25 0218 - Emporia - Adams St - IFB - DWGS.pdf
PDF 8 MB Posted
- Attached to
- Adams Street - Sanitary Sewer Replacement
- Solicitation number
- 88827
- Issued by
- Frederick County, Virginia
About this file
This file contains engineering drawings and specifications for the Adams Street Sanitary Sewer Replacement project for the City of Emporia, Virginia, prepared by CHA Companies with an issue date of February 18, 2025. The project involves replacing sanitary sewer infrastructure along Adams Street, including new sewer lines, manholes, and related components. The drawings include details for erosion and sediment control measures, sewer plan and profile views, standard construction details, and specifications for materials and installation methods. The project requires coordination with existing utilities and includes provisions for temporary construction easements, traffic control, and site restoration.
The drawings specify technical requirements including pipe bedding details, manhole construction specifications, pavement restoration standards, and erosion control measures that must be implemented. Construction must comply with City of Emporia standards, VDOT specifications, and applicable state and local requirements. The contractor is required to obtain all necessary permits and maintain erosion/sediment controls throughout construction. The documents include detailed engineering specifications for materials like precast concrete manholes, watertight frames and covers, PVC sewer pipe, and restoration of disturbed areas including asphalt and concrete surfaces.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IFB Project Manual - 25 0218 - Emporia - Adams St - IFB - SPECS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
G-001
COVER SHEET
Designed By: Checked By:
Drawing No.:
Issue Date:
Designed By: Drawn By:
Project No: Scale:
No. By DateSubmittal / Revision
080542
ADAMS STREET
SANITARY SEWER
REPLACEMENT
App'd.
2/18/2025
Drawing Copyright © 2025
540.552.5548 . www.chacompanies.com Blacksburg, VA 24060-5548
1341 Research Center Drive, Suite 2100
MRD MRD EBH
AS SHOWN
PREPARED BY:
BING MAP IMAGE COPYRIGHT 2022 MICROSOFT CORPORATION
LOCATION MAP
SCALE:
VICINITY MAP
NO SCALE
ADAMS STREET SANITARY SEWER REPLACEMENT
540.552.5548 . www.chacompanies.com Blacksburg, VA 24060-5548
1341 Research Center Drive, Suite 2100
CITY OF EMPORIA
PREPARED FOR:
CITY OF EMPORIA ADDRESS:
201 S. Main Street
EMPORIA, VA 23847
PHONE: (434) 634 - 3332
AutoCAD SHX Text
ADAMS STREET
AutoCAD SHX Text
LOW GROUND ROAD
AutoCAD SHX Text
SOUTH MAIN STREET
AutoCAD SHX Text
OLD HALIFAX RD
AutoCAD SHX Text
TILLAR AVENUE
AutoCAD SHX Text
MADISON STREET
AutoCAD SHX Text
JEFFERSON STREET
AutoCAD SHX Text
SOUTH MAIN STREET
AutoCAD SHX Text
LAUREL STREET
AutoCAD SHX Text IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT OR LAND SURVEYOR TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT OR LAND SURVEYOR SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
AutoCAD SHX Text File: V:\PROJECTS\ANY\K6\080542.000\09_DESIGN\DRAWINGS\01_SHEETS\G_001_080542.DWGV:\PROJECTS\ANY\K6\080542.000\09_DESIGN\DRAWINGS\01_SHEETS\G_001_080542.DWG
AutoCAD SHX Text Saved: 2/13/2025 12:13:13 PM Plotted: 2/17/2025 10:26:11 AM Current User: Dean, Margaret LastSavedBy: 80752/13/2025 12:13:13 PM Plotted: 2/17/2025 10:26:11 AM Current User: Dean, Margaret LastSavedBy: 8075 Plotted: 2/17/2025 10:26:11 AM Current User: Dean, Margaret LastSavedBy: 80752/17/2025 10:26:11 AM Current User: Dean, Margaret LastSavedBy: 8075 Current User: Dean, Margaret LastSavedBy: 8075Dean, Margaret LastSavedBy: 8075 LastSavedBy: 80758075
AutoCAD SHX Text
AutoCAD SHX Text
BID SUBMITTAL
AutoCAD SHX Text
EBH
AutoCAD SHX Text
MRD
AutoCAD SHX Text 2/18/2025
AutoCAD SHX Text 2/18/25
AutoCAD SHX Text
AutoCAD SHX Text Scale in feet
AutoCAD SHX Text
AutoCAD SHX Text 1,000
G-002
GENERAL NOTES
GENERAL NOTES EROSION AND SEDIMENT CONTROL NOTES
PERMITTING NOTES
SURVEY NOTES
SITE RESTORATION AND ACCESS NOTES
Designed By: Checked By:
Drawing No.:
Issue Date:
Designed By: Drawn By:
Project No: Scale:
No. By DateSubmittal / Revision
080542
ADAMS STREET
SANITARY SEWER
REPLACEMENT
App'd.
2/18/2025
Drawing Copyright © 2025
540.552.5548 . www.chacompanies.com Blacksburg, VA 24060-5548
1341 Research Center Drive, Suite 2100
MRD MRD EBH
AS SHOWN
AutoCAD SHX Text
1. CONSTRUCTION ON THIS PROJECT SHALL BE IN ACCORDANCE WITH THE CITY STANDARD DETAILS, CODE OF CONSTRUCTION ON THIS PROJECT SHALL BE IN ACCORDANCE WITH THE CITY STANDARD DETAILS, CODE OF ORDINANCES AND STANDARD SPECIFICATIONS IF APPLICABLE. 2. ALL SITE WORK, AT A MINIMUM, SHALL BE PERFORMED IN ACCORDANCE WITH HAMPTON ROADS REGIONAL ALL SITE WORK, AT A MINIMUM, SHALL BE PERFORMED IN ACCORDANCE WITH HAMPTON ROADS REGIONAL CONSTRUCTION STANDARDS, VDOT ROAD AND BRIDGE SPECIFICATIONS AND STANDARDS (CURRENT EDITIONS) AS INDICATED. 3. CONSTRUCTION ON THIS PROJECT SHALL BE IN ACCORDANCE WITH ASSOCIATED SPECIFICATIONS AND THE MOST CONSTRUCTION ON THIS PROJECT SHALL BE IN ACCORDANCE WITH ASSOCIATED SPECIFICATIONS AND THE MOST CURRENT CITY, COUNTY, STATE, AND UTILITY PROVIDER STANDARDS, SPECIFICATIONS AND BUILDING CODES. 4. UNDERGROUND UTILITIES MAY EXIST ON, ALONG OR WITHIN THE CONFINES OF THIS PROJECT. THE CONTRACTOR UNDERGROUND UTILITIES MAY EXIST ON, ALONG OR WITHIN THE CONFINES OF THIS PROJECT. THE CONTRACTOR IS RESPONSIBLE FOR CONTACTING VA-811 OR THE APPROPRIATE UTILITY COMPANIES PRIOR TO ANY EXCAVATION. 5. THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR THE DEMOLITION OF ALL INDICATED ON SITE ITEMS, ABOVE THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR THE DEMOLITION OF ALL INDICATED ON SITE ITEMS, ABOVE AND BELOW GROUND. THE CONTRACTOR IS ALSO RESPONSIBLE FOR REMOVAL OF ALL WASTE RESULTING FROM DEMOLITION, AS WELL AS GRADING AND FILLING OF ALL DEPRESSIONS TO INSURE THE SITE REMAINS AESTHETICALLY ACCEPTABLE, SAFE AND FUNCTIONAL. 6. THE CONTRACTOR SHALL OBSERVE ALL REQUIRED SAFETY PRECAUTIONS IN THE PERFORMANCE OF ALL WORK IN THE CONTRACTOR SHALL OBSERVE ALL REQUIRED SAFETY PRECAUTIONS IN THE PERFORMANCE OF ALL WORK IN ACCORDANCE WITH OSHA REQUIREMENTS. 7. THE CONTRACTOR SHALL GRADE, SEED AND SOD OR OTHERWISE PROVIDE TEMPORARY AND PERMANENT THE CONTRACTOR SHALL GRADE, SEED AND SOD OR OTHERWISE PROVIDE TEMPORARY AND PERMANENT STABILIZATION OF ALL DISTURBED AREAS, ESPECIALLY SLOPES. SEE EROSION CONTROL REQUIREMENTS. 8. WORK WITHIN PUBLIC RIGHT-OF-WAYS SHALL BE IN ACCORDANCE WITH ALL STATE AND LOCAL REQUIREMENTS, WORK WITHIN PUBLIC RIGHT-OF-WAYS SHALL BE IN ACCORDANCE WITH ALL STATE AND LOCAL REQUIREMENTS, STANDARDS AND POLICIES. 9. ANY SUBSTITUTIONS, CHANGES, OR MODIFICATIONS SHALL BE APPROVED IN WRITING BY THE PROJECT ENGINEER ANY SUBSTITUTIONS, CHANGES, OR MODIFICATIONS SHALL BE APPROVED IN WRITING BY THE PROJECT ENGINEER AND THE CITY OF EMPORIA PRIOR TO INSTALLATION/CONSTRUCTION OF CORRESPONDING ITEMS. KNOCK-OUT BOXES SHALL NOT BE USED. 10. PRIOR TO BEGINNING CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR ACQUIRING ALL PERMITS PRIOR TO BEGINNING CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR ACQUIRING ALL PERMITS NECESSARY FOR CONSTRUCTION. THE CONTRACTOR SHALL READ ALL PERMITS AND ENSURE THAT CONSTRUCTION COMPLIES WITH THE PERMITS. REQUIRED PERMITS AND REVIEWS MAY INCLUDE, BUT ARE NOT LIMITED TO: CITY/COUNTY APPROVALS/PERMITS, CITY FIRE DEPARTMENT, SOLID WASTE REVIEWS, DRIVEWAY PERMITS, RIGHT OF WAY ENCROACHMENT AGREEMENTS, SOIL AND EROSION CONTROL PERMITS, VADEQ PERMITS, WATER PERMITS, SEWER PERMITS, ENVIRONMENTAL PERMITS, WETLAND DISTURBANCE PERMITS, STREAM CROSSING PERMITS, POWER EASEMENT ENCROACHMENT AGREEMENTS, USACE/DWQ PERMITS, STORMWATER PERMITS, ZONING APPROVAL, AND BUILDING CODE APPROVALS/PERMITS. IF THE CONTRACTOR HAS QUESTIONS ABOUT PERMIT LANGUAGE, OR THE NEED FOR A PERMIT, HE MUST CONTACT THE CITY AND THE ENGINEER PRIOR TO BEGINNING CONSTRUCTION. 11. ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR IN ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR IN ACCORDANCE WITH THE VIRGINIA EROSION & SEDIMENT CONTROL HANDBOOK AND VIRGINIA STORMWATER MANAGEMENT PROGRAM. AN INDIVIDUAL CERTIFIED BY THE VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY, HOLDING A RESPONSIBLE LAND DISTURBER CERTIFICATION, SHALL BE IN CHARGE OF THE LAND DISTURBING ACTIVITY AND ON THE WORK SITE AT ALL TIMES. 12. ALL PRE-CAST UNITS SHALL BE VDOT APPROVED. CERTIFICATION AND VDOT STAMP WILL BE REQUIRED ON ALL ALL PRE-CAST UNITS SHALL BE VDOT APPROVED. CERTIFICATION AND VDOT STAMP WILL BE REQUIRED ON ALL UNITS. SHOP DRAWINGS SHALL BE SUBMITTED TO THE ENGINEER AS A PACKAGE FOR REVIEW AND APPROVAL. 13. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND PROTECTING ALL UNDERGROUND AND OVERHEAD THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND PROTECTING ALL UNDERGROUND AND OVERHEAD UTILITIES, WHETHER OR NOT THEY ARE SHOWN ON THE PLANS, PRIOR TO STARTING WORK. THE CONTRACTOR WILL BE RESPONSIBLE FOR REPAIRS, AT HIS OWN EXPENSE, OF ANY UTILITIES DAMAGED BY HIS CONSTRUCTION METHODS. MISS UTILITY MUST BE CONTACTED AT 811 AT LEAST 72 HOURS PRIOR TO THE COMMENCEMENT OF CONSTRUCTION. THE DEVELOPER SHALL BE RESPONSIBLE FOR THE RELOCATION OF ANY UTILITY WITHIN EXISTING OR PROPOSED RIGHT OF WAY. 14. ALL CONSTRUCTION DEBRIS, MATERIALS, DUMPSTERS, ETC. SHALL BE LOCATED OUTSIDE THE RIGHT OF WAY. ALL CONSTRUCTION DEBRIS, MATERIALS, DUMPSTERS, ETC. SHALL BE LOCATED OUTSIDE THE RIGHT OF WAY. 15. ALL COST FOR AGGREGATE BEDDING OR AGGREGATE BASE MATERIAL SHALL BE INCLUDED IN THE PRICE OF ALL COST FOR AGGREGATE BEDDING OR AGGREGATE BASE MATERIAL SHALL BE INCLUDED IN THE PRICE OF OTHER ITEMS. 16. ALL COST FOR REMOVAL OF EXISTING PIPING SHALL BE INCLUDED IN THE PRICE FOR PIPING. THIS WORK ALL COST FOR REMOVAL OF EXISTING PIPING SHALL BE INCLUDED IN THE PRICE FOR PIPING. THIS WORK INCLUDES COMPLETE REMOVAL OF ALL LANDSCAPING, FIXTURES, UTILITIES, CURB, GUTTER, DRAINAGE PIPES, PAVEMENT AND BASE MATERIAL DOWN TO SUBGRADE ELEVATION. ANY ABANDONED PLUMBING OR WIRING SHALL BE CAPPED IN ACCORDANCE WITH APPLICABLE CODE(S) AND APPROVED BY THE ENGINEER. 17. COST FOR DISPOSAL OF ALL WASTE MATERIAL SHALL BE INCLUDED IN THE PRICE FOR PIPING. COST FOR DISPOSAL OF ALL WASTE MATERIAL SHALL BE INCLUDED IN THE PRICE FOR PIPING. 18. PRIOR TO EXCAVATING NEAR POLES THE CONTRACTOR SHALL NOTIFY THE CITY OF EMPORIA AND OTHER POLE PRIOR TO EXCAVATING NEAR POLES THE CONTRACTOR SHALL NOTIFY THE CITY OF EMPORIA AND OTHER POLE OCCUPANTS. 19. POLE RELOCATIONS, GUY WIRE RELOCATIONS, AND SUPPORT DURING CONSTRUCTION SHALL BE THE POLE RELOCATIONS, GUY WIRE RELOCATIONS, AND SUPPORT DURING CONSTRUCTION SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. 20. WATER AND SEWER INTERRUPTIONS SHALL BE KEPT TO A MINIMUM. CONTRACTOR SHALL NOTIFY OCCUPANTS AT WATER AND SEWER INTERRUPTIONS SHALL BE KEPT TO A MINIMUM. CONTRACTOR SHALL NOTIFY OCCUPANTS AT LEAST 48 HOURS IN ADVANCE WHEN INTERRUPTIONS ARE SCHEDULED TO OCCUR. 21. SEWER BYPASS PUMPING SHALL BE UTILIZED TO ROUTE ACTIVE FLOWS AROUND CONSTRUCTION ACTIVITIES WHILE SEWER BYPASS PUMPING SHALL BE UTILIZED TO ROUTE ACTIVE FLOWS AROUND CONSTRUCTION ACTIVITIES WHILE NEW INFRASTRUCTURE IS BEING INSTALLED. BYPASS PUMP SIZE SELECTION TO BE SUBMITTED WITH SHOP DRAWINGS FOR ENGINEERING APPROVAL PRIOR TO USE. 22. NEW SANITARY SEWER MAINS AND MANHOLES SHALL BE TESTED AS REQUIRED BY AND IN ASSOCIATION WITH NEW SANITARY SEWER MAINS AND MANHOLES SHALL BE TESTED AS REQUIRED BY AND IN ASSOCIATION WITH THE CITY OF EMPORIA UTILITY INSPECTIONS DEPARTMENT. ONCE APPROVED THE SERVICE CONNECTION SHALL BE MADE.
AutoCAD SHX Text
1. THE CONTRACTOR SHALL PROVIDE A COPY OF THE CONTRACTOR'S DESIGNATED CERTIFIED VIRGINIA THE CONTRACTOR SHALL PROVIDE A COPY OF THE CONTRACTOR'S DESIGNATED CERTIFIED VIRGINIA RESPONSIBLE LAND DISTURBER CERTIFICATE TO THE OWNER PRIOR TO CONSTRUCTION. 2. THE CONTRACTOR SHALL PROVIDE ADEQUATE MEANS OF CLEANING ALL VEHICLES AND EQUIPMENT PRIOR TO THE CONTRACTOR SHALL PROVIDE ADEQUATE MEANS OF CLEANING ALL VEHICLES AND EQUIPMENT PRIOR TO ENTERING PUBLIC STREETS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ENSURE THAT THE STREETS ARE KEPT IN A CLEAN, MUD AND DUST-FREE CONDITION AT ALL TIMES. 3. CONSTRUCTION DEBRIS SHALL BE CONTAINERIZED IN ACCORDANCE WITH THE VIRGINIA LITTER CONTROL ACT. CONSTRUCTION DEBRIS SHALL BE CONTAINERIZED IN ACCORDANCE WITH THE VIRGINIA LITTER CONTROL ACT. 4. PRIOR TO COMMENCING WORK, THE CONTRACTOR'S CERTIFIED RESPONSIBLE LAND DISTURBER SHALL OBTAIN PRIOR TO COMMENCING WORK, THE CONTRACTOR'S CERTIFIED RESPONSIBLE LAND DISTURBER SHALL OBTAIN AN EROSION AND SEDIMENT CONTROL PERMIT FOR THE PROJECT FROM THE LOCAL GOVERNING JURISDICTION AND STORMWATER MANAGEMENT PERMIT FROM DCR (IF REQUIRED). ALL EROSION AND SEDIMENT CONTROL MEASURES MUST BE IN ACCORDANCE WITH THE LATEST EDITION OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND SHALL BE INSTALLED PRIOR TO CONSTRUCTION. 5. ALL REQUIRED TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSTALLED AND ALL REQUIRED TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSTALLED AND MAINTAINED BY THE CONTRACTOR IN ACCORDANCE WITH THE APPROVED SEDIMENT AND EROSION CONTROL PLAN. 6. FEMA 100-YR FLOODPLAIN BOUNDARY DETERMINED FROM FEMA FLOOD INSURANCE STUDY (FIS).FEMA 100-YR FLOODPLAIN BOUNDARY DETERMINED FROM FEMA FLOOD INSURANCE STUDY (FIS).
AutoCAD SHX Text
1. THE CONTRACTOR SHALL HAVE A VALID MISS UTILITY TICKET PRIOR TO EXCAVATION. CONTACT THE CONTRACTOR SHALL HAVE A VALID MISS UTILITY TICKET PRIOR TO EXCAVATION. CONTACT MISS UTILITY AT 1-800-552-7001. 2. PRIOR TO CONSTRUCTION, ALL APPLICABLE PERMITS FROM THE GOVERNING JURISDICTIONS PRIOR TO CONSTRUCTION, ALL APPLICABLE PERMITS FROM THE GOVERNING JURISDICTIONS AND/OR AGENCIES MUST BE OBTAINED AND A COPY KEPT ON THE PROJECT SITE. THE CONTRACTOR SHALL OBTAIN ALL REQUIRED PERMITS AND PAY ALL FEES OF SUCH, PRIOR TO COMMENCING WORK. 3. THE CONTRACTOR SHALL COMPLY WITH ALL PERMITTING REQUIREMENTS FOR THE PROTECTION OF THE CONTRACTOR SHALL COMPLY WITH ALL PERMITTING REQUIREMENTS FOR THE PROTECTION OF ENDANGERED AND THREATENED SPECIES.
AutoCAD SHX Text
1. CONTRACTOR SHALL BE RESPONSIBLE FOR THE STAKING AND LAYOUT OF ALL PROPOSED CONTRACTOR SHALL BE RESPONSIBLE FOR THE STAKING AND LAYOUT OF ALL PROPOSED STRUCTURES AND IMPROVEMENTS. 2. HORIZONTAL DATUM IS VIRGINIA STATE PLANE COORDINATE SYSTEM SOUTH ZONE NAD 83. HORIZONTAL DATUM IS VIRGINIA STATE PLANE COORDINATE SYSTEM SOUTH ZONE NAD 83. VERTICAL DATUM IS NAVD 88. 3. THE TOPOGRAPHIC AND ELEVATION DATA SHOWN HEREON WAS OBTAINED FROM CIVIL THE TOPOGRAPHIC AND ELEVATION DATA SHOWN HEREON WAS OBTAINED FROM CIVIL SURVEYORS INC., HAS BEEN SUBJECTED TO CHA'S QUALITY ASSURANCE REQUIREMENTS, AND IS ACCEPTED BY CHA AS COMPLIANT WITH THE PROFESSIONAL STANDARDS REQUIRED FOR LICENSED LAND SURVEYORS REGISTERED AND PRACTICING IN VIRGINIA. THE TOPOGRAPHIC AND ELEVATION DATA ARE NOT CERTIFIED AS CORRECT AND/OR ACCURATE BY THIS ENGINEER BUT HAS BEEN REVIEWED BY CHA AND APPROVED FOR USE FOR THE INTENDED PURPOSE.
AutoCAD SHX Text
1. ALL DISTURBED AREAS SHALL BE RETURNED TO LIKE OR BETTER CONDITION WHETHER THEY ARE ALL DISTURBED AREAS SHALL BE RETURNED TO LIKE OR BETTER CONDITION WHETHER THEY ARE GRASSED, LANDSCAPED, GRAVELED OR OTHER. 2. ANY FENCING DISTURBED BY CONSTRUCTION ACTIVITIES SHALL BE IMMEDIATELY REPLACED OR ANY FENCING DISTURBED BY CONSTRUCTION ACTIVITIES SHALL BE IMMEDIATELY REPLACED OR SUPPLEMENTED BY TEMPORARY FENCING TO MAINTAIN A SECURE SITE THROUGHOUT CONSTRUCTION. UPON COMPLETION OF CONSTRUCTION ACTIVITIES, FENCING SHALL BE RESTORED TO ORIGINAL CONDITIONS. 3. ACCESS TO PRIVATE, PUBLIC, AND COMMERCIAL BUSINESSES AFFECTED BY THE UTILITY ACCESS TO PRIVATE, PUBLIC, AND COMMERCIAL BUSINESSES AFFECTED BY THE UTILITY CONSTRUCTION SHALL BE MAINTAINED AT ALL TIMES DURING THEIR RESPECTIVE NORMAL BUSINESS HOURS. 4. THE CONTRACTOR SHALL MAKE PROVISIONS TO PROVIDE ACCESS TO ALL PROPERTIES DURING THE CONTRACTOR SHALL MAKE PROVISIONS TO PROVIDE ACCESS TO ALL PROPERTIES DURING CONSTRUCTION AND SHALL MAINTAIN SAFE ACCESSIBILITY TO FIRE HYDRANTS AT ALL TIMES. 5. THE CONTRACTOR SHALL RESTORE ALL AREAS DISTURBED BY CONSTRUCTION, INCLUDING THE CONTRACTOR SHALL RESTORE ALL AREAS DISTURBED BY CONSTRUCTION, INCLUDING ACCESS AND SITE ROADWAYS, DITCHES, DRAINAGE STRUCTURES AND OTHER EXISTING FEATURES TO THEIR ORIGINAL CONDITION OR TO A CONDITION SATISFACTORY TO THE OWNER.
AutoCAD SHX Text IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT OR LAND SURVEYOR TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT OR LAND SURVEYOR SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
AutoCAD SHX Text File: V:\PROJECTS\ANY\K6\080542.000\09_DESIGN\DRAWINGS\01_SHEETS\G_002_080542.DWGV:\PROJECTS\ANY\K6\080542.000\09_DESIGN\DRAWINGS\01_SHEETS\G_002_080542.DWG
AutoCAD SHX Text Saved: 2/13/2025 12:25:41 PM Plotted: 2/17/2025 10:26:18 AM Current User: Dean, Margaret LastSavedBy: 80752/13/2025 12:25:41 PM Plotted: 2/17/2025 10:26:18 AM Current User: Dean, Margaret LastSavedBy: 8075 Plotted: 2/17/2025 10:26:18 AM Current User: Dean, Margaret LastSavedBy: 80752/17/2025 10:26:18 AM Current User: Dean, Margaret LastSavedBy: 8075 Current User: Dean, Margaret LastSavedBy: 8075Dean, Margaret LastSavedBy: 8075 LastSavedBy: 80758075
AutoCAD SHX Text
AutoCAD SHX Text
BID SUBMITTAL
AutoCAD SHX Text
EBH
AutoCAD SHX Text
MRD
AutoCAD SHX Text 2/18/2025
2/18/25
G-003
GENERAL LEGEND
AND
ABBREVIATIONS
Designed By: Checked By:
Drawing No.:
Issue Date:
Designed By: Drawn By:
Project No: Scale:
No. By DateSubmittal / Revision
080542
ADAMS STREET
SANITARY SEWER
REPLACEMENT
App'd.
2/18/2025
Drawing Copyright © 2025
540.552.5548 . www.chacompanies.com Blacksburg, VA 24060-5548
1341 Research Center Drive, Suite 2100
MRD MRD EBH
AS SHOWN
AutoCAD SHX Text
HIGH DENSITY POLYETHELENE PIPE
AutoCAD SHX Text
LAMP POST, LIGHT POLE, LIGHT PANEL
AutoCAD SHX Text
LT
AutoCAD SHX Text
MFR
AutoCAD SHX Text
MH
AutoCAD SHX Text
LP
AutoCAD SHX Text
LAT
AutoCAD SHX Text
LONG
AutoCAD SHX Text
LB
AutoCAD SHX Text
LF
AutoCAD SHX Text
IP(F)
AutoCAD SHX Text
JB
AutoCAD SHX Text
HYD
AutoCAD SHX Text
IN
AutoCAD SHX Text
MANUFACTURER
AutoCAD SHX Text
LEFT
AutoCAD SHX Text
MANHOLE
AutoCAD SHX Text
OR LOW POINT
AutoCAD SHX Text
IRON PIPE (FOUND)
AutoCAD SHX Text
LINEAR FOOT OR LINEAR FEET
AutoCAD SHX Text
LATITUDE
AutoCAD SHX Text
LONGITUDE
AutoCAD SHX Text
POUND
AutoCAD SHX Text
INCH(ES)
AutoCAD SHX Text
HYDRANT
AutoCAD SHX Text
JUNCTION BOX
AutoCAD SHX Text
GRD
AutoCAD SHX Text
HT
AutoCAD SHX Text
HW
AutoCAD SHX Text
HPS
AutoCAD SHX Text
HR
AutoCAD SHX Text
HORIZ
AutoCAD SHX Text
HP
AutoCAD SHX Text
GV
AutoCAD SHX Text
HDPE
AutoCAD SHX Text
GPM
AutoCAD SHX Text
FFE
AutoCAD SHX Text
FT
AutoCAD SHX Text
GAL
AutoCAD SHX Text
EOP
AutoCAD SHX Text
FD
AutoCAD SHX Text
FDN
AutoCAD SHX Text
ELEV
AutoCAD SHX Text
GROUND OR GRADE
AutoCAD SHX Text
HAND RAIL OR HOUR
AutoCAD SHX Text
HIGH PRESSURE SODIUM
AutoCAD SHX Text
HIGH POINT OR HORSE POWER
AutoCAD SHX Text
HEADWALL
AutoCAD SHX Text
HEIGHT
AutoCAD SHX Text
GATE VALVE
AutoCAD SHX Text
HORIZONTAL
AutoCAD SHX Text
EDGE OF PAVEMENT
AutoCAD SHX Text
FINISHED FLOOR ELEVATION
AutoCAD SHX Text
GALLONS PER MINUTE
AutoCAD SHX Text
GALLON
AutoCAD SHX Text
FOOT OR FEET
AutoCAD SHX Text
ELEVATION
AutoCAD SHX Text
FLOOR DRAIN
AutoCAD SHX Text
FOUNDATION
AutoCAD SHX Text
VERTICAL CURVE
AutoCAD SHX Text
UNDERGROUND
AutoCAD SHX Text
VERTICAL
AutoCAD SHX Text
WOOD FRAME
AutoCAD SHX Text
WING WALL
AutoCAD SHX Text
WITHOUT
AutoCAD SHX Text
VITRIFIED CLAY PIPE
AutoCAD SHX Text
OR WOVEN WIRE FABRIC
AutoCAD SHX Text
WELDED WIRE FABIC
AutoCAD SHX Text
WF
AutoCAD SHX Text W/O
AutoCAD SHX Text
WW
AutoCAD SHX Text
WWF
AutoCAD SHX Text
U(ND)G
AutoCAD SHX Text
VERT
AutoCAD SHX Text W
AutoCAD SHX Text
VOL
AutoCAD SHX Text W/
AutoCAD SHX Text
VCP
AutoCAD SHX Text
VC
AutoCAD SHX Text
UTIL
AutoCAD SHX Text
WEST
AutoCAD SHX Text
WITH
AutoCAD SHX Text
VOLUME
AutoCAD SHX Text
UTILITY
AutoCAD SHX Text
UNDERDRAIN
AutoCAD SHX Text
TAXIWAY SAFETY AREA
AutoCAD SHX Text
TAXIWAY
AutoCAD SHX Text
STORM MANHOLE
AutoCAD SHX Text
TANGENT
AutoCAD SHX Text
TOP OF CURB
AutoCAD SHX Text
SQUARE YARD
AutoCAD SHX Text
TOP OF FRAME
AutoCAD SHX Text
TEMPORARY
AutoCAD SHX Text
TELEPHONE
AutoCAD SHX Text
TELEVISION
AutoCAD SHX Text
TEMPORARY CONSTRUCTION EASEMENT
AutoCAD SHX Text
TRANSFORMER OR TRANSVERSE
AutoCAD SHX Text
STATION OR STATIONARY
AutoCAD SHX Text
TEL
AutoCAD SHX Text
UD, U/D
AutoCAD SHX Text
TWY, T/W
AutoCAD SHX Text
TRANS
AutoCAD SHX Text
TV
AutoCAD SHX Text
TYP
AutoCAD SHX Text
TSA
AutoCAD SHX Text
TF
AutoCAD SHX Text
TEMP
AutoCAD SHX Text
TYPICAL
AutoCAD SHX Text
SY
AutoCAD SHX Text
TC
AutoCAD SHX Text
TAN
AutoCAD SHX Text
TCE
AutoCAD SHX Text
STA
AutoCAD SHX Text
STMH
AutoCAD SHX Text
SS
AutoCAD SHX Text
STY
AutoCAD SHX Text
SANITARY SEWER
AutoCAD SHX Text
STORY
AutoCAD SHX Text
ASPHALT COATED CORRUGATED METAL
AutoCAD SHX Text
HIGHWAY AND TRANSPORTAION OFFICIALS
AutoCAD SHX Text
AMERICAN ASSOCIATION OF STATE
AutoCAD SHX Text
TABLE OF ABBREVIATIONS (NOT ALL ABBREVIATIONS MAY HAVE BEEN USED)
AutoCAD SHX Text
BOTTOM OF BANK OR BERM
AutoCAD SHX Text
BB
AutoCAD SHX Text
CLASS OR CENTERLINE
AutoCAD SHX Text
CL
AutoCAD SHX Text
CY
AutoCAD SHX Text
DWG
AutoCAD SHX Text E
AutoCAD SHX Text
ELEC
AutoCAD SHX Text
EJ
AutoCAD SHX Text
EA
AutoCAD SHX Text
DI
AutoCAD SHX Text
DIA
AutoCAD SHX Text
DIP
AutoCAD SHX Text
CULV
AutoCAD SHX Text
CV
AutoCAD SHX Text
CSP
AutoCAD SHX Text
CTR
AutoCAD SHX Text
CONC
AutoCAD SHX Text
CR
AutoCAD SHX Text
CMP
AutoCAD SHX Text
CO
AutoCAD SHX Text
CUBIC YARD
AutoCAD SHX Text
EXPANSION JOINT
AutoCAD SHX Text
DUCTILE IRON PIPE
AutoCAD SHX Text
DRAWING
AutoCAD SHX Text
ELECTRIC
AutoCAD SHX Text
EAST
AutoCAD SHX Text
EACH
AutoCAD SHX Text
DROP INLET
AutoCAD SHX Text
DIAMETER
AutoCAD SHX Text
CORRUGATED STEEL PIPE
AutoCAD SHX Text
CORRUGATED METAL PIPE
AutoCAD SHX Text
CENTER
AutoCAD SHX Text
CULVERT
AutoCAD SHX Text
CHECK VALVE
AutoCAD SHX Text
COUNTRY ROAD
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
CLEANOUT
AutoCAD SHX Text
CF
AutoCAD SHX Text
CIP
AutoCAD SHX Text
CI
AutoCAD SHX Text
CFM
AutoCAD SHX Text C
AutoCAD SHX Text
CB
AutoCAD SHX Text
CAP
AutoCAD SHX Text
BW
AutoCAD SHX Text
BRL
AutoCAD SHX Text
BSMT
AutoCAD SHX Text
BVC
AutoCAD SHX Text
BOT
AutoCAD SHX Text
BFE
AutoCAD SHX Text
BM
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
BC
AutoCAD SHX Text
BOTTOM OF WALL
AutoCAD SHX Text
CORRUGATED ALUMINIM PIPE
AutoCAD SHX Text
CAST IRON PIPE
AutoCAD SHX Text
CUBIC FEET PER MINUTE
AutoCAD SHX Text
CUBIC FOOT OR CUBIC FEET
AutoCAD SHX Text
CURB INLET
AutoCAD SHX Text
CATCH BASIN
AutoCAD SHX Text
CHORD
AutoCAD SHX Text
BUILDING RESTRICTION LINE
AutoCAD SHX Text
BASEMENT FLOOR ELEVATION
AutoCAD SHX Text
BEGINNING OF VERTICAL CURVE
AutoCAD SHX Text
BOTTOM OF CURB
AutoCAD SHX Text
BOTTOM
AutoCAD SHX Text
BASEMENT
AutoCAD SHX Text
BUILDING
AutoCAD SHX Text
BENCHMARK
AutoCAD SHX Text
ASPH
AutoCAD SHX Text
ATCT
AutoCAD SHX Text
AWG
AutoCAD SHX Text
BL
AutoCAD SHX Text
ASZ
AutoCAD SHX Text
AFF
AutoCAD SHX Text
ALT
AutoCAD SHX Text
APPROX
AutoCAD SHX Text
ACCM
AutoCAD SHX Text
AC
AutoCAD SHX Text
ABS
AutoCAD SHX Text
AASHTO
AutoCAD SHX Text
AIR TRAFFIC CONTROL TOWER
AutoCAD SHX Text
AIRPORT SAFETY ZONE
AutoCAD SHX Text
ABOVE FINISHED FLOOR
AutoCAD SHX Text
AMERICAN WIRE GAUGE
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
BASELINE
AutoCAD SHX Text
APPROXIMATE
AutoCAD SHX Text
ALTERNATE
AutoCAD SHX Text
PLASTIC PIPE
AutoCAD SHX Text
ACRE
AutoCAD SHX Text
PERPENDICULAR
AutoCAD SHX Text
PERP
AutoCAD SHX Text
REINFORCING
AutoCAD SHX Text
REINF
AutoCAD SHX Text
RUNWAY SAFETY AREA
AutoCAD SHX Text
REQUIRED
AutoCAD SHX Text
RIGHT-OF-WAY
AutoCAD SHX Text
SCHEDULE
AutoCAD SHX Text
RETAINING WALL
AutoCAD SHX Text
RAILROAD, RIPRAP
AutoCAD SHX Text
RIGHT-OF-WAY WITH ACCESS
AutoCAD SHX Text
SQUARE FOOT OR SQUARE FEET
AutoCAD SHX Text
REVOLUTIONS PER MINUTE
AutoCAD SHX Text
RIGHT-OF-WAY WITHOUT ACCESS
AutoCAD SHX Text
STATE HIGHWAY
AutoCAD SHX Text
SPECIFICATIONS
AutoCAD SHX Text
SANITARY MANHOLE
AutoCAD SHX Text
RW
AutoCAD SHX Text
RWY, R/W
AutoCAD SHX Text
SPECS
AutoCAD SHX Text
SF
AutoCAD SHX Text
SHT
AutoCAD SHX Text
SMH
AutoCAD SHX Text
SH
AutoCAD SHX Text S
AutoCAD SHX Text
SCH
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
RUNWAY
AutoCAD SHX Text
SOUTH
AutoCAD SHX Text
ROW WO/A
AutoCAD SHX Text
ROW W/A
AutoCAD SHX Text
RSA
AutoCAD SHX Text
RT
AutoCAD SHX Text
RPM
AutoCAD SHX Text
RR
AutoCAD SHX Text
REQD
AutoCAD SHX Text
ROW
AutoCAD SHX Text
RIGHT
AutoCAD SHX Text
ROOF DRAIN
AutoCAD SHX Text
POWER POLE, POWER PANEL
AutoCAD SHX Text
POINT OF REVERSE CURVATURE
AutoCAD SHX Text
POUNDS PER SQUARE INCH
AutoCAD SHX Text
POINT OF VERTICAL TANGENCY
AutoCAD SHX Text
POINT OF VERTICAL INTERSECTION
AutoCAD SHX Text
POINT OR POINT OF TANGENCY
AutoCAD SHX Text
POUNDS PER SQUARE FOOT
AutoCAD SHX Text
PARTS PER MILLION
AutoCAD SHX Text
REINFORCED CONCRETE PIPE
AutoCAD SHX Text
REINFORCED CONCRETE CULVERT PIPE
AutoCAD SHX Text
OR POLYVINYL CHLORIDE
AutoCAD SHX Text
POINT OF VERTICAL CURVATURE
AutoCAD SHX Text
RAD
AutoCAD SHX Text
RCCP
AutoCAD SHX Text
RD
AutoCAD SHX Text
RCP
AutoCAD SHX Text
PVI
AutoCAD SHX Text
PWR
AutoCAD SHX Text
PVT
AutoCAD SHX Text R
AutoCAD SHX Text
RADIAL
AutoCAD SHX Text
POWER
AutoCAD SHX Text
RADIUS
AutoCAD SHX Text
PT
AutoCAD SHX Text
PSI
AutoCAD SHX Text
PVC
AutoCAD SHX Text
PPM
AutoCAD SHX Text
PRC
AutoCAD SHX Text
PP
AutoCAD SHX Text
PSF
AutoCAD SHX Text
OBSTACLE FREE ZONE
AutoCAD SHX Text
OBJECT FREE AREA
AutoCAD SHX Text
OWNER'S AUTHORIZED REPRESENTATIVE
AutoCAD SHX Text
MONUMENT
AutoCAD SHX Text
MISCELLANEOUS
AutoCAD SHX Text
NOTICE TO AIRMEN
AutoCAD SHX Text
PERFORATED
AutoCAD SHX Text
PERMANENT UTILITY EASEMENT
AutoCAD SHX Text
POINT OF CURVATURE
AutoCAD SHX Text
PROPERTY LINE
AutoCAD SHX Text
PL
AutoCAD SHX Text
PUE
AutoCAD SHX Text
PERF
AutoCAD SHX Text
PC
AutoCAD SHX Text
OFZ
AutoCAD SHX Text
OFA
AutoCAD SHX Text
OAR
AutoCAD SHX Text O/S
AutoCAD SHX Text
OFFSET
AutoCAD SHX Text
MIN
AutoCAD SHX Text N
AutoCAD SHX Text
NOTAM
AutoCAD SHX Text
MON
AutoCAD SHX Text
MISC
AutoCAD SHX Text
MINIMUM
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
NAVAIDS
AutoCAD SHX Text
NAVIGATIONAL AIDS
AutoCAD SHX Text
NIC
AutoCAD SHX Text
NOT IN CONTRACT
AutoCAD SHX Text D
AutoCAD SHX Text
DRAIN
AutoCAD SHX Text
HORIZONTAL BEND
AutoCAD SHX Text
HB
AutoCAD SHX Text
SANITARY SEWER
AutoCAD SHX Text
STORM SEWER
AutoCAD SHX Text
1' OR 2' CONTOUR LINE
AutoCAD SHX Text
5' OR 10' CONTOUR LINE
AutoCAD SHX Text
SILT FENCE
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
AutoCAD SHX Text
NOTE: SOME FEATURES IN THE LEGEND MAY NOT HAVE BEEN USED
AutoCAD SHX Text
DETAIL CALLOUT
AutoCAD SHX Text
SHEET NO. WHERE DETAIL IS INDICATED
AutoCAD SHX Text
DETAIL IDENTIFICATION NO.
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
PROPOSED
AutoCAD SHX Text X
AutoCAD SHX Text X-X
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text
RIGHT-OF-WAY
AutoCAD SHX Text
TEMPORARY CONSTRUCTION EASEMENT
AutoCAD SHX Text
SANITARY SEWER MANHOLE
AutoCAD SHX Text
IRON PIN/MONUMENT
AutoCAD SHX Text
24"RCP
AutoCAD SHX Text
PROPERTY CORNER
AutoCAD SHX Text
EDGE OF RIVER
AutoCAD SHX Text
PROPERTY LINES
AutoCAD SHX Text
WATER MAIN
AutoCAD SHX Text
PERMANENT SEWER EASEMENT
AutoCAD SHX Text X
AutoCAD SHX Text %%uVIEW TITLE
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
AutoCAD SHX Text Scale in feet
AutoCAD SHX Text
SCALE
AutoCAD SHX Text 2X
AutoCAD SHX Text
DETAIL IDENTIFICATION NO.
AutoCAD SHX Text
RIPRAP
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
SEWER AND APPURTENANCE DEMOLITION
AutoCAD SHX Text
UTILITY POLE
AutoCAD SHX Text
FENCE
AutoCAD SHX Text
ABANDON IN PLACE SEWER
AutoCAD SHX Text
GRAVEL ROAD REPAIR
AutoCAD SHX Text
OVERHEAD ELECTRIC
AutoCAD SHX Text
PERMANENT SEWER EASEMENT
AutoCAD SHX Text
PSE
AutoCAD SHX Text
SUBSURFACE UTILITY ENGINEERING
AutoCAD SHX Text
SUE
AutoCAD SHX Text
AutoCAD SHX Text
MECHANICAL JOINT
AutoCAD SHX Text
MJ
AutoCAD SHX Text D
AutoCAD SHX Text
DRAINAGE MANHOLE
AutoCAD SHX Text
TAX MAP
AutoCAD SHX Text
TMP
AutoCAD SHX Text
ASPHALT PAVEMENT REPAIR
AutoCAD SHX Text
FULL DEPTH ASPHALT
AutoCAD SHX Text
ASPHALT PAVEMENT REPAIR
AutoCAD SHX Text
MILL & RESURFACE
AutoCAD SHX Text Sheet List Table
AutoCAD SHX Text
SHEET NUMBER
AutoCAD SHX Text
SHEET TITLE
AutoCAD SHX Text G-001
AutoCAD SHX Text
COVER SHEET
AutoCAD SHX Text G-002
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text G-003
AutoCAD SHX Text
GENERAL LEGEND AND ABBREVIATIONS
AutoCAD SHX Text C-001
AutoCAD SHX Text
EROSION AND SEDIMENT CONTROL NARRATIVE
AutoCAD SHX Text C-002
AutoCAD SHX Text
EROSION AND SEDIMENT CONTROL DETAILS
AutoCAD SHX Text C-101
AutoCAD SHX Text
SEWER PLAN AND PROFILE
AutoCAD SHX Text C-501
AutoCAD SHX Text
DETAILS
AutoCAD SHX Text C-502
AutoCAD SHX Text
DETAILS
AutoCAD SHX Text IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT OR LAND SURVEYOR TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT OR LAND SURVEYOR SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
AutoCAD SHX Text File: V:\PROJECTS\ANY\K6\080542.000\09_DESIGN\DRAWINGS\01_SHEETS\G_003_080542.DWGV:\PROJECTS\ANY\K6\080542.000\09_DESIGN\DRAWINGS\01_SHEETS\G_003_080542.DWG
AutoCAD SHX Text Saved: 2/13/2025 12:26:34 PM Plotted: 2/17/2025 10:26:24 AM Current User: Dean, Margaret LastSavedBy: 80752/13/2025 12:26:34 PM Plotted: 2/17/2025 10:26:24 AM Current User: Dean, Margaret LastSavedBy: 8075 Plotted: 2/17/2025 10:26:24 AM Current User: Dean, Margaret LastSavedBy: 80752/17/2025 10:26:24 AM Current User: Dean, Margaret LastSavedBy: 8075 Current User: Dean, Margaret LastSavedBy: 8075Dean, Margaret LastSavedBy: 8075 LastSavedBy: 80758075
AutoCAD SHX Text
AutoCAD SHX Text
BID SUBMITTAL
AutoCAD SHX Text
EBH
AutoCAD SHX Text
MRD
AutoCAD SHX Text 2/18/2025
C-001
EROSION AND
SEDIMENT
CONTROL
NARRATIVE
Designed By: Checked By:
Drawing No.:
Issue Date:
Designed By: Drawn By:
Project No: Scale:
No. By DateSubmittal / Revision
080542
ADAMS STREET
SANITARY SEWER
REPLACEMENT
App'd.
2/18/2025
Drawing Copyright © 2025
540.552.5548 . www.chacompanies.com Blacksburg, VA 24060-5548
1341 Research Center Drive, Suite 2100
MRD MRD EBH
AS SHOWN
AutoCAD SHX Text
IP
AutoCAD SHX Text
3.07 & 3.08
AutoCAD SHX Text
ST'D. & SPEC.
AutoCAD SHX Text 3.05
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
INLET PROTECTION
AutoCAD SHX Text
SILT FENCE
AutoCAD SHX Text
EROSION AND SEDIMENT CONTROL LEGEND
AutoCAD SHX Text
SYMBOL
AutoCAD SHX Text
SF
AutoCAD SHX Text
* STABILIZE ALL DISTURBED AND DENUDED AREAS
AutoCAD SHX Text 3.31
AutoCAD SHX Text
TEMPORARY SEEDING
AutoCAD SHX Text
TS
AutoCAD SHX Text 3.32
AutoCAD SHX Text
PERMANENT SEEDING
AutoCAD SHX Text
PS
AutoCAD SHX Text 3.35
AutoCAD SHX Text
MULCHING
AutoCAD SHX Text
MU
AutoCAD SHX Text
TO
AutoCAD SHX Text
TOPSOILING
AutoCAD SHX Text 3.30
AutoCAD SHX Text GENERAL EROSION AND SEDIMENT CONTROL NOTES: ES-1: UNLESS OTHERWISE INDICATED, CONSTRUCT AND MAINTAIN ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL UNLESS OTHERWISE INDICATED, CONSTRUCT AND MAINTAIN ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK, AND VIRGINIA REGULATIONS VR 625-02-00 EROSION AND SEDIMENT CONTROL REGULATIONS. ES-2: VESCP AUTHORITY INSPECTORS WILL MAKE A CONTINUING REVIEW AND EVALUATION OF THE METHODS AND EFFECTIVENESS OF THE VESCP AUTHORITY INSPECTORS WILL MAKE A CONTINUING REVIEW AND EVALUATION OF THE METHODS AND EFFECTIVENESS OF THE E.S.C. PLAN. ES-3: PLACE ALL EROSION AND SEDIMENT CONTROL MEASURES PRIOR TO OR AS THE FIRST STEP IN CLEARING, GRADING, OR LAND PLACE ALL EROSION AND SEDIMENT CONTROL MEASURES PRIOR TO OR AS THE FIRST STEP IN CLEARING, GRADING, OR LAND DISTURBANCE. ES-4: MAINTAIN A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN ON THE SITE AT ALL TIMES. MAINTAIN A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN ON THE SITE AT ALL TIMES. ES-5: PRIOR TO COMMENCING LAND-DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT PRIOR TO COMMENCING LAND-DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO, OFFSITE BORROW OR WASTE AREA), SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE ARCHITECT/ENGINEER FOR REVIEW AND ACCEPTANCE. ES-6: PROVIDE ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE PROVIDE ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE LOCAL AUTHORITY HAVING JURISDICTION. ES-7: ALL DISTURBED AREAS SHALL DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND-DISTURBING ACTIVITIES ALL DISTURBED AREAS SHALL DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND-DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT. ES-8: DURING DEWATERING OPERATIONS, PUMP WATER INTO AN APPROVED FILTERING DEVICE IN ACCORDANCE WITH VA E&S STD. 3.26. DURING DEWATERING OPERATIONS, PUMP WATER INTO AN APPROVED FILTERING DEVICE IN ACCORDANCE WITH VA E&S STD. 3.26. ES-9: INSPECT ALL EROSION CONTROL MEASURES DAILY AND AFTER EACH RUNOFF-PRODUCING RAINFALL EVENT. MAKE ANY NECESSARY INSPECT ALL EROSION CONTROL MEASURES DAILY AND AFTER EACH RUNOFF-PRODUCING RAINFALL EVENT. MAKE ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES IMMEDIATELY.
AutoCAD SHX Text EROSION AND SEDIMENT CONTROL NARRATIVE: PROJECT DESCRIPTION: PROJECT CONSIST OF CONSTRUCTION ACTIVITIES TO REPLACE SECTIONS OF THE CITY'S SANITARY SEWER ALONG ADAMS STREET, AS SHOWN ON THE PLANS. WORK INCLUDES THE FOLLOWING ACTIVITIES: 1. INSTALL EROSION AND SEDIMENT CONTROL MEASURES (ESC) AS SHOWN ON THE DRAWINGS IN ACCORDANCE WITH THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK INSTALL EROSION AND SEDIMENT CONTROL MEASURES (ESC) AS SHOWN ON THE DRAWINGS IN ACCORDANCE WITH THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK (VESCH). 2. TRENCH EXCAVATION, SEWER INSTALLATION, AND BACKFILLING, PRIMARILY CONFINED TO WITHIN ROAD PAVEMENT. TRENCH EXCAVATION, SEWER INSTALLATION, AND BACKFILLING, PRIMARILY CONFINED TO WITHIN ROAD PAVEMENT. 3. THROUGHOUT CONSTRUCTION, USE TEMPORARY SEEDING WITHIN 7 DAYS FOR DENUDED AREAS THAT WILL NOT BE BROUGHT TO FINAL GRADE WITHIN 30 DAYS. THROUGHOUT CONSTRUCTION, USE TEMPORARY SEEDING WITHIN 7 DAYS FOR DENUDED AREAS THAT WILL NOT BE BROUGHT TO FINAL GRADE WITHIN 30 DAYS. 4. ASPHALT PAVEMENT RESTORATION INCLUDING MILLING AND SURFACE OVERLAY. ASPHALT PAVEMENT RESTORATION INCLUDING MILLING AND SURFACE OVERLAY. 5. ALL DISTURBED AREAS SHALL BE PERMANENTLY STABILIZED IMMEDIATELY FOLLOWING COMPLETION OF CONSTRUCTION. ALL DISTURBED AREAS SHALL BE PERMANENTLY STABILIZED IMMEDIATELY FOLLOWING COMPLETION OF CONSTRUCTION. 6. REMOVE EROSION AND SEDIMENT CONTROL MEASURES ONCE CONSTRUCTION IS COMPLETE AND THE SITE HAS BEEN STABILIZED AND APPROVED BY THE EROSION AND REMOVE EROSION AND SEDIMENT CONTROL MEASURES ONCE CONSTRUCTION IS COMPLETE AND THE SITE HAS BEEN STABILIZED AND APPROVED BY THE EROSION AND SEDIMENT INSPECTOR. EXISTING SITE CONDITIONS: THE PROPOSED CONSTRUCTION IS GENERALLY LOCATED IN EXISTING STREET RIGHT-OF-WAYS. ADJACENT PROPERTY: ADJACENT PROPERTY INCLUDES RESIDENTIAL AND COMMERCIAL PROPERTIES. OFF-SITE AREAS: THERE ARE NO OFFSITE LAND DISTURBING AREAS ASSOCIATED WITH THIS PROJECT.
AutoCAD SHX Text STRUCTURAL PRACTICES: 1. SILT FENCE - STD. & SPEC. 3.05 SILT FENCE - STD. & SPEC. 3.05 SILT FENCE SHALL BE USED TO INTERCEPT AND DETAIN SMALL AMOUNTS OF SEDIMENT FROM DISTURBED AREAS AND TO DECREASE THE VELOCITY OF SHEET FLOWS AND FLOWS AND LOW-TO-MODERATE LEVEL CHANNEL FLOWS DURING CONSTRUCTION AND TO DECREASE THE VELOCITY OF SHEET FLOWS AND LOW-TO-MODERATE LEVEL CHANNEL FLOWS. SEQUENCE OF INSTALLATION: PRIOR TO ANY LAND DISTURBANCE. MAINTENANCE: SILT FENCE WILL BE IMMEDIATELY INSPECTED AFTER EACH RAINFALL EVENT AND AT LEAST DAILY DURING PROLONGED RAINFALL. ANY REQUIRED REPAIRS WILL BE MADE IMMEDIATELY. SEDIMENT DEPOSITS SHOULD BE REMOVED AFTER EACH STORM EVENT. ADDITIONALLY THEY MUST BE REMOVED WHEN SEDIMENT REACHES ONE-HALF THE HEIGHT OF BARRIER. REMOVAL EVENT: FOLLOWING PERMANENT STABILIZATION OF ALL UPSTREAM AND DOWNSTREAM AREAS. FOLLOWING PERMANENT STABILIZATION OF ALL UPSTREAM AND DOWNSTREAM AREAS. 2. STORM DRAIN INLET PROTECTION - STD. & SPEC. 3.07 STORM DRAIN INLET PROTECTION - STD. & SPEC. 3.07 STORM DRAIN INLET PROTECTION SHALL BE USED TO PREVENT SEDIMENT FROM ENTERING STORM DRAINAGE SYSTEMS. SEQUENCE OF INSTALLATION: PRIOR TO PERMANENT STABILIZATION OF THE DISTURBED DRAINAGE AREA. MAINTENANCE: THE STRUCTURE WILL BE IMMEDIATELY INSPECTED AFTER EACH RAINFALL EVENT, AND ANY REQUIRED REPAIRS WILL BE MADE IMMEDIATELY. SEDIMENT DEPOSITS SHOULD BE REMOVED, AND TRAP RESTORED TO ITS ORIGINAL DIMENSIONS WHEN SEDIMENT REACHES ONE-HALF THE DESIGN DEPTH. REMOVAL EVENT: FOLLOWING PERMANENT STABILIZATION OF ALL UPSTREAM AND DOWNSTREAM AREAS. FOLLOWING PERMANENT STABILIZATION OF ALL UPSTREAM AND DOWNSTREAM AREAS. 3. CULVERT INLET PROTECTION - STD. & SPEC. 3.08 CULVERT INLET PROTECTION - STD. & SPEC. 3.08 CULVERT INLET PROTECTION SHALL BE USED TO PREVENT SEDIMENT FROM ENTERING, ACCUMULATING IN AND BEING TRANSFERRED BY A CULVERT AND ASSOCIATED DRAINAGE SYSTEM. SEQUENCE OF INSTALLATION: PRIOR TO PERMANENT STABILIZATION OF THE DISTURBED DRAINAGE AREA. MAINTENANCE: THE STRUCTURE WILL BE IMMEDIATELY INSPECTED AFTER EACH RAINFALL EVENT, AND ANY REQUIRED REPAIRS WILL BE MADE IMMEDIATELY. AGGREGATE SHALL BE REPLACED OR CLEANED WHEN INSPECTION REVEALS THAT CLOGGED VOIDS ARE CAUSING PONDING PROBLEMS. SEDIMENT SHALL BE REMOVED AND THE IMPOUNDMENT RESTORED TO ITS ORIGINAL DIMENSIONS WHEN SEDIMENT HAS ACCUMULATED TO ONE-HALF THE DESIGN DEPTH. REMOVAL EVENT: FOLLOWING PERMANENT STABILIZATION OF ALL UPSTREAM AND DOWNSTREAM AREAS. FOLLOWING PERMANENT STABILIZATION OF ALL UPSTREAM AND DOWNSTREAM AREAS. VEGETATIVE PRACTICES GENERAL: A PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON DENUDED AREAS NOT OTHERWISE PERMANENTLY STABILIZED BY PAVEMENT. PERMANENT ENERAL: A PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON DENUDED AREAS NOT OTHERWISE PERMANENTLY STABILIZED BY PAVEMENT. PERMANENT A PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON DENUDED AREAS NOT OTHERWISE PERMANENTLY STABILIZED BY PAVEMENT. PERMANENT A PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON DENUDED AREAS NOT OTHERWISE PERMANENTLY STABILIZED BY PAVEMENT. PERMANENT PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON DENUDED AREAS NOT OTHERWISE PERMANENTLY STABILIZED BY PAVEMENT. PERMANENT PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON DENUDED AREAS NOT OTHERWISE PERMANENTLY STABILIZED BY PAVEMENT. PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON DENUDED AREAS NOT OTHERWISE PERMANENTLY STABILIZED BY PAVEMENT. PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON DENUDED AREAS NOT OTHERWISE PERMANENTLY STABILIZED BY PAVEMENT. PERMANENT COVER SHALL BE ESTABLISHED ON DENUDED AREAS NOT OTHERWISE PERMANENTLY STABILIZED BY PAVEMENT. PERMANENT COVER SHALL BE ESTABLISHED ON DENUDED AREAS NOT OTHERWISE PERMANENTLY STABILIZED BY PAVEMENT. PERMANENT SHALL BE ESTABLISHED ON DENUDED AREAS NOT OTHERWISE PERMANENTLY STABILIZED BY PAVEMENT. PERMANENT SHALL BE ESTABLISHED ON DENUDED AREAS NOT OTHERWISE PERMANENTLY STABILIZED BY PAVEMENT. PERMANENT BE ESTABLISHED ON DENUDED AREAS NOT OTHERWISE PERMANENTLY STABILIZED BY PAVEMENT. PERMANENT BE ESTABLISHED ON DENUDED AREAS NOT OTHERWISE PERMANENTLY STABILIZED BY PAVEMENT. PERMANENT ESTABLISHED ON DENUDED AREAS NOT OTHERWISE PERMANENTLY STABILIZED BY PAVEMENT. PERMANENT ESTABLISHED ON DENUDED AREAS NOT OTHERWISE PERMANENTLY STABILIZED BY PAVEMENT. PERMANENT ON DENUDED AREAS NOT OTHERWISE PERMANENTLY STABILIZED BY PAVEMENT. PERMANENT ON DENUDED AREAS NOT OTHERWISE PERMANENTLY STABILIZED BY PAVEMENT. PERMANENT DENUDED AREAS NOT OTHERWISE PERMANENTLY STABILIZED BY PAVEMENT. PERMANENT DENUDED AREAS NOT OTHERWISE PERMANENTLY STABILIZED BY PAVEMENT. PERMANENT AREAS NOT OTHERWISE PERMANENTLY STABILIZED BY PAVEMENT. PERMANENT AREAS NOT OTHERWISE PERMANENTLY STABILIZED BY PAVEMENT. PERMANENT NOT OTHERWISE PERMANENTLY STABILIZED BY PAVEMENT. PERMANENT NOT OTHERWISE PERMANENTLY STABILIZED BY PAVEMENT. PERMANENT OTHERWISE PERMANENTLY STABILIZED BY PAVEMENT. PERMANENT OTHERWISE PERMANENTLY STABILIZED BY PAVEMENT. PERMANENT PERMANENTLY STABILIZED BY PAVEMENT. PERMANENT PERMANENTLY STABILIZED BY PAVEMENT. PERMANENT STABILIZED BY PAVEMENT. PERMANENT STABILIZED BY PAVEMENT. PERMANENT BY PAVEMENT. PERMANENT BY PAVEMENT. PERMANENT PAVEMENT. PERMANENT PAVEMENT. PERMANENT PERMANENT PERMANENT VEGETATION SHALL NOT BE CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS ACHIEVED THAT IS UNIFORM AND MATURE ENOUGH TO SURVIVE AND INHIBIT SHALL NOT BE CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS ACHIEVED THAT IS UNIFORM AND MATURE ENOUGH TO SURVIVE AND INHIBIT SHALL NOT BE CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS ACHIEVED THAT IS UNIFORM AND MATURE ENOUGH TO SURVIVE AND INHIBIT NOT BE CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS ACHIEVED THAT IS UNIFORM AND MATURE ENOUGH TO SURVIVE AND INHIBIT NOT BE CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS ACHIEVED THAT IS UNIFORM AND MATURE ENOUGH TO SURVIVE AND INHIBIT BE CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS ACHIEVED THAT IS UNIFORM AND MATURE ENOUGH TO SURVIVE AND INHIBIT BE CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS ACHIEVED THAT IS UNIFORM AND MATURE ENOUGH TO SURVIVE AND INHIBIT CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS ACHIEVED THAT IS UNIFORM AND MATURE ENOUGH TO SURVIVE AND INHIBIT CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS ACHIEVED THAT IS UNIFORM AND MATURE ENOUGH TO SURVIVE AND INHIBIT ESTABLISHED UNTIL A GROUND COVER IS ACHIEVED THAT IS UNIFORM AND MATURE ENOUGH TO SURVIVE AND INHIBIT ESTABLISHED UNTIL A GROUND COVER IS ACHIEVED THAT IS UNIFORM AND MATURE ENOUGH TO SURVIVE AND INHIBIT UNTIL A GROUND COVER IS ACHIEVED THAT IS UNIFORM AND MATURE ENOUGH TO SURVIVE AND INHIBIT UNTIL A GROUND COVER IS ACHIEVED THAT IS UNIFORM AND MATURE ENOUGH TO SURVIVE AND INHIBIT A GROUND COVER IS ACHIEVED THAT IS UNIFORM AND MATURE ENOUGH TO SURVIVE AND INHIBIT A GROUND COVER IS ACHIEVED THAT IS UNIFORM AND MATURE ENOUGH TO SURVIVE AND INHIBIT GROUND COVER IS ACHIEVED THAT IS UNIFORM AND MATURE ENOUGH TO SURVIVE AND INHIBIT GROUND COVER IS ACHIEVED THAT IS UNIFORM AND MATURE ENOUGH TO SURVIVE AND INHIBIT COVER IS ACHIEVED THAT IS UNIFORM AND MATURE ENOUGH TO SURVIVE AND INHIBIT COVER IS ACHIEVED THAT IS UNIFORM AND MATURE ENOUGH TO SURVIVE AND INHIBIT IS ACHIEVED THAT IS UNIFORM AND MATURE ENOUGH TO SURVIVE AND INHIBIT IS ACHIEVED THAT IS UNIFORM AND MATURE ENOUGH TO SURVIVE AND INHIBIT ACHIEVED THAT IS UNIFORM AND MATURE ENOUGH TO SURVIVE AND INHIBIT ACHIEVED THAT IS UNIFORM AND MATURE ENOUGH TO SURVIVE AND INHIBIT THAT IS UNIFORM AND MATURE ENOUGH TO SURVIVE AND INHIBIT THAT IS UNIFORM AND MATURE ENOUGH TO SURVIVE AND INHIBIT IS UNIFORM AND MATURE ENOUGH TO SURVIVE AND INHIBIT IS UNIFORM AND MATURE ENOUGH TO SURVIVE AND INHIBIT UNIFORM AND MATURE ENOUGH TO SURVIVE AND INHIBIT UNIFORM AND MATURE ENOUGH TO SURVIVE AND INHIBIT AND MATURE ENOUGH TO SURVIVE AND INHIBIT AND MATURE ENOUGH TO SURVIVE AND INHIBIT MATURE ENOUGH TO SURVIVE AND INHIBIT MATURE ENOUGH TO SURVIVE AND INHIBIT ENOUGH TO SURVIVE AND INHIBIT ENOUGH TO SURVIVE AND INHIBIT TO SURVIVE AND INHIBIT TO SURVIVE AND INHIBIT SURVIVE AND INHIBIT SURVIVE AND INHIBIT AND INHIBIT AND INHIBIT INHIBIT INHIBIT EROSION. NEW VEGETATION SHALL BE MAINTAINED AT A MINIMUM OF ONE FULL YEAR AFTER PLANTING. NEW SEEDING SHALL BE SUPPLIED WITH ADEQUATE NEW VEGETATION SHALL BE MAINTAINED AT A MINIMUM OF ONE FULL YEAR AFTER PLANTING. NEW SEEDING SHALL BE SUPPLIED WITH ADEQUATE NEW VEGETATION SHALL BE MAINTAINED AT A MINIMUM OF ONE FULL YEAR AFTER PLANTING. NEW SEEDING SHALL BE SUPPLIED WITH ADEQUATE VEGETATION SHALL BE MAINTAINED AT A MINIMUM OF ONE FULL YEAR AFTER PLANTING. NEW SEEDING SHALL BE SUPPLIED WITH ADEQUATE VEGETATION SHALL BE MAINTAINED AT A MINIMUM OF ONE FULL YEAR AFTER PLANTING. NEW SEEDING SHALL BE SUPPLIED WITH ADEQUATE SHALL BE MAINTAINED AT A MINIMUM OF ONE FULL YEAR AFTER PLANTING. NEW SEEDING SHALL BE SUPPLIED WITH ADEQUATE SHALL BE MAINTAINED AT A MINIMUM OF ONE FULL YEAR AFTER PLANTING. NEW SEEDING SHALL BE SUPPLIED WITH ADEQUATE BE MAINTAINED AT A MINIMUM OF ONE FULL YEAR AFTER PLANTING. NEW SEEDING SHALL BE SUPPLIED WITH ADEQUATE BE MAINTAINED AT A MINIMUM OF ONE FULL YEAR AFTER PLANTING. NEW SEEDING SHALL BE SUPPLIED WITH ADEQUATE MAINTAINED AT A MINIMUM OF ONE FULL YEAR AFTER PLANTING. NEW SEEDING SHALL BE SUPPLIED WITH ADEQUATE MAINTAINED AT A MINIMUM OF ONE FULL YEAR AFTER PLANTING. NEW SEEDING SHALL BE SUPPLIED WITH ADEQUATE AT A MINIMUM OF ONE FULL YEAR AFTER PLANTING. NEW SEEDING SHALL BE SUPPLIED WITH ADEQUATE AT A MINIMUM OF ONE FULL YEAR AFTER PLANTING. NEW SEEDING SHALL BE SUPPLIED WITH ADEQUATE A MINIMUM OF ONE FULL YEAR AFTER PLANTING. NEW SEEDING SHALL BE SUPPLIED WITH ADEQUATE A MINIMUM OF ONE FULL YEAR AFTER PLANTING. NEW SEEDING SHALL BE SUPPLIED WITH ADEQUATE MINIMUM OF ONE FULL YEAR AFTER PLANTING. NEW SEEDING SHALL BE SUPPLIED WITH ADEQUATE MINIMUM OF ONE FULL YEAR AFTER PLANTING. NEW SEEDING SHALL BE SUPPLIED WITH ADEQUATE OF ONE FULL YEAR AFTER PLANTING. NEW SEEDING SHALL BE SUPPLIED WITH ADEQUATE OF ONE FULL YEAR AFTER PLANTING. NEW SEEDING SHALL BE SUPPLIED WITH ADEQUATE ONE FULL YEAR AFTER PLANTING. NEW SEEDING SHALL BE SUPPLIED WITH ADEQUATE ONE FULL YEAR AFTER PLANTING. NEW SEEDING SHALL BE SUPPLIED WITH ADEQUATE FULL YEAR AFTER PLANTING. NEW SEEDING SHALL BE SUPPLIED WITH ADEQUATE FULL YEAR AFTER PLANTING. NEW SEEDING SHALL BE SUPPLIED WITH ADEQUATE YEAR AFTER PLANTING. NEW SEEDING SHALL BE SUPPLIED WITH ADEQUATE YEAR AFTER PLANTING. NEW SEEDING SHALL BE SUPPLIED WITH ADEQUATE AFTER PLANTING. NEW SEEDING SHALL BE SUPPLIED WITH ADEQUATE AFTER PLANTING. NEW SEEDING SHALL BE SUPPLIED WITH ADEQUATE PLANTING. NEW SEEDING SHALL BE SUPPLIED WITH ADEQUATE PLANTING. NEW SEEDING SHALL BE SUPPLIED WITH ADEQUATE NEW SEEDING SHALL BE SUPPLIED WITH ADEQUATE NEW SEEDING SHALL BE SUPPLIED WITH ADEQUATE SEEDING SHALL BE SUPPLIED WITH ADEQUATE SEEDING SHALL BE SUPPLIED WITH ADEQUATE SHALL BE SUPPLIED WITH ADEQUATE SHALL BE SUPPLIED WITH ADEQUATE BE SUPPLIED WITH ADEQUATE BE SUPPLIED WITH ADEQUATE SUPPLIED WITH ADEQUATE SUPPLIED WITH ADEQUATE WITH ADEQUATE WITH ADEQUATE ADEQUATE ADEQUATE MOISTURE, ESPECIALLY LATE IN THE SEASON, AND IN ABNORMALLY HOT OR DRY WEATHER. STABILIZATION PRACTICES SHALL BE ACCOMPLISHED IN ACCORDANCE ESPECIALLY LATE IN THE SEASON, AND IN ABNORMALLY HOT OR DRY WEATHER. STABILIZATION PRACTICES SHALL BE ACCOMPLISHED IN ACCORDANCE ESPECIALLY LATE IN THE SEASON, AND IN ABNORMALLY HOT OR DRY WEATHER. STABILIZATION PRACTICES SHALL BE ACCOMPLISHED IN ACCORDANCE LATE IN THE SEASON, AND IN ABNORMALLY HOT OR DRY WEATHER. STABILIZATION PRACTICES SHALL BE ACCOMPLISHED IN ACCORDANCE LATE IN THE SEASON, AND IN ABNORMALLY HOT OR DRY WEATHER. STABILIZATION PRACTICES SHALL BE ACCOMPLISHED IN ACCORDANCE IN THE SEASON, AND IN ABNORMALLY HOT OR DRY WEATHER. STABILIZATION PRACTICES SHALL BE ACCOMPLISHED IN ACCORDANCE IN THE SEASON, AND IN ABNORMALLY HOT OR DRY WEATHER. STABILIZATION PRACTICES SHALL BE ACCOMPLISHED IN ACCORDANCE THE SEASON, AND IN ABNORMALLY HOT OR DRY WEATHER. STABILIZATION PRACTICES SHALL BE ACCOMPLISHED IN ACCORDANCE THE SEASON, AND IN ABNORMALLY HOT OR DRY WEATHER. STABILIZATION PRACTICES SHALL BE ACCOMPLISHED IN ACCORDANCE SEASON, AND IN ABNORMALLY HOT OR DRY WEATHER. STABILIZATION PRACTICES SHALL BE ACCOMPLISHED IN ACCORDANCE SEASON, AND IN ABNORMALLY HOT OR DRY WEATHER. STABILIZATION PRACTICES SHALL BE ACCOMPLISHED IN ACCORDANCE AND IN ABNORMALLY HOT OR DRY WEATHER. STABILIZATION PRACTICES SHALL BE ACCOMPLISHED IN ACCORDANCE AND IN ABNORMALLY HOT OR DRY WEATHER. STABILIZATION PRACTICES SHALL BE ACCOMPLISHED IN ACCORDANCE IN ABNORMALLY HOT OR DRY WEATHER. STABILIZATION PRACTICES SHALL BE ACCOMPLISHED IN ACCORDANCE IN ABNORMALLY HOT OR DRY WEATHER. STABILIZATION PRACTICES SHALL BE ACCOMPLISHED IN ACCORDANCE ABNORMALLY HOT OR DRY WEATHER. STABILIZATION PRACTICES SHALL BE ACCOMPLISHED IN ACCORDANCE ABNORMALLY HOT OR DRY WEATHER. STABILIZATION PRACTICES SHALL BE ACCOMPLISHED IN ACCORDANCE HOT OR DRY WEATHER. STABILIZATION PRACTICES SHALL BE ACCOMPLISHED IN ACCORDANCE HOT OR DRY WEATHER. STABILIZATION PRACTICES SHALL BE ACCOMPLISHED IN ACCORDANCE OR DRY WEATHER. STABILIZATION PRACTICES SHALL BE ACCOMPLISHED IN ACCORDANCE OR DRY WEATHER. STABILIZATION PRACTICES SHALL BE ACCOMPLISHED IN ACCORDANCE DRY WEATHER. STABILIZATION PRACTICES SHALL BE ACCOMPLISHED IN ACCORDANCE DRY WEATHER. STABILIZATION PRACTICES SHALL BE ACCOMPLISHED IN ACCORDANCE WEATHER. STABILIZATION PRACTICES SHALL BE ACCOMPLISHED IN ACCORDANCE WEATHER. STABILIZATION PRACTICES SHALL BE ACCOMPLISHED IN ACCORDANCE STABILIZATION PRACTICES SHALL BE ACCOMPLISHED IN ACCORDANCE STABILIZATION PRACTICES SHALL BE ACCOMPLISHED IN ACCORDANCE PRACTICES SHALL BE ACCOMPLISHED IN ACCORDANCE PRACTICES SHALL BE ACCOMPLISHED IN ACCORDANCE SHALL BE ACCOMPLISHED IN ACCORDANCE SHALL BE ACCOMPLISHED IN ACCORDANCE BE ACCOMPLISHED IN ACCORDANCE BE ACCOMPLISHED IN ACCORDANCE ACCOMPLISHED IN ACCORDANCE ACCOMPLISHED IN ACCORDANCE IN ACCORDANCE IN ACCORDANCE ACCORDANCE ACCORDANCE WITH THE APPROPRIATE VESCH STANDARD AND SPECIFICATION AND THE EROSION AND SEDIMENT CONTROL PLAN.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .