph 3.01.
Additional copies may be obtained from Rocky Mountain E-Purchasing System (RMEPS) at www.bidnetdirect.com/colorado.
11.02 All forms must be completed and legible to the City. Whether forms submitted to the City are legible shall be determined by the City in its sole and absolute discretion.
11.03 For corporations, the Bidder’s Certification must be executed in the corporate name by the president or a vice-president (or other corporate officer accompanied by evidence of authority to sign) and the corporate seal must be affixed and attested to by the secretary or an assistant secretary. The corporate address and state of incorporation shall be shown below the signature.
11.04 For partnerships, the Bidder’s Certification must be executed in the partnership name and signed by a partner, whose title must appear under the signature. The official address of the partnership must be shown below the signature.
11.05 For joint ventures, the Bidder’s Certification shall be signed by each participant in the joint venture or by an authorized agent of each participant and accompanied by evidence of authority to sign.
11.06 The names of all persons signing the Bidder’s Certification must also be legibly printed or typed below the signature. A bid by a person who affixes to their signature the word “president,” “secretary,” “agent,” or other designation without disclosing their principal may be held to be the bid of the individual signing. When requested by the City, evidence of the authority of the person signing shall be furnished.
11.07 The full name of each person or company interested in the bid shall be listed on the Bidder’s Certification.
11.08 The Bidder’s Certification shall contain an acknowledgment of receipt of all Addenda (the numbers of which shall be filled in).
11.09 No alterations in bids, or in the printed forms - by erasures, interpolations, or otherwise - will be acceptable unless each such alteration is signed or initialed by the Bidder. If initialed, the City may require the Bidder to identify an alteration so initialed. No alteration in any bid, or in any form submitted as part of a bid, shall be made after the bid has been submitted.
11.10 The address to which communications regarding the bid are to be directed must be shown.
11.11 All prices must be written in words and expressed in figures. The unit price items in the Bid Form are intended to cover all items of work to be done and material to be furnished to fully complete the work in accordance with the Contract Documents. The cost of appurtenant items of work, material, and equipment not listed separately, not shown on the drawings or not specified as necessary to complete the work in accordance with the Contract Documents shall be considered as included in the unit price bid.
11.12 Bids should be made on each separate item of work shown in this Bid Packet, with reasonable relation to the probable cost of doing the work included in such item. The City reserves the right to reject any bid in case an item or items thereof are obviously unbalanced or appear to be so unbalanced as to affect adversely an interest of the City.
11.13 The quantities provided by the City in Part IV of this Bid Packet, the Bid Form, are approximate and are given only for use in comparing bids and to indicate approximately the total amount of the Construction Contract. The City does not expressly or by implication represent that the actual amounts of work will correspond therewith but does call particular attention to the uncertainty in the quantities of the Work involved that cannot be predicted in advance. The Work under certain items may be materially greater or less than those predicted in this Bid Packet, as may be necessary in the judgment of the Project Manager to complete the Work contemplated in the Construction Contract. An increase or decrease in the quantity for any item shall not be regarded as grounds for a decrease or increase in the unit prices, except as may be set forth in the Contract Documents.
PART 12- SUBMISSION OF BIDS
12.01 Each bid shall be accompanied by the Bid Security and other required documents.
12.02 Each Bid must be submitted electronically in Adobe portable document format to www.bidnetdirect.com/colorado with the following information in the file name: the Bidder's name, address, the word “BID.” The Bid Security must be submitted in a separate electronic file with the following information in the file name: the Bidder's name and the words “BID SECURITY.” No Bids will be accepted if mailed or hand delivered. Submittals will be accepted if actually received by the City until 2:00 P.M. local time on the 1st day of October, 2025, as determined by the City’s clock.
12.03 Bids shall be submitted prior to the time and date set for receipt of bids in this IFB, or the modified time and date as indicated by Addendum. Bids received after the time and date set for receipt of bids will be returned unopened. Bidder shall assume full responsibility for timely delivery at the location designated for receipt of bids.
12.04 Oral, telephone, or telegraph bids are invalid and will not receive consideration. No Bidder may submit more than one bid. Multiple bids under different names will not be accepted from one firm or association. Evidence of collusion among Bidders shall be grounds for exclusion of any Bidder who is a participant in any such collusion.
12.05 The City is a Colorado governmental entity. Therefore, all information included in bids and other written information submitted by the Bidder to the City is subject to the provisions of the Colorado Open Records Act, Colorado Revised Statutes Sections 24-72-201, et seq. (“CORA”). Bidders should expect their bid may be viewed by the general public and competitors once submitted to the City. If a Bidder requests any restrictions on the use or inspection of material contained within the bid, the Bidder must:
1. clearly identify and segregate any portion(s) of its bid that it believes constitutes trade secrets, privileged information, and/or confidential commercial, financial, geological or geophysical data, which may not be subject to disclosure under CORA (“Confidential Information”),
2. place a cover page on such segregated Confidential Information requesting that such Confidential Information be restricted from inspection under CORA, and
3. state with such request, on the cover page, the statutory basis supporting the request under CORA
The Bid Form, bid price information or the bid, in its entirety, will not be considered Confidential Information. Any information that will be included in any resulting Construction Contract cannot be considered Confidential Information. Co‐mingling of Confidential Information with information that is not Confidential Information is not acceptable.
If the Bidder fails to satisfy 1 through 3 set forth above, the City may treat the entire bid as a public record available for inspection by the public under CORA. However, if Bidder satisfies 1 through 3, the City intends to redact or withhold such identified and segregated material in response to a CORA request. If the City is subject to a legal challenge (e.g., mediation, litigation) as a result of the redaction or withholding of such Confidential Information, Bidder shall be responsible to enter into an agreement with the City to cover all City costs incurred, including penalties that may be imposed by a judge, to defend its CORA response, with the City retaining full discretion on how to defend and to what extent. If Bidder fails to enter into such agreement, it shall be discretionary with the City whether to defend the legal challenge.
12.06 Bids that are not completed in the form and manner required by this IFB are subject to immediate rejection in the discretion of the City of Centennial.
12.07 The submission of a bid constitutes Bidder’s representation that Bidder has complied with every requirement of this IFB and that the Contract Documents, as provided in this IFB, are sufficient in scope and detail to indicate and convey understanding of all terms and conditions for performance of the work. Further, the submission of a bid constitutes a Bidder’s acceptance of all of the terms and conditions of the City’s form of Construction Contract, and its General Conditions, included with this Bid Packet. In addition, by submitting a bid, Bidder accepts all of the terms and conditions set forth in the Special Conditions, included as Exhibit C to this IFB. By submitting a bid, Bidder is agreeing to execute the Construction Contract in substantially the same form as presented immediately following Bidder’s receipt of the City’s notice of award of this Construction Contract.
Any requested changes to the Construction Contract must be submitted along with the bid. Changes submitted after the deadline for submitting bids will be disregarded.
12.08 The City shall not be liable for any costs incurred by the Bidder in preparation and submission of the bid, contract negotiations or for any work performed by Bidder prior to the execution of the Construction Contract.
12.09 Nothing in the IFB or any resulting Construction Contract shall be construed to waive, limit, or otherwise modify any governmental immunity that may be available by law to the City, its officials, employees, contractors, or agents, or any other person acting on behalf of the City and, in particular, governmental immunity afforded or available pursuant to the Colorado Governmental Immunity Act, Title 24, Article 10 of the Colorado Revised Statutes.
PART 13 - MODIFICATION AND WITHDRAWAL OF BIDS
13.01 Bids submitted early may be modified or withdrawn by notice to the party receiving bids at the place and prior to the time designated for receipt of bids. Withdrawn bids may be resubmitted up to the time designated for the receipt of bids provided that they are then fully in conformance with these Instructions to Bidders and the Bid Security is in an amount sufficient for the bid as modified or resubmitted.
13.02 If within twenty-four (24) hours after bids are opened, any Bidder files a duly signed, written notice with the City and promptly thereafter demonstrates to the reasonable satisfaction of the City that there was a material and substantial mistake in the preparation of their bid, that Bidder may withdraw their bid and the Bid Security will be returned. Thereafter, that Bidder will be disqualified from further bidding on the Work.
PART 14 - OPENING OF BIDS
Bids will be publicly opened, read aloud and tabulated by the Purchasing Manager or other City representative(s) as noted above. Bids should be acted upon by the City Manager, or City Council (if required), within ninety (90) days of the opening of the bids. An abstract of the amounts of the bids and major alternates will be made available after the opening of the bids.
PART 15 - BIDS TO REMAIN OPEN
Bids shall remain open until the time specified on page one of these Instructions after the date of the bid opening, but the City will, under other provisions stated in these Instructions or may in its sole discretion, release any bid and return the Bid Security prior to that date.
PART 16 - AWARD OF CONTRACT OR CONTRACTS
16.01 The City reserves the right and discretion to reject any and all bids, to waive any and all informalities and to negotiate contract terms with the Successful Bidder, and the right to disregard all nonconforming, nonresponsive or conditional bids. Discrepancies between words and figures will be resolved in favor of the words. Discrepancies between the indicated sum of any column of figures and the correct sum thereof shall be resolved in favor of the correct sum. Your attention is called to the fact that bids that are not completed in the form and manner required by this IFB are subject to immediate rejection in the discretion of the City.
16.02 In evaluating bids, the City shall consider the qualifications of the Bidders, and whether or not the bids comply with the prescribed requirements. The City reserves the right to reject the bid of any Bidder who does not pass any such evaluation to the City's satisfaction. The City may accept bids in any order or combination and may award each section of the Work to different Bidders.
16.03 The bid of any Bidder that is in arrears to the City upon debt of contract or that is a defaulter, as surety or otherwise, upon any obligation to the City may be rejected.
16.04 If the Construction Contract is to be awarded, it will be awarded to the Bidder whose evaluation by the City indicates to the City that the award will provide the best value and be in the best interests of the City.
16.05 The Successful Bidder shall furnish the City with a proposed schedule of construction and estimated monthly payments within ten (10) business days of the date of the Notice of Award.
PART 17 – PERFORMANCE, PAYMENT, MAINTENANCE AND WARRANTY BOND
The Contract Documents set forth Owner's requirements as to the Performance, Payment, Maintenance and Warranty Bond. When the Successful Bidder delivers the executed Construction Contract to the City, it shall be accompanied by the required Performance, Payment, Maintenance and Warranty Bond in the form attached as Exhibit D to this IFB. Said bond shall be issued by a responsible surety approved by the City and shall guarantee the Successful Bidder’s faithful performance of the Construction Contract, including but not limited to all warranty and guarantee provisions. Accompanying the bond form shall be a Power of Attorney authorizing the attorney in fact to bind the surety company, and the form shall be certified to include the date of the Bond.
PART 18 - SIGNING OF CONTRACT
When the City gives a Notice of Award to the Successful Bidder, it will be accompanied by counterparts of the Construction Contract and all other Contract Documents. The Successful Bidder shall execute the Construction Contract and deliver it, together with evidence of insurance and the Performance, Payment, Maintenance and Warranty Bond, to the City within ten (10) business days of the date of the Notice of Award. Failure to do so will be adequate and just cause for the annulment or cancellation of the awards, and in such cases the Bid Security shall be forfeited to the City.
PART 19 - SALES AND USE TAXES
19.01 This Project is being undertaken directly by the City. Therefore, pursuant to Centennial Municipal Code Section 4-1-350(1)(a), no sales or use tax shall be due on construction materials used in this Project.
These materials may be subject to sales and use taxes imposed by other taxing authorities.
19.02 Within ten (10) business days from the date of the Notice of Award, the Successful Bidder shall deliver to the City three (3) copies of the completed and executed Contractor Application for Exemption Certificate with the approval of the Colorado Department of Revenue affixed (Department of Revenue Form Number 172), if requested by the City. These certificates will serve as an indication to the City that the Successful Bidder has acquired the necessary exemption for the state and other state collected sales and use taxes. The Successful Bidder shall make the same requirement, as contained above, of any subcontractors on the Project.
19.03 All books and records pertaining to the Project that will allow the accurate determination of any tax due must be retained and kept available for inspection by the City for three (3) years after the completion of the Project.
19.04 All applicable taxes are to be paid by the Successful Bidder and are to be included in appropriate bid items, except that, the Successful Bidder shall not be reimbursed for any State or other sales and use taxes incurred as a result of failure to obtain an exemption certificate prior to issuance of the Notice to Proceed.
PART 20 - INSURANCE REQUIREMENTS
20.01 The Successful Bidder shall carry the insurance specified in the Construction Contract and/or Contract Documents and shall submit proof of such insurance when the Successful Bidder delivers the executed Construction Contract to the City of Centennial. The City must be named as an additional insured on the specified liability insurance policies and certificates of insurance. Insurance certificates required for this project shall be sent or delivered to Anna Bunce, Project Manager, 13133 E. Arapahoe Road, Centennial, Colorado 80112.
PART 21 – PERMITS AND REGULATIONS
The Successful Bidder shall be required to comply with all applicable permits and regulations to perform construction activities associated with the project. Permits from the City will be issued on a no-fee basis. The Successful Bidder will be responsible for all fees related to required permits not issued by the City.
Usual permit requirements include:
-City of Centennial Right of Way Permit.
-C.D.O.T. Right-of-Way Use Permit and associated Notice to Proceed, if applicable.
-Grading, Erosion and Sediment Control (GESC) Permit and applicable BMP’s (required by SEMSWA).
-Stormwater Public Improvement Permit (SPIP) (SEMSWA), if applicable.
-Floodplain Development Permit (FPDP) (SEMSWA), if applicable.
-State of Colorado Water Quality Permits (S.W.M.P. and/or Dewatering Permits), if applicable.
-State of Colorado Air Quality Permits, if applicable.
III. BID FORM
Bidder: ______________________________
City of Centennial Project No. 25-09-03
This Bid is dated _______________________________, 20___
To: The City of Centennial, State of Colorado.
BID
Item # Description Unit Quantity Unit Cost Total 201-00000 Clearing and Grubbing LS 4 202-00828 Removal of Traffic Signal Equipment LS 4 202-04010 Clean Inlet EA 2 203-01597 Potholing HR 20 208-00035 Aggregate Bag LF 78 208-00045 Concrete Washout Structure EA 4 208-00054 Storm Drain Inlet Protection (Type II) EA 2 208-00103 Removal and Disposal of Sediment (Labor) HR 16 208-00105 Removal and Disposal of Sediment (Equipment) HR 16 208-00106 Sweeping (Sediment Removal) HR 16 208-00207 Erosion Control Management DAY 4 210-00890 Reset Intersection Detection System (Camera) EA 2 503-00200 Caisson (Special 24 Inch) LF 40 503-00200 Caisson (Special 36 Inch) LF 105 503-00200 Caisson (Special 42 Inch) LF 40 503-00200 Caisson (Special 48 Inch) LF 22 613-00200 2 Inch Electrical Conduit LF 750 613-00206 2 Inch Electrical Conduit (Bored) LF 2,550 613-00300 3 Inch Electrical Conduit LF 750 613-00306 3 Inch Electrical Conduit (Bored) LF 2,550 613-07034 Pull Box (24"x36"x18") EA 14 613-10000 Wiring LS 4 613-13030 Luminaire (LED) (30,000 Lumens) EA 8 613-80130 Service Meter Cabinet EA 4 614-00011 Sign Panel (Class I) SF 345 614-70150 Pedestrian Signal Face (16) (Countdown) EA 20 614-70200 Accessible Pedestrian Signal EA 32 614-70336 Traffic Signal Face (12-12-12) EA 30 614-70448 Traffic Signal Face (12-12-12-12) EA 21 614-72855 Traffic Signal Controller Cabinet EA 4 614-72863 Pedestrian Push Button Post Assembly EA 8 614-72866 Fire Preemption Unit and Timer EA 6 614-72886 Intersection Detection System EA 1 614-81130 Traffic Signal-Light Pole Steel (30 Foot Mast Arm) EA 3 614-81140 Traffic Signal-Light Pole Steel (40 Foot Mast Arm) EA 2
614-81145 Traffic Signal-Light Pole Steel (45 Foot Mast Arm) EA 1 614-81150 Traffic Signal-Light Pole Steel (50 Foot Mast Arm) EA 1 614-81175 Traffic Signal-Light Pole Steel (75 Foot Mast Arm) EA 1 614-82015 Traffic Signal-Light Pole Steel (1 Mast Arm) (Special) EA 2 614-84100 Traffic Signal Pedestal Pole Aluminum (10 Foot) EA 4 614-84100 Traffic Signal Pedestal Pole Aluminum (15 Foot) EA 4 614-86105 Telemetry (Field) EA 4 614-86800 Uninterrupted Power Supply EA 4 614-87333 Closed Circuit Television Camera (Traffic Surveillance) EA 4 625-00000 Construction Surveying LS 1 626-00000 Mobilization LS 1 627-00005 Epoxy Pavement Marking GAL 4 627-30205 Thermoplastic Pavement Marking (Word-Symbol) SF 138 627-30210 Thermoplastic Pavement Marking (X-Walk-Stop Line) SF 689 630-00016 Traffic Control (Special) LS LS 1
Subtotal Bid Items
700-70010 F/A Minor Contract Revisions FA 1 700-70082 F/A Furnish & Install Electrical Service FA 1
Subtotal Force Account Items
Total Bid Items and Force Account Items
(Total Bid Written in Words)
IV. NONCOLLUSION AFFIDAVIT OF PRIME BIDDER
(Complete and submit attached to your bid)
STATE OF ____________________ )
) ss.
COUNTY OF _________________ )
__________________________________________, being first duly sworn, deposes and says that:
(1) He or She is the ___________________of_______________________ ____________________, the Bidder that has submitted the attached bid (the “Bid”);
(2) He or She is fully informed respecting the preparation and contents of the attached Bid and of all pertinent circumstances respecting such Bid;
(3) Such Bid is genuine and is not a collusive or sham bid;
(4) Neither the said Bidder nor any of its officers, partner, owners agents, representatives, employees or parties in interest, including this affiant, have in any way colluded, conspired, connived, or agreed, directly or indirectly, with any other Bidder, firm or person to submit a collusive or sham bid in connection with the Construction Contract for which the attached Bid has been submitted or to refrain from bidding in connection with such Construction Contract, or has in any manner, directly or indirectly, sought by agreement or collusion or communication or conference with any other Bidder, or to fix any overhead, profit or cost element of the bid price or the bid price of any other Bidder, or to secure through the collusion, conspiracy, connivance or unlawful agreement any advantage against the City of Centennial or persons interested in the proposed Construction Contract; and
(5) The price or prices quoted in the attached Bid are fair and proper and are not tainted by any collusion, conspiracy, connivance or unlawful agreement on the part of the Bidder or any of its agents, representatives, owners, employees, or parties in interest, including this affiant.
Signed:
By: _____________________________________
Printed Name: _____________________________
Subscribed and sworn to before me this day of , 20 , by _____ ____________________ ____
________________________, as ______________________, (Affiant) (Title) Of _______________________________, a _________________________, organized (Bidder) (Corporation or partnership)
Pursuant to the laws of the State of ______________________.
Notary Public My Commission Expires______________________
V. BIDDER’S CERTIFICATION (Complete and submit attached to your bid)
To: City of Centennial, Colorado (hereinafter called “CITY”).
From: ___________________________________________________ (hereinafter “Bidder”), organized and existing under the laws of the State of ________________ doing business as (a corporation), (a partnership), (an individual).
The Bidder, in compliance with the City’s Invitation for Bids and Instructions to Bidders, hereby proposes to perform all work in strict accordance with the Contract Documents within the time set forth therein, and at the prices stated on the included Bid Form as totaled herein (the “Bid”).
By submission of this Bidder’s Certification, Bidder certifies, and in the case of a joint venture each party thereto certifies as to Bidder's own organization, that the Bid has been arrived at independently, without consultation, communication, or agreement as to any matters relating to this Bid with any other Bidder or with any competitor.
The undersigned, having thoroughly inspected the existing conditions in the Project area affecting the cost of the Work and having thoroughly examined all of the Contract Documents, together with all other forms, attachments, and information required or otherwise submitted with this Bid, hereby offers to furnish all supervision, technical personnel, labor, materials, machinery, tools, equipment and services including utility and transportation services and to perform and complete all work required for:
City of Centennial Project No. 25-09-03 Project Description: This project shall include all labor, equipment, and materials necessary to partially or fully reconstruct existing pole and mastarm type traffic signals as per plans at the intersections of Dry Creek & Monaco; Dry Creek & Quebec; Dry Creek & Willow Way; and Easter & Peoria.
It is understood by the Bidder that should the cost of the Bid exceed budgeted funds, the City reserves the right to reject any or all bids, or portions of work bid, or to use any of the methods stated in the Instructions to Bidders to obtain the most advantageous bid price. Bidders must bid on all items, additive schedules, alternatives, and supplementary unit price schedule as contained in the Bid Form.
The Bid is based on subcontracting certain major portions of the work to subcontractors as listed below:
Item No. Subcontractor License Number
(Add additional names on separate sheet, if necessary.)
In addition, by submission of this Bid and this Bidder’s Certification, Bidder certifies as follows:
1. Bidder understands that the City reserves the right to reject any or all bids and to waive any informalities in the bidding.
2. The Bidder agrees that this Bid shall be good and will not be withdrawn for a period of ninety (90) calendar days after the scheduled closing time for receiving bids. If written notice of the acceptance of this Bid is mailed or otherwise delivered to the undersigned within this period, or at any time thereafter before this Bid is withdrawn, the undersigned agrees to execute and deliver a Construction Contract in the prescribed form and furnish the required surety bond within ten (10) business days after the Construction Contract is presented to him for signature.
3. As required by the Instructions to Bidders, attached hereto is the Non-Collusion Affidavit of Prime Bidder, submitted as proof that the undersigned has not colluded with any person in respect to this Bid or any other bid or the submitting of bids for the Construction Contract for which this Bid is submitted.
4. The Bidder is submitting, or will submit upon request, such additional proof as the City may require that Bidder can qualify in accordance with these Contract Documents with this Bid.
5. Bidder agrees to execute the Construction Contract, including its General Conditions, in the form presented in the Bid Packet, or as negotiated based on requests for changes submitted with the Bid.
The undersigned Bidder hereby agrees to be ready and to appear at the office of the City’s Purchasing Manager to execute the Construction Contract in conformity with their Bid and also to have ready and to furnish at that time the attached Performance, Payment, Maintenance and Warranty Bond each in an amount not less than the full amount of the attached Bid Form.
The ________________________________________________, a corporation of the State of _________________________, is hereby offered as surety on said bond. If such surety is not approved by the City, another and satisfactory surety company shall be furnished.
Enclosed herewith is Bid Security, as defined in the attached Instructions to Bidders, in the amount of ___________, which Bid Security the undersigned Bidder agrees is to be paid to and become the property of the City, as liquidated damages, and not as a penalty, to compensate the City for actual costs, delay and the difference between this Bid and the next acceptable bid, as ranked by the City, should this Bid be accepted and the Construction Contract awarded this Bidder and should Bidder fail to enter into the Construction Contract in the form prescribed or fail to furnish the required Performance, Payment, Maintenance and Warranty Bond within ten (10) business days as stipulated.
The undersigned Bidder acknowledges receipt of the following Addenda:
Addendum No. Date Initial by Bidder
Addendum No. Date Initial by Bidder
Addendum No. Date Initial by Bidder
Addendum No. Date Initial by Bidder
The undersigned Bidder certifies that Bidder and each of their subcontractors possess an adequate supply of workers qualified and equipment satisfactory to perform the Work specified in the Contract Documents;
that there is no existing or impending dispute between it and any labor organization; and that it is prepared to comply fully with the provisions contained in the Contract Documents.
This Bid is submitted upon the declaration that neither I (we) nor, to the best of my (our) knowledge, none of the members of my (our) firm or company have either otherwise taken any action in restraint of free competitive bidding in connection with this Bid.
Dated at __________________________ this __________ day of ________________, 20___.
Signature of Bidder:
If an Individual: _______________________________
Doing business as ________________________________
If a Partnership: ______________________________________
By _______________________________, General Partner.
If a Corporation: ________________________________________
A ___________________________, Corporation
By ___________________________, President.
Attest:
Secretary
[Corporate Seal]
Business Address of Bidder ________________________________
City, State, Zip Code _____________________________________
Telephone Number of Bidder ________________________________
Email of Bidder ______________________________________
VI. QUESTIONNAIRE (Complete and submit with your bid)
Submitted by: Telephone: ___________________________ ____________________________
Principal Office Address: ______________________________________________________________
1. List the major construction projects your organization has in progress as of this date:
Owner: _____________________________________________________________
Project Location: _____________________________________________________________
Type of Project: _____________________________________________________________
Contact and Information: _____________________________________________________________
Owner: _____________________________________________________________
Project Location: _____________________________________________________________
Type of Project: _____________________________________________________________
Contact and Information: _____________________________________________________________
Owner: _____________________________________________________________
Project Location: _____________________________________________________________
Type of Project: _____________________________________________________________
Contact and Information: _____________________________________________________________
2. List at least three projects similar in nature to the project defined in these specifications, which your organization has completed within the last 5 years:
Owner: _____________________________________________________________
Project Location: _____________________________________________________________
Type of Project: _____________________________________________________________
Contact and Information: _____________________________________________________________
Owner: _____________________________________________________________
Project Location: _____________________________________________________________
Type of Project: _____________________________________________________________
Contact and Information: _____________________________________________________________
Owner: _____________________________________________________________
Project Location: _____________________________________________________________
Type of Project: _____________________________________________________________
Contact and Information: _____________________________________________________________
3. Have you, your firm, or any principal in your firm been adjudged bankrupt in any voluntary or involuntary bankruptcy proceeding within the last 10 years? ____ YES ____ NO
If so, when and where? _________________________________________________________________
4. Have you, your firm, or any principal in your firm been sued by any "owner" or Bonding Company insuring said "owner" for default on a contract within the last 10 years? ____ YES ____ NO
If so, what was the disposition of the lawsuit? ________________________________________________
If the lawsuit is still pending, what is the case number and Court of Jurisdiction: ____________________
5. Have you, your firm, or any principal in your firm been sued by any subcontractor or material supplier for default on a contract within the last 10 years? ____ YES ____ NO
If the lawsuit is still pending, what is the case number and Court of Jurisdiction: ____________________
6. Has any Bonding Company refused to bond you, your firm, or any principal in your firm for a contract within the last 10 years? ____ YES ____ NO
If so, what were the circumstances? ________________________________________________________
7. Has a Bonding Company been required to pay on a Bond issued to you, your firm, or any principal in your firm for a contract within the last 10 years? ____ YES ____ NO
If so, what were the circumstances? ________________________________________________________
8. Have you, your firm, or any principal in your firm had to submit to binding arbitration to resolve a dispute arising from a contract within the last 10 years? ____ YES ____ NO
If so, what were the circumstances? ________________________________________________________
9. Within the last 10 years have you, your firm, or any principal in your firm been penalized with liquidated damages for failure to complete the terms of a contract within the specified time?
YES NO ____ ____
If so, what were the circumstances? ________________________________________________________
10. Briefly describe your company’s strategy regarding de-escalation of interactions with citizens, the driving public, and municipal staff and how it is implemented on projects ___________________________
VII. BID BOND (Complete and submit with your bid)
KNOW ALL MEN BY THESE PRESENTS, that we, the undersigned, ___________________________________ as Principal, and ___________________________________ as Surety, are hereby held…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .