25-0701-P-KF949_Cost_Proposal.xlsx
XLSX spreadsheet 50 KB Posted
- Attached to
- Water and Wastewater Services
- Solicitation number
- 25-0701-P-KF949
- Issued by
- Florida
About this file
The document is a Labor and Rates Form for RFP 25-0701-P-KF949, issued by Lake County School District in Florida for Water and Wastewater Services. The solicitation seeks a contractor to provide comprehensive maintenance and repair services for water and wastewater infrastructure, including twenty-three Primary Lift Stations, three Double Pit Lift Stations, and twenty Pot Belly Lift Stations. The bid is scheduled to open on June 16, 2025, with services encompassing labor, materials, equipment, and transportation for repairing, replacing, and maintaining water treatment plants, wastewater treatment plants, lift stations, plumbing repairs, new installations, and equipment replacements.
The cost proposal includes detailed rate structures for labor categories (Supervisor, Foreman, Helper-Labor Only, Helper with Truck/Trailer, Backflow Technician) and an extensive equipment rate schedule covering items such as excavators, backhoes, vac trucks, CCTV cameras, bypass pumps, generators, and specialized equipment like hydro tanks and concrete mixers. The form allows for both hourly and extended-period (daily, weekly, monthly) equipment rates, with options for owned and rented equipment. Additionally, the proposal includes markup percentages for materials purchased for specific jobs, materials from stock, subcontractor labor, and performance and payment bonds, providing a comprehensive pricing framework for potential bidders.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Labor/Rates Form | ||
| RFP: 25-0701-P-KF949 | ||
| Title: Water and Wastewater Services | ||
| Bid Opens: June 16, 2025 | ||
| Lake County School District | ||
| LABOR AND EQUIPMENT RATES | RATES | |
| Working Hours | After Hours | |
| Supervisor | ||
| Foreman | ||
| Helper-Labor Only | ||
| Helper with Truck/Trailer | ||
| Backflow Technician | ||
| Other: (explain) | ||
| Please provide when after hours would be applied |
| EQUIPMENT RATES | SET UP FEE | HOURLY | DAILY | WEEKLY | MONTHLY | OWNED | RENTED |
| Mini Excavator with Operator | |||||||
| Back Hoe with Operator | |||||||
| Vac Truck - 2 man Crew | |||||||
| CCTV Camera Trailer with Operator | |||||||
| Tracker with Bucket with Operator | |||||||
| 4" Sewage Bypass Pump with Hoses | |||||||
| Bypass Pump Fuel Additional Cost | Price per gallon: | ||||||
| 1500 Gallon Temporary Hydro Tank | |||||||
| 3000 Gallon Temporary Hydro Tank | |||||||
| 10000 Gallon Temporary Hydro Tank | |||||||
| Aerator for Ground Storage Tank | |||||||
| 13000 Watt Generator | |||||||
| Infiltrator MH Leak Stop Plus Labor | |||||||
| Portable Concrete Mixer with Crew | |||||||
| Metal Fabrication/Welding Lead | |||||||
| Metal Fabrication/Welder | |||||||
| Sand Blast Trailer Rig with Crew | |||||||
| Sand Blasting Sand | Bag Size (lb.): | Price per bag: | |||||
| Compactor with Operator | |||||||
| Air Compressor Road Bore |
| OTHER RATES | % MARK UP | |
| Materials Purchased for a Specific Job | ||
| Materials from Stock | ||
| Subcontractor Labor | ||
| Performance and Payment Bond | * % markup over cost | |
| Company Name: | ||
| Authorized Signature/Date: |