This is Addendum No. 3 issued by the City of Albany, Georgia for Bid Reference #25-035 regarding the Joshua Street WPCP Solids Handling Improvements project. The addendum, dated February 7, 2025, modifies the technical specifications for the project, with bids due on February 20, 2025 at 2:30 p.m. The key modification replaces Article 1.6-E of Technical Specification 40 61 13 (Process Control System General Provisions) to establish that the PCSS shall be Southern Flow, MR Systems, or Revere as the basis of design and standard of quality for the project.
The addendum requires bidders to acknowledge receipt on the Bid Form when submitting their bids. The document is signed by Ricky Gladney, Buyer for the City of Albany, and includes distribution to project stakeholders from Ardurra (consulting firm) and City of Albany officials. The addendum is administered through the City of Albany's Finance Department.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 25_035_ITB_Solids Handling Upgrades.pdf | ||
| 25_035_Addendum_1.pdf | ||
| 25_035_Addendum_4.pdf | ||
| 25_035_Addendum_2.pdf | ||
| 25_035_Addendum_1.pdf | ||
| 25_035_ITB_Solids Handling Upgrades.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
02/07/2025
TO: All Potential Bidders
SUBJECT: Joshua Street WPCP Solids Handling Improvements
Bid Ref. #25-035
Bid Opening Date & Time: February 20, 2025 @ 2:30 p.m.
ADDENDUM NO. 3
The items contained in this addendum are added to and/or deleted from and become part of the specifications and bid documents for the above-referenced Invitation to Bid. Bidders must acknowledge receipt of the Addendum on the Bid Form, located in the invitation to bid, when the bids are submitted.
PERTAINING TO TECHNICAL SPECIFICATIONS
ITEM 1: In order to establish a basis of design and establish the standard of quality expected for the project, Technical Specification 40 61 13 – Process Control System General Provisions, Article 1.6-E shall be deleted in its entirety and replaced with the following:
A. PCSS shall be Southern Flow, MR Systems or Revere
End of Addendum 3
Ricky Gladney Ricky Gladney, Buyer
Cc:
Jeff Duplantis, Ardurra
Aaron Baird, Ardurra
Tracy Schmidt, Ardurra
Jeff Hughes, City of Albany
Robert Griffin, City of Albany
Scott Tennison, City of Albany
F I N A N C E
P.O. BOX 447 ALBANY, GA 31702 | PHONE: 229.431.3211 | FAX: 229.431.2184 | www.albanyga.gov rgladney Line