25-02425 Requirements and Specifications ARTIQ zynq batching.pdf
PDF 174 KB Posted
- Attached to
- ARTIQ Zynq Batching and Ndscan Federal contract opportunity
- Solicitation number
- NB688000-25-02425
About this file
This document is a Requirements/Specifications form for a NIST federal contract opportunity involving software development for the ARTIQ experimental control system. The Ion Storage Group at NIST requires software, firmware, and gateware to enable two specific technical capabilities: 1) increasing the throughput of RTIO events from Zynq-based core devices through batching, and 2) enabling the use of the ndscan ARTIQ extension package without requiring patches to the ARTIQ system. The procurement is a sources sought market research effort to identify potential vendors, with a potential small business set-aside if at least two qualified small businesses can fulfill the requirements. The requirement falls under NAICS code 334516 (Analytical Laboratory Instrument Manufacturing) with a small business size standard of 1,000 employees, and vendors are requested to submit four-page capability statements including details about product manufacturing, lead times, and technical specifications demonstrating ability to meet the requirements.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 25-02425 Detailed Specifications ARTIQ Zynq batching.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
Requirements / Specifications: ARTIQ Zynq batching and ndscan 1 Version 1.0 (2019) Double-click on for further assistance.
Use this document to detail specifications/requirements for an item and/or ancillary services.
TITLE: ARTIQ Zynq batching and ndscan Requesting Lab/Division/Group: PML 688.10
General Statement of Need The Ion Storage Group at NIST performs a variety of quantum computing, quantum simulation, and optical clock experiments using trapped ions. These experiments are very complex and require advanced real-time classical control. The ARTIQ experimental control system, initially developed for the Ion Storage Group, is used to operate our experiments. For the next generation of quantum information and clock experiments, we require the ability to increase the throughput of RTIO events from Zynq-based core devices in ARTIQ through batching. We also require modifications to ARTIQ to enable the use of the ndscan ARTIQ extension package without patching of ARTIQ.
Items and/or Ancillary Services
Item 1: Software, firmware, and gateware to enable RTIO event batching on Zynq-based core devices and the use of ndscan with unpatched ARTIQ.
Quantity: 1 Specifications: See attachment for detailed specifications. All list specifications must be met to satisfy the need.
Separately Priced Options and Services:
Item 2: [List minimum specifications.
Quantity: [Enter quantity here.] Specifications: [Enter quantity here.]
[List any other item(s) or service requirements here using the same format above.]
Service Requirements / Item Specifications
Section Requirements/Specifications Planning Considerations ☒ N/A
☐ List any visits required to allow potential vendors to see site specific constraints.
[Explain requirement here] ☐ US citizen required on-site (foreign nationals require preregistration 30 days prior) ☐ Vendor rep on-site more than three days ☐ Other considerations: [List other considerations to ensure an accurate quote]
Shipping & Delivery ☐ N/A
Standard shipping Shipping criteria:
☐ Partial delivery acceptable ☐ Direct delivery to building required
Requirements / Specifications: ARTIQ Zynq batching and ndscan 2
[Explain need for requirement here] Building has: ☐ Loading dock ☐ Containerization preference: [Choose container] Other requirements: [List any other requirements here] Delivery date criteria:
☐ Delivery of goods, installation, and training shall be completed no later than:
One year from ARO ☐ Deliver no earlier than: [Insert date here] ☐ Other: [List other shipping, delivery, or specil requirements]
Electronic Media ☐ N/A
[Enter electronic media requirements by item here.] ☒ Software ☐ Electronic manuals ☐ License Key ☐ Other: [List any other Electronic Media requirements here] [Enter email address for software delivery here]
Installation ☒ N/A
[Enter installation requirements by item here.] ☐ Vendor technician on site ☐ Rigging ☐ Uncrating / Unpackaging ☐ Removal of packaging material ☐ Equipment set up ☐ Start-up services ☐ Turn key installation ☐ Other [Enter details here.] Note: When installation is required, TPOC or COR shall be the coordination point.
Facility / Utility Considerations ☒ N/A
No utility or facility requirements.
☐ OFPM Work Order Number(s) [List any Work Order Number(s) here] ☐ Power available Voltage: [Enter voltage here] (V) Max Current: [Enter max current draw here] (A) Phase: [Choose phase] Frequency: [Typically 60Hz] (Hz) NEMA Plug Type: [Enter plug type here] (i.e.: NEMA L5-20P) Environment: [Choose environment] Other power consideration: [List any other power considerations here] ☐ Utility connections: [List relevant available utilities, pressure(s), and flowrate(s)] ☐ Other considerations: [List other considerations to ensure an accurate quote]
Requirements / Specifications: ARTIQ Zynq batching and ndscan 3
Warranty ☐ N/A
Base Manufacturer Warranty is acceptable [If you require an Extended Manufacturer Warranty, describe the warranty requirements per item here.] What is included?
☐ Labor ☐ Parts ☐ Travel ☐ Cost and liability for returns ☐ Other: [Enter other requirements here] ☐ Warranty length: [Enter warranty length here] Period Length:[Ex. month, 6 month, year etc.]
Training ☒ N/A
No training requirements ☐ On-site ☐ Off-site location: [Enter location(s) here] ☐ Number of trainees: [Enter number of trainees here] Scope of training:
☐ Operations ☐ Maintenance ☐ Troubleshooting ☐ Safety ☐ Other: [Enter other scope requirements here] ☐ Training materials to be provided: [Describe requirement here] ☐ Other: [Enter other training requirements here] Note: When training is required, TPOC or COR shall be the coordination point.
Inspection and Acceptance ☐ N/A
[Enter inspection requirements per item here] ☒ Planned government acceptance testing (7 business days) ☐ Gov’t acceptance expected to take longer than 7 business days: [Duration] ☐ Inspection and acceptance plan: [Explain here] ☐ Other: [Enter other requirements here]
Maintenance ☒ N/A none Period Length: [Ex. month, 6 month, year etc.] What is included?
☐ Labor ☐ Spare parts ☐ Consumables ☐ Travel ☐ Cost and liability for returns ☐ Software updates ☐ Manuals ☐ Service plan length: [Enter service plan length here] ☐ Other: [Enter other requirements here] ☐ Requirements: [Enter requirements here] (i.e.: onsite within 72 hours, etc.)
☐ Option Period 1 ☐ Option Period 2 ☐ Option Period 3 ☐ Option Period 4
Government Furnished Material / Equipment ☒ N/A none ☐ Samples for testing ☐ Government equipment which will leave gov't site (TPOC must coordinate with division property custodian) Serial Number: [Enter Serial Number here] Description: [Enter description here] NIST property number: [Enter NIST property number here]
Requirements / Specifications: ARTIQ Zynq batching and ndscan 4
☐ Other: [Enter other details here] Travel ☒ N/A none ☐ Explain: [Explain here] ☐ Other: [Enter other requirements here] Vendor: To the maximum extent possible, include as part of appropriate sections above (maintenance, repair, etc.). Otherwise, it will be a separate line item, reimbursable per the Federal Travel Regulation.
Provide suggestions to improve this form by clicking here.
https://oaam.nist.gov/OAAMAcquisitions/FormFeedback/default.aspx
| Use this document to detail specifications/requirements for an item and/or ancillary services. |
| TITLE: ARTIQ Zynq batching and ndscan |
| Requesting Lab/Division/Group: PML 688.10 |
| General Statement of Need |
| Provide suggestions to improve this form by clicking here. |
File details come from the government source that posted it. Updated .